1 GENERAL
Purpose
The purpose of the directive is to ensure that
a Safe Job Analysis is used when planning critical work tasks
a Safe Job Analysis is carried out in a systematic manner
and in accordance with standard practice on the Norwegian
continental shelf
Domain
The directive applies to all BP-operated and contracted installations on the Norwegian continental shelf
Onshore facilities or projects where BP Norge have a particular
responsibility and which are assessed being part of the petroleum activities. Contractors of contracted installations who have
a system that satisfies the requirements in this directive, may
use their own system provided this has been clarified upon
implementation
References
Activities regulations 30
OMS Risk 3.1 Risk Assessment and Management
Norwegian Oil and Gas Association guideline 090 Common
Model for Safe Job Analysis
HSE Directive no. 1 - Work Permits
Definitions and abbreviations
A Work Permit (WP) is a written permission to carry out
a defined job at a specific place on an installation in a safe
manner and under certain conditions
The Department Manager is the manager of a specific
department
CCR (Central Control Room)
HSE function (safety officer) - HSE advisor
The Area Authority is head of all activities within a certain
area
The Area Technician has the operational responsibility for a
specific system or area
The Offshore Installation Manager (OIM) is the top
manager of all activities in the field
A Safe Job Analysis(SJA) is a systematic and step-bystep review of all elements of risk carried out prior to a
specific task or operatoin so that measures can be taken to
remove or control any elements of risk identified during the
preparation for or performance of the said task or operation.
The person responsible for the SJA is the person
responsible for the SJA, e.g. the supervisor, area authority
or anyone else given the responsibility for the work to be
performed.
A CCR Technician is a person in the central control room
who controls and coordinates all production and other work
on board.
307
2 RESPONSIBILITY
Offshore Installation Manager (OIM)
is responsible for
ensuring that a Safe Job Analysis (SJA) is carried out for
critical operations as described in the directive
ensuring that SJAs are performed in accordance with the
directive and guidelines
ensuring that all relevant personnel have the knowledge
necessary to prepare a SJA, in line with their roles in
connection with the performance of SJAs
Person responsible for the SJA
is responsible for
preparing and inviting to the SJA meeting
chairing the SJA meeting
ensuring that analyses with participants are documented
ensuring that all identified measures are implemented
ensuring that experiences are summed up on completion
of the work
Person responsible for performing the work (Supervisor)
is responsible for
performing the work concerned
ensuring that conditions and measures identified in the SJA
are satisfied and implemented
Person responsible for measures
is responsible for carrying out measures identified in the SJA
Department Manager
is responsible for
filing all completed SJAs in his/her department
Area Authority
is responsible for
approving the SJA
Offshore Installation Manager (OIM)
is responsible for
ensuring that a Safe Job Analysis (SJA) is carried out for
critical operations as described in the directive
ensuring that SJAs are performed in accordance with the
directive and guidelines
ensuring that all relevant personnel have the knowledge
necessary to prepare a SJA, in line with their roles in
connection with the performance of SJAs
308
4 PERFORMING SJA`S
Preparation
In preparation for an SJA meeting, the person responsible
for the SJA shall
collect data, drawings, previous experience and any available
risk assessments for the work in question
prepare draft breakdown of the work into sub-tasks and
showing sequence of the work execution
consider preconditions for the work
define participants to carry out the SJA (the SJA group)
call an SJA meeting
The SJA meeting must be carried out as near in time as
practically possible to the start-up of the work
309
310
Approval
The area authority and supervisor review and approve the
SJA form
The daily information meeting will be informed of, and
coordinate the planned SJA job
Performing a job
All personnel involved will go through the job immediately
before starting to work. The job must be performed in
accordance with the SJA and the work permit
Prior to and during the work being performed, the supervisor
shall ensure that
oo the preconditions for the work are fulfilled
oo all planned measures have been taken
The work must be stopped forthwith in the event of changes in
the preconditions or measures described in the SJA and may
not be resumed until a new SJA has been carried out.
The supervisor must make sure that any new performing
personnel go through the SJA documentation thoroughly
before starting to work. This must be documented and
signed for on the List of Participants
Experience transfer
On completion of the work the person responsible for the
SJA will prepare a brief summary of the SJA-related lessons
learnt from the work. The summary will be registered in the
SJA form
The department manager will file the SJA form w/
appendices and the lessons learnt for his/her department.
The SJA must be numbered so as to be easily retrievable.
311
HSE DIRECTIVE 11
SAFE JOB ANALYSIS ATTACHMENTS
Attachment 1:
SJA - Form
Attachment 2:
Attachment 1:
Attachment 4:
Work
SJA participant
list Permit Form Level 1
Attachment 2:
Attachment 5:
Risk Matrix Work Permit Form Level 2
Attachment 3:
Guidelines For Completing And Using Work Permit Form
Attachment 4:
Fire Guards Duties
Attachment 5:
Safety Measures For Working With Hydrocarbon Carrying
Systems
Attachment 6:
Safety Measures For Working With Hazardous Chemicals
Attachment 7:
Safety Measures For Jet Water Washing Over 250 Bar
Attachment 8:
Safety Measures For Pressure Testing
Attachment 9:
Form For Approval Of Hot Work Class A In Classified Areas
Attachment 10:
Advance Approval Of Hot Work Class A In Classified Areas
Attachment 11:
Form For Logging Heating Value
Conclusion/comments:
Approval
Person responsible for SJA
Responsible for execution
Area/Operations supervisor
Other position
Date/Signature
(Appro.)
(Appro.)
(Recom.)
(Recom.)
Number of attachments:
WP/WO no.:
Basic steps
Measures
Potential consequence
Area/Module/Deck:
Installation:
Department/Discipline:
No
Hazard/cause
SJA No.:
Requirements/Preconditions:
SJA title:
ATTACHMENT 1: SJA-FORM
315
SJA no.
Dept./discipline
SJA officer
Description of
work
Installation
Area/module/
deck
No. equipment/
line
Prerequisites
WP/ WO no.
No. of
appendices
316
No
Subtask
Elements of
risk/cause
Possible
consequence
Measures
Responsible
person
Signature
Conclusion/
comments
SJA responsible
Responsible
for the job
performance
Area/operating
authority
Other position
(not in use)
Experience
summary after
the job
317
A
1
2
SJA Title:
Documentation and experience
Is this a familiar work operation for the crew?
Is there an adequate procedure/instruction/work package?
B
1
2
C
1
2
3
4
5
6
D
1
2
3
4
5
6
E
1
2
3
F
1
2
3
G
1
2
3
4
H
1
2
3
4
5
6
7
I
318
Competence
Do we have the necessary personnel and skills for the job?
Are there other parties that should participate in the SJA meeting?
Communication and coordination
Is this a job where several units/crews must be coordinated?
Is good communications and suitable means of communication in place?
Are there potential conflicts with simultaneous activities (system/area/
installation)?
Has it been made clear who is in charge for the work?
Has sufficient time been allowed for the planning of the activities?
Has the team considered handling of alarm/emergency situations and
informed emergency functions about possible measures/actions?
Key physical safety systems
Are barriers, to reduce the likelihood of unwanted release/leakage
maintained intact (safety valve, pipe, vessel, control system etc.)?
Are barriers, to reduce the likelihood of the ignition of a HC leakage
maintained intact (detection, overpressure protection, isolation of ignition
sources etc.)?
Are barriers to isolate leakage sources/lead hydrocarbons to safe location
maintained intact (process/emergency shutdown system, blowdown system,
x-mastree, drains etc.)?
Are barriers to extinguish or limit extent/spread of fire/explosion maintained
intact (detection/ alarm, fire pump, extinguishing system/equipment etc.)?
Are barriers to provide safe evacuation of personnel maintained intact
(emergency power/lightning, alarm/PA, escape-ways, lifeboats etc.)?
Are barriers that provide stability to floating installations maintained intact
(bulkheads/doors, open tanks, ballast pumps etc.)?
Equipment worked on/involved in the job
Is the necessary isolation from energy provided (rotation, pressure, electrical
voltage etc.)?
May high temperature represent a danger?
Is there sufficient machinery protection/shields?
Equipment for the execution of the job
Is lifting equipment, special tools, equipment/material for the job available,
familiar to the users, checked and found in order?
Do the involved personnel have proper and adequate protective equipment?
Is there danger of uncontrolled movement/rotation of equipment/tools?
The area
Is it necessary to make a worksite inspection to verify access, knowledge
about the working area working conditions etc.?
Has work at heights/at several levels above each other/falling objects been
considered?
Has flammable gas/liquid/material in the area been considered?
Has possible exposure to noise, vibration, poisonous gas/liquid, smoke, dust,
vapour, chemicals, solvents or radioactive substances been considered?
The workplace
Is the workplace clean and tidy?
Has the need for tags/signs/barriers been considered?
Has the need for transportation to/from the workplace been considered?
Has the need for additional guards/watches been considered?
Has weather, wind, waves, visibility and light been considered?
Has access/escape been considered?
Has difficult working positions, potential for work related diseases been
considered?
Additional local questions
Yes
No
Not
Applic.
Comments
SJA TITLE:
Dep/Discipline Date
Signature
SJA-responsible:
Name (Block letters)
SJA Meeting
SJA NO:
Dep/Discipline Date
319
Medium
High
Low
Medium
High
Consequence
Degree of consequence/severity
High
Medium
Low
Probability:
320
High
Medium
Low
competence?