You are on page 1of 2

CONFINED SPACE RESCUE PLAN

Area inc charge:

Confined space location

Schedule start date

Area inc charge phone


number:

Unit : TPS

16-09-2016

Shutdown engineer:

TPS BOILER Furnace

Description of
equipment
Cooling tower
Description of the work:
Cleaning and Inspection and maintenance of column and column internals (Maintenance
includes cleaning, welding, grinding, radiography)
Describe the confined space
Height : 55m

Depth:

Width/diameter : 8 m

Material of construction
Concrete and CS

Describe the entry point:


Descibe
entry point :
Type
of the
entry
Vertical

Describe Access to
primary entry point

Horizontal

Location of entry point


Ground level
Top of space

Side of space

Platform area
scaffolding
space

Above

Type of opening
Manway

Dyked area

Open top
Other

Pipe

More than one opening

-------------------------MSDS
reviewed for above chemicals

Trays
Scaffolds

Standpipe

Sumps

1 Fan and fills

Is there vehicle access?


Yes

--Hydrocarbon--

Yes

NO

List of rescue equipment in use


or near entry point
60 min SCBA
air mask
Full body harness
Wristlet

No

Supplied

Lifeline

Mech retrieval device-tripod


Mech retrieval device fishing

Photo attached
Yes

Exposure

Agitator
Fan blades

NO

If ye give other location description (drg


attached)

Chemical
symptom

Describe any interior configurations


the rescue team should be aware of :

Other

Other

Diameter of opening

Yes

Top of

Respiratory
symptoms (eg, coughing,
gagging, choking)

By ladder only

Entry point
Elevation location
ground

Ground

List of chemicals entrants


could possibly be exposed
to and signs and
symptoms of exposure

pole
No

Area map attached?

Mech retrieval deviceother

Describe means of communication from firehouse to attendant


Through unit operating personnel (walkie Talkie, talk back system, telephone)

Describe means of attendant communication with emergency response


group
1. MCP -219
2. Through unit operating personnel (walkie Talkie, talk back system,
telephone)

Describe any special PPE likely to be required by the emergency response


group
NIL
Describe any special requirement for the emergency response group

Reviewed with incident


Commander?
Incident Commander (CPNM):
Sign
Date:
Comments:

Authorization signature

Area in charge
Name
Sign
Shutdown engineer
Name
Sign

You might also like