You are on page 1of 36

Project: 337107132.

xlsx
Sheet: Basic Data

Page: 1 of 36
Print Date: 11/15/2016

WORK-UP SHEET
BASIC DATA
Project:

Units:

Location:

Date:

Architect:

By:

Estimate No:

Checked:

metric

Perimeters
Qty
OWSP

Length

Width

Recess

Thickness

2.00

Total
0.000 m

Foundation Wall Perimeter

0.000 m

Foundation IWSP

0.000 m

1st Floor Wall Perimeter

0.000 m

1st Floor IWSP

0.000 m

Brick Perimeter

0.000 m

Sloped Trench
elevation:

@ grade

@ bottom

@ top

@ bottom

rise: run

Trench Depth

0.000 m
width:

Trench Width

#DIV/0!

@ grade

0.000 m

rise

Trench Perimeter

0.000 m

4'0"
or
1.2
0m

run

Straight Trench
elevation:

@ grade

Trench Depth

@ bottom
@ bottom
@ bottom

0.000 m
trench width

Trench Width

0.000 m

Trench Perimeter

0.000 m

Areas
Total Area

Qty
1.00

Length
0.000

Width

Thickness

0.000

0.00 m

Recess

0.00 m

Recess

0.00 m

Cutout

0.00 m

Cutout

0.00 m

Gross Area
Wall

0.00 m
(1.00)

0.000

0.000

Basement Floor Area


Wall

0.00 m
0.00 m

(1.00)

0.000

0.000

Floor & Ceiling Area

0.00 m
0.00 m

Stepped Footing
Foundation Wall Heights

Top of Wall elevation:


Top of Pier elevation:
Bottom of Footing Elevation:
file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

deepest

Project: 337107132.xlsx
Sheet: Basic Data

Page: 2 of 36
Print Date: 11/15/2016

WORK-UP SHEET
BASIC DATA
Project:

Units:

Location:

Date:

Architect:

By:

Estimate No:

Checked:

El. 0.000

El. 0.000

El. 0.000

Top of Wall

0.000 m

0.000 m

0.000 m

Btm Footing

0.000 m

0.000 m

0.000 m

0.000 m

0.000 m

0.000 m

0.000 m

0.000 m

0.000 m

Footing

metric

shallowest

Foundation Wall Lengths based on Wall Thickness and Height


Thickness:
Height:

0.000

0.000

0.000

Total Length
0.000

0.000

0.000

0.000

0.000 m

0.000
Actual Difference:

0.000 m

Acceptable Difference:

0.000 m

(thicker wall-thinner wall) x 2

Pier Heights
Footing A

Footing B

Footing C

Elevation
Top of Pier

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

Btm Footing

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

Footing A

Piers

Slab Area
Qty

Height

Total

Qty

Length

Width

Type A

0.000

0.000 m

Type A

0.000

0.000 m

Type A

0.000

0.000 m

Type B

0.000

0.000 m

Type B

0.000

0.000 m

(1.00)

0.000

0.000

0.00

Type B

0.000

0.000 m

(1.00)

0.000

0.000

0.00

Type C

0.000

0.000 m

Type C

0.000

0.000 m

Gross Area (from row 41 above)

0.00 m

Wall Area

Piers

0.00

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

0.00
0.00

Project: 337107132.xlsx
Sheet: Basic Data

Page: 3 of 36
Print Date: 11/15/2016

WORK-UP SHEET
BASIC DATA
Project:

Units:

Location:

Date:

Architect:

By:

Estimate No:

Checked:

Type C

0.000

metric

0.000 m

0.00

0.000 m

Basement Floor Area

0.00 m

Framing
Interior Wall Openings

Exterior Wall Openings

Intersections

Intersections

Corners

Corners

Interior Wall Lengths


2x4 walls
Height

N-S

2x6 walls

E-W

Total Length
0.000

0.000

0.000

0.000

0.000 m

0.000

Doors & Windows


Unit Size

Windows

Qty

Height

Rough Opening

Lintel

Width

Height

0.00

0.050

0.050

0.125

0.00

W2

0.00

0.050

0.050

0.125

0.00

W3

0.00

0.050

0.050

0.125

0.00

W4

0.00

0.050

0.050

0.125

0.00

W5

0.00

0.050

0.050

0.125

0.00

W6

0.00

0.050

0.050

0.125

0.00

W7

0.00

0.050

0.050

0.125

0.00

0.00

0.050

0.050

0.125

0.00

0.00

0.000

0.000

0.000

0.00

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

Size

Area

W1

0.00

Width

Area

Width

Project: 337107132.xlsx
Sheet: Basic Data

Page: 4 of 36
Print Date: 11/15/2016

WORK-UP SHEET
BASIC DATA
Project:

Units:

Location:

Date:

Architect:

By:

Estimate No:

Checked:

Doors-Interior

Qty

Width

Height

Width

Height

D1

0.00

0.075

0.050

0.150

0.00

D2

0.00

0.075

0.050

0.150

0.00

D3

0.00

0.075

0.050

0.150

0.00

D4

0.00

0.075

0.050

0.150

0.00

D5

0.00

0.075

0.050

0.150

0.00

D6

0.00

0.075

0.050

0.150

0.00

D7

0.00

0.075

0.050

0.150

0.00

0.00

0.075

0.050

0.150

0.00

0.00

0.000

0.000

0.000

0.00

Width

Height

D1

0.00

0.075

0.050

0.150

0.00

D2

0.00

0.075

0.050

0.150

0.00

D3

0.00

0.075

0.050

0.150

0.00

D4

0.00

0.075

0.050

0.150

0.00

D5

0.00

0.075

0.050

0.150

0.00

D6

0.00

0.075

0.050

0.150

0.00

D7

0.00

0.075

0.050

0.150

0.00

0.00

0.075

0.050

0.150

0.00

0.00

0.000

0.000

0.000

0.00

0.00

Doors-Exterior

Qty

Width

Height

0.00

Gable Roof

Size

Size

Main Roof

Roof #2

Roof #3

vert: horiz

vert: horiz

vert: horiz

Roof Slope

12

12

12

Building Width

Building Length

Eave Overhang

Roof Width

0.00 m

0.00 m

0.00 m

Roof Length

0.00 m

0.00 m

0.00 m

Ridge Length

0.00 m

#DIV/0! m

#DIV/0! m

Ridge Height

0.00 m

0.00 m

0.00 m

Rafter Length

0.00 m

0.00 m

0.00 m

Roof Area
Valley Length

#DIV/0! m

#DIV/0! m

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

Width

metric

Width

Project: 337107132.xlsx
Sheet: Div 3

Page: 5 of 36
Print Date: 11/15/2016

ESTIMATE WORKSHEET
Division 03-Concrete
metric

Project:

Project No:

Estimate No:

Units:

Element/Trade:

Measured:

Estimate Type:

Date:

Element/UCI Reference:

Extended:

Priced:

Checked:

Dimensions
Description

No.

Extensions

Unit

Quantity

03 30 00 - CAST-IN-PLACE CONCRETE
Footings
Concrete Strip Footing; ### x ###; ## Mpa
Strip Footing

0.00

0.00

0.00

0.00

0.00

Steps

0.00

Steps

0.00

0.00

0.0 m

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.0 m

0.00

0 m

Forms to Strip Footing


Strip Footing

Keyway ### x ###

Concrete Spread Footing; varying sizes; ## Mpa


0.00

0.00

0.00

0.00

0.0 m

0.00

0.00

0.00

Forms to Spread Footing

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

Unit

Cost

Price

($)

Project: 337107132.xlsx
Sheet: Div 3

Page: 6 of 36
Print Date: 11/15/2016

ESTIMATE WORKSHEET
Division 03-Concrete
metric

Project:

Project No:

Estimate No:

Units:

Element/Trade:

Measured:

Estimate Type:

Date:

Element/UCI Reference:

Extended:

Priced:

Checked:

Dimensions
Description

No.

Extensions

Quantity

Unit

0.00

0.0 m

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Foundation Wall
Foundation Wall; ### x ###; ## Mpa

Brickshelf

0.00

0.00

0.0 m

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.0 m

Forms to Foundation Wall

" x 8" Anchor Bolts @ 7'-0" o.c.


o.c.

#DIV/0!

pcs

corners

#DIV/0! pcs
Concrete Piers; ### x ###; ## Mpa
0.00

0.00

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

Unit

Cost

Price

($)

Project: 337107132.xlsx
Sheet: Div 3

Page: 7 of 36
Print Date: 11/15/2016

ESTIMATE WORKSHEET
Division 03-Concrete
metric

Project:

Project No:

Estimate No:

Units:

Element/Trade:

Measured:

Estimate Type:

Date:

Element/UCI Reference:

Extended:

Priced:

Checked:

Dimensions
Description

No.

Extensions

Quantity

0.00

Unit

0.00

0.00

0.0 m

0.00

0.00

0.00

0.00

0.00

0.0 m

0.00

0 m

Forms to Concrete Piers

Extra for Brickshelf; 80mm wide x 300mm high

Slab on Grade
Slab on Grade; ###; ## MPa
0.00

0.00

0.00

0.00

0.00

0.00

0.0 m

0.00

0.00

0.00

0.00

" Clear Stone; ### thick

0.00

0.00

0.0 m

Expansion Joint Filler; ### x ###


0.00

0.00

0.00

0 m

Welded Wire Fabric; 6x6 W1.4/1.4


0.00

0.00

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

Unit

Cost

Price

($)

Project: 337107132.xlsx
Sheet: Div 3

Page: 8 of 36
Print Date: 11/15/2016

ESTIMATE WORKSHEET
Division 03-Concrete
metric

Project:

Project No:

Estimate No:

Units:

Element/Trade:

Measured:

Estimate Type:

Date:

Element/UCI Reference:

Extended:

Priced:

Checked:

Dimensions
Description

No.

Extensions

Quantity

Unit

0.00

0.00

0 m

laps

Polyethylene Vapour Barrier below Slab


0.00
laps

0.00

0 m

0.00

0 m

Screeding, curing and trowel finish

Perimeter Drain ###


0.00

0.00

0.00

0 m

" Clear Stone; ### cover to Perimeter Drain


0.00

0.00

0.00

0.0 m

0.00

Suspended Slabs
Concrete to Suspended Slab, ###, ## Mpa
Spand Btm

0.00

Recess

0.00

0.00

Cutout

0.00

Opening

0.00

0.00

0.0 m

0.00

0.00

Soffit Forms
0.0
Spand Btm

(1.0)

0.00

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

Unit

Cost

Price

($)

Project: 337107132.xlsx
Sheet: Div 3

Page: 9 of 36
Print Date: 11/15/2016

ESTIMATE WORKSHEET
Division 03-Concrete
metric

Project:

Project No:

Estimate No:

Units:

Element/Trade:

Measured:

Estimate Type:

Date:

Element/UCI Reference:

Extended:

Priced:

Checked:

Dimensions
Description

Inter Btm

No.

(1.0)

0.00

Extensions

Quantity

Unit

0.00

Recess

0.00

Cutout

0.00

Opening

0.00

0.00

0.0 m

Opening Edge forms; ### high


Opening

0.00

0.00

0.00

0.00

0.00

0 m
m

height

0.0 m
Slab Perimeter Edge forms; ### high
m
m
m
m
0.00

0 m
m

height

0.0 m
Drop Panel Edge Forms; ### high
m
m
m
m
0.00

0 m
m

height

0.0 m
Slab; Steel Trowel Finish/Screeding/Curing

0 m

Spandrel Beams
Concrete to spandrel beams, varying sizes, ## Mpa
SP1

0.00

SP2

0.00

SP3

0.00

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

Unit

Cost

Price

($)

Project: 337107132.xlsx
Sheet: Div 3

Page: 10 of 36
Print Date: 11/15/2016

ESTIMATE WORKSHEET
Division 03-Concrete
metric

Project:

Project No:

Estimate No:

Units:

Element/Trade:

Measured:

Estimate Type:

Date:

Element/UCI Reference:

Extended:

Priced:

Checked:

Dimensions
Description

No.

Extensions

Quantity

Unit

SP4

0.00

SP5

0.00

SP6

0.00

SP7

0.00

0.00

0.00

0.0 m

Bottom Forms to Spandrel Beams


SP1

0.0

0.00

SP2

0.0

0.00

SP3

0.0

0.00

SP4

0.0

0.00

SP5

0.0

0.00

SP6

0.0

0.00

SP7

0.0

0.00

0.0

0.00

0.00

0.0 m

Side Forms to Spandrel Beams


SP1

0.0

0.00

SP2

0.0

0.00

SP3

0.0

0.00

SP4

0.0

0.00

SP5

0.0

0.00

SP6

0.0

0.00

SP7

0.0

0.00

0.0

0.00

Ends-

0.00

Ends-

0.00

0.00

0.0 m

B1

0.00

B2

0.00

B3

0.00

B4

0.00

B5

0.00

B6

0.00

B7

0.00

Intermediate Beams
Concrete to Intermediate beams, varying sizes, ## Mpa

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

Unit

Cost

Price

($)

Project: 337107132.xlsx
Sheet: Div 3

Page: 11 of 36
Print Date: 11/15/2016

ESTIMATE WORKSHEET
Division 03-Concrete
metric

Project:

Project No:

Estimate No:

Units:

Element/Trade:

Measured:

Estimate Type:

Date:

Element/UCI Reference:

Extended:

Priced:

Checked:

Dimensions
Description

No.

Extensions

Quantity

Unit

0.00

0.00

0.0 m

Bottom Forms to Intermediate Beams


B1

0.0

0.00

B2

0.0

0.00

B3

0.0

0.00

B4

0.0

0.00

B5

0.0

0.00

B6

0.0

0.00

B7

0.0

0.00

0.0

0.00

0.00

0.0 m

Side Forms to Intermediate Beams


B1

0.0

0.00

B2

0.0

0.00

B3

0.0

0.00

B4

0.0

0.00

B5

0.0

0.00

B6

0.0

0.00

0.0

0.00

0.0

0.00

0.00

0.00

0.0 m

B7
0
Ends-

Concrete Columns
Exterior Concrete Columns;### x ###, ## Mpa
1.0 Err:509

Err:509

Err:509

Err:509

1.0 Err:509

Err:509

Err:509

Err:509

1.0 Err:509

Err:509

Err:509

Err:509

1.0 Err:509

Err:509

Err:509

Err:509

1.0 Err:509

Err:509

Err:509

Err:509

1.0 Err:509

Err:509

Err:509

Err:509

1.0 Err:509

Err:509

Err:509

Err:509

0.00

0.00

Err:509

Err:509 m

Forms to Exterior Columns

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

Unit

Cost

Price

($)

Project: 337107132.xlsx
Sheet: Div 3

Page: 12 of 36
Print Date: 11/15/2016

ESTIMATE WORKSHEET
Division 03-Concrete
metric

Project:

Project No:

Estimate No:

Units:

Element/Trade:

Measured:

Estimate Type:

Date:

Element/UCI Reference:

Extended:

Priced:

Checked:

Dimensions
Description

No.

Extensions

Quantity

Unit

1.0

Err:509

Err:509

Err:509

Err:509

1.0

Err:509

Err:509

Err:509

Err:509

1.0

Err:509

Err:509

Err:509

Err:509

1.0

Err:509

Err:509

Err:509

Err:509

1.0

Err:509

Err:509

Err:509

Err:509

1.0

Err:509

Err:509

Err:509

Err:509

1.0

Err:509

Err:509

Err:509

Err:509

0.00

0.00

Err:509

Err:509 m

Interior Concrete Columns;### x ###, ## Mpa


1.0 Err:509

Err:509

Err:509

Err:509

1.0 Err:509

Err:509

Err:509

Err:509

1.0 Err:509

Err:509

Err:509

Err:509

1.0 Err:509

Err:509

Err:509

Err:509

1.0 Err:509

Err:509

Err:509

Err:509

1.0 Err:509

Err:509

Err:509

Err:509

1.0 Err:509

Err:509

Err:509

Err:509

0.00

0.00

Err:509

Err:509 m

Forms to Interior Columns


1.0

Err:509

Err:509

Err:509

Err:509

1.0

Err:509

Err:509

Err:509

Err:509

1.0

Err:509

Err:509

Err:509

Err:509

1.0

Err:509

Err:509

Err:509

Err:509

1.0

Err:509

Err:509

Err:509

Err:509

1.0

Err:509

Err:509

Err:509

Err:509

1.0

Err:509

Err:509

Err:509

Err:509

0.00

0.00

Err:509

Err:509 m

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

Unit

Cost

Price

($)

Project: 337107132.xlsx
Sheet: Div 3

Page: 13 of 36
Print Date: 11/15/2016

ESTIMATE WORKSHEET
Division 03-Concrete
metric

Project:

Project No:

Estimate No:

Units:

Element/Trade:

Measured:

Estimate Type:

Date:

Element/UCI Reference:

Extended:

Priced:

Checked:

Dimensions
Description

No.

length

edge

Extensions

Quantity

Unit

Suspended Slab with Pan Joists


Length of Pans

# of Pans

span

Pan Displacement

bottom

edge

top

0.000

0.000

spacing

0.00

pcs

0.00

pcs

height

0.000

m/m

Spandrel beams, ## Mpa


0.00

0.0 m

0.00

0.0 m

0.00

0.00

m
m

Spandrel Side Forms

Pan Joist Slab, ### thk, ## Mpa

Pan displacement

0.0

0.00

Pan displacement

0.0

0.00

0.00

0.0 m

Soffit Forms, Joists, ### wide


0.00
0.00
0.00

0.0 m

0.00

0.0 m

Soffit Forms, Joists, ### wide, next to spandrel beam

Pan Forms, Joists, ### - ### wide x ### high


0.00
0.00
0.00
Pan Forms, end caps

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

0.0 m

Unit

Cost

Price

($)

Project: 337107132.xlsx
Sheet: Div 3

Page: 14 of 36
Print Date: 11/15/2016

ESTIMATE WORKSHEET
Division 03-Concrete
metric

Project:

Project No:

Estimate No:

Units:

Element/Trade:

Measured:

Estimate Type:

Date:

Element/UCI Reference:

Extended:

Priced:

Checked:

Dimensions
Description

No.

Extensions

2 sides

0.00

2 sides

0.00

Quantity

0.00

Unit

0.0 pcs

Slab; Steel Trowel Finish/Screeding/Curing


0.00
0.00
0.00

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

0.0 m

Unit

Cost

Price

($)

Page: 15 of 36
Print Date: 11/15/2016

Project: 337107132.xlsx
Sheet: Cut & Fill

ESTIMATE WORKSHEET
CUT & FILL
Project:

Parking Lot

Location:

St. Catharines

Architect:

Dana Scully

Estimate No:

Location

Future Present
Cut Fill

CIVL1130 03 - A9
DEPTHS APPLICABLE
1

AVERAGE
DEPTH
Grid Size:

AREA

UNITS

CUT VOLUME

20.000
20.000
400.00 m

Cut
1.700

1.200

1.300

1.200

0.900
0.000
1.100
0.800
1.000
1.200

# of Grids
Depth
# of Cut/Fill

8.000
8

2.400
2

0.000
0

0.000
0
Avg Depth

12.80

12
1.067 1,200.00 m

12

<- double check

1,280.40
"In Place"

Fill
0.700

1.000

0.700

1.600

2.400

2.300

1.000

1.400

0.000

1.400

2.100

2.000

0.600

2.600

0.700

2.400

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

Page: 16 of 36
Print Date: 11/15/2016

Project: 337107132.xlsx
Sheet: Cut & Fill

ESTIMATE WORKSHEET
CUT & FILL
Project:

Parking Lot

Location:

St. Catharines

Architect:

Dana Scully

Estimate No:

Future Present
Cut Fill

CIVL1130 03 - A9
DEPTHS APPLICABLE

Location

AVERAGE
DEPTH

3.200

2.200

2.400

0.400

3.200

2.900

3.200

3.700

1.400

2.100

AREA

UNITS

CUT VOLUME

# of Grids
Depth

11.900

18.500

# of Cut/Fill

4.500
4

12.700
6
Avg Depth

Transition Parcel

113.20

15

60
1.887 6,000.00 m

E1

2 corner cut/2 corner fill


1.2

6.86

2.3

131.43 m

268.57 m
1.1

6.29

2.4

Cut
1.200
1.100
0.000

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

60

<- double check

Page: 17 of 36
Print Date: 11/15/2016

Project: 337107132.xlsx
Sheet: Cut & Fill

ESTIMATE WORKSHEET
CUT & FILL
Project:

Parking Lot

Location:

St. Catharines

Architect:

Dana Scully

Estimate No:

Future Present
Cut Fill

CIVL1130 03 - A9
DEPTHS APPLICABLE

Location

AVERAGE
DEPTH

AREA

UNITS

CUT VOLUME

0.000
Depth

2.300

# of Cut/Fill

2.30

4
Avg Depth

0.575

131.43 m

75.57
"In Place"

Fill
2.300
2.400
0.000
0.000
Depth

4.700

# of Cut/Fill

4.70

4
Avg Depth

Transition Parcel

1.175

268.57 m

E2

2 corner cut/2 corner fill


0.8

4.00

3.2

108.57 m

291.43 m
1.2

6.86

2.3

Cut
0.800
1.200

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

Page: 18 of 36
Print Date: 11/15/2016

Project: 337107132.xlsx
Sheet: Cut & Fill

ESTIMATE WORKSHEET
CUT & FILL
Project:

Parking Lot

Location:

St. Catharines

Architect:

Dana Scully

Estimate No:

Future Present
Cut Fill

CIVL1130 03 - A9
DEPTHS APPLICABLE

Location

AVERAGE
DEPTH

AREA

UNITS

CUT VOLUME

0.000
0.000
Depth

2.000

# of Cut/Fill

2.00

4
Avg Depth

0.500

108.57 m

54.29
"In Place"

Fill
3.200
2.300
0.000
0.000
Depth

5.500

# of Cut/Fill

5.50

4
Avg Depth

Transition Parcel

1.375

291.43 m

E5

2 corner cut/2 corner fill


0.2

2.50

1.4

163.46 m

236.54 m
0.9

13.85

0.4

Cut
0.200

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

Page: 19 of 36
Print Date: 11/15/2016

Project: 337107132.xlsx
Sheet: Cut & Fill

ESTIMATE WORKSHEET
CUT & FILL
Project:

Parking Lot

Location:

St. Catharines

Architect:

Dana Scully

Estimate No:

Location

Future Present
Cut Fill

CIVL1130 03 - A9
DEPTHS APPLICABLE
1

AVERAGE
DEPTH

AREA

UNITS

CUT VOLUME

0.900
0.000
0.000
Depth
# of Cut/Fill

1.100

1.10

4
Avg Depth

0.275

163.46 m

44.95
"In Place"

Fill
1.400
0.400
0.000
0.000
Depth
# of Cut/Fill

1.800

1.80

4
Avg Depth

0.450

236.54 m

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

Page: 20 of 36
Print Date: 11/15/2016

Project: 337107132.xlsx
Sheet: Cut & Fill

ESTIMATE WORKSHEET
CUT & FILL
Project:

Parking Lot

Location:

St. Catharines

Architect:

Dana Scully

Estimate No:

Future Present
Cut Fill

CIVL1130 03 - A9
DEPTHS APPLICABLE

Location

Transition Parcel

AVERAGE
DEPTH

AREA

UNITS

CUT VOLUME

n/a

3 corner cut/1 corner fill


0.00
0.00
400.00 m

0.00 m

Cut
0.000
0.000
0.000
0.000
Depth
# of Cut/Fill

0.000

0.00

4
Avg Depth

0.000

400.00 m

0.00
"In Place"

Fill
0.000
0.000
0.000

Depth
# of Cut/Fill

0.000

0.00

3
Avg Depth

0.000

0.00 m

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

Page: 21 of 36
Print Date: 11/15/2016

Project: 337107132.xlsx
Sheet: Cut & Fill

ESTIMATE WORKSHEET
CUT & FILL
Project:

Parking Lot

Location:

St. Catharines

Architect:

Dana Scully

Estimate No:

Future Present
Cut Fill

CIVL1130 03 - A9
DEPTHS APPLICABLE

Location

Transition Parcel

AVERAGE
DEPTH

AREA

UNITS

CUT VOLUME

B1

3 corner fill/1 corner cut


0.9

11.25

0.7

20.00
112.50 m

287.50 m
0.0

0.7

Cut
0.900
0.000
0.000

Depth
# of Cut/Fill

0.900

0.90

3
Avg Depth

0.300

112.50 m

33.75
"In Place"

Fill
0.700
0.700
0.000
0.000
Depth
# of Cut/Fill

1.400

1.40

4
Avg Depth

0.350

287.50 m

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

Page: 22 of 36
Print Date: 11/15/2016

Project: 337107132.xlsx
Sheet: Cut & Fill

ESTIMATE WORKSHEET
CUT & FILL
Project:

Parking Lot

Location:

St. Catharines

Architect:

Dana Scully

Estimate No:

Future Present
Cut Fill

CIVL1130 03 - A9
DEPTHS APPLICABLE

Location

Transition Parcel

AVERAGE
DEPTH

AREA

UNITS

CUT VOLUME

A2

3 corner fill/1 corner cut


1.3

20.00

0.0

13.68
136.84 m

263.16 m
0.6

1.0

Cut
1.300
0.000
0.000

Depth
# of Cut/Fill

1.300

1.30

3
Avg Depth

0.433

136.84 m

59.25
"In Place"

Fill
0.000
1.000
0.600
0.000
Depth
# of Cut/Fill

1.600

1.60

4
Avg Depth

0.400

263.16 m

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

Page: 23 of 36
Print Date: 11/15/2016

Project: 337107132.xlsx
Sheet: Cut & Fill

ESTIMATE WORKSHEET
CUT & FILL
Project:

Parking Lot

Location:

St. Catharines

Architect:

Dana Scully

Estimate No:

Location

Future Present
Cut Fill

CIVL1130 03 - A9
DEPTHS APPLICABLE
1

AVERAGE
DEPTH

AREA

CUT VOLUME

UNITS

1,548.21
"In Place"
TOTAL CUT "In Place"

1,548

Swell Factor

39%

TOTAL CUT "Loose"

2,153
TOTAL FILL "In Place"
Compaction Factor

TOTAL FILL "Compacted"


Truckload size

12.0

Truckloads

180

Total truckloads of earthfill to import

1,251

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

Project: 337107132.xlsx
Sheet: Cut & Fill

Units:

metric

Date:

4-Nov-16

By:

Meggan McMillan

Checked:

UNITS

FILL VOLUME

UNITS

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

Page: 24 of 36
Print Date: 11/15/2016

Project: 337107132.xlsx
Sheet: Cut & Fill

Units:

metric

Date:

4-Nov-16

By:

Meggan McMillan

Checked:

UNITS

FILL VOLUME

UNITS

11,322.00 m
"In Place"

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

Page: 25 of 36
Print Date: 11/15/2016

Project: 337107132.xlsx
Sheet: Cut & Fill

Units:

metric

Date:

4-Nov-16

By:

Meggan McMillan

Checked:

UNITS

FILL VOLUME

UNITS

315.57 m
"In Place"

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

Page: 26 of 36
Print Date: 11/15/2016

Project: 337107132.xlsx
Sheet: Cut & Fill

Units:

metric

Date:

4-Nov-16

By:

Meggan McMillan

Checked:

UNITS

FILL VOLUME

UNITS

400.72 m
"In Place"

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

Page: 27 of 36
Print Date: 11/15/2016

Project: 337107132.xlsx
Sheet: Cut & Fill

Units:

metric

Date:

4-Nov-16

By:

Meggan McMillan

Checked:

UNITS

FILL VOLUME

UNITS

106.44 m
"In Place"

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

Page: 28 of 36
Print Date: 11/15/2016

Project: 337107132.xlsx
Sheet: Cut & Fill

Units:

metric

Date:

4-Nov-16

By:

Meggan McMillan

Checked:

UNITS

FILL VOLUME

UNITS

0.00 m
"In Place"

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

Page: 29 of 36
Print Date: 11/15/2016

Project: 337107132.xlsx
Sheet: Cut & Fill

Units:

metric

Date:

4-Nov-16

By:

Meggan McMillan

Checked:

UNITS

FILL VOLUME

UNITS

100.63 m
"In Place"

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

Page: 30 of 36
Print Date: 11/15/2016

Project: 337107132.xlsx
Sheet: Cut & Fill

Units:

metric

Date:

4-Nov-16

By:

Meggan McMillan

Checked:

UNITS

FILL VOLUME

UNITS

105.26 m

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

Page: 31 of 36
Print Date: 11/15/2016

Project: 337107132.xlsx
Sheet: Cut & Fill

Units:

metric

Date:

4-Nov-16

By:

Meggan McMillan

Checked:

UNITS

FILL VOLUME

UNITS

"In Place"

12,350.62 m
"In Place"

m
m

TOTAL FILL "In Place"


Compaction Factor

AL FILL "Compacted"
m
loads

12,351 m
39%
17,168 m
12.0 m
1,431 loads

loads

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

Page: 32 of 36
Print Date: 11/15/2016

Project: 337107132.xlsx
Sheet: Div 31

Page: 33 of 36
Print Date: 11/15/2016

ESTIMATE WORKSHEET
Division 31-Earthwork
imperial

Project:

Project No:

Estimate No:

Units:

Element/Trade:

Measured:

Estimate Type:

Date:

Element/UCI Reference:

Extended:

Priced:

Checked:

Dimensions
Description

No.

Extensions

Scale Ratio:

Unit

Quantity

0.00 in =

lf

EARTHWORK
31 14 00 - Strip Topsoil & Stockpile on site
0.00

cf

0.00

cf

0.00
0.00

cf
0 cy

31 23 00 - Sitework; Excavation & Fill


Simpson's Rule to El.

Even

Odd

Interval

YFIRST

sf

Y1

sf

Y2

sf

Y3

sf

Y4

sf

Y5

sf

Y6

sf

Y7

sf

Y8

sf
sf

YLAST

sf

V=h/3[first + last + 2(even) + 4(odd)]


Average End Area
V=(A1 + A2)/2 x h

A1

A2

Abase

Cone(Pyramid)

A1

cf

0.00

cf

0.00

cf

0.00

cf

0.00

cf

0.00

cf

V= Abase x h/3
Prismoidal Formula
V=[A1+4(Amiddle)+A2]/6 x h

0.00

Amiddle

A2
h

Parabolic Segment

c
A=2/3 ch

0.667

Circular Segment
A=2/3 ch + h/(2c)

0.667

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

Unit

Cost

Price

($)

Calculation:

volume

Project: 337107132.xlsx
Sheet: Div 31

Page: 34 of 36
Print Date: 11/15/2016

ESTIMATE WORKSHEET
Division 31-Earthwork
imperial

Project:

Project No:

Estimate No:

Units:

Element/Trade:

Measured:

Estimate Type:

Date:

Element/UCI Reference:

Extended:

Priced:

Checked:

Dimensions
Description

No.

Extensions

Volume of Topsoil stocked on site


Volume of Cut from "Cut & Fill"
Volume of Fill from "Cut & Fill"

Quantity

Unit

0.00

cf

0.00

cf

0.00

cf

0.00

cf

0.00

cf

0.00

cf

0.00

cf

1548.21

cf

(12350.62)

cf

(10802.41)

(400) cy

31 23 16 - Mass Excavation to Basement


Bldg

0.00

Footing

0.00

cf

0.00

cf

Sloped Trench

0.00

cf

Straight Trench

0.00

cf

0.00

0 cy

31 23 16 - Hand excavation to footings


0.00

cf

0.00

cf

0.00

cf

0.00

cf

0.00

0 cy

31 23 33 - Backfill with Native Material


Trench

Hand Excavation
Perimeter Drain

0.00

cf

0.00

cf

0.00

cf

0.00

0 cy

(400)

cy

cy

(400)

(400) cy

Native Material for Disposal


Excavation
Backfill

1.0

-400.0

(1.0)

0.0

swell
compaction

truck capacity

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

0 loads

Unit

Cost

Price

($)

Project: 337107132.xlsx
Sheet: Div 31

Page: 35 of 36
Print Date: 11/15/2016

ESTIMATE WORKSHEET
Division 31-Earthwork
imperial

Project:

Project No:

Estimate No:

Units:

Element/Trade:

Measured:

Estimate Type:

Date:

Element/UCI Reference:

Extended:

Priced:

Checked:

Dimensions
Description

No.

Extensions

Quantity

file:///var/www/apps/conversion/tmp/scratch_5/337107132.xlsx

Unit

Unit

Cost

Price

($)

MEMBER CLASSIFICATION

1 BEAMS

2 PLATE GIRDERS
3 COLUMNS

4 SPANDRELS
5 TRUSSES

6 BRACING

7 PURLINS

8 STUB GIRDER
9 GIRTS

10 SAG RODS
11 OWSJ
12 LOOSE LINTELS
13 BASE PLATES
14 BOLTS
15 WELDS
16 SHEAR STUDS
17 ANCILLARY STEEL

MASS OF CARBON STEEL

Connection
Factor
Cost Factor
(Confac)
(Cosfac)

W-SHAPES < 50 kg/m (35 lb/ft)

1.05

1.50

W-SHAPES > 50 kg/m (35 lb/ft)


C,M,S-SHAPES < 50 kg/m (35 lb/ft)
C,M,S-SHAPES > 50 kg/m (35 lb/ft)

1.05
1.05
1.05
1.05
1.10
1.05
1.10
1.02
1.10
1.05
1.15
1.15
1.10
1.15
1.10
1.15

1.00
1.60
1.10
1.30
1.60
1.05
1.45
1.30
2.20
1.20
1.35
1.30
1.50
1.45
2.00
1.20

W-SHAPES < 50 kg/m (35 lb/ft)


W-SHAPES > 50 kg/m (35 lb/ft)
HSS
BUILT-UP SECTIONS
W-SHAPES < 50 kg/m (35 lb/ft)
W-SHAPES > 50 kg/m (35 lb/ft)
TEE SHAPE CHORDS (with L internals)
DOUBLE-L CHORDS
All W-SHAPES
HSS CHORDS (with L internals)
All HSS
All ANGLES
W-SHAPES
ANGLE
HSS
FLAT PLATE
W-SHAPES < 50 kg/m (35 lb/ft)
W-SHAPES > 50 kg/m (35 lb/ft)
HSS
HOT ROLLED
COLD FORMED
HSS
CHARGE FOR EACH = MCI x $0.015
JOISTS
BRIDGING(+ 10% JOIST MASS)
MINOR FABRICATION
CANADIAN STEEL
Cost included in Connection Factor
Cost included in Connection Factor
Shop-Applied
Field-Applied
FRAMES FOR FLOOR OPENINGS,
STAIRS, H-RAILS, CATWALKS,
PIPE BRACKETS, DOORS,
VENTS, ETC.

1.10
1.75
1.15
1.40
1.15
2.20
1.15
1.40
1.02
1.10
1.02
1.00
1.02
1.30
1.40
1.05
1.02
1.10
1.02
2.00
1.02
1.50
MCI x $0.015
1.15
1.15
1.00
1.15
1.00
0.75
1.02
1.00

MCI / $1,600.00
MCI / $700.00

1.20

1.20

7850.00
490.06

kg/m
lb/cf

You might also like