Tabla de Peso de Acero por Metro Lineal

Peso por Metro Lineal


Dimetro
Redondo Cuadrado Hexagonal
Pulgada Milmetro
Kgs.
Kgs.
Kgs.
1/8
3.18
0.062
0.079
0.068
3/16
4.76
0.139
0.177
0.154
1/4
6.35
0.248
0.316
0.273
5/16
7.938
0.388
0.495
0.428
3/8
9.525
0.559
0.711
0.616
7/16
11.113
0.76
0.969
0.839
1/2
12.7
0.993
1.265
1.095
9/16
14.288
1.258
1.601
1.387
5/8
15.875
1.553
1.976
1.711
11/16
17.463
1.879
2.393
2.071
3/4
19.05
2.236
2.846
2.464
13/16
20.638
2.625
3.34
2.893
7/8
22.225
3.043
3.873
3.354
15/16
23.813
3.494
4.447
3.851
1
25.4
3.975
5.059
4.382
1-1/16
26.988
4.487
5.711
4.946
1-1/8
28.575
5.031
6.403
5.546
1-3/16
30.163
5.607
7.135
6.178
1-1/4
31.75
6.213
7.904
6.846
1-5/16
33.338
6.849
8.715
7.547
1-3/8
34.925
7.517
9.565
8.284
1-7/16
36.513
8.216
10.455
9.054
1-1/2
38.1
8.939
11.383
9.858
1-9/16
39.688
9.701
12.352
10.697
1-5/8
41.275
10.492
13.359
11.569
1-11/16 42.863
11.315
14.407
12.477
1-3/4
44.45
12.169
15.49
13.419
1-13/16 46.038
13.854
16.621
14.393
1-7/8
47.625
13.989
17.782
15.416
1-15/16 49.213
14.909
18.987
16.442
2
50.8
15.892
20.237
17.529
2-1/8
53.975
17.945
22.841
19.79
2-1/4
57.15
20.118
25.623
22.186

Metrado de Estructuras Pgina 1

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

GLB

GLB

Ambientes C/estructuras triplay, madera y cobertura calam GLB

GLB

01

SISTEMA DE AGUA

01.01

RED DE ADUCCION

01.01.01

RED DE ADUCCION

01.01.01.01

OBRAS PRELIMINARES
TRAZO Y REPLANTEO

01.02

02
02.01

CASETA PARA GUARDIANIA Y ALMACEN

TRABAJOS PRELIMINARES
DEMOLICIONES DE AMBIENTES PROVISIONALES
DEMOLICIONES DE AMBIENTES PROVISIONALES

02.02

03.01

M2

M2

GLB

GLB

MOVILIZACION Y DESMOVILIZACION DE EQUIPO PESADO


MONTO GLOBAL ESTIMADO

03

M2

TRANSPORTE DE MATERIALES, EQUIPO Y HERRAMIENTAS A OBRA


VER HOJA DE CALCULO DE PESO DE MATERIALES

02.05

M2

TRAZO NIVELES Y REPLANTEO PRELIMINAR


LIMPIEZA DE TERRENO CERCADO

02.04

GLB

LIMPIEZA DE TERRENO
LIMPIEZA DE TERRENO CERCADO

02.03

GLB

GLB

GLB

MOVIMIENTOS DE TIERRAS
EXCAVACION DE ZANJAS PARA ZAPATAS 2.10 M. DE PROFUNDIDAD
BLOCK A
Z4 (EJE I,1)

M3

M3

Z4 (EJE L,1)

M3

M3

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 2

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

Z4 (EJE G,2)

M3

M3

Z4 (EJE J,2)

M3

M3

Z4 (EJE M,2)

M3

M3

Z4 (EJE N,2)

M3

M3

Z4 (EJE E,3)

M3

M3

Z4 (EJE J,3)

M3

M3

Z4 (EJE M,3)

M3

M3

Z4 (EJE N,3)

M3

M3

Z4 (EJE D,4)

M3

M3

Z4 (EJE J,4)

M3

M3

Z4 (EJE M,4)

M3

M3

Z4 (EJE O,4)

M3

M3

Z4 (EJE R,4)

M3

M3

Z4 (EJE C,5)

M3

M3

Z4 (EJE F,5)

M3

M3

Z4 (EJE J,5)

M3

M3

Z4 (EJE M,5)

M3

M3

Z4 (EJE O,5)

M3

M3

Z4 (EJE T,5)

M3

M3

Z4 (EJE A,6)

M3

M3

Z4 (EJE F,6)

M3

M3

Z4 (EJE J,6)

M3

M3

Z4 (EJE M,6)

M3

M3

Z4 (EJE O,6)

M3

M3

Z4 (EJE V,6)

M3

M3

Z4 (EJE A,7)

M3

M3

Z4 (EJE F,7)

M3

M3

Z4 (EJE J,7)

M3

M3

Z4 (EJE M,7)

M3

M3

Z4 (EJE O,7)

M3

M3

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 3

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

Z4 (EJE W,7)

M3

M3

Z4 (EJE B,8)

M3

M3

Z4 (EJE F,8)

M3

M3

Z4 (EJE J,8)

M3

M3

Z4 (EJE M,8)

M3

M3

Z4 (EJE O,8)

M3

M3

Z4 (EJE V,8)

M3

M3

Z4 (EJE F,9)

M3

M3

Z4 (EJE J,10)

M3

M3

Z4 (EJE M,11)

M3

M3

Z4 (EJE O,11)

M3

M3

Z4 (EJE T,11)

M3

M3

Z4 (EJE O,14)

M3

M3

Z4 (EJE S,16)

M3

M3

Z4 (EJE H,1)

M3

M3

Z4 (EJE I,2)

M3

M3

Z4 (EJE H,2)

M3

M3

Z4 (EJE G,2)

M3

M3

Z4 (EJE I,3)

M3

M3

Z4 (EJE H,3)

M3

M3

Z4 (EJE G,3)

M3

M3

Z4 (EJE F,3)

M3

M3

Z4 (EJE J,4)

M3

M3

Z4 (EJE I,4)

M3

M3

Z4 (EJE H,4)

M3

M3

Z4 (EJE G,4)

M3

M3

Z4 (EJE F,4)

M3

M3

Z4 (EJE D,4)

M3

M3

Z4 (EJE K,5)

M3

M3

BLOCK B

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 4

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

Z4 (EJE I,5)

M3

M3

Z4 (EJE H,5)

M3

M3

Z4 (EJE G,5)

M3

M3

Z4 (EJE F,5)

M3

M3

Z4 (EJE L,6)

M3

M3

Z4 (EJE K,6)

M3

M3

Z4 (EJE I,6)

M3

M3

Z4 (EJE H,6)

M3

M3

Z4 (EJE G,6)

M3

M3

Z4 (EJE F,6)

M3

M3

Z4 (EJE D,6)

M3

M3

Z4 (EJE C,6)

M3

M3

Z4 (EJE M,7)

M3

M3

Z4 (EJE K,7)

M3

M3

Z4 (EJE I,7)

M3

M3

Z4 (EJE H,7)

M3

M3

Z4 (EJE G,7)

M3

M3

Z4 (EJE F,7)

M3

M3

Z4 (EJE D,7)

M3

M3

Z4 (EJE B,7)

M3

M3

Z4 (EJE K,9)

M3

M3

Z4 (EJE I,9)

M3

M3

Z4 (EJE G,9)

M3

M3

Z4 (EJE F,9)

M3

M3

Z4 (EJE D,9)

M3

M3

Z4 (EJE A,9)

M3

M3

Z4 (EJE N,10)

M3

M3

Z4 (EJE K,11)

M3

M3

Z4 (EJE I,11)

M3

M3

Z4 (EJE G,11)

M3

M3

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 5

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

Z4 (EJE F,11)

M3

M3

Z4 (EJE D,11)

M3

M3

Z4 (EJE N,12)

M3

M3

Z4 (EJE K,12)

M3

M3

Z4 (EJE I,12)

M3

M3

Z4 (EJE H,12)

M3

M3

Z4 (EJE G,12)

M3

M3

Z4 (EJE F,12)

M3

M3

Z4 (EJE D,12)

M3

M3

Z4 (EJE B,12)

M3

M3

Z4 (EJE N,15)

M3

M3

Z4 (EJE G,16)

M3

M3

Z4 (EJE F,16)

M3

M3

Z4 (EJE D,16)

M3

M3

Z4 (EJE C,16)

M3

M3

Z4 (EJE I,17)

M3

M3

Z4 (EJE H,17)

M3

M3

Z4 (EJE N,18)

M3

M3

Z4 (EJE G,18)

M3

M3

Z4 (EJE F,19)

M3

M3

Z4 (EJE D,19)

M3

M3

Z4 (EJE F,20)

M3

M3

Z4 (EJE E,20)

M3

M3

Z4 (EJE O,1)

M3

M3

Z4 (EJE I,1)

M3

M3

Z4 (EJE H,1)

M3

M3

Z4 (EJE G,1)

M3

M3

Z4 (EJE L,2)

M3

M3

Z4 (EJE E,2)

M3

M3

BLOCK C

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 6

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

Z4 (EJE Q,3)

M3

M3

Z5 (EJE O,3)

M3

M3

Z4 (EJE C,3)

M3

M3

Z3 (EJE K,4)

M3

M3

Z4 (EJE I,4)

M3

M3

Z4 (EJE H,4)

M3

M3

Z4 (EJE G,4)

M3

M3

Z4 (EJE F,4)

M3

M3

Z4 (EJE C,4)

M3

M3

Z4 (EJE B,4)

M3

M3

Z4 (EJE P,5)

M3

M3

Z4 (EJE Q,6)

M3

M3

Z3 (EJE P,7)

M3

M3

Z2 (EJE K,7)

M3

M3

Z4 (EJE I,7)

M3

M3

Z4 (EJE H,7)

M3

M3

Z4 (EJE G,7)

M3

M3

Z4 (EJE D,7)

M3

M3

Z4 (EJE C,7)

M3

M3

Z4 (EJE A,7)

M3

M3

Z4 (EJE O,8)

M3

M3

Z4 (EJE M,8)

M3

M3

Z4 (EJE E,8)

M3

M3

Z1 (EJE P,9)

M3

M3

Z4 (EJE L,9)

M3

M3

Z4 (EJE I,9)

M3

M3

Z4 (EJE H,9)

M3

M3

Z4 (EJE G,9)

M3

M3

Z4 (EJE E,9)

M3

M3

Z4 (EJE C,9)

M3

M3

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 7

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

03.02

DESCRIPCION

UND

CANT

Z4 (EJE N,10)

M3

M3

Z4 (EJE J,10)

M3

M3

Z4 (EJE H,10)

M3

M3

Z4 (EJE G,10)

M3

M3

Z4 (EJE E,10)

M3

M3

EXCAVACION DE ZANJAS PARA VIGAS DE CONECCION Y CIMENTACION HASTA 1.


BLOCK A
VC1 0.40X0.60 (EJE 1)

M3

M3

VC1 0.40X0.60 (EJE 2)

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VC1 0.40X0.60 (EJE 3)

VC1 0.40X0.60 (EJE 4)

VC1 0.40X0.60 (EJE 5)

VC1 0.40X0.60 (EJE 6)

VC1 0.40X0.60 (EJE 7)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 8

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VC1 0.40X0.60 (EJE 14,16)

M3

M3

VC1 0.40X0.60 (EJE F)

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VC1 0.40X0.60 (EJE 8)

VC1 0.40X0.60 (EJE 9,10,11)

VC1 0.40X0.60 (EJE J)

VC1 0.40X0.60 (EJE M)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 9

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

VC1 0.40X0.60 (EJE O)

VC1 0.40X0.60 (EJE A,I)

VC1 0.40X0.60 (EJE L,V)

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

BLOCK B
VC1 0.40X0.60 (EJE 2)
VC1 0.40X0.60 (EJE 3)

VC1 0.40X0.60 (EJE 4)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 10

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

VC1 0.40X0.60 (EJE 5)

VC1 0.40X0.60 (EJE 6)

VC1 0.40X0.60 (EJE 7)

VC1 0.40X0.60 (EJE 9)

VC1 0.40X0.60 (EJE 11)

VC1 0.40X0.60 (EJE 12)

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 11

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VC1 0.40X0.60 (EJE 20)

M3

M3

VC1 0.40X0.60 (EJE K)

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VC1 0.40X0.60 (EJE 16)

VC1 0.40X0.60 (EJE 17)

VC1 0.40X0.60 (EJE 19)

VC1 0.40X0.60 (EJE I)

VC1 0.40X0.60 (EJE H)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 12

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

VC1 0.40X0.60 (EJE G)

VC1 0.40X0.60 (EJE F)

VC1 0.40X0.60 (EJE D)

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 13

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

VC1 0.40X0.60 (EJE N,H)

VC1 0.40X0.60 (EJE H,A)

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

BLOCK C
VC1 0.40X0.60 (EJE 4)

VC1 0.40X0.60 (EJE 7)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 14

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

VC1 0.40X0.60 (EJE 9)


VC1 0.40X0.60 (EJE C)
VC1 0.40X0.60 (EJE E)
VC1 0.40X0.60 (EJE G)

VC1 0.40X0.60 (EJE H)

VC1 0.40X0.60 (EJE I)

VC1 0.40X0.60 (CIRCULO INTERIOR)

VC1 0.40X0.60 (EJE 1,7)

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 15

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

VC1 0.40X0.60 (EJE 7,10)

03.03

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M4

M4

EXCAVACION ZANJAS PARA CIMIENTOS CORRIDOS HASTA 1.50 M. EN TERRENO N


BLOCK A
VC1 0.40X0.60 (EJE 1)

M3

M3

VC1 0.40X0.60 (EJE 2)

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VC1 0.40X0.60 (EJE 3)

VC1 0.40X0.60 (EJE 4)

VC1 0.40X0.60 (EJE 5)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 16

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VC1 0.40X0.60 (EJE 14,16)

M3

M3

VC1 0.40X0.60 (EJE F)

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VC1 0.40X0.60 (EJE 6)

VC1 0.40X0.60 (EJE 7)

VC1 0.40X0.60 (EJE 8)

VC1 0.40X0.60 (EJE 9,10,11)

VC1 0.40X0.60 (EJE J)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 17

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

VC1 0.40X0.60 (EJE M)

VC1 0.40X0.60 (EJE O)

VC1 0.40X0.60 (EJE A,I)

VC1 0.40X0.60 (EJE L,V)

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 18

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

BLOCK B
VC1 0.40X0.60 (EJE 2)
VC1 0.40X0.60 (EJE 3)

VC1 0.40X0.60 (EJE 4)

VC1 0.40X0.60 (EJE 5)

VC1 0.40X0.60 (EJE 6)

VC1 0.40X0.60 (EJE 7)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 19

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VC1 0.40X0.60 (EJE 20)

M3

M3

VC1 0.40X0.60 (EJE K)

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VC1 0.40X0.60 (EJE 9)

VC1 0.40X0.60 (EJE 11)

VC1 0.40X0.60 (EJE 12)

VC1 0.40X0.60 (EJE 16)

VC1 0.40X0.60 (EJE 17)

VC1 0.40X0.60 (EJE 19)

VC1 0.40X0.60 (EJE I)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 20

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

VC1 0.40X0.60 (EJE H)

VC1 0.40X0.60 (EJE G)

VC1 0.40X0.60 (EJE F)

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 21

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

VC1 0.40X0.60 (EJE D)

VC1 0.40X0.60 (EJE N,H)

VC1 0.40X0.60 (EJE H,A)

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

BLOCK C
VC1 0.40X0.60 (EJE 4)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 22

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

VC1 0.40X0.60 (EJE 7)

VC1 0.40X0.60 (EJE 9)


VC1 0.40X0.60 (EJE C)
VC1 0.40X0.60 (EJE E)
VC1 0.40X0.60 (EJE G)

VC1 0.40X0.60 (EJE H)

VC1 0.40X0.60 (EJE I)

VC1 0.40X0.60 (CIRCULO INTERIOR)

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 23

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

VC1 0.40X0.60 (EJE 1,7)

VC1 0.40X0.60 (EJE 7,10)

03.04

03.05

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M4

M4

EXCAVACION DE ZANJAS PARA ASCENSOR, CISTERNAS Y ESCALERAS


MONTACARGAS

M3

M3

CISTERNA

M3

M3

ESCALERA 01

M3

M3

ESCALERA 02

M3

M3

ESCALERA 03

M3

M3

RELLENO Y COMPACTADO EN ZANJAS CON EQUIPO LIVIANO (CON MATERIAL PR

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 24

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

Z1 (EJE D,1)

M3

M3

Z2 (EJE D,2)

M3

M3

Z2 (EJE D,3)

M3

M3

Z2 (EJE D,4)

M3

M3

Z2 (EJE D,5)

M3

M3

Z2 (EJE D,6)

M3

M3

Z3 (EJE A,B,1,2)

M3

M3

Z3 (EJE A,B,6)

M3

M3

Z4 (EJE A,B,2)

M3

M3

Z4 (EJE A,B,3)

M3

M3

Z4 (EJE A,B,4)

M3

M3

Z4 (EJE A,B,5)

M3

M3

Z10 (EJE C,D,3,4)

M3

M3

DESCUENTO COLUMNAS C1

M3

M3

DESCUENTO COLUMNAS C2

M3

M3

DESCUENTO COLUMNAS C3

M3

M3

DESCUENTO CIMIENTOS CORRIDOS

M3

M3

Z6 (EJE A,B,7)

M3

M3

Z6 (EJE A,B,10)

M3

M3

Z7 (EJE A,B,8)

M3

M3

Z7 (EJE A,B,9)

M3

M3

Z2 (EJE C,7)

M3

M3

Z2 (EJE C,10)

M3

M3

Z2 (EJE D,7)

M3

M3

Z2 (EJE D,10)

M3

M3

Z2 (EJE E,7)

M3

M3

Z2 (EJE E,10)

M3

M3

Z2 (EJE F,7)

M3

M3

BLOCK 01

BLOCK 02

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 25

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

03.06

DESCRIPCION

UND

CANT

Z2 (EJE F,10)

M3

M3

Z2 (EJE G,7)

M3

M3

Z2 (EJE G,10)

M3

M3

Z1 (EJE H,7)

M3

M3

Z1 (EJE H,10)

M3

M3

Z5 (EJE C,8)

M3

M3

Z5 (EJE C,9)

M3

M3

Z5 (EJE D,8)

M3

M3

Z5 (EJE D,9)

M3

M3

Z5 (EJE E,8)

M3

M3

Z5 (EJE E,9)

M3

M3

Z5 (EJE F,8)

M3

M3

Z5 (EJE F,9)

M3

M3

Z5 (EJE G,8)

M3

M3

Z5 (EJE G,9)

M3

M3

Z8 (EJE G,8)

M3

M3

Z8 (EJE G,9)

M3

M3

Z11 (EJE G,8)

M3

M3

Z12 (EJE G,9)

M3

M3

DESCUENTO COLUMNAS C1

M3

M3

DESCUENTO COLUMNAS C2

M3

M3

DESCUENTO CIMIENTOS CORRIDOS

M3

M3

ESCALERA 01

M3

M3

ESCALERA 02

M3

M3

ESCALERA 03

M3

M3

ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA DIST.= 4 KM. + 20% de


EXCAVACION DE ZANJAS PARA ZAPATAS

M3

M3

EXCAVACION DE ZANJAS PARA VIGAS DE CONECCION M3

M3

EXCAVACION ZANJAS PARA CIMIENTOS CORRIDOS

M3

M3

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 26

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

M3

M3

RELLENO Y COMPACTADO EN ZANJAS CON EQUIPO LI M3

M3

EXCAVACION DE ZANJAS ASCENSOR, CISTERNAS Y

03.07

03.08

04

NIVELACION INTERIOR Y APISONADO P/RECIBIR FALSO PISO E = 4" C/EQUIPO LIV


INGRESO Y VESTIBULO

M2

M2

HALL

M2

M2

VIGILANCIA

M2

M2

INFORMES

M2

M2

SS.HH. VARONES

M2

M2

SS.HH. MUJERES

M2

M2

CIRCULACION

M2

M2

OFICINAS ADMINISTRATIVAS

M2

M2

AULA 01 - IDIOMAS

M2

M2

AULA 02 - IDIOMAS

M2

M2

LABORATORIO - IDIOMAS

M2

M2

AULA 03 - IDIOMAS

M2

M2

AULA 04 - IDIOMAS

M2

M2

ESCALERA 01

M2

M2

ESCALERA 02

M2

M2

ESCALERA 03

M2

M2

AFIRMADO DE 4" PARA PATIOS, VEREDAS Y RAMPAS CON EQUIPO LIVIANO


PATIO DURO GRANDE

M2

M2

PATIO DURO CHICO

M2

M2

VEREDILLA GRANDE

M2

M2

VEREDILLA CHICA

M2

M2

SUBESTACION ELECTRICA

M2

M2

ACCESO SERVICIO

M2

M2

OBRAS DE CONCRETO SIMPLE

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 27

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

04.01
04.01.01

DESCRIPCION

UND

CANT

SOLADOS
SOLADO ZAPATA. MEZCLA 1:10 CEMENTO : HORMIGON
BLOCK 01
Z1 (EJE D,1)

M3

M3

Z2 (EJE D,2)

M3

M3

Z2 (EJE D,3)

M3

M3

Z2 (EJE D,4)

M3

M3

Z2 (EJE D,5)

M3

M3

Z2 (EJE D,6)

M3

M3

Z3 (EJE A,B,1,2)

M3

M3

Z3 (EJE A,B,6)

M3

M3

Z4 (EJE A,B,2)

M3

M3

Z4 (EJE A,B,3)

M3

M3

Z4 (EJE A,B,4)

M3

M3

Z4 (EJE A,B,5)

M3

M3

Z10 (EJE C,D,3,4)

M3

M3

Z6 (EJE A,B,7)

M3

M3

Z6 (EJE A,B,10)

M3

M3

Z7 (EJE A,B,8)

M3

M3

Z7 (EJE A,B,9)

M3

M3

Z2 (EJE C,7)

M3

M3

Z2 (EJE C,10)

M3

M3

Z2 (EJE D,7)

M3

M3

Z2 (EJE D,10)

M3

M3

Z2 (EJE E,7)

M3

M3

Z2 (EJE E,10)

M3

M3

Z2 (EJE F,7)

M3

M3

Z2 (EJE F,10)

M3

M3

Z2 (EJE G,7)

M3

M3

BLOCK 02

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 28

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

04.01.02

DESCRIPCION

UND

CANT

Z2 (EJE G,10)

M3

M3

Z1 (EJE H,7)

M3

M3

Z1 (EJE H,10)

M3

M3

Z5 (EJE C,8)

M3

M3

Z5 (EJE C,9)

M3

M3

Z5 (EJE D,8)

M3

M3

Z5 (EJE D,9)

M3

M3

Z5 (EJE E,8)

M3

M3

Z5 (EJE E,9)

M3

M3

Z5 (EJE F,8)

M3

M3

Z5 (EJE F,9)

M3

M3

Z5 (EJE G,8)

M3

M3

Z5 (EJE G,9)

M3

M3

Z8 (EJE G,8)

M3

M3

Z8 (EJE G,9)

M3

M3

Z11 (EJE G,8)

M3

M3

Z12 (EJE G,9)

M3

M3

SOLADO ASCENSOR. MEZCLA 1:10 CEMENTO : HORMIGON


BLOCK 01
ASCENSOR

04.01.03

M3

M3

SOLADO CISTERNA. MEZCLA 1:10 CEMENTO : HORMIGON


BLOCK 01
CISTERNA

04.02
04.02.01

M3

M3

CIMIENTOS

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO:HORMIGON 30% PIEDRA GRANDE


BLOCK 01

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 29

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

CC4 (EJE A,1,2)

M3

M3

CC2 (EJE A,2,3)

M3

M3

CC2 (EJE A,3,4)

M3

M3

CC2 (EJE A,4,5)

M3

M3

CC2 (EJE A,5,6)

M3

M3

CC3 (EJE A,B,4,5)

M3

M3

CC3 (EJE A,B,5,6)

M3

M3

CC1 (EJE B,2,3)

M3

M3

CC2 (EJE B,3,4)

M3

M3

CC2 (EJE B,4,5)

M3

M3

CC3 (EJE B,5,6)

M3

M3

CC6 (EJE B,1)

M3

M3

CC6 (EJE C,1)

M3

M3

CC3 (EJE C,3,4)

M3

M3

CC3 (EJE C,4,5)

M3

M3

CC3 (EJE C,D,4,5)

M3

M3

M3

M3

M3

M3

CC7 (EJE D)

M3

M3

CC2 (EJE D,1,2)

M3

M3

CC2 (EJE D,2,3)

M3

M3

CC2 (EJE D,3,4)

M3

M3

CC2 (EJE D,4,5)

M3

M3

CC1 (EJE D,5,6)

M3

M3

CC1 (EJE 1,A,B)

M3

M3

CC1 (EJE 1,B,C)

M3

M3

CC1 (EJE 1,C,D)

M3

M3

CC4 (EJE 2,A,B)

M3

M3

CC3 (EJE 3,A,B)

M3

M3

CC3 (EJE 3,4,A,B)

M3

M3

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 30

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

CC3 (EJE 3,4,C,D)

M3

M3

CC1 (EJE 4,5,A,B)

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

CC3 (EJE 5,A,B)

M3

M3

CC3 (EJE 5,6,A,B)

M3

M3

CC2 (EJE 6,A,B)

M3

M3

CC2 (EJE 6,B,D)

M3

M3

CC2 (EJE A,7,8)

M3

M3

CC2 (EJE A,8,9)

M3

M3

CC2 (EJE A,9,10)

M3

M3

CC1 (EJE B,7,8)

M3

M3

CC1 (EJE B,8,9)

M3

M3

CC1 (EJE B,9,10)

M3

M3

CC1 (EJE C,7,8)

M3

M3

CC1 (EJE C,8,9)

M3

M3

CC1 (EJE C,9,10)

M3

M3

CC4 (EJE D,7,8)

M3

M3

CC2 (EJE D,9,10)

M3

M3

CC5 (EJE F,7,8)

M3

M3

CC5 (EJE F,9,10)

M3

M3

CC3 (EJE F,G,9,10)

M3

M3

CC2 (EJE H,7,8)

M3

M3

CC2 (EJE H,9,10)

M3

M3

CC2 (EJE I,8,9)

M3

M3

CC2 (EJE 7,A,B)

M3

M3

CC2 (EJE 7,B,C)

M3

M3

CC1 (EJE 4,5,C,D)

BLOCK 02

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 31

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

CC2 (EJE 7,C,D)

M3

M3

CC2 (EJE 7,D,E)

M3

M3

CC2 (EJE 7,E,F)

M3

M3

CC2 (EJE 7,F,G)

M3

M3

CC2 (EJE 7,G,H)

M3

M3

CC1 (EJE 7,8,A,B)

M3

M3

CC1 (EJE 8,B,C)

M3

M3

CC1 (EJE 8,D,E)

M3

M3

CC2 (EJE 8,E,F)

M3

M3

CC2 (EJE 8,F,G)

M3

M3

CC2 (EJE 8,G,H)

M3

M3

CC2 (EJE 8,H,I)

M3

M3

CC1 (EJE 8,9,A,B)

M3

M3

CC1 (EJE 8,9,B,C)

M3

M3

CC1 (EJE 9,B,C)

M3

M3

CC1 (EJE 9,D,E)

M3

M3

CC2 (EJE 9,E,F)

M3

M3

CC2 (EJE 9,F,G)

M3

M3

CC2 (EJE 9,G,H)

M3

M3

CC2 (EJE 9,H,I)

M3

M3

CC1 (EJE 9,10,A,B)

M3

M3

CC2 (EJE 10,A,B)

M3

M3

CC2 (EJE 10,B,C)

M3

M3

CC2 (EJE 10,C,D)

M3

M3

CC2 (EJE 10,D,E)

M3

M3

CC2 (EJE 10,E,F)

M3

M3

CC2 (EJE 10,F,G)

M3

M3

CC2 (EJE 10,G,H)

M3

M3

CC1 (EJE 10,8,A,B)

M3

M3

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 32

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

04.03
04.03.01

DESCRIPCION

UND

CANT

CC4 (EJE A,1,2)

M3

M3

CC2 (EJE A,2,3)

M3

M3

CC2 (EJE A,3,4)

M3

M3

CC2 (EJE A,4,5)

M3

M3

CC2 (EJE A,5,6)

M3

M3

CC3 (EJE A,B,3,4)

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

CC3 (EJE C,3,4)

M3

M3

CC3 (EJE C,4,5)

M3

M3

CC3 (EJE C,D,4,5)

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

CC2 (EJE D,1,2)

M3

M3

CC2 (EJE D,2,3)

M3

M3

CC2 (EJE D,3,4)

M3

M3

CC2 (EJE D,4,5)

M3

M3

CC4 (EJE 2,A,B)

M3

M3

CC3 (EJE 3,A,B)

M3

M3

CC3 (EJE 4,A,B)

M3

M3

SOBRECIMIENTOS
CONCRETO EN SOBRECIMIENTO 1:8 C:H + 25% PM
BLOCK 01

CC3 (EJE A,B,4,5)


CC3 (EJE A,B,5,6)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 33

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

CC3 (EJE 4,5,C,D)

M3

M3

CC3 (EJE 5,A,B)

M3

M3

CC2 (EJE 6,A,B)

M3

M3

CC2 (EJE A,7,8)

M3

M3

CC2 (EJE A,8,9)

M3

M3

CC2 (EJE A,9,10)

M3

M3

CC4 (EJE D,7,8)

M3

M3

CC2 (EJE D,9,10)

M3

M3

CC5 (EJE F,7,8)

M3

M3

CC5 (EJE F,9,10)

M3

M3

CC3 (EJE F,G,9,10)

M3

M3

M3

M3

CC2 (EJE H,7,8)

M3

M3

CC2 (EJE H,9,10)

M3

M3

CC2 (EJE I,8,9)

M3

M3

CC2 (EJE 7,A,B)

M3

M3

CC2 (EJE 7,B,C)

M3

M3

M3

M3

CC2 (EJE 7,D,E)

M3

M3

CC2 (EJE 7,E,F)

M3

M3

CC2 (EJE 7,F,G)

M3

M3

CC2 (EJE 7,G,H)

M3

M3

CC1 (EJE 8,D,E)

M3

M3

M3

M3

CC2 (EJE 8,E,F)

M3

M3

CC2 (EJE 8,F,G)

M3

M3

CC2 (EJE 8,G,H)

M3

M3

CC2 (EJE 8,H,I)

M3

M3

CC2 (EJE 9,E,F)

M3

M3

BLOCK 02

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 34

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

04.03.02

DESCRIPCION

UND

CANT

CC2 (EJE 9,F,G)

M3

M3

CC2 (EJE 9,G,H)

M3

M3

CC2 (EJE 9,H,I)

M3

M3

CC2 (EJE 10,A,B)

M3

M3

CC2 (EJE 10,B,C)

M3

M3

M3

M3

CC2 (EJE 10,D,E)

M3

M3

CC2 (EJE 10,E,F)

M3

M3

CC2 (EJE 10,F,G)

M3

M3

CC2 (EJE 10,G,H)

M3

M3

ENCOFRADO Y DESENCOFRADO NORMAL DE SOBRECIMIENTOS


BLOCK 01
CC4 (EJE A,1,2)

M2

M2

CC2 (EJE A,2,3)

M2

M2

CC2 (EJE A,3,4)

M2

M2

CC2 (EJE A,4,5)

M2

M2

CC2 (EJE A,5,6)

M2

M2

CC3 (EJE A,B,3,4)

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

CC3 (EJE C,3,4)

M2

M2

CC3 (EJE C,4,5)

M2

M2

CC3 (EJE C,D,4,5)

M2

M2

M2

M2

M2

M2

CC3 (EJE A,B,4,5)


CC3 (EJE A,B,5,6)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 35

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

M2

M2

M2

M2

M2

M2

CC2 (EJE D,1,2)

M2

M2

CC2 (EJE D,2,3)

M2

M2

CC2 (EJE D,3,4)

M2

M2

CC2 (EJE D,4,5)

M2

M2

CC4 (EJE 2,A,B)

M2

M2

CC3 (EJE 3,A,B)

M2

M2

CC3 (EJE 4,A,B)

M2

M2

CC3 (EJE 4,5,C,D)

M2

M2

CC3 (EJE 5,A,B)

M2

M2

CC2 (EJE 6,A,B)

M2

M2

CC2 (EJE A,7,8)

M2

M2

CC2 (EJE A,8,9)

M2

M2

CC2 (EJE A,9,10)

M2

M2

CC4 (EJE D,7,8)

M2

M2

CC2 (EJE D,9,10)

M2

M2

CC5 (EJE F,7,8)

M2

M2

CC5 (EJE F,9,10)

M2

M2

CC3 (EJE F,G,9,10)

M2

M2

M2

M2

CC2 (EJE H,7,8)

M2

M2

CC2 (EJE H,9,10)

M2

M2

CC2 (EJE I,8,9)

M2

M2

CC2 (EJE 7,A,B)

M2

M2

CC2 (EJE 7,B,C)

M2

M2

M2

M2

M2

M2

BLOCK 02

CC2 (EJE 7,D,E)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 36

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

04.04
04.04.01

DESCRIPCION

UND

CANT

CC2 (EJE 7,E,F)

M2

M2

CC2 (EJE 7,F,G)

M2

M2

CC2 (EJE 7,G,H)

M2

M2

CC1 (EJE 8,D,E)

M2

M2

M2

M2

CC2 (EJE 8,E,F)

M2

M2

CC2 (EJE 8,F,G)

M2

M2

CC2 (EJE 8,G,H)

M2

M2

CC2 (EJE 8,H,I)

M2

M2

CC2 (EJE 9,E,F)

M2

M2

CC2 (EJE 9,F,G)

M2

M2

CC2 (EJE 9,G,H)

M2

M2

CC2 (EJE 9,H,I)

M2

M2

CC2 (EJE 10,A,B)

M2

M2

CC2 (EJE 10,B,C)

M2

M2

M2

M2

CC2 (EJE 10,D,E)

M2

M2

CC2 (EJE 10,E,F)

M2

M2

CC2 (EJE 10,F,G)

M2

M2

CC2 (EJE 10,G,H)

M2

M2

CARAS LATERALES

M2

M2

FALSOS PISOS
CONCRETO EN FALSO PISO DE 4" CEM:HOR 1:10 PARA PISO CERAMICO O SIMILA
INGRESO Y VESTIBULO

M2

M2

HALL

M2

M2

VIGILANCIA

M2

M2

INFORMES

M2

M2

SS.HH. VARONES

M2

M2

SS.HH. MUJERES

M2

M2

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 37

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

04.04.02

04.04.03

05
05.01
05.01.01

DESCRIPCION

UND

CANT

CIRCULACION

M2

M2

OFICINAS ADMINISTRATIVAS

M2

M2

AULA 01 - IDIOMAS

M2

M2

AULA 02 - IDIOMAS

M2

M2

LABORATORIO - IDIOMAS

M2

M2

AULA 03 - IDIOMAS

M2

M2

AULA 04 - IDIOMAS

M2

M2

CONCRETO EN FALSO PISO DE 4"CEM:HOR 1:8 PARA PISO DE CEMENTO PULIDO


PATIO DURO GRANDE

M2

M2

PATIO DURO CHICO

M2

M2

VEREDILLA GRANDE

M2

M2

VEREDILLA CHICA

M2

M2

SUBESTACION ELECTRICA

M2

M2

CONCRETO EN FALSO PISO DE 4"CEM:HOR 1:8 PARA PISO DE CONCRETO FROTA


ACCESO SERVICIO

M2

M2

ESCALERA 02

M2

M2

ESCALERA 03

M2

M2

Z1 (EJE D,1)

M3

M3

Z2 (EJE D,2)

M3

M3

Z2 (EJE D,3)

M3

M3

Z2 (EJE D,4)

M3

M3

Z2 (EJE D,5)

M3

M3

OBRAS DE CONCRETO ARMADO


ZAPATAS
CONCRETO EN ZAPATAS F'C=210KG/CM2
BLOCK 01

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 38

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

Z2 (EJE D,6)

M3

M3

Z3 (EJE A,B,1,2)

M3

M3

Z3 (EJE A,B,6)

M3

M3

Z4 (EJE A,B,2)

M3

M3

Z4 (EJE A,B,3)

M3

M3

Z4 (EJE A,B,4)

M3

M3

Z4 (EJE A,B,5)

M3

M3

Z10 (EJE C,D,3,4)

M3

M3

Z6 (EJE A,B,7)

M3

M3

Z6 (EJE A,B,10)

M3

M3

Z7 (EJE A,B,8)

M3

M3

Z7 (EJE A,B,9)

M3

M3

Z2 (EJE C,7)

M3

M3

Z2 (EJE C,10)

M3

M3

Z2 (EJE D,7)

M3

M3

Z2 (EJE D,10)

M3

M3

Z2 (EJE E,7)

M3

M3

Z2 (EJE E,10)

M3

M3

Z2 (EJE F,7)

M3

M3

Z2 (EJE F,10)

M3

M3

Z2 (EJE G,7)

M3

M3

Z2 (EJE G,10)

M3

M3

Z1 (EJE H,7)

M3

M3

Z1 (EJE H,10)

M3

M3

Z5 (EJE C,8)

M3

M3

Z5 (EJE C,9)

M3

M3

Z5 (EJE D,8)

M3

M3

Z5 (EJE D,9)

M3

M3

Z5 (EJE E,8)

M3

M3

BLOCK 02

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 39

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

05.01.02

DESCRIPCION

UND

CANT

Z5 (EJE E,9)

M3

M3

Z5 (EJE F,8)

M3

M3

Z5 (EJE F,9)

M3

M3

Z5 (EJE G,8)

M3

M3

Z5 (EJE G,9)

M3

M3

Z8 (EJE G,8)

M3

M3

Z8 (EJE G,9)

M3

M3

Z11 (EJE G,8)

M3

M3

Z12 (EJE G,9)

M3

M3

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

ACERO PARA ZAPATAS F'Y = 4200 KG/CM2 GRADO 60


BLOCK 01
Z1 (EJE D,1)

Z2 (EJE D,2)

Z2 (EJE D,3)

Z2 (EJE D,4)

Z2 (EJE D,5)

Z2 (EJE D,6)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 40

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Z3 (EJE A,B,1,2)

Z3 (EJE A,B,6)

Z4 (EJE A,B,2)

Z4 (EJE A,B,3)

Z4 (EJE A,B,4)

Z4 (EJE A,B,5)

Z10 (EJE C,D,3,4)

BLOCK 02
Z6 (EJE A,B,7)

Z6 (EJE A,B,10)

Z7 (EJE A,B,8)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 41

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Z7 (EJE A,B,9)

Z2 (EJE C,7)

Z2 (EJE C,10)

Z2 (EJE D,7)

Z2 (EJE D,10)

Z2 (EJE E,7)

Z2 (EJE E,10)

Z2 (EJE F,7)

Z2 (EJE F,10)

Z2 (EJE G,7)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 42

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Z2 (EJE G,10)

Z1 (EJE H,7)

Z1 (EJE H,10)

Z5 (EJE C,8)

Z5 (EJE C,9)

Z5 (EJE D,8)

Z5 (EJE D,9)

Z5 (EJE E,8)

Z5 (EJE E,9)

Z5 (EJE F,8)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 43

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Acero 3/4" (Horizontal)

KG

KG

Acero 3/4" (Vertical)

KG

KG

Z5 (EJE F,9)

Z5 (EJE G,8)

Z5 (EJE G,9)

Z8 (EJE G,8)

Z8 (EJE G,9)

Z11 (EJE G,8)

Z12 (EJE G,9)

05.02
05.02.01

VIGA DE CIMENTACION
CONCRETO EN VIGA DE CIMENTACION F'C=210KG/CM2
BLOCK 01
VC2 0.40X0.60 (EJE A)

M3

M3

M3

M3

M3

M3

M3

M3

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 44

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

VC2 0.40X0.60 (EJE B)

VC2 0.40X0.60 (EJE D)

VC1 0.40X0.90 (EJE 1)

VC1 0.40X0.90 (EJE 2)

VC1 0.40X0.90 (EJE 3)

VC1 0.40X0.90 (EJE 4)

VC1 0.40X0.90 (EJE 5)

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 45

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

VC1 0.40X0.90 (EJE 6)

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

BLOCK 02
VC2 0.40X0.60 (EJE 7)

VC2 0.40X0.60 (EJE 8)

VC2 0.40X0.60 (EJE 9)

VC2 0.40X0.60 (EJE 10)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 46

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

VC1 0.40X0.90 (EJE A)

VC1 0.40X0.90 (EJE B)

VC1 0.40X0.90 (EJE C)

VC1 0.40X0.90 (EJE D)

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 47

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

VC1 0.40X0.90 (EJE E)

VC1 0.40X0.90 (EJE F)

VC1 0.40X0.90 (EJE G)

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 48

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

VC1 0.40X0.90 (EJE H)

05.02.02

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

ENCOFRADO Y DESENCOFRADO EN VIGA DE CIMENTACION


BLOCK 01
VC2 0.40X0.60 (EJE A)

VC2 0.40X0.60 (EJE B)

VC2 0.40X0.60 (EJE D)

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 49

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

VC1 0.40X0.90 (EJE 1)

VC1 0.40X0.90 (EJE 2)

VC1 0.40X0.90 (EJE 3)

VC1 0.40X0.90 (EJE 4)

VC1 0.40X0.90 (EJE 5)

VC1 0.40X0.90 (EJE 6)

UND

CANT

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

BLOCK 02
VC2 0.40X0.60 (EJE 7)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 50

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

VC2 0.40X0.60 (EJE 8)

VC2 0.40X0.60 (EJE 9)

VC2 0.40X0.60 (EJE 10)

VC1 0.40X0.90 (EJE A)

VC1 0.40X0.90 (EJE B)

UND

CANT

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 51

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

VC1 0.40X0.90 (EJE C)

VC1 0.40X0.90 (EJE D)

VC1 0.40X0.90 (EJE E)

UND

CANT

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 52

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

VC1 0.40X0.90 (EJE F)

VC1 0.40X0.90 (EJE G)

VC1 0.40X0.90 (EJE H)

UND

CANT

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 53

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

05.02.03

DESCRIPCION

UND

CANT

M2

M2

ACERO EN VIGA DE CIMENTACION F'Y = 4200 KG/CM2. GRADO 60


BLOCK 01
VC2 0.40X0.60 (EJE A)
Acero Superior 3/4"

KG

KG

Acero Inferior 3/4"

KG

KG

Estribos 3/8"

KG

KG

Acero Superior 3/4"

KG

KG

Acero Inferior 3/4"

KG

KG

Estribos 3/8"

KG

KG

Acero Superior 3/4"

KG

KG

Acero Inferior 3/4"

KG

KG

Estribos 3/8"

KG

KG

Acero Superior 3/4"

KG

KG

Acero Inferior 3/4"

KG

KG

Estribos 3/8"

KG

KG

Acero Superior 3/4"

KG

KG

Acero Inferior 3/4"

KG

KG

Estribos 3/8"

KG

KG

Acero Superior 3/4"

KG

KG

Acero Inferior 3/4"

KG

KG

Estribos 3/8"

KG

KG

Acero Superior 3/4"

KG

KG

VC2 0.40X0.60 (EJE B)

VC2 0.40X0.60 (EJE D)

VC1 0.40X0.90 (EJE 1)

VC1 0.40X0.90 (EJE 2)

VC1 0.40X0.90 (EJE 3)

VC1 0.40X0.90 (EJE 4)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 54

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

Acero Inferior 3/4"

KG

KG

Estribos 3/8"

KG

KG

Acero Superior 3/4"

KG

KG

Acero Inferior 3/4"

KG

KG

Estribos 3/8"

KG

KG

Acero Superior 3/4"

KG

KG

Acero Inferior 3/4"

KG

KG

Estribos 3/8"

KG

KG

Acero Superior 3/4"

KG

KG

Acero Inferior 3/4"

KG

KG

Estribos 3/8"

KG

KG

Acero Superior 3/4"

KG

KG

Acero Inferior 3/4"

KG

KG

Estribos 3/8"

KG

KG

Acero Superior 3/4"

KG

KG

Acero Inferior 3/4"

KG

KG

Estribos 3/8"

KG

KG

Acero Superior 3/4"

KG

KG

Acero Inferior 3/4"

KG

KG

Estribos 3/8"

KG

KG

Acero Superior 3/4"

KG

KG

Acero Inferior 3/4"

KG

KG

VC1 0.40X0.90 (EJE 5)

VC1 0.40X0.90 (EJE 6)

BLOCK 02
VC2 0.40X0.60 (EJE 7)

VC2 0.40X0.60 (EJE 8)

VC2 0.40X0.60 (EJE 9)

VC2 0.40X0.60 (EJE 10)

VC1 0.40X0.90 (EJE A)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 55

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

KG

KG

Acero Superior 3/4"

KG

KG

Acero Inferior 3/4"

KG

KG

Estribos 3/8"

KG

KG

Acero Superior 3/4"

KG

KG

Acero Inferior 3/4"

KG

KG

Estribos 3/8"

KG

KG

Acero Superior 3/4"

KG

KG

Acero Inferior 3/4"

KG

KG

Estribos 3/8"

KG

KG

Acero Superior 3/4"

KG

KG

Acero Inferior 3/4"

KG

KG

Estribos 3/8"

KG

KG

Acero Superior 3/4"

KG

KG

Acero Inferior 3/4"

KG

KG

Estribos 3/8"

KG

KG

Acero Superior 3/4"

KG

KG

Acero Inferior 3/4"

KG

KG

Estribos 3/8"

KG

KG

Acero Superior 3/4"

KG

KG

Acero Inferior 3/4"

KG

KG

Estribos 3/8"

KG

KG

Estribos 3/8"
VC1 0.40X0.90 (EJE B)

VC1 0.40X0.90 (EJE C)

VC1 0.40X0.90 (EJE D)

VC1 0.40X0.90 (EJE E)

VC1 0.40X0.90 (EJE F)

VC1 0.40X0.90 (EJE G)

VC1 0.40X0.90 (EJE H)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 56

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

05.03
05.03.01

DESCRIPCION

UND

CANT

C1 (EJE A)

M3

M3

C2 (EJE A)

M3

M3

C1 (EJE B)

M3

M3

C3 (EJE C)

M3

M3

C2 (EJE C)

M3

M3

C1 (EJE D)

M3

M3

C3 (EJE D)

M3

M3

C1 (EJE A)

M3

M3

C2 (EJE A)

M3

M3

C1 (EJE B)

M3

M3

C3 (EJE C)

M3

M3

C2 (EJE C)

M3

M3

C1 (EJE D)

M3

M3

C3 (EJE D)

M3

M3

C1 (EJE A)

M3

M3

C2 (EJE A)

M3

M3

C1 (EJE B)

M3

M3

C3 (EJE C)

M3

M3

C2 (EJE C)

M3

M3

C1 (EJE D)

M3

M3

C3 (EJE D)

M3

M3

C1 (EJE A)

M3

M3

C2 (EJE A)

M3

M3

COLUMNAS
CONCRETO EN COLUMNAS F'C = 210 KG/CM2
BLOCK 01
PRIMER NIVEL

SEGUNDO NIVEL

TERCER NIVEL

CUARTO NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 57

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

C1 (EJE B)

M3

M3

C3 (EJE C)

M3

M3

C2 (EJE C)

M3

M3

C1 (EJE D)

M3

M3

C3 (EJE D)

M3

M3

C1 (EJE A)

M3

M3

C2 (EJE A)

M3

M3

C1 (EJE B)

M3

M3

C3 (EJE C)

M3

M3

C2 (EJE C)

M3

M3

C1 (EJE D)

M3

M3

C3 (EJE D)

M3

M3

C1 (EJE A)

M3

M3

C1 (EJE B)

M3

M3

C1 (EJE C)

M3

M3

C1 (EJE D)

M3

M3

C1 (EJE E)

M3

M3

C1 (EJE F)

M3

M3

C1 (EJE G)

M3

M3

C1 (EJE H)

M3

M3

C2 (EJE I)

M3

M3

C1 (EJE A)

M3

M3

C1 (EJE B)

M3

M3

C1 (EJE C)

M3

M3

C1 (EJE D)

M3

M3

C1 (EJE E)

M3

M3

QUINTO NIVEL

BLOCK 02
PRIMER NIVEL

SEGUNDO NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 58

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

C1 (EJE F)

M3

M3

C1 (EJE G)

M3

M3

C1 (EJE H)

M3

M3

C2 (EJE I)

M3

M3

C1 (EJE A)

M3

M3

C1 (EJE B)

M3

M3

C1 (EJE C)

M3

M3

C1 (EJE D)

M3

M3

C1 (EJE E)

M3

M3

C1 (EJE F)

M3

M3

C1 (EJE G)

M3

M3

C1 (EJE H)

M3

M3

C2 (EJE I)

M3

M3

C1 (EJE A)

M3

M3

C1 (EJE B)

M3

M3

C1 (EJE C)

M3

M3

C1 (EJE D)

M3

M3

C1 (EJE E)

M3

M3

C1 (EJE F)

M3

M3

C1 (EJE G)

M3

M3

C1 (EJE H)

M3

M3

C2 (EJE I)

M3

M3

C1 (EJE A)

M3

M3

C1 (EJE B)

M3

M3

C1 (EJE C)

M3

M3

C1 (EJE D)

M3

M3

C1 (EJE E)

M3

M3

TERCER NIVEL

CUARTO NIVEL

QUINTO NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 59

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

05.03.02

DESCRIPCION

UND

CANT

C1 (EJE F)

M3

M3

C1 (EJE G)

M3

M3

C1 (EJE H)

M3

M3

C2 (EJE I)

M3

M3

ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS


BLOCK 01
PRIMER NIVEL
C1 (EJE A)

M2

M2

C2 (EJE A)

M2

M2

C1 (EJE B)

M2

M2

C3 (EJE C)

M2

M2

C2 (EJE C)

M2

M2

C1 (EJE D)

M2

M2

C3 (EJE D)

M2

M2

C1 (EJE A)

M2

M2

C2 (EJE A)

M2

M2

C1 (EJE B)

M2

M2

C3 (EJE C)

M2

M2

C2 (EJE C)

M2

M2

C1 (EJE D)

M2

M2

C3 (EJE D)

M2

M2

C1 (EJE A)

M2

M2

C2 (EJE A)

M2

M2

C1 (EJE B)

M2

M2

C3 (EJE C)

M2

M2

C2 (EJE C)

M2

M2

C1 (EJE D)

M2

M2

SEGUNDO NIVEL

TERCER NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 60

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

C3 (EJE D)

M2

M2

C1 (EJE A)

M2

M2

C2 (EJE A)

M2

M2

C1 (EJE B)

M2

M2

C3 (EJE C)

M2

M2

C2 (EJE C)

M2

M2

C1 (EJE D)

M2

M2

C3 (EJE D)

M2

M2

C1 (EJE A)

M2

M2

C2 (EJE A)

M2

M2

C1 (EJE B)

M2

M2

C3 (EJE C)

M2

M2

C2 (EJE C)

M2

M2

C1 (EJE D)

M2

M2

C3 (EJE D)

M2

M2

C1 (EJE A)

M2

M2

C1 (EJE B)

M2

M2

C1 (EJE C)

M2

M2

C1 (EJE D)

M2

M2

C1 (EJE E)

M2

M2

C1 (EJE F)

M2

M2

C1 (EJE G)

M2

M2

C1 (EJE H)

M2

M2

C2 (EJE I)

M2

M2

C1 (EJE A)

M2

M2

CUARTO NIVEL

QUINTO NIVEL

BLOCK 02
PRIMER NIVEL

SEGUNDO NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 61

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

C1 (EJE B)

M2

M2

C1 (EJE C)

M2

M2

C1 (EJE D)

M2

M2

C1 (EJE E)

M2

M2

C1 (EJE F)

M2

M2

C1 (EJE G)

M2

M2

C1 (EJE H)

M2

M2

C2 (EJE I)

M2

M2

C1 (EJE A)

M2

M2

C1 (EJE B)

M2

M2

C1 (EJE C)

M2

M2

C1 (EJE D)

M2

M2

C1 (EJE E)

M2

M2

C1 (EJE F)

M2

M2

C1 (EJE G)

M2

M2

C1 (EJE H)

M2

M2

C2 (EJE I)

M2

M2

C1 (EJE A)

M2

M2

C1 (EJE B)

M2

M2

C1 (EJE C)

M2

M2

C1 (EJE D)

M2

M2

C1 (EJE E)

M2

M2

C1 (EJE F)

M2

M2

C1 (EJE G)

M2

M2

C1 (EJE H)

M2

M2

C2 (EJE I)

M2

M2

C1 (EJE A)

M2

M2

TERCER NIVEL

CUARTO NIVEL

QUINTO NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 62

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

05.03.03

DESCRIPCION

UND

CANT

C1 (EJE B)

M2

M2

C1 (EJE C)

M2

M2

C1 (EJE D)

M2

M2

C1 (EJE E)

M2

M2

C1 (EJE F)

M2

M2

C1 (EJE G)

M2

M2

C1 (EJE H)

M2

M2

C2 (EJE I)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C2 (EJE A)

M2

M2

Acero 3/4"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE B)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C3 (EJE C)

M2

M2

Acero 3/4"

KG

KG

Estribos 3/8"

KG

KG

C2 (EJE C)

M2

M2

Acero 3/4"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE D)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

ACERO EN COLUMNA F'Y = 4200 KG/CM2 GRADO 60


BLOCK 01
PRIMER NIVEL
C1 (EJE A)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 63

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

C3 (EJE D)

M2

M2

Acero 3/4"

KG

KG

Estribos 3/8"

KG

KG

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C2 (EJE A)

M2

M2

Acero 3/4"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE B)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C3 (EJE C)

M2

M2

Acero 3/4"

KG

KG

Estribos 3/8"

KG

KG

C2 (EJE C)

M2

M2

Acero 3/4"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE D)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C3 (EJE D)

M2

M2

Acero 3/4"

KG

KG

Estribos 3/8"

KG

KG

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C2 (EJE A)

M2

M2

SEGUNDO NIVEL
C1 (EJE A)

TERCER NIVEL
C1 (EJE A)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 64

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

Acero 3/4"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE B)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C3 (EJE C)

M2

M2

Acero 3/4"

KG

KG

Estribos 3/8"

KG

KG

C2 (EJE C)

M2

M2

Acero 3/4"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE D)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C3 (EJE D)

M2

M2

Acero 3/4"

KG

KG

Estribos 3/8"

KG

KG

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C2 (EJE A)

M2

M2

Acero 3/4"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE B)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C3 (EJE C)

M2

M2

Acero 3/4"

KG

KG

Estribos 3/8"

KG

KG

CUARTO NIVEL
C1 (EJE A)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 65

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

C2 (EJE C)

M2

M2

Acero 3/4"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE D)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C3 (EJE D)

M2

M2

Acero 3/4"

KG

KG

Estribos 3/8"

KG

KG

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C2 (EJE A)

M2

M2

Acero 3/4"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE B)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C3 (EJE C)

M2

M2

Acero 3/4"

KG

KG

Estribos 3/8"

KG

KG

C2 (EJE C)

M2

M2

Acero 3/4"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE D)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C3 (EJE D)

M2

M2

Acero 3/4"

KG

KG

QUINTO NIVEL
C1 (EJE A)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 66

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

Estribos 3/8"

KG

KG

C1 (EJE A)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE B)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE C)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE D)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE E)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE F)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE G)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE H)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C2 (EJE I)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

BLOCK 02
PRIMER NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 67

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

C1 (EJE A)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE B)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE C)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE D)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE E)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE F)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE G)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE H)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C2 (EJE I)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE A)

M2

M2

SEGUNDO NIVEL

TERCER NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 68

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE B)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE C)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE D)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE E)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE F)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE G)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE H)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C2 (EJE I)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE A)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

CUARTO NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 69

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

C1 (EJE B)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE C)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE D)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE E)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE F)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE G)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE H)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C2 (EJE I)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE A)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE B)

M2

M2

Acero 1"

KG

KG

QUINTO NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 70

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

05.04
05.04.01

DESCRIPCION

UND

CANT

Estribos 3/8"

KG

KG

C1 (EJE C)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE D)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE E)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE F)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE G)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C1 (EJE H)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C2 (EJE I)

M2

M2

Acero 1"

KG

KG

Estribos 3/8"

KG

KG

C4

M3

M3

C5

M3

M3

C6

M3

M3

COLUMNETAS
CONCRETO EN COLUMNETAS F'C = 175 KG/CM2
BLOCK 01
PRIMER NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 71

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

C7

M3

M3

C8

M3

M3

C9

M3

M3

C4

M3

M3

C5

M3

M3

C6

M3

M3

C7

M3

M3

C8

M3

M3

C9

M3

M3

C4

M3

M3

C5

M3

M3

C6

M3

M3

C7

M3

M3

C8

M3

M3

C9

M3

M3

C4

M3

M3

C5

M3

M3

C6

M3

M3

C7

M3

M3

C8

M3

M3

C9

M3

M3

C4

M3

M3

C5

M3

M3

C6

M3

M3

C7

M3

M3

C8

M3

M3

SEGUNDO NIVEL

TERCER NIVEL

CUARTO NIVEL

QUINTO NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 72

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

C9

M3

M3

C4

M3

M3

C7

M3

M3

C4

M3

M3

C7

M3

M3

C4

M3

M3

C7

M3

M3

C4

M3

M3

C7

M3

M3

C4

M3

M3

C10

M3

M3

BLOCK 02
PRIMER NIVEL

SEGUNDO NIVEL

TERCER NIVEL

CUARTO NIVEL

QUINTO NIVEL

05.04.02

ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNETAS


BLOCK 01
PRIMER NIVEL
C4

M2

M2

C5

M2

M2

C6

M2

M2

C7

M2

M2

C8

M2

M2

C9

M2

M2

C4

M2

M2

C5

M2

M2

SEGUNDO NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 73

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

C6

M2

M2

C7

M2

M2

C8

M2

M2

C9

M2

M2

C4

M2

M2

C5

M2

M2

C6

M2

M2

C7

M2

M2

C8

M2

M2

C9

M2

M2

C4

M2

M2

C5

M2

M2

C6

M2

M2

C7

M2

M2

C8

M2

M2

C9

M2

M2

C4

M2

M2

C5

M2

M2

C6

M2

M2

C7

M2

M2

C8

M2

M2

C9

M2

M2

C4

M2

M2

C7

M2

M2

TERCER NIVEL

CUARTO NIVEL

QUINTO NIVEL

BLOCK 02
PRIMER NIVEL

SEGUNDO NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 74

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

C4

M2

M2

C7

M2

M2

C4

M2

M2

C7

M2

M2

C4

M2

M2

C7

M2

M2

C4

M2

M2

C10

M2

M2

TERCER NIVEL

CUARTO NIVEL

QUINTO NIVEL

05.04.03

ACERO EN COLUMNETAS F'Y = 4200 KG/CM2 GRADO 60


BLOCK 01
PRIMER NIVEL
C4
Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C5

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C6

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C7

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C8

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 75

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

C9

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C5

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C6

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C7

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C8

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C9

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C5

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C6

KG

KG

SEGUNDO NIVEL
C4

TERCER NIVEL
C4

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 76

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C7

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C8

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C9

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C5

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C6

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C7

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C8

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C9

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

CUARTO NIVEL
C4

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 77

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C5

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C6

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C7

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C8

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C9

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C4

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C7

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C4

KG

KG

Acero 3/8"

KG

KG

QUINTO NIVEL
C4

BLOCK 02
PRIMER NIVEL

SEGUNDO NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 78

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

Estribos 1/4"

KG

KG

C7

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C4

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C7

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C4

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C7

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C4

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

C7

KG

KG

Acero 3/8"

KG

KG

Estribos 1/4"

KG

KG

TERCER NIVEL

CUARTO NIVEL

QUINTO NIVEL

05.05
05.05.01

VIGAS
CONCRETO EN VIGAS F'C = 210 KG/CM2
BLOCK 01
PRIMER NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 79

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VP2 (0.40X0.60) (EJE 3,4)

M3

M3

VP2 (0.40X0.60) (EJE 4)

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VB1 (0.20X0.20) (EJE 2)

M3

M3

VB1 (0.20X0.20) (EJE C)

M3

M3

VS1 (0.25X0.50) (EJE A)

M3

M3

VS1 (0.25X0.50) (EJE A)

VS1 (0.25X0.50) (EJE B)

VS1 (0.25X0.50) (EJE D)

VP2 (0.40X0.60) (EJE 2)


VP2 (0.40X0.60) (EJE 3)

VP2 (0.40X0.60) (EJE 5)


VP1 (0.40X0.50) (EJE 6)

SEGUNDO NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 80

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VP2 (0.40X0.60) (EJE 3,4)

M3

M3

VP2 (0.40X0.60) (EJE 4)

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VB1 (0.20X0.20) (EJE 2)

M3

M3

VB1 (0.20X0.20) (EJE C)

M3

M3

VS1 (0.25X0.50) (EJE A)

M3

M3

M3

M3

VS1 (0.25X0.50) (EJE B)

VS1 (0.25X0.50) (EJE D)

VP2 (0.40X0.60) (EJE 2)


VP2 (0.40X0.60) (EJE 3)

VP2 (0.40X0.60) (EJE 5)


VP1 (0.40X0.50) (EJE 6)

TERCER NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 81

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VP2 (0.40X0.60) (EJE 3,4)

M3

M3

VP2 (0.40X0.60) (EJE 4)

M3

M3

M3

M3

M3

M3

M3

M3

VS1 (0.25X0.50) (EJE B)

VS1 (0.25X0.50) (EJE D)

VP1 (0.40X0.50) (EJE 1)

VP2 (0.40X0.60) (EJE 2)

VP2 (0.40X0.60) (EJE 3)

VP2 (0.40X0.60) (EJE 5)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 82

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

M3

M3

M3

M3

VB1 (0.20X0.20) (EJE 1')

M3

M3

VB1 (0.20X0.20) (EJE A')

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VP1 (0.40X0.50) (EJE 6)

VB1 (0.20X0.20) (EJE C)

CUARTO NIVEL
VS1 (0.25X0.50) (EJE A)

VS1 (0.25X0.50) (EJE B)

VS1 (0.25X0.50) (EJE D)

VP1 (0.40X0.50) (EJE 1)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 83

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VP2 (0.40X0.60) (EJE 3,4)

M3

M3

VP2 (0.40X0.60) (EJE 4)

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VB1 (0.20X0.20) (EJE 1')

M3

M3

VB1 (0.20X0.20) (EJE A')

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VP2 (0.40X0.60) (EJE 2)

VP2 (0.40X0.60) (EJE 3)

VP2 (0.40X0.60) (EJE 5)


VP1 (0.40X0.50) (EJE 6)

VB1 (0.20X0.20) (EJE C)

QUINTO NIVEL
VS2 (0.25X0.40) (EJE A)

VS2 (0.25X0.40) (EJE B)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 84

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

VS2 (0.25X0.40) (EJE C)

VS2 (0.25X0.40) (EJE D)

VP1 (0.40X0.50) (EJE 1)

VP1 (0.40X0.50) (EJE 2)

VP1 (0.40X0.50) (EJE 3)

VP1 (0.40X0.50) (EJE 4)

VP1 (0.40X0.50) (EJE 5)


VP1 (0.40X0.50) (EJE 6)

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 85

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

VB1 (0.20X0.20) (EJE 1')

M3

M3

VB1 (0.20X0.20) (EJE A')

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VB2 (0.30X0.20) (EJE 8)

M3

M3

VS3 (0.25X0.50) (EJE 8)

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VB2 (0.30X0.20) (EJE 9)

M3

M3

VS3 (0.25X0.50) (EJE 9)

M3

M3

M3

M3

M3

M3

VB1 (0.20X0.20) (EJE C)


BLOCK 02
PRIMER NIVEL
VS3 (0.25X0.50) (EJE 7)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 86

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

VS3 (0.25X0.50) (EJE 10)

VP3 (0.40X0.50) (EJE A)

VP4 (0.40X0.60) (EJE B)

VP4 (0.40X0.60) (EJE C)

VP4 (0.40X0.60) (EJE D)

VP4 (0.40X0.60) (EJE E)

VP4 (0.40X0.60) (EJE F)

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 87

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VB1 (0.20X0.20) (EJE I)

M3

M3

VB1 (0.20X0.20) (EJE A')

M3

M3

VB1 (0.20X0.20) (ELIPSE)

M3

M3

VS3 (0.25X0.50) (EJE 7)

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VB2 (0.30X0.20) (EJE 8)

M3

M3

VS3 (0.25X0.50) (EJE 8)

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VP4 (0.40X0.60) (EJE G)

VP3 (0.40X0.50) (EJE H)

SEGUNDO NIVEL

VB2 (0.30X0.20) (EJE 9)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 88

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

VS3 (0.25X0.50) (EJE 9)

VS3 (0.25X0.50) (EJE 10)

VP3 (0.40X0.50) (EJE A)

VP4 (0.40X0.60) (EJE B)

VP4 (0.40X0.60) (EJE C)

VP4 (0.40X0.60) (EJE D)

VP4 (0.40X0.60) (EJE E)

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 89

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VB1 (0.20X0.20) (EJE I)

M3

M3

VB1 (0.20X0.20) (EJE A')

M3

M3

VB1 (0.20X0.20) (ELIPSE)

M3

M3

VS3 (0.25X0.50) (EJE 7)

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VB2 (0.30X0.20) (EJE 8)

M3

M3

VS3 (0.25X0.50) (EJE 8)

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VP4 (0.40X0.60) (EJE F)

VP4 (0.40X0.60) (EJE G)

VP3 (0.40X0.50) (EJE H)

TERCER NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 90

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

M3

M3

M3

M3

VB2 (0.30X0.20) (EJE 9)

M3

M3

VS3 (0.25X0.50) (EJE 9)

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VS3 (0.25X0.50) (EJE 10)

VP3 (0.40X0.50) (EJE A)

VP4 (0.40X0.60) (EJE B)

VP4 (0.40X0.60) (EJE C)

VP4 (0.40X0.60) (EJE D)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 91

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VB1 (0.20X0.20) (EJE I)

M3

M3

VB1 (0.20X0.20) (EJE A')

M3

M3

VB1 (0.20X0.20) (ELIPSE)

M3

M3

VS3 (0.25X0.50) (EJE 7)

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VB2 (0.30X0.20) (EJE 8)

M3

M3

VS3 (0.25X0.50) (EJE 8)

M3

M3

M3

M3

M3

M3

VP4 (0.40X0.60) (EJE E)

VP4 (0.40X0.60) (EJE F)

VP4 (0.40X0.60) (EJE G)

VP3 (0.40X0.50) (EJE H)

CUARTO NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 92

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VB2 (0.30X0.20) (EJE 9)

M3

M3

VS3 (0.25X0.50) (EJE 9)

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VS3 (0.25X0.50) (EJE 10)

VP3 (0.40X0.50) (EJE A)

VP4 (0.40X0.60) (EJE B)

VP4 (0.40X0.60) (EJE C)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 93

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VB1 (0.20X0.20) (EJE I)

M3

M3

VB1 (0.20X0.20) (EJE A')

M3

M3

VB1 (0.20X0.20) (ELIPSE)

M3

M3

VS4 (0.25X0.40) (EJE 7)

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VP4 (0.40X0.60) (EJE D)

VP4 (0.40X0.60) (EJE E)

VP4 (0.40X0.60) (EJE F)

VP4 (0.40X0.60) (EJE G)

VP3 (0.40X0.50) (EJE H)

QUINTO NIVEL

VS4 (0.25X0.40) (EJE 10)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 94

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

VB1 (0.20X0.20) (EJE I)

M3

M3

VB1 (0.20X0.20) (EJE A')

M3

M3

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

VP3 (0.40X0.50) (EJE A)

VP3 (0.40X0.50) (EJE H)

05.05.02

ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS


BLOCK 01
PRIMER NIVEL
VS1 (0.25X0.50) (EJE A)

VS1 (0.25X0.50) (EJE B)

VS1 (0.25X0.50) (EJE D)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 95

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

VP2 (0.40X0.60) (EJE 3,4)

M2

M2

VP2 (0.40X0.60) (EJE 4)

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

VB1 (0.20X0.20) (EJE 2)

M2

M2

VB1 (0.20X0.20) (EJE C)

M2

M2

DESCUENTO LOSA ALIGERADA

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

VP2 (0.40X0.60) (EJE 2)


VP2 (0.40X0.60) (EJE 3)

VP2 (0.40X0.60) (EJE 5)


VP1 (0.40X0.50) (EJE 6)

SEGUNDO NIVEL
VS1 (0.25X0.50) (EJE A)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 96

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

VP2 (0.40X0.60) (EJE 3,4)

M2

M2

VP2 (0.40X0.60) (EJE 4)

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

VB1 (0.20X0.20) (EJE 2)

M2

M2

VB1 (0.20X0.20) (EJE C)

M2

M2

DESCUENTO LOSA ALIGERADA

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

VS1 (0.25X0.50) (EJE B)

VS1 (0.25X0.50) (EJE D)

VP2 (0.40X0.60) (EJE 2)


VP2 (0.40X0.60) (EJE 3)

VP2 (0.40X0.60) (EJE 5)


VP1 (0.40X0.50) (EJE 6)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 97

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

TERCER NIVEL
VS1 (0.25X0.50) (EJE A)

VS1 (0.25X0.50) (EJE B)

VS1 (0.25X0.50) (EJE D)

VP1 (0.40X0.50) (EJE 1)

VP2 (0.40X0.60) (EJE 2)

VP2 (0.40X0.60) (EJE 3)

UND

CANT

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 98

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

M2

M2

M2

M2

VP2 (0.40X0.60) (EJE 3,4)

M2

M2

VP2 (0.40X0.60) (EJE 4)

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

VB1 (0.20X0.20) (EJE 1')

M2

M2

VB1 (0.20X0.20) (EJE A')

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

VP2 (0.40X0.60) (EJE 5)


VP1 (0.40X0.50) (EJE 6)

VB1 (0.20X0.20) (EJE C)

DESCUENTO LOSA ALIGERADA

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 99

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

CUARTO NIVEL
VS1 (0.25X0.50) (EJE A)

VS1 (0.25X0.50) (EJE B)

VS1 (0.25X0.50) (EJE D)

VP1 (0.40X0.50) (EJE 1)

VP2 (0.40X0.60) (EJE 2)

VP2 (0.40X0.60) (EJE 3)

UND

CANT

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 100

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

VP2 (0.40X0.60) (EJE 3,4)

M2

M2

VP2 (0.40X0.60) (EJE 4)

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

VB1 (0.20X0.20) (EJE 1')

M2

M2

VB1 (0.20X0.20) (EJE A')

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

VP2 (0.40X0.60) (EJE 5)


VP1 (0.40X0.50) (EJE 6)

VB1 (0.20X0.20) (EJE C)

DESCUENTO LOSA ALIGERADA

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 101

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

QUINTO NIVEL
VS2 (0.25X0.40) (EJE A)

VS2 (0.25X0.40) (EJE B)

VS2 (0.25X0.40) (EJE C)

VS2 (0.25X0.40) (EJE D)

VP1 (0.40X0.50) (EJE 1)

VP1 (0.40X0.50) (EJE 2)

VP1 (0.40X0.50) (EJE 3)

UND

CANT

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 102

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

VB1 (0.20X0.20) (EJE 1')

M2

M2

VB1 (0.20X0.20) (EJE A')

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

VP1 (0.40X0.50) (EJE 4)

VP1 (0.40X0.50) (EJE 5)


VP1 (0.40X0.50) (EJE 6)

VB1 (0.20X0.20) (EJE C)


DESCUENTO LOSA ALIGERADA

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 103

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

M2

M2

M2

M2

BLOCK 02

M2

M2

PRIMER NIVEL

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

VB2 (0.30X0.20) (EJE 8)

M2

M2

VS3 (0.25X0.50) (EJE 8)

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

VB2 (0.30X0.20) (EJE 9)

M2

M2

VS3 (0.25X0.50) (EJE 9)

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

VS3 (0.25X0.50) (EJE 7)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 104

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

VS3 (0.25X0.50) (EJE 10)

VP3 (0.40X0.50) (EJE A)

VP4 (0.40X0.60) (EJE B)

VP4 (0.40X0.60) (EJE C)

VP4 (0.40X0.60) (EJE D)

VP4 (0.40X0.60) (EJE E)

VP4 (0.40X0.60) (EJE F)

VP4 (0.40X0.60) (EJE G)

UND

CANT

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 105

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

M2

M2

M2

M2

M2

M2

VB1 (0.20X0.20) (EJE I)

M2

M2

VB1 (0.20X0.20) (EJE A')

M2

M2

VB1 (0.20X0.20) (ELIPSE)

M2

M2

DESCUENTO LOSA ALIGERADA

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

VP3 (0.40X0.50) (EJE H)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 106

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

VB2 (0.30X0.20) (EJE 8)

M2

M2

VS3 (0.25X0.50) (EJE 8)

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

VB2 (0.30X0.20) (EJE 9)

M2

M2

VS3 (0.25X0.50) (EJE 9)

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

SEGUNDO NIVEL
VS3 (0.25X0.50) (EJE 7)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 107

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

VS3 (0.25X0.50) (EJE 10)

VP3 (0.40X0.50) (EJE A)

VP4 (0.40X0.60) (EJE B)

VP4 (0.40X0.60) (EJE C)

VP4 (0.40X0.60) (EJE D)

VP4 (0.40X0.60) (EJE E)

VP4 (0.40X0.60) (EJE F)

VP4 (0.40X0.60) (EJE G)

UND

CANT

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 108

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

M2

M2

M2

M2

M2

M2

VB1 (0.20X0.20) (EJE I)

M2

M2

VB1 (0.20X0.20) (EJE A')

M2

M2

VB1 (0.20X0.20) (ELIPSE)

M2

M2

DESCUENTO LOSA ALIGERADA

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

VP3 (0.40X0.50) (EJE H)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 109

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

VB2 (0.30X0.20) (EJE 8)

M2

M2

VS3 (0.25X0.50) (EJE 8)

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

VB2 (0.30X0.20) (EJE 9)

M2

M2

VS3 (0.25X0.50) (EJE 9)

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

TERCER NIVEL
VS3 (0.25X0.50) (EJE 7)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 110

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

VS3 (0.25X0.50) (EJE 10)

VP3 (0.40X0.50) (EJE A)

VP4 (0.40X0.60) (EJE B)

VP4 (0.40X0.60) (EJE C)

VP4 (0.40X0.60) (EJE D)

VP4 (0.40X0.60) (EJE E)

VP4 (0.40X0.60) (EJE F)

VP4 (0.40X0.60) (EJE G)

UND

CANT

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 111

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

M2

M2

M2

M2

M2

M2

VB1 (0.20X0.20) (EJE I)

M2

M2

VB1 (0.20X0.20) (EJE A')

M2

M2

VB1 (0.20X0.20) (ELIPSE)

M2

M2

DESCUENTO LOSA ALIGERADA

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

VP3 (0.40X0.50) (EJE H)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 112

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

VB2 (0.30X0.20) (EJE 8)

M2

M2

VS3 (0.25X0.50) (EJE 8)

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

VB2 (0.30X0.20) (EJE 9)

M2

M2

VS3 (0.25X0.50) (EJE 9)

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

CUARTO NIVEL
VS3 (0.25X0.50) (EJE 7)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 113

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

VS3 (0.25X0.50) (EJE 10)

VP3 (0.40X0.50) (EJE A)

VP4 (0.40X0.60) (EJE B)

VP4 (0.40X0.60) (EJE C)

VP4 (0.40X0.60) (EJE D)

VP4 (0.40X0.60) (EJE E)

VP4 (0.40X0.60) (EJE F)

VP4 (0.40X0.60) (EJE G)

UND

CANT

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 114

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

M2

M2

M2

M2

M2

M2

VB1 (0.20X0.20) (EJE I)

M2

M2

VB1 (0.20X0.20) (EJE A')

M2

M2

VB1 (0.20X0.20) (ELIPSE)

M2

M2

DESCUENTO LOSA ALIGERADA

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

VP3 (0.40X0.50) (EJE H)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 115

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

VB1 (0.20X0.20) (EJE I)

M2

M2

VB1 (0.20X0.20) (EJE A')

M2

M2

DESCUENTO LOSA ALIGERADA

M2

M2

QUINTO NIVEL
VS4 (0.25X0.40) (EJE 7)

VS4 (0.25X0.40) (EJE 10)

VP3 (0.40X0.50) (EJE A)

VP3 (0.40X0.50) (EJE H)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 116

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

05.05.03

DESCRIPCION

UND

CANT

ACERO EN VIGAS F'Y = 4200 KG/CM2 GRADO 60


BLOCK 01
PRIMER NIVEL
VS1 (0.25X0.50) (EJE A)
Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

VS1 (0.25X0.50) (EJE B)


Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 117

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

Estribos 3/8" KG

CANT

KG

VS1 (0.25X0.50) (EJE D)


Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

VP2 (0.40X0.60) (EJE 2)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP2 (0.40X0.60) (EJE 3)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 118

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

Estribos 3/8" KG

CANT

KG

VP2 (0.40X0.60) (EJE 3,4)


Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP2 (0.40X0.60) (EJE 4)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP2 (0.40X0.60) (EJE 5)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP1 (0.40X0.50) (EJE 6)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VB1 (0.20X0.20) (EJE 2)


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 119

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

VB1 (0.20X0.20) (EJE C)


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

SEGUNDO NIVEL
VS1 (0.25X0.50) (EJE A)
Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

VS1 (0.25X0.50) (EJE B)


Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 120

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

VS1 (0.25X0.50) (EJE D)


Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

VP2 (0.40X0.60) (EJE 2)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP2 (0.40X0.60) (EJE 3)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 121

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP2 (0.40X0.60) (EJE 3,4)


Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP2 (0.40X0.60) (EJE 4)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP2 (0.40X0.60) (EJE 5)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP1 (0.40X0.50) (EJE 6)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VB1 (0.20X0.20) (EJE 2)


Acero Superior 1/2" KG

KG

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 122

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

VB1 (0.20X0.20) (EJE C)


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

TERCER NIVEL
VS1 (0.25X0.50) (EJE A)
Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

VS1 (0.25X0.50) (EJE B)


Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 123

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

VS1 (0.25X0.50) (EJE D)


Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

VP1 (0.40X0.50) (EJE 1)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 124

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP2 (0.40X0.60) (EJE 2)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP2 (0.40X0.60) (EJE 3)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

Estribos 3/8"
VP2 (0.40X0.60) (EJE 3,4)

VP2 (0.40X0.60) (EJE 4)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP2 (0.40X0.60) (EJE 5)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 125

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP1 (0.40X0.50) (EJE 6)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VB1 (0.20X0.20) (EJE 1')


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

VB1 (0.20X0.20) (EJE A')


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

VB1 (0.20X0.20) (EJE C)


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

CUARTO NIVEL
VS1 (0.25X0.50) (EJE A)
Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 126

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

VS1 (0.25X0.50) (EJE B)


Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

VS1 (0.25X0.50) (EJE D)


Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 127

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

VP1 (0.40X0.50) (EJE 1)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP2 (0.40X0.60) (EJE 2)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP2 (0.40X0.60) (EJE 3)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 128

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP2 (0.40X0.60) (EJE 3,4)


Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP2 (0.40X0.60) (EJE 4)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP2 (0.40X0.60) (EJE 5)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP1 (0.40X0.50) (EJE 6)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VB1 (0.20X0.20) (EJE 1')


Acero Superior 1/2" KG

KG

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 129

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

VB1 (0.20X0.20) (EJE A')


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

VB1 (0.20X0.20) (EJE C)


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

QUINTO NIVEL
VS2 (0.25X0.40) (EJE A)
Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

VS2 (0.25X0.40) (EJE B)


Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 130

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

VS2 (0.25X0.40) (EJE C)


Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

VS2 (0.25X0.40) (EJE D)


Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

VP1 (0.40X0.50) (EJE 1)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 131

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP1 (0.40X0.50) (EJE 2)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP1 (0.40X0.50) (EJE 3)


Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP1 (0.40X0.50) (EJE 4)


Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP1 (0.40X0.50) (EJE 5)


Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 132

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

VP1 (0.40X0.50) (EJE 6)


Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VB1 (0.20X0.20) (EJE 1')


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

VB1 (0.20X0.20) (EJE A')


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

VB1 (0.20X0.20) (EJE C)


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

BLOCK 02
PRIMER NIVEL
VS3 (0.25X0.50) (EJE 7)
Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

VS3 (0.25X0.50) (EJE 8)


Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

VS3 (0.25X0.50) (EJE 9)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 133

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

VS3 (0.25X0.50) (EJE 10)


Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

VP3 (0.40X0.50) (EJE A)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP4 (0.40X0.60) (EJE B)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP4 (0.40X0.60) (EJE C)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 134

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP4 (0.40X0.60) (EJE D)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP4 (0.40X0.60) (EJE E)


Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP4 (0.40X0.60) (EJE F)


Acero Superior 1" KG

KG

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 135

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP4 (0.40X0.60) (EJE G)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP3 (0.40X0.50) (EJE H)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 136

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

Estribos 3/8" KG

CANT

KG

VB1 (0.20X0.20) (EJE A')


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

VB1 (0.20X0.20) (ELIPSE)


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

VB1 (0.20X0.20) (EJE I)


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

VB2 (0.30X0.20) (EJE 8)


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

VB2 (0.30X0.20) (EJE 9)


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

SEGUNDO NIVEL
VS3 (0.25X0.50) (EJE 7)
Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

VS3 (0.25X0.50) (EJE 8)


Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 137

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

VS3 (0.25X0.50) (EJE 9)


Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

VS3 (0.25X0.50) (EJE 10)


Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

VP3 (0.40X0.50) (EJE A)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP4 (0.40X0.60) (EJE B)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 138

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

VP4 (0.40X0.60) (EJE C)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP4 (0.40X0.60) (EJE D)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP4 (0.40X0.60) (EJE E)


Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP4 (0.40X0.60) (EJE F)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 139

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP4 (0.40X0.60) (EJE G)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP3 (0.40X0.50) (EJE H)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 140

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VB1 (0.20X0.20) (EJE A')


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

VB1 (0.20X0.20) (ELIPSE)


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

VB1 (0.20X0.20) (EJE I)


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

VB2 (0.30X0.20) (EJE 8)


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

VB2 (0.30X0.20) (EJE 9)


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

TERCER NIVEL
VS3 (0.25X0.50) (EJE 7)
Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

VS3 (0.25X0.50) (EJE 8)


Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 141

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

Estribos 3/8" KG

CANT

KG

VS3 (0.25X0.50) (EJE 9)


Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

VS3 (0.25X0.50) (EJE 10)


Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

VP3 (0.40X0.50) (EJE A)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP4 (0.40X0.60) (EJE B)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 142

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

Estribos 3/8" KG

CANT

KG

VP4 (0.40X0.60) (EJE C)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP4 (0.40X0.60) (EJE D)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP4 (0.40X0.60) (EJE E)


Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 143

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

VP4 (0.40X0.60) (EJE F)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP4 (0.40X0.60) (EJE G)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP3 (0.40X0.50) (EJE H)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 144

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VB1 (0.20X0.20) (EJE A')


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

VB1 (0.20X0.20) (ELIPSE)


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

VB1 (0.20X0.20) (EJE I)


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

VB2 (0.30X0.20) (EJE 8)


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

VB2 (0.30X0.20) (EJE 9)


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

CUARTO NIVEL
VS3 (0.25X0.50) (EJE 7)
Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

VS3 (0.25X0.50) (EJE 8)


Acero Superior 5/8" KG

KG

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 145

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

VS3 (0.25X0.50) (EJE 9)


Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

VS3 (0.25X0.50) (EJE 10)


Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

VP3 (0.40X0.50) (EJE A)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP4 (0.40X0.60) (EJE B)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 146

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP4 (0.40X0.60) (EJE C)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP4 (0.40X0.60) (EJE D)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP4 (0.40X0.60) (EJE E)


Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 147

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

Estribos 3/8" KG

CANT

KG

VP4 (0.40X0.60) (EJE F)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP4 (0.40X0.60) (EJE G)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP3 (0.40X0.50) (EJE H)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 148

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VB1 (0.20X0.20) (EJE A')


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

VB1 (0.20X0.20) (ELIPSE)


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

VB1 (0.20X0.20) (EJE I)


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

VB2 (0.30X0.20) (EJE 8)


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

VB2 (0.30X0.20) (EJE 9)


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

QUINTO NIVEL
VS3 (0.25X0.50) (EJE 7)
Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

VS3 (0.25X0.50) (EJE 10)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 149

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Estribos 3/8" KG

KG

VP3 (0.40X0.50) (EJE A)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VP3 (0.40X0.50) (EJE H)


Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Superior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Acero Inferior 1" KG

KG

Estribos 3/8" KG

KG

VB1 (0.20X0.20) (EJE A')


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

VB1 (0.20X0.20) (EJE I)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 150

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

VB2 (0.30X0.20) (EJE 8)


Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

VB2 (0.30X0.20) (EJE 9)

05.06
05.06.01

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Estribos 3/8" KG

KG

VIGUETAS
CONCRETO EN VIGUETAS F'C = 175 KG/CM2
BLOCK 01
PRIMER NIVEL
VICOL7

M3

M3

VICOL4

M3

M3

VICOL7

M3

M3

VICOL4

M3

M3

VICOL7

M3

M3

VICOL4

M3

M3

VICOL7

M3

M3

VICOL4

M3

M3

VICOL7

M3

M3

VICOL4

M3

M3

SEGUNDO NIVEL

TERCER NIVEL

CUARTO NIVEL

QUINTO NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 151

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

VICOL7

M3

M3

VICOL4

M3

M3

VICOL7

M3

M3

VICOL4

M3

M3

VICOL7

M3

M3

VICOL4

M3

M3

VICOL7

M3

M3

VICOL4

M3

M3

VICOL7

M3

M3

VICOL4

M3

M3

BLOCK 02
PRIMER NIVEL

SEGUNDO NIVEL

TERCER NIVEL

CUARTO NIVEL

QUINTO NIVEL

05.06.02

ENCOFRADO Y DESENCOFRADO NORMAL EN VIGUETAS


BLOCK 01
PRIMER NIVEL
VICOL7

M2

M2

VICOL4

M2

M2

M2

M2

VICOL7

M2

M2

VICOL4

M2

M2

M2

M2

VICOL7

M2

M2

VICOL4

M2

M2

M2

M2

M2

M2

SEGUNDO NIVEL

TERCER NIVEL

CUARTO NIVEL
VICOL7

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 152

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

M2

M2

M2

M2

VICOL7

M2

M2

VICOL4

M2

M2

BLOCK 02

M2

M2

PRIMER NIVEL

M2

M2

VICOL7

M2

M2

VICOL4

M2

M2

M2

M2

VICOL7

M2

M2

VICOL4

M2

M2

M2

M2

VICOL7

M2

M2

VICOL4

M2

M2

M2

M2

VICOL7

M2

M2

VICOL4

M2

M2

M2

M2

VICOL7

M2

M2

VICOL4

M2

M2

Acero 1/2" KG

KG

Estribos 1/4" KG

KG

Acero 1/2" KG

KG

Estribos 1/4" KG

KG

VICOL4
QUINTO NIVEL

SEGUNDO NIVEL

TERCER NIVEL

CUARTO NIVEL

QUINTO NIVEL

05.06.03

ACERO EN VIGUETAS F'Y = 4200 KG/CM2 GRADO 60


BLOCK 01
PRIMER NIVEL
VICOL7

VICOL4

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 153

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

SEGUNDO NIVEL
VICOL7
Acero 1/2" KG

KG

Estribos 1/4" KG

KG

Acero 1/2" KG

KG

Estribos 1/4" KG

KG

Acero 1/2" KG

KG

Estribos 1/4" KG

KG

Acero 1/2" KG

KG

Estribos 1/4" KG

KG

Acero 1/2" KG

KG

Estribos 1/4" KG

KG

Acero 1/2" KG

KG

Estribos 1/4" KG

KG

Acero 1/2" KG

KG

Estribos 1/4" KG

KG

Acero 1/2" KG

KG

Estribos 1/4" KG

KG

VICOL4

TERCER NIVEL
VICOL7

VICOL4

CUARTO NIVEL
VICOL7

VICOL4

QUINTO NIVEL
VICOL7

VICOL4

BLOCK 02
PRIMER NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 154

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

VICOL7
Acero 1/2" KG

KG

Estribos 1/4" KG

KG

Acero 1/2" KG

KG

Estribos 1/4" KG

KG

Acero 1/2" KG

KG

Estribos 1/4" KG

KG

Acero 1/2" KG

KG

Estribos 1/4" KG

KG

Acero 1/2" KG

KG

Estribos 1/4" KG

KG

Acero 1/2" KG

KG

Estribos 1/4" KG

KG

Acero 1/2" KG

KG

Estribos 1/4" KG

KG

Acero 1/2" KG

KG

Estribos 1/4" KG

KG

Acero 1/2" KG

KG

VICOL4

SEGUNDO NIVEL
VICOL7

VICOL4

TERCER NIVEL
VICOL7

VICOL4

CUARTO NIVEL
VICOL7

VICOL4

QUINTO NIVEL
VICOL7

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 155

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

Estribos 1/4" KG

KG

Acero 1/2" KG

KG

Estribos 1/4" KG

KG

VICOL4

05.07
05.07.01

LOSA ALIGERADA h = 0.20 m.


CONCRETO EN LOSA ALIGERADA FC = 210 Kg/cm2
BLOCK 01
PRIMER NIVEL
M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

SEGUNDO NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 156

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

TERCER NIVEL

CUARTO NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 157

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

QUINTO NIVEL

BLOCK 02
PRIMER NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 158

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

SEGUNDO NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 159

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

TERCER NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 160

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

CUARTO NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 161

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

M3

QUINTO NIVEL

05.07.02

ENCOFRADO Y DESENCOFRADO NORMAL EN LOSA ALIGERADA


BLOCK 01

M2

M2

PRIMER NIVEL

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 162

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

SEGUNDO NIVEL

TERCER NIVEL

UND

CANT

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 163

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

CUARTO NIVEL

QUINTO NIVEL

UND

CANT

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 164

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

BLOCK 02

M2

M2

PRIMER NIVEL

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 165

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

SEGUNDO NIVEL

UND

CANT

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 166

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

TERCER NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 167

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

CUARTO NIVEL

QUINTO NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 168

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

05.07.03

DESCRIPCION

UND

CANT

M2

M2

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

ACERO EN LOSA ALIGERADA F'Y = 4200 KG/GRADO 60


BLOCK 01
PRIMER NIVEL

SEGUNDO NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 169

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

TERCER NIVEL
Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

CUARTO NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 170

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

Acero Superior 3/8" KG

KG

Acero Inferior 3/8" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

Acero Superior 3/8" KG

KG

Acero Inferior 3/8" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

Acero Superior 3/8" KG

KG

Acero Inferior 3/8" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

Acero Superior 3/8" KG

KG

Acero Inferior 3/8" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Temperatura 1/4" KG

KG

QUINTO NIVEL

BLOCK 02
PRIMER NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 171

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

Estribos 1/4" KG

KG

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Temperatura 1/4" KG

KG

SEGUNDO NIVEL

TERCER NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 172

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

Estribos 1/4" KG

KG

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

CUARTO NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 173

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

QUINTO NIVEL

05.07.04

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Temperatura 1/4" KG

KG

Estribos 1/4" KG

KG

LADRILLO HUECO DE ARCILLA DE 15 X 30 X 30 PARA LOSA ALIGERADA


BLOCK 01

UND

UND

PRIMER NIVEL

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

SEGUNDO NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 174

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

TERCER NIVEL

CUARTO NIVEL

UND

CANT

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 175

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

BLOCK 02

UND

UND

PRIMER NIVEL

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

QUINTO NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 176

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

SEGUNDO NIVEL

UND

CANT

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 177

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

TERCER NIVEL

UND

CANT

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 178

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

CUARTO NIVEL

UND

CANT

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 179

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

UND

C6

M3

M3

C6

M3

M3

C7

M3

M3

C7

M3

M3

C7

M3

M3

C7

M3

M3

QUINTO NIVEL

05.08
05.08.01

PLACAS DE CONCRETO ARMADO


CONCRETO EN PLACAS F'C=210KG/CM2
BLOCK 01
PRIMER NIVEL

SEGUNDO NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 180

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

C7

M3

M3

C7

M3

M3

C7

M3

M3

C7

M3

M3

C7

M3

M3

C7

M3

M3

C6

M3

M3

C6

M3

M3

C7

M3

M3

C7

M3

M3

C7

M3

M3

C7

M3

M3

C7

M3

M3

C7

M3

M3

C7

M3

M3

C7

M3

M3

C7

M3

M3

C7

M3

M3

TERCER NIVEL

CUARTO NIVEL

QUINTO NIVEL

05.08.02

ENCOFRADO Y DESENCOFRADO EN PLACAS


BLOCK 01
PRIMER NIVEL

SEGUNDO NIVEL

TERCER NIVEL

CUARTO NIVEL

QUINTO NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 181

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

05.08.03

DESCRIPCION

UND

CANT

ACERO EN PLACAS
BLOCK 01
PRIMER NIVEL
C6
Acero Vertical 3/8" KG

KG

Acero Horizontal 3/8" KG

KG

Acero Vertical 3/8" KG

KG

Acero Horizontal 3/8" KG

KG

Acero Vertical 3/8" KG

KG

Acero Horizontal 3/8" KG

KG

Acero Vertical 3/8" KG

KG

Acero Horizontal 3/8" KG

KG

Acero Vertical 3/8" KG

KG

Acero Horizontal 3/8" KG

KG

Acero Vertical 3/8" KG

KG

Acero Horizontal 3/8" KG

KG

Acero Vertical 3/8" KG

KG

Acero Horizontal 3/8" KG

KG

Acero Vertical 3/8" KG

KG

Acero Horizontal 3/8" KG

KG

C6

C7

C7

SEGUNDO NIVEL
C7

C7

TERCER NIVEL
C7

C7

CUARTO NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 182

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

C7
Acero Vertical 3/8" KG

KG

Acero Horizontal 3/8" KG

KG

Acero Vertical 3/8" KG

KG

Acero Horizontal 3/8" KG

KG

Acero Vertical 3/8" KG

KG

Acero Horizontal 3/8" KG

KG

Acero Vertical 3/8" KG

KG

Acero Horizontal 3/8" KG

KG

C7

QUINTO NIVEL
C7

C7

05.09
05.09.01

CAJA ASCENSOR DE CONCRETO ARMADO


CONCRETO EN CAJA ASCENSOR F'C=210KG/CM2
BLOCK 01
PRIMER NIVEL
BASE

M3

M3

PAREDE ENTERRADA

M3

M3

PAREDES

M3

M3

PAREDES

M3

M3

PAREDES

M3

M3

PAREDES

M3

M3

PAREDES

M3

M3

SEGUNDO NIVEL
TERCER NIVEL
CUARTO NIVEL
QUINTO NIVEL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 183

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

05.09.02

DESCRIPCION

UND

CANT

BASE

M2

M2

PAREDE ENTERRADA

M2

M2

PAREDES

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

TECHO

M2

M2

PAREDES

M2

M2

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

ENCOFRADO Y DESENCOFRADO EN ASCENSOR


BLOCK 01
PRIMER NIVEL

SEGUNDO NIVEL
PAREDES
TERCER NIVEL
PAREDES
CUARTO NIVEL
PAREDES
QUINTO NIVEL

05.09.03

ACERO EN ASCENSOR F'Y = 4200 KG/GRADO 60


BLOCK 01
PRIMER NIVEL
BASE

PARED ENTERRADA FRONTAL


Acero Vertical 5/8" KG

KG

Acero Vertical 5/8" KG

KG

Acero Horizontal 5/8" KG

KG

Acero Horizontal 5/8" KG

KG

PAREDES

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 184

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

Acero Vertical 5/8" KG

KG

Acero Vertical 5/8" KG

KG

Acero Horizontal 5/8" KG

KG

Acero Horizontal 5/8" KG

KG

Acero Vertical 5/8" KG

KG

Acero Vertical 5/8" KG

KG

Acero Horizontal 5/8" KG

KG

Acero Horizontal 5/8" KG

KG

Acero Vertical 5/8" KG

KG

Acero Vertical 5/8" KG

KG

Acero Horizontal 5/8" KG

KG

Acero Horizontal 5/8" KG

KG

Acero Vertical 5/8" KG

KG

Acero Vertical 5/8" KG

KG

Acero Horizontal 5/8" KG

KG

Acero Horizontal 5/8" KG

KG

Acero Vertical 5/8" KG

KG

Acero Vertical 5/8" KG

KG

Acero Horizontal 5/8" KG

KG

Acero Horizontal 5/8" KG

KG

Acero Superior 5/8" KG

KG

SEGUNDO NIVEL
PAREDES

TERCER NIVEL
PAREDES

CUARTO NIVEL
PAREDES

QUINTO NIVEL
PAREDES

TECHO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 185

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

05.10
05.10.01

DESCRIPCION

UND

CANT

Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

CISTERNA DE CONCRETO ARMADO


CONCRETO EN CISTERNA F'C=210KG/CM2
BLOCK 01
PRIMER NIVEL

05.10.02

BASE

M3

M3

PAREDES

M3

M3

TECHO

M3

M3

BASE

M2

M2

PAREDES

M2

M2

M2

M2

M2

M2

M2

M2

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

ENCOFRADO Y DESENCOFRADO DE CISTERNA


BLOCK 01
PRIMER NIVEL

TECHO

05.10.03

ACERO EN CISTERNA
BLOCK 01
PRIMER NIVEL
BASE

PAREDES

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 186

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

Acero Vertical 5/8" KG

KG

Acero Horizontal 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Superior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

Acero Inferior 5/8" KG

KG

TECHO

05.11
05.11.01

TANQUE ELEVADO DE CONCRETO ARMADO


CONCRETO EN TANQUE ELEVADO F'C=210KG/CM2
BLOCK 01
PRIMER NIVEL

05.11.02

BASE

M3

M3

PAREDES

M3

M3

TECHO

M3

M3

ENCOFRADO Y DESENCOFRADO DE TANQUE ELEVADO


BLOCK 01
PRIMER NIVEL
BASE

M2

M2

PAREDES

M2

M2

M2

M2

M2

M2

M2

M2

Acero Superior 1/2" KG

KG

TECHO

05.11.03

ACERO EN TANQUE ELEVADO


BLOCK 01
PRIMER NIVEL
BASE

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 187

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Acero Vertical 1/2" KG

KG

Acero Horizontal 1/2" KG

KG

Acero Superior 1/2" KG

KG

Acero Superior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

Acero Inferior 1/2" KG

KG

PAREDES

TECHO

05.12
05.12.01

05.12.02

CIMIENTOS DE ESCALERAS METALICAS


CONCRETO EN CIMIENTO ESCALERAS METALICAS F'C=210KG/CM2
ESCALERA 01

M3

M3

ESCALERA 02

M3

M3

ESCALERA 03

M3

M3

Acero Vertical 1/2" KG

KG

Acero Horizontal 1/2" KG

KG

Acero Vertical 1/2" KG

KG

Acero Horizontal 1/2" KG

KG

Acero Vertical 1/2" KG

KG

Acero Horizontal 1/2" KG

KG

ACERO EN CIMIENTO ESCALERAS METALICAS


ESCALERA 01

ESCALERA 02

ESCALERA 03

06

COBERTURAS METALICAS

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 188

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

06.01

DESCRIPCION

UND

CANT

L 4"X3"X3/8"

L 4"X3"X3/8"

L 4"X3"X3/8"

L 4"X3"X3/8"

L 4"X3"X3/8"

L 4"X3"X3/8"

L 4"X3"X3/8"

L 4"X3"X3/8"

L 4"X3"X3/8"

L 4"X3"X3/8"

L 3"X3/8"

PL 15"X7"X3/8"

UND

UND

PL 14"X20"X3/8"

UND

UND

PL 21"X7"X3/8"

UND

UND

TIJERAL METALICO TIPO 01


BRIDA SUPERIOR
BRIDA INFERIOR
MONTANTES

DIAGONALES

CARTELAS

PERNOS CARTEL TIJERAL


L 3"X3/8"

3/4"X4"

UND

UND

PL 15"X7"X3/8"

3/4"X4"

UND

UND

PL 14"X20"X3/8"

3/4"X4"

UND

UND

PL 21"X7"X3/8"

3/4"X4"

UND

UND

UND

UND

PERNOS ANCLAJE TIJERAL


1/2"X16"
06.02

ANGULOS ESQUINEROS Y TRASLAPES


ANGULOS ESQUINEROS

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 189

HOJA DE METRADO DE INS


PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CANT

L 4"X2"X1/4"

PIE

PIE

L 4"X4"X1/4"

PIE

PIE

PL 6"X2"X1/4"

UND

UND

PL 5"X2"X1/4"

UND

UND

FIJACION TUBO Y TIJERAL


TRASLAPE CORREAS

06.03

ARRIOSTRES Y TENSORES CON TUERCAS


ARRIOSTRES CON TUERCAS Y TENSORES

06.04

DIAGONAL

1/2" X 6.50M

UND

UND

DIAGONAL

5/8" X 9.00M

UND

UND

TRANSVERSAL

3/8" X 1.50M

UND

UND

L 2 1/2"X3/16"

L 4"X2"X1/4"

5/8"X4"

UND

UND

5/8"X4"

UND

UND

C 4"X3"X3/8"

TUBO 7CM X 7CM X 3MM

TUBO 7CM X 7CM X 3MM

BORDES
LATERALES
FRONTALES
BORDES LATERALES
BORDES FRONTALES

06.05

CORREAS
CORREA SUPERIOR
CORREA INFERIOR

PERNOS CORREA INFERIOR

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 190

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

UND

UND

UND

UND

PERFIL METALICO "C" DE E=4mm, SOLDADURA


PUNTO AZUL, ANTICORROSIVO ZINC CROMATO
PINTURA ESMALTE ALUMINIZADA

M2

M2

GOMA ALTO TRAFICO ESTRIADA CON PESTAA TIPO


NOMAD COLOR NEGRO

M2

M2

CANTONERA DE ALUMINIO CON PVC ESTRIADA


TIPO NOMAD COLOR NEGRO Ancho=0.075

M2

M2

CONCRETO SIMPLE EN GRADAS

M3

M3

PERFIL TUBULAR METALICO A - 36 DE 250x100mm


e=4.5mm, ANTICORROSIVO ZINC CROMATO PINTURA
ESMALTE ALUMINIZADA

GOMA ALTO TRAFICO ESTRIADA CON PESTAA TIPO


NOMAD COLOR NEGRO

M2

M2

PLACA COLABORANTE AD - 900 ACERO DECK,


GALVANIZADO PESADO

M2

M2

CONECTOR DE CORTE 1/2" @ 90 NS-500/250

UND

UND

M3

M3

KG

KG

KG

KG

5/8"X4"
PERNOS CORREA SUPERIOR
5/8"X4"
07
07.01
07.01.01

07.01.02

ESCALERAS METALICAS
ESCALERA METALICA TIPO 01
GRADAS ESCALERA METALICA TIPO 01

DESCANZOS ESCALERA METALICA TIPO 01

CONCRETO SIMPLE EN DESCANZOS


PARILLA DE ACERO 3/8" EN DESCANZOS

PERFIL TUBULAR METALICO A - 36 DE 250x100mm


e=4.5mm, ANTICORROSIVO ZINC CROMATO PINTURA
ESMALTE ALUMINIZADA

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 191

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

07.01.03

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION
UND
PERFIL TUBULAR METALICO A - 36 DE 250x100mm
e=4.5mm, ANTICORROSIVO ZINC CROMATO PINTURA
ESMALTE ALUMINIZADA

CANT

PERFIL TUBULAR METALICO A - 36 DE 150x100mm


e=4.5mm, ANTICORROSIVO ZINC CROMATO PINTURA
ESMALTE ALUMINIZADA

PERFIL METALICO L A - 36 DE 100x100mm e=2.00mm,


ANTICORROSIVO ZINC CROMATO PINTURA
ESMALTE ALUMINIZADA

ANGULO METALICO "L" A-36 ENRAZADA EN


COLUMNA DE 300x125mm e=4mm, ANTICORROSIVO
ZINC CROMATO PINTURA ESMALTE ALUMINIZADA

PZA.

PZA.

PERNOS DE ANCLAJE 1/2"X3"

UND

UND

PLATINA DE ANCLAJE PARA SOLDAR DE ACERO


INOXIDABLE SATINADO DE 100x100x6mm

UND

UND

TAPA DECORATIVA EN PISO CUADRADO DE ACERO


INOXIDABLE SATINADO DE 105x105xh=15mm

UND

UND

BALAUSTRE PERFIL TUBULAR CUADRADO DE


ACERO INOXIDABLE SATINADO DE 1 1/2"x1 1/2"x2mm
DE ALTURA APROXIMADA H=0.90M

PERFIL TUBULAR 1/2" e= 2.0mm DE ACERO


INOXIDABLE SATINADO

UND

UND

BALAUSTRES ESCALERA METALICA TIPO 01

PERNOS DE FIJACION
07.01.04

BARANDAS ESCALERA METALICA TIPO 01


PASAMANO DE ACERO INOXIDABLE SATINADO 1
1/2" e=2mm.

PERFIL TUBULAR 1/2" e= 2.0mm DE ACERO


INOXIDABLE SATINADO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 192

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

ANCLAJE COLUMNA SEGN DISEO

PZA.

PZA.

PINTURA ESCALERA METALICA TIPO 01

GLB

GLB

PERFIL TUBULAR 1/2" e= 2.0mm DE ACERO


INOXIDABLE SATINADO
07.01.05

COLUMNAS ESCALERA METALICA TIPO 01


COLUMNA TUBULAR METALICA A-36, 250x250mm,
e=6mm.

07.01.06

ANTICORROSIVO ZINC CROMATO PINTURA


ESMALTE ALUMINIZADA Y EN GENERAL
07.01.07

MANO DE OBRA ESCALERA METALICA TIPO 01 (INCLUIDO HERRAMIENTAS Y AND


GLB

GLB

M2

M2

ANGULO "L" Fe 2"X 2" e=4.5 mm


ACABADO: ANTICORROSIVO ZINCROMATO,
PINTURA ESMALTE SINTETICO CORLOR GRIS
OSCURO, APLICADA A SOPLETE, DOS MANOS

PERFIL "T" Fe 2"X 2" e=4.5 mm


ACABADO: ANTICORROSIVO ZINCROMATO,
PINTURA ESMALTE SINTETICO CORLOR GRIS
OSCURO, APLICADA A SOPLETE, DOS MANOS

UND

UND

M2

M2

MANO DE OBRA ESCALERA METALICA TIPO 01


(INCLUIDO HERRAMIENTAS Y ANDAMIO)
07.02
07.02.01

ESCALERA METALICA TIPO 02


GRADAS ESCALERA METALICA TIPO 02
PLANCHA ESTRIADA GALVANIZADA e=3mm

PERNO DE FIJACION 1/4"x2"


PERFIL TUBULAR METALICO A - 36 DE 250x100mm
e=4.5mm, ANTICORROSIVO ZINC CROMATO PINTURA
ESMALTE ALUMINIZADA
07.02.02

DESCANZOS ESCALERA METALICA TIPO 02


PLANCHA ESTRIADA GALVANIZADA e=3mm
PERFIL TUBULAR RECTANGULAR METALICO A - 36
DE 250x100mm e=SEGUN DISEO ESTRUCTURAL,
ANTICORROSIVO ZINC CROMATO PINTURA
ESMALTE ALUMINIZADA

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 193

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

07.02.03

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

PERFIL TUBULAR METALICO A - 36 DE 150x100mm


e=SEGUN DISEO ESTRUCTURAL, ANTICORROSIVO
ZINC CROMATO PINTURA ESMALTE ALUMINIZADA

M2

M2

PARANTES ESCALERA METALICA TIPO 02


PERFIL TUBULAR CUADRADO Fe
1 1/2"X 1 1/2" e=2 mm
ACABADO: ANTICORROSIVO ZINCROMATO,
PINTURA ESMALTE SINTETICO CORLOR GRIS
OSCURO, APLICADA A SOPLETE, DOS MANOS.

07.02.04

BARANDAS ESCALERA METALICA TIPO 02


PERFIL TUBULAR Fe 2" e=2 mm
ACABADO: ANTICORROSIVO ZINCROMATO,
PINTURA ALUMINIZADA APLICADA
A SOPLETE, DOS MANOS.
PERFIL TUBULAR CUADRADO Fe 1"X 1" e=2 mm
ACABADO: ANTICORROSIVO ZINCROMATO,
PINTURA ESMALTE SINTETICO CORLOR GRIS
OSCURO, APLICADA A SOPLETE, DOS MANOS
BARILLA CUADRADA Fe 1/2"X 1/2"
ACABADO: ANTICORROSIVO ZINCROMATO,
PINTURA ESMALTE SINTETICO CORLOR GRIS
OSCURO, APLICADA A SOPLETE, DOS MANOS
PERFIL L 1/2"X 1/2" e=2 mm
ACABADO: ANTICORROSIVO ZINCROMATO,
PINTURA ESMALTE SINTETICO CORLOR GRIS
OSCURO, APLICADA A SOPLETE, DOS MANOS
PLANCHA PERFORADA MODELO D138G
GALVANIZADA DIAMETRO DE PERFORACINES: 10
mm DISTANCIA EN CENTROS: 14 mm
ESPESOR: 0.9 mm

07.02.05

COLUMNAS ESCALERA METALICA TIPO 02


COLUMNA TUBULAR METALICA 100X200mm e=6mm.
ACABADO: ANTICORROSIVO ZINCROMATO, PINTURA
ALUMINIZADA APLICADA A SOPLETE, DOS MANOS.

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 194

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

PZA.

PZA.

CORREA METALICA 2"X 2" e=3.00mm ACABADO:


ANTICORROSIVO ZINCROMATO, PINTURA
ALUMINIZADA APLICADA A SOPLETE, DOS MANOS.

PERFIL TUBULAR 100X200mm e=3.00mm. ACABADO:


ANTICORROSIVO ZINCROMATO, PINTURA
ALUMINIZADA APLICADA A SOPLETE, DOS MANOS.

PLANCHA DE ACERO RECUBIERTO CON ALUZINC


(CALAMINON) MODELO -T

M2

M2

GLB

GLB

COLUMNA TUBULAR METALICA 100X200mm e=6mm.


ACABADO: ANTICORROSIVO ZINCROMATO, PINTURA
ALUMINIZADA APLICADA A SOPLETE, DOS MANOS.
ANCLAJE COLUMNA SEGN DISEO
07.02.06

07.02.07

COBERTURA ESCALERA METALICA TIPO 02

PINTURA ESCALERA METALICA TIPO 02


ANTICORROSIVO ZINC CROMATO PINTURA
ESMALTE ALUMINIZADA Y EN GENERAL

07.02.08

MANO DE OBRA ESCALERA METALICA TIPO 02 (INCLUIDO HERRAMIENTAS Y AND


GLB

GLB

M2

M2

ANGULO "L" Fe 2"X 2" e=4.5 mm


ACABADO: ANTICORROSIVO ZINCROMATO,
PINTURA ESMALTE SINTETICO CORLOR GRIS
OSCURO, APLICADA A SOPLETE, DOS MANOS

PERFIL "T" Fe 2"X 2" e=4.5 mm


ACABADO: ANTICORROSIVO ZINCROMATO,
PINTURA ESMALTE SINTETICO CORLOR GRIS
OSCURO, APLICADA A SOPLETE, DOS MANOS

UND

UND

MANO DE OBRA ESCALERA METALICA TIPO 02


(INCLUIDO HERRAMIENTAS Y ANDAMIO)
07.03
07.03.01

ESCALERA METALICA TIPO 03


GRADAS ESCALERA METALICA TIPO 03
PLANCHA ESTRIADA GALVANIZADA e=3mm

PERNO DE FIJACION 1/4"x2"


PERFIL TUBULAR METALICO A - 36 DE 250x100mm
e=4.5mm, ANTICORROSIVO ZINC CROMATO PINTURA
ESMALTE ALUMINIZADA

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 195

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

UND

CANT

M2

M2

PERFIL TUBULAR METALICO A - 36 DE 250x100mm


e=4.5mm, ANTICORROSIVO ZINC CROMATO PINTURA
ESMALTE ALUMINIZADA
07.03.02

DESCANZOS ESCALERA METALICA TIPO 03


PLANCHA ESTRIADA GALVANIZADA e=3mm
PERFIL TUBULAR RECTANGULAR METALICO A - 36
DE 250x100mm e=SEGUN DISEO ESTRUCTURAL,
ANTICORROSIVO ZINC CROMATO PINTURA
ESMALTE ALUMINIZADA
PERFIL TUBULAR METALICO A - 36 DE 150x100mm
e=SEGUN DISEO ESTRUCTURAL, ANTICORROSIVO
ZINC CROMATO PINTURA ESMALTE ALUMINIZADA

07.03.03

PARANTES ESCALERA METALICA TIPO 03


PERFIL TUBULAR CUADRADO Fe
1 1/2"X 1 1/2" e=2 mm
ACABADO: ANTICORROSIVO ZINCROMATO,
PINTURA ESMALTE SINTETICO CORLOR GRIS
OSCURO, APLICADA A SOPLETE, DOS MANOS.

07.03.04

BARANDAS ESCALERA METALICA TIPO 03


PERFIL TUBULAR Fe 2" e=2 mm
ACABADO: ANTICORROSIVO ZINCROMATO,
PINTURA ALUMINIZADA APLICADA
A SOPLETE, DOS MANOS.

PERFIL TUBULAR CUADRADO Fe 1"X 1" e=2 mm


ACABADO: ANTICORROSIVO ZINCROMATO,
PINTURA ESMALTE SINTETICO CORLOR GRIS
OSCURO, APLICADA A SOPLETE, DOS MANOS

BARILLA CUADRADA Fe 1/2"X 1/2"


ACABADO: ANTICORROSIVO ZINCROMATO,
PINTURA ESMALTE SINTETICO CORLOR GRIS
OSCURO, APLICADA A SOPLETE, DOS MANOS

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 196

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION
BARILLA CUADRADA Fe 1/2"X 1/2"
ACABADO: ANTICORROSIVO ZINCROMATO,
PINTURA ESMALTE SINTETICO CORLOR GRIS
OSCURO, APLICADA A SOPLETE, DOS MANOS

UND

CANT

M2

M2

PZA.

PZA.

CORREA METALICA 2"X 2" e=3.00mm ACABADO:


ANTICORROSIVO ZINCROMATO, PINTURA
ALUMINIZADA APLICADA A SOPLETE, DOS MANOS.

PERFIL TUBULAR 100X200mm e=3.00mm. ACABADO:


ANTICORROSIVO ZINCROMATO, PINTURA
ALUMINIZADA APLICADA A SOPLETE, DOS MANOS.

PLANCHA DE ACERO RECUBIERTO CON ALUZINC


(CALAMINON) MODELO -T

M2

M2

GLB

GLB

PERFIL L 1/2"X 1/2" e=2 mm


ACABADO: ANTICORROSIVO ZINCROMATO,
PINTURA ESMALTE SINTETICO CORLOR GRIS
OSCURO, APLICADA A SOPLETE, DOS MANOS

PLANCHA PERFORADA MODELO D138G


GALVANIZADA DIAMETRO DE PERFORACINES: 10
mm DISTANCIA EN CENTROS: 14 mm
ESPESOR: 0.9 mm
07.03.05

COLUMNAS ESCALERA METALICA TIPO 03


COLUMNA TUBULAR METALICA 100X200mm e=6mm.
ACABADO: ANTICORROSIVO ZINCROMATO, PINTURA
ALUMINIZADA APLICADA A SOPLETE, DOS MANOS.
ANCLAJE COLUMNA SEGN DISEO

07.03.06

07.03.07

COBERTURA ESCALERA METALICA TIPO 03

PINTURA ESCALERA METALICA TIPO 3


ANTICORROSIVO ZINC CROMATO PINTURA
ESMALTE ALUMINIZADA Y EN GENERAL

07.03.08

MANO DE OBRA ESCALERA METALICA TIPO 03 (INCLUIDO HERRAMIENTAS Y AND

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 197

HOJA DE METRADO DE INS


PROYECTO:

ESPECIALIDAD:
FECHA:
HECHO POR:

CODIGO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


IDIOMAS Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HER
INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

DESCRIPCION

MANO DE OBRA ESCALERA METALICA TIPO 03


(INCLUIDO HERRAMIENTAS Y ANDAMIO)

UND

CANT

GLB

GLB

ASCENSOR HIDRONEUMATICO DOBLE CABINA

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 198

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

GLB

GLB

GLB

GLB

GLB

GLB

M2

M2

2,011.37

M2

M2

2,011.37

GLB

GLB

GLB

GLB

0.00
M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 199

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 200

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73
0.00

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 201

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 202

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73
0.00

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 203

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

3.50

3.50

2.10

25.73

M3

M3

4.00

3.00

2.10

25.20

M3

M3

3.50

3.50

2.10

25.73

M3

M3

4.00

4.00

2.10

33.60

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

4.00

4.00

2.10

33.60

M3

M3

5.00

4.00

2.10

42.00

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

6.00

4.00

2.10

50.40

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 204

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

M3

M3

3.50

3.50

2.10

25.73

CIMENTACION HASTA 1.80M DE PROFUNDIDAD


0.00
M3

M3

2.31

1.20

1.80

4.99

M3

M3

2.01

1.20

1.80

4.34

M3

M3

4.50

1.20

1.80

9.72

M3

M3

0.32

1.20

1.80

0.69

M3

M3

5.50

1.20

1.80

11.88

M3

M3

4.50

1.20

1.80

9.72

M3

M3

5.75

1.20

1.80

12.42

M3

M3

8.58

1.20

1.80

18.53

M3

M3

4.50

1.20

1.80

9.72

M3

M3

4.50

1.20

1.80

9.72

M3

M3

1.67

1.20

1.80

3.61

M3

M3

2.99

1.20

1.80

6.46

M3

M3

4.50

1.20

1.80

9.72

M3

M3

4.50

1.20

1.80

9.72

M3

M3

4.50

1.20

1.80

9.72

M3

M3

4.50

1.20

1.80

9.72

M3

M3

4.74

1.20

1.80

10.24

M3

M3

4.50

1.20

1.80

9.72

M3

M3

4.50

1.20

1.80

9.72

M3

M3

4.50

1.20

1.80

9.72

M3

M3

6.11

1.20

1.80

13.20

M3

M3

5.01

1.20

1.80

10.82

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 205

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

4.50

1.20

1.80

9.72

M3

M3

4.50

1.20

1.80

9.72

M3

M3

4.50

1.20

1.80

9.72

M3

M3

6.72

1.20

1.80

14.52

M3

M3

4.23

1.20

1.80

9.14

M3

M3

4.50

1.20

1.80

9.72

M3

M3

4.50

1.20

1.80

9.72

M3

M3

4.50

1.20

1.80

9.72

M3

M3

6.31

1.20

1.80

13.63

M3

M3

4.55

1.20

1.80

9.83

M3

M3

4.51

1.20

1.80

9.74

M3

M3

4.50

1.20

1.80

9.72

M3

M3

4.87

1.20

1.80

10.52

M3

M3

3.44

1.20

1.80

7.43

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

3.79

1.20

1.80

8.19

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

4.99

1.20

1.80

10.78

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 206

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

6.00

1.20

1.80

12.96

M3

M3

6.00

1.20

1.80

12.96

M3

M3

5.79

1.20

1.80

12.51

M3

M3

5.69

1.20

1.80

12.29

M3

M3

5.58

1.20

1.80

12.05

M3

M3

5.52

1.20

1.80

11.92

M3

M3

5.52

1.20

1.80

11.92

M3

M3

7.77

1.20

1.80

16.78

M3

M3

6.44

1.20

1.80

13.91

M3

M3

6.00

1.20

1.80

12.96

M3

M3

5.77

1.20

1.80

12.46

M3

M3

5.57

1.20

1.80

12.03

M3

M3

5.53

1.20

1.80

11.94

M3

M3

5.51

1.20

1.80

11.90

M3

M3

5.59

1.20

1.80

12.07

M3

M3

2.59

1.20

1.80

5.59
0.00

M3

M3

5.50

1.20

1.80

11.88

M3

M3

3.20

1.20

1.80

6.91

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

4.87

1.20

1.80

10.52

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 207

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

3.91

1.20

1.80

8.45

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

3.46

1.20

1.80

7.47

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

1.02

1.20

1.80

2.20

M3

M3

5.45

1.20

1.80

11.77

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

2.95

1.20

1.80

6.37

M3

M3

6.36

1.20

1.80

13.74

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

4.98

1.20

1.80

10.76

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 208

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

3.00

1.20

1.80

6.48

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

6.00

1.20

1.80

12.96

M3

M3

5.50

1.20

1.80

11.88

M3

M3

13.16

1.20

1.80

28.43

M3

M3

5.50

1.20

1.80

11.88

M3

M3

10.80

1.20

1.80

23.33

M3

M3

3.98

1.20

1.80

8.60

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

6.79

1.20

1.80

14.67

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

7.05

1.20

1.80

15.23

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 209

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

1.96

1.20

1.80

4.23

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

4.49

1.20

1.80

9.70

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.40

1.20

1.80

11.66

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 210

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

5.50

1.20

1.80

11.88

M3

M3

3.75

1.20

1.80

8.10

M3

M3

5.47

1.20

1.80

11.82

M3

M3

5.49

1.20

1.80

11.86

M3

M3

11.39

1.20

1.80

24.60

M3

M3

5.60

1.20

1.80

12.10

M3

M3

6.25

1.20

1.80

13.50

M3

M3

5.42

1.20

1.80

11.71

M3

M3

7.98

1.20

1.80

17.24

M3

M3

5.62

1.20

1.80

12.14

M3

M3

7.40

1.20

1.80

15.98

M3

M3

8.98

1.20

1.80

19.40

M3

M3

8.98

1.20

1.80

19.40

M3

M3

8.61

1.20

1.80

18.60

M3

M3

15.68

1.20

1.80

33.87

M3

M3

5.59

1.20

1.80

12.07

M3

M3

4.41

1.20

1.80

9.53

M3

M3

4.18

1.20

1.80

9.03

M3

M3

7.30

1.20

1.80

15.77
0.00

M3

M3

9.05

1.20

1.80

19.55

M3

M3

2.33

1.20

1.80

5.03

M3

M3

4.22

1.20

1.80

9.12

M3

M3

4.44

1.20

1.80

9.59

M3

M3

4.13

1.20

1.80

8.92

M3

M3

4.12

1.20

1.80

8.90

M3

M3

2.64

1.20

1.80

5.70

M3

M3

8.73

1.20

1.80

18.86

M3

M3

4.23

1.20

1.80

9.14

M3

M3

4.44

1.20

1.80

9.59

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 211

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

3.52

1.20

1.80

7.60

M3

M3

4.44

1.20

1.80

9.59

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

1.68

1.20

1.80

3.63

M3

M3

4.52

1.20

1.80

9.76

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

7.92

1.20

1.80

17.11

M3

M3

3.12

1.20

1.80

6.74

M3

M3

6.20

1.20

1.80

13.39

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.14

1.20

1.80

11.10

M3

M3

6.74

1.20

1.80

14.56

M3

M3

5.40

1.20

1.80

11.66

M3

M3

5.50

1.20

1.80

11.88

M3

M3

5.50

1.20

1.80

11.88

M3

M3

2.61

1.20

1.80

5.64

M3

M3

4.67

1.20

1.80

10.09

M3

M3

3.50

1.20

1.80

7.56

M3

M3

3.44

1.20

1.80

7.43

M3

M3

4.99

1.20

1.80

10.78

M3

M3

3.82

1.20

1.80

8.25

M3

M3

3.57

1.20

1.80

7.71

M3

M3

4.25

1.20

1.80

9.18

M3

M3

5.11

1.20

1.80

11.04

M3

M3

3.00

1.20

1.80

6.48

M3

M3

5.97

1.20

1.80

12.90

M3

M3

5.98

1.20

1.80

12.92

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 212

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

4.24

1.20

1.80

9.16

M3

M3

4.44

1.20

1.80

9.59

M3

M3

5.72

1.20

1.80

12.36

M3

M3

6.94

1.20

1.80

14.99

M3

M3

7.87

1.20

1.80

17.00

M3

M3

5.48

1.20

1.80

11.84

M3

M3

8.14

1.20

1.80

17.58

M3

M3

8.29

1.20

1.80

17.91

M3

M3

5.92

1.20

1.80

12.79

M3

M3

4.25

1.20

1.80

9.18

M3

M3

8.26

1.20

1.80

17.84

M3

M3

9.36

1.20

1.80

20.22

M4

M4

5.64

1.20

1.80

12.18

TA 1.50 M. EN TERRENO NORMAL


0.00
M3

M3

2.31

0.40

0.80

0.74

M3

M3

2.01

0.40

0.80

0.64

M3

M3

4.50

0.40

0.80

1.44

M3

M3

0.32

0.40

0.80

0.10

M3

M3

5.50

0.40

0.80

1.76

M3

M3

4.50

0.40

0.80

1.44

M3

M3

5.75

0.40

0.80

1.84

M3

M3

8.58

0.40

0.80

2.75

M3

M3

4.50

0.40

0.80

1.44

M3

M3

4.50

0.40

0.80

1.44

M3

M3

1.67

0.40

0.80

0.53

M3

M3

2.99

0.40

0.80

0.96

M3

M3

4.50

0.40

0.80

1.44

M3

M3

4.50

0.40

0.80

1.44

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 213

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

4.50

0.40

0.80

1.44

M3

M3

4.50

0.40

0.80

1.44

M3

M3

4.74

0.40

0.80

1.52

M3

M3

4.50

0.40

0.80

1.44

M3

M3

4.50

0.40

0.80

1.44

M3

M3

4.50

0.40

0.80

1.44

M3

M3

6.11

0.40

0.80

1.96

M3

M3

5.01

0.40

0.80

1.60

M3

M3

4.50

0.40

0.80

1.44

M3

M3

4.50

0.40

0.80

1.44

M3

M3

4.50

0.40

0.80

1.44

M3

M3

6.72

0.40

0.80

2.15

M3

M3

4.23

0.40

0.80

1.35

M3

M3

4.50

0.40

0.80

1.44

M3

M3

4.50

0.40

0.80

1.44

M3

M3

4.50

0.40

0.80

1.44

M3

M3

6.31

0.40

0.80

2.02

M3

M3

4.55

0.40

0.80

1.46

M3

M3

4.51

0.40

0.80

1.44

M3

M3

4.50

0.40

0.80

1.44

M3

M3

4.87

0.40

0.80

1.56

M3

M3

3.44

0.40

0.80

1.10

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

3.79

0.40

0.80

1.21

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 214

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

4.99

0.40

0.80

1.60

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

6.00

0.40

0.80

1.92

M3

M3

6.00

0.40

0.80

1.92

M3

M3

5.79

0.40

0.80

1.85

M3

M3

5.69

0.40

0.80

1.82

M3

M3

5.58

0.40

0.80

1.79

M3

M3

5.52

0.40

0.80

1.77

M3

M3

5.52

0.40

0.80

1.77

M3

M3

7.77

0.40

0.80

2.49

M3

M3

6.44

0.40

0.80

2.06

M3

M3

6.00

0.40

0.80

1.92

M3

M3

5.77

0.40

0.80

1.85

M3

M3

5.57

0.40

0.80

1.78

M3

M3

5.53

0.40

0.80

1.77

M3

M3

5.51

0.40

0.80

1.76

M3

M3

5.59

0.40

0.80

1.79

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 215

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

M3

M3

DIMENSIONES
LARGO ANCHO
ALTO
2.59

0.40

0.80

LONG.

SUB TOTAL
AREA
VOL.
0.83
0.00

M3

M3

5.50

0.40

0.80

1.76

M3

M3

3.20

0.40

0.80

1.02

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

4.87

0.40

0.80

1.56

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

3.91

0.40

0.80

1.25

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

3.46

0.40

0.80

1.11

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

1.02

0.40

0.80

0.33

M3

M3

5.45

0.40

0.80

1.74

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

2.95

0.40

0.80

0.94

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 216

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

6.36

0.40

0.80

2.04

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

4.98

0.40

0.80

1.59

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

3.00

0.40

0.80

0.96

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

6.00

0.40

0.80

1.92

M3

M3

5.50

0.40

0.80

1.76

M3

M3

13.16

0.40

0.80

4.21

M3

M3

5.50

0.40

0.80

1.76

M3

M3

10.80

0.40

0.80

3.46

M3

M3

3.98

0.40

0.80

1.27

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

6.79

0.40

0.80

2.17

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 217

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

7.05

0.40

0.80

2.26

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

1.96

0.40

0.80

0.63

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

4.49

0.40

0.80

1.44

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 218

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.40

0.40

0.80

1.73

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

3.75

0.40

0.80

1.20

M3

M3

5.47

0.40

0.80

1.75

M3

M3

5.49

0.40

0.80

1.76

M3

M3

11.39

0.40

0.80

3.64

M3

M3

5.60

0.40

0.80

1.79

M3

M3

6.25

0.40

0.80

2.00

M3

M3

5.42

0.40

0.80

1.73

M3

M3

7.98

0.40

0.80

2.55

M3

M3

5.62

0.40

0.80

1.80

M3

M3

7.40

0.40

0.80

2.37

M3

M3

8.98

0.40

0.80

2.87

M3

M3

8.98

0.40

0.80

2.87

M3

M3

8.61

0.40

0.80

2.76

M3

M3

15.68

0.40

0.80

5.02

M3

M3

5.59

0.40

0.80

1.79

M3

M3

4.41

0.40

0.80

1.41

M3

M3

4.18

0.40

0.80

1.34

M3

M3

7.30

0.40

0.80

2.34
0.00

M3

M3

9.05

0.40

0.80

2.90

M3

M3

2.33

0.40

0.80

0.75

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 219

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

4.22

0.40

0.80

1.35

M3

M3

4.44

0.40

0.80

1.42

M3

M3

4.13

0.40

0.80

1.32

M3

M3

4.12

0.40

0.80

1.32

M3

M3

2.64

0.40

0.80

0.84

M3

M3

8.73

0.40

0.80

2.79

M3

M3

4.23

0.40

0.80

1.35

M3

M3

4.44

0.40

0.80

1.42

M3

M3

3.52

0.40

0.80

1.13

M3

M3

4.44

0.40

0.80

1.42

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

1.68

0.40

0.80

0.54

M3

M3

4.52

0.40

0.80

1.45

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

7.92

0.40

0.80

2.53

M3

M3

3.12

0.40

0.80

1.00

M3

M3

6.20

0.40

0.80

1.98

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.14

0.40

0.80

1.64

M3

M3

6.74

0.40

0.80

2.16

M3

M3

5.40

0.40

0.80

1.73

M3

M3

5.50

0.40

0.80

1.76

M3

M3

5.50

0.40

0.80

1.76

M3

M3

2.61

0.40

0.80

0.84

M3

M3

4.67

0.40

0.80

1.49

M3

M3

3.50

0.40

0.80

1.12

M3

M3

3.44

0.40

0.80

1.10

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 220

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

4.99

0.40

0.80

1.60

M3

M3

3.82

0.40

0.80

1.22

M3

M3

3.57

0.40

0.80

1.14

M3

M3

4.25

0.40

0.80

1.36

M3

M3

5.11

0.40

0.80

1.64

M3

M3

3.00

0.40

0.80

0.96

M3

M3

5.97

0.40

0.80

1.91

M3

M3

5.98

0.40

0.80

1.91

M3

M3

4.24

0.40

0.80

1.36

M3

M3

4.44

0.40

0.80

1.42

M3

M3

5.72

0.40

0.80

1.83

M3

M3

6.94

0.40

0.80

2.22

M3

M3

7.87

0.40

0.80

2.52

M3

M3

5.48

0.40

0.80

1.75

M3

M3

8.14

0.40

0.80

2.60

M3

M3

8.29

0.40

0.80

2.65

M3

M3

5.92

0.40

0.80

1.89

M3

M3

4.25

0.40

0.80

1.36

M3

M3

8.26

0.40

0.80

2.64

M3

M3

9.36

0.40

0.80

3.00

M4

M4

5.64

0.40

0.80

1.80

M3

M3

2.10

29.19

61.30

M3

M3

4.00

21.00

84.00

M3

M3

1.20

Area=

4.80

5.76

M3

M3

1.20

Area=

11.80

14.16

M3

M3

1.20

Area=

10.75

12.90

Y ESCALERAS

ANO (CON MATERIAL PROPIO)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 221

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.
0.00

M3

M3

2.30

2.10

1.20

5.80

M3

M3

2.30

2.10

1.20

5.80

M3

M3

2.30

2.10

1.20

5.80

M3

M3

2.30

2.10

1.20

5.80

M3

M3

2.30

2.10

1.20

5.80

M3

M3

2.30

2.10

1.20

5.80

M3

M3

3.95

2.30

1.20

10.90

M3

M3

3.95

2.30

1.20

10.90

M3

M3

3.95

2.30

1.20

10.90

M3

M3

3.95

2.30

1.20

10.90

M3

M3

3.95

2.30

1.20

10.90

M3

M3

3.95

2.30

1.20

10.90

M3

M3

6.55

2.10

1.20

16.51

M3

M3

0.40

0.60

1.20

0.29

M3

M3

0.40

0.30

1.20

0.14

M3

M3

0.40

0.45

1.20

0.22

M3

M3

0.80

Area=

24.05

19.24
0.00

M3

M3

4.65

2.10

1.20

11.72

M3

M3

4.65

2.10

1.20

11.72

M3

M3

4.65

2.10

1.20

11.72

M3

M3

4.65

2.10

1.20

11.72

M3

M3

2.30

2.10

1.20

5.80

M3

M3

2.30

2.10

1.20

5.80

M3

M3

2.30

2.10

1.20

5.80

M3

M3

2.30

2.10

1.20

5.80

M3

M3

2.30

2.10

1.20

5.80

M3

M3

2.30

2.10

1.20

5.80

M3

M3

2.30

2.10

1.20

5.80

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 222

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

2.30

2.10

1.20

5.80

M3

M3

2.30

2.10

1.20

5.80

M3

M3

2.30

2.10

1.20

5.80

M3

M3

2.30

2.10

1.20

5.80

M3

M3

2.30

2.10

1.20

5.80

M3

M3

2.30

2.10

1.20

5.80

M3

M3

2.30

2.10

1.20

5.80

M3

M3

2.30

2.10

1.20

5.80

M3

M3

2.30

2.10

1.20

5.80

M3

M3

2.30

2.10

1.20

5.80

M3

M3

2.30

2.10

1.20

5.80

M3

M3

2.30

2.10

1.20

5.80

M3

M3

2.30

2.10

1.20

5.80

M3

M3

2.30

2.10

1.20

5.80

M3

M3

2.30

2.10

1.20

5.80

M3

M3

2.30

2.10

1.20

5.80

M3

M3

2.30

2.10

1.20

5.80

M3

M3

2.30

2.10

1.20

5.80

M3

M3

2.30

2.10

1.20

5.80

M3

M3

0.40

0.60

1.20

0.29

M3

M3

0.40

0.30

1.20

0.14

M3

M3

0.80

Area=

35.60

28.48

M3

M3

0.60

Area=

4.80

2.88

M3

M3

0.60

Area=

11.80

7.08

M3

M3

0.60

Area=

10.75

6.45

RIA DIST.= 4 KM. + 20% de ESPONJAMIENTO


M3

M3

4043.55

4043.55

M3

M3

2825.65

2825.65

M3

M3

418.61

418.61

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 223

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

178.12

178.12

M3

M3

379.47

379.47

PISO E = 4" C/EQUIPO LIVIANO CON MATERIAL PROPIO


M2

M2

Area=

47.21

M2

M2

Area=

110.37

M2

M2

Area=

16.10

M2

M2

Area=

11.37

M2

M2

Area=

17.61

M2

M2

Area=

10.60

M2

M2

Area=

112.35

M2

M2

Area=

127.05

M2

M2

Area=

43.90

M2

M2

Area=

42.15

M2

M2

Area=

57.35

M2

M2

Area=

42.65

M2

M2

Area=

43.90

M2

M2

Area=

4.80

M2

M2

Area=

11.80

M2

M2

Area=

10.75

M2

M2

Area=

46.20

M2

M2

Area=

9.35

M2

M2

Area=

8.15

M2

M2

Area=

5.90

M2

M2

Area=

15.35

M2

M2

Area=

135.55

N EQUIPO LIVIANO

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 224

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

0.00
M3

M3

2.30

2.10

0.10

0.48

M3

M3

2.30

2.10

0.10

0.48

M3

M3

2.30

2.10

0.10

0.48

M3

M3

2.30

2.10

0.10

0.48

M3

M3

2.30

2.10

0.10

0.48

M3

M3

2.30

2.10

0.10

0.48

M3

M3

3.95

2.30

0.10

0.91

M3

M3

3.95

2.30

0.10

0.91

M3

M3

3.95

2.30

0.10

0.91

M3

M3

3.95

2.30

0.10

0.91

M3

M3

3.95

2.30

0.10

0.91

M3

M3

3.95

2.30

0.10

0.91

M3

M3

6.55

2.10

0.10

1.38
0.00

M3

M3

4.65

2.10

0.10

0.98

M3

M3

4.65

2.10

0.10

0.98

M3

M3

4.65

2.10

0.10

0.98

M3

M3

4.65

2.10

0.10

0.98

M3

M3

2.30

2.10

0.10

0.48

M3

M3

2.30

2.10

0.10

0.48

M3

M3

2.30

2.10

0.10

0.48

M3

M3

2.30

2.10

0.10

0.48

M3

M3

2.30

2.10

0.10

0.48

M3

M3

2.30

2.10

0.10

0.48

M3

M3

2.30

2.10

0.10

0.48

M3

M3

2.30

2.10

0.10

0.48

M3

M3

2.30

2.10

0.10

0.48

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 225

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

2.30

2.10

0.10

0.48

M3

M3

2.30

2.10

0.10

0.48

M3

M3

2.30

2.10

0.10

0.48

M3

M3

2.30

2.10

0.10

0.48

M3

M3

2.30

2.10

0.10

0.48

M3

M3

2.30

2.10

0.10

0.48

M3

M3

2.30

2.10

0.10

0.48

M3

M3

2.30

2.10

0.10

0.48

M3

M3

2.30

2.10

0.10

0.48

M3

M3

2.30

2.10

0.10

0.48

M3

M3

2.30

2.10

0.10

0.48

M3

M3

2.30

2.10

0.10

0.48

M3

M3

2.30

2.10

0.10

0.48

M3

M3

2.30

2.10

0.10

0.48

M3

M3

2.30

2.10

0.10

0.48

M3

M3

2.30

2.10

0.10

0.48

M3

M3

2.30

2.10

0.10

0.48

0.00
M3

M3

0.10

8.40

0.84

0.00
M3

M3

0.10

21.00

2.10

ON 30% PIEDRA GRANDE


0.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 226

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

4.70

0.50

0.80

1.88

M3

M3

3.40

0.40

0.80

1.09

M3

M3

3.90

0.40

0.80

1.25

M3

M3

3.75

0.40

0.80

1.20

M3

M3

3.50

0.40

0.80

1.12

M3

M3

2.55

0.40

0.80

0.82

M3

M3

1.60

0.40

0.80

0.51

M3

M3

3.40

0.40

0.80

1.09

M3

M3

3.90

0.40

0.80

1.25

M3

M3

2.05

0.40

0.80

0.66

M3

M3

3.50

0.40

0.80

1.12

M3

M3

1.25

0.40

0.80

0.40

M3

M3

1.25

0.40

0.80

0.40

M3

M3

1.65

0.40

0.80

0.53

M3

M3

2.05

0.40

0.80

0.66

M3

M3

0.50

0.40

0.80

0.16

M3

M3

4.35

0.40

0.80

1.39

M3

M3

1.15

0.40

0.80

0.37

M3

M3

0.70

0.40

0.80

0.22

M3

M3

4.70

0.40

0.80

1.50

M3

M3

3.40

0.40

0.80

1.09

M3

M3

1.65

0.40

0.80

0.53

M3

M3

3.75

0.40

0.80

1.20

M3

M3

3.50

0.40

0.80

1.12

M3

M3

2.00

0.40

0.80

0.64

M3

M3

3.25

0.40

0.80

1.04

M3

M3

3.75

0.40

0.80

1.20

M3

M3

2.00

0.50

0.80

0.80

M3

M3

2.00

0.40

0.80

0.64

M3

M3

2.40

0.40

0.80

0.77

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 227

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

0.45

0.40

0.80

0.14

M3

M3

0.70

0.40

0.80

0.22

M3

M3

1.35

0.40

0.80

0.43

M3

M3

2.00

0.40

0.80

0.64

M3

M3

1.15

0.40

0.80

0.37

M3

M3

0.35

0.40

0.80

0.11

M3

M3

2.20

0.40

0.80

0.70

M3

M3

2.80

0.40

0.80

0.90

M3

M3

2.00

0.40

0.80

0.64

M3

M3

7.40

0.40

0.80

2.37
0.00

M3

M3

5.05

0.40

0.80

1.62

M3

M3

6.35

0.40

0.80

2.03

M3

M3

5.05

0.40

0.80

1.62

M3

M3

5.05

0.40

0.80

1.62

M3

M3

6.35

0.40

0.80

2.03

M3

M3

5.05

0.40

0.80

1.62

M3

M3

5.05

0.40

0.80

1.62

M3

M3

6.35

0.40

0.80

2.03

M3

M3

5.05

0.40

0.80

1.62

M3

M3

5.05

0.50

0.80

2.02

M3

M3

5.05

0.40

0.80

1.62

M3

M3

5.05

0.40

0.80

1.62

M3

M3

5.05

0.40

0.80

1.62

M3

M3

7.15

0.40

0.80

2.29

M3

M3

5.05

0.40

0.80

1.62

M3

M3

5.05

0.40

0.80

1.62

M3

M3

6.10

0.40

0.80

1.95

M3

M3

2.90

0.40

0.80

0.93

M3

M3

3.00

0.40

0.80

0.96

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 228

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

3.00

0.40

0.80

0.96

M3

M3

3.25

0.40

0.80

1.04

M3

M3

3.35

0.40

0.80

1.07

M3

M3

3.35

0.40

0.80

1.07

M3

M3

3.25

0.40

0.80

1.04

M3

M3

2.90

0.40

0.80

0.93

M3

M3

3.00

0.40

0.80

0.96

M3

M3

3.30

0.40

0.80

1.06

M3

M3

3.35

0.40

0.80

1.07

M3

M3

2.05

0.40

0.80

0.66

M3

M3

3.25

0.40

0.80

1.04

M3

M3

2.65

0.40

0.80

0.85

M3

M3

2.90

0.40

0.80

0.93

M3

M3

3.00

0.40

0.80

0.96

M3

M3

3.00

0.40

0.80

0.96

M3

M3

3.30

0.40

0.80

1.06

M3

M3

3.35

0.40

0.80

1.07

M3

M3

2.05

0.40

0.80

0.66

M3

M3

3.25

0.40

0.80

1.04

M3

M3

2.65

0.40

0.80

0.85

M3

M3

2.90

0.40

0.80

0.93

M3

M3

2.90

0.40

0.80

0.93

M3

M3

3.00

0.40

0.80

0.96

M3

M3

3.00

0.40

0.80

0.96

M3

M3

3.25

0.40

0.80

1.04

M3

M3

3.35

0.40

0.80

1.07

M3

M3

3.35

0.40

0.80

1.07

M3

M3

3.25

0.40

0.80

1.04

M3

M3

2.90

0.40

0.80

0.93

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 229

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

0.00
M3

M3

4.70

0.30

0.40

0.56

M3

M3

3.40

0.15

0.40

0.20

M3

M3

3.90

0.15

0.40

0.23

M3

M3

2.20

0.15

0.40

0.13

M3

M3

3.50

0.15

0.40

0.21

M3

M3

1.40

0.15

0.40

0.08

M3

M3

0.50

0.15

0.40

0.03

M3

M3

2.30

0.15

0.40

0.14

M3

M3

0.85

0.15

0.40

0.05

M3

M3

1.50

0.15

0.40

0.09

M3

M3

1.40

0.15

0.40

0.08

M3

M3

0.45

0.15

0.40

0.03

M3

M3

1.65

0.15

0.40

0.10

M3

M3

1.90

0.15

0.40

0.11

M3

M3

0.50

0.15

0.40

0.03

M3

M3

0.50

0.15

0.40

0.03

M3

M3

0.50

0.15

0.40

0.03

M3

M3

4.90

0.15

0.40

0.29

M3

M3

0.45

0.15

0.40

0.03

M3

M3

0.70

0.15

0.40

0.04

M3

M3

3.30

0.15

0.40

0.20

M3

M3

3.40

0.15

0.40

0.20

M3

M3

1.65

0.15

0.40

0.10

M3

M3

3.75

0.15

0.40

0.23

M3

M3

2.00

0.30

0.40

0.24

M3

M3

2.00

0.15

0.40

0.12

M3

M3

1.40

0.15

0.40

0.08

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 230

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

1.50

0.15

0.40

0.09

M3

M3

1.20

0.15

0.40

0.07

M3

M3

2.00

0.15

0.40

0.12
0.00

M3

M3

5.05

0.15

0.40

0.30

M3

M3

6.35

0.15

0.40

0.38

M3

M3

5.05

0.15

0.40

0.30

M3

M3

5.05

0.30

0.40

0.61

M3

M3

5.05

0.15

0.40

0.30

M3

M3

5.05

0.15

0.40

0.30

M3

M3

5.05

0.15

0.40

0.30

M3

M3

2.85

0.15

0.40

0.17

M3

M3

2.85

0.15

0.40

0.17

M3

M3

5.05

0.15

0.40

0.30

M3

M3

5.05

0.15

0.40

0.30

M3

M3

6.10

0.15

0.40

0.37

M3

M3

2.90

0.15

0.40

0.17

M3

M3

3.00

0.15

0.40

0.18

M3

M3

0.35

0.15

0.40

0.02

M3

M3

3.25

0.15

0.40

0.20

M3

M3

3.35

0.15

0.40

0.20

M3

M3

3.35

0.15

0.40

0.20

M3

M3

3.25

0.15

0.40

0.20

M3

M3

0.90

0.15

0.40

0.05

M3

M3

1.35

0.15

0.40

0.08

M3

M3

3.35

0.15

0.40

0.20

M3

M3

2.35

0.15

0.40

0.14

M3

M3

3.25

0.15

0.40

0.20

M3

M3

2.65

0.15

0.40

0.16

M3

M3

3.35

0.15

0.40

0.20

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 231

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

2.35

0.15

0.40

0.14

M3

M3

3.25

0.15

0.40

0.20

M3

M3

2.65

0.15

0.40

0.16

M3

M3

2.90

0.15

0.40

0.17

M3

M3

3.00

0.15

0.40

0.18

M3

M3

0.35

0.15

0.40

0.02

M3

M3

3.25

0.15

0.40

0.20

M3

M3

3.35

0.15

0.40

0.20

M3

M3

3.35

0.15

0.40

0.20

M3

M3

3.25

0.15

0.40

0.20

M2

M2

4.70

0.40

1.88

M2

M2

3.40

0.40

1.36

M2

M2

3.90

0.40

1.56

M2

M2

2.20

0.40

0.88

M2

M2

3.50

0.40

1.40

M2

M2

1.40

0.40

0.56

M2

M2

0.50

0.40

0.20

M2

M2

2.30

0.40

0.92

M2

M2

0.85

0.40

0.34

M2

M2

1.50

0.40

0.60

M2

M2

1.40

0.40

0.56

M2

M2

0.45

0.40

0.18

M2

M2

1.65

0.40

0.66

M2

M2

1.90

0.40

0.76

M2

M2

0.50

0.40

0.20

M2

M2

0.50

0.40

0.20

M2

M2

0.50

0.40

0.20

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 232

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

4.90

0.40

1.96

M2

M2

0.45

0.40

0.18

M2

M2

0.70

0.40

0.28

M2

M2

3.30

0.40

1.32

M2

M2

3.40

0.40

1.36

M2

M2

1.65

0.40

0.66

M2

M2

3.75

0.40

1.50

M2

M2

2.00

0.40

0.80

M2

M2

2.00

0.40

0.80

M2

M2

1.40

0.40

0.56

M2

M2

1.50

0.40

0.60

M2

M2

1.20

0.40

0.48

M2

M2

2.00

0.40

0.80
0.00

M2

M2

5.05

0.40

2.02

M2

M2

6.35

0.40

2.54

M2

M2

5.05

0.40

2.02

M2

M2

5.05

0.40

2.02

M2

M2

5.05

0.40

2.02

M2

M2

5.05

0.40

2.02

M2

M2

5.05

0.40

2.02

M2

M2

2.85

0.40

1.14

M2

M2

2.85

0.40

1.14

M2

M2

5.05

0.40

2.02

M2

M2

5.05

0.40

2.02

M2

M2

6.10

0.40

2.44

M2

M2

2.90

0.40

1.16

M2

M2

3.00

0.40

1.20

M2

M2

0.35

0.40

0.14

M2

M2

3.25

0.40

1.30

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 233

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

3.35

0.40

1.34

M2

M2

3.35

0.40

1.34

M2

M2

3.25

0.40

1.30

M2

M2

0.90

0.40

0.36

M2

M2

1.35

0.40

0.54

M2

M2

3.35

0.40

1.34

M2

M2

2.35

0.40

0.94

M2

M2

3.25

0.40

1.30

M2

M2

2.65

0.40

1.06

M2

M2

3.35

0.40

1.34

M2

M2

2.35

0.40

0.94

M2

M2

3.25

0.40

1.30

M2

M2

2.65

0.40

1.06

M2

M2

2.90

0.40

1.16

M2

M2

3.00

0.40

1.20

M2

M2

0.35

0.40

0.14

M2

M2

3.25

0.40

1.30

M2

M2

3.35

0.40

1.34

M2

M2

3.35

0.40

1.34

M2

M2

3.25

0.40

1.30

M2

M2

0.40

0.06

0.15

ISO CERAMICO O SIMILAR SEGN PLANOS DE ARQUITECTURA


M2

M2

Area=

47.21

M2

M2

Area=

110.37

M2

M2

Area=

16.10

M2

M2

Area=

11.37

M2

M2

Area=

17.61

M2

M2

Area=

10.60

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 234

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

Area=

112.35

M2

M2

Area=

127.05

M2

M2

Area=

43.90

M2

M2

Area=

42.15

M2

M2

Area=

57.35

M2

M2

Area=

42.65

M2

M2

Area=

43.90

O DE CEMENTO PULIDO Y BRUADO


M2

M2

Area=

46.20

M2

M2

Area=

9.35

M2

M2

Area=

8.15

M2

M2

Area=

5.90

M2

M2

Area=

15.35

O DE CONCRETO FROTACHADO Y BRUADO


M2

M2

Area=

135.55

M2

M2

Area=

11.80

M2

M2

Area=

10.75

0.00
M3

M3

2.30

2.10

0.80

3.86

M3

M3

2.30

2.10

0.80

3.86

M3

M3

2.30

2.10

0.80

3.86

M3

M3

2.30

2.10

0.80

3.86

M3

M3

2.30

2.10

0.80

3.86

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 235

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

2.30

2.10

0.80

3.86

M3

M3

3.95

2.30

0.80

7.27

M3

M3

3.95

2.30

0.80

7.27

M3

M3

3.95

2.30

0.80

7.27

M3

M3

3.95

2.30

0.80

7.27

M3

M3

3.95

2.30

0.80

7.27

M3

M3

3.95

2.30

0.80

7.27

M3

M3

6.55

2.10

0.80

11.00
0.00

M3

M3

4.65

2.10

0.80

7.81

M3

M3

4.65

2.10

0.80

7.81

M3

M3

4.65

2.10

0.80

7.81

M3

M3

4.65

2.10

0.80

7.81

M3

M3

2.30

2.10

0.80

3.86

M3

M3

2.30

2.10

0.80

3.86

M3

M3

2.30

2.10

0.80

3.86

M3

M3

2.30

2.10

0.80

3.86

M3

M3

2.30

2.10

0.80

3.86

M3

M3

2.30

2.10

0.80

3.86

M3

M3

2.30

2.10

0.80

3.86

M3

M3

2.30

2.10

0.80

3.86

M3

M3

2.30

2.10

0.80

3.86

M3

M3

2.30

2.10

0.80

3.86

M3

M3

2.30

2.10

0.80

3.86

M3

M3

2.30

2.10

0.80

3.86

M3

M3

2.30

2.10

0.80

3.86

M3

M3

2.30

2.10

0.80

3.86

M3

M3

2.30

2.10

0.80

3.86

M3

M3

2.30

2.10

0.80

3.86

M3

M3

2.30

2.10

0.80

3.86

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 236

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

2.30

2.10

0.80

3.86

M3

M3

2.30

2.10

0.80

3.86

M3

M3

2.30

2.10

0.80

3.86

M3

M3

2.30

2.10

0.80

3.86

M3

M3

2.30

2.10

0.80

3.86

M3

M3

2.30

2.10

0.80

3.86

M3

M3

2.30

2.10

0.80

3.86

M3

M3

2.30

2.10

0.80

3.86

M3

M3

2.30

2.10

0.80

3.86

KG/M
KG

KG

2.25

2.20

11.00

KG

KG

2.25

2.00

12.00

KG/M
KG

KG

2.25

2.20

11.00

KG

KG

2.25

2.00

12.00

KG/M
KG

KG

2.25

2.20

11.00

KG

KG

2.25

2.00

12.00

KG/M
KG

KG

2.25

2.20

11.00

KG

KG

2.25

2.00

12.00

KG/M
KG

KG

2.25

2.20

11.00

KG

KG

2.25

2.00

12.00

KG/M
KG

KG

2.25

2.20

11.00

KG

KG

2.25

2.00

12.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 237

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

2.25

3.85

12.00

KG

KG

2.25

2.20

20.00

KG/M
KG

KG

2.25

3.85

12.00

KG

KG

2.25

2.20

20.00

KG/M
KG

KG

2.25

3.85

12.00

KG

KG

2.25

2.20

20.00

KG/M
KG

KG

2.25

3.85

12.00

KG

KG

2.25

2.20

20.00

KG/M
KG

KG

2.25

3.85

12.00

KG

KG

2.25

2.20

20.00

KG/M
KG

KG

2.25

3.85

12.00

KG

KG

2.25

2.20

20.00

KG/M
KG

KG

2.25

6.45

11.00

KG

KG

2.25

2.00

33.00

KG/M
KG

KG

2.25

4.55

11.00

KG

KG

2.25

2.00

24.00

KG/M
KG

KG

2.25

4.55

11.00

KG

KG

2.25

2.00

24.00

4.55

11.00

KG/M
KG

KG

2.25

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 238

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

KG

KG

DIMENSIONES
LARGO ANCHO
ALTO
2.25

2.00

24.00

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

2.25

4.55

11.00

KG

KG

2.25

2.00

24.00

KG/M
KG

KG

2.25

2.20

11.00

KG

KG

2.25

2.00

12.00

KG/M
KG

KG

2.25

2.20

11.00

KG

KG

2.25

2.00

12.00

KG/M
KG

KG

2.25

2.20

11.00

KG

KG

2.25

2.00

12.00

KG/M
KG

KG

2.25

2.20

11.00

KG

KG

2.25

2.00

12.00

KG/M
KG

KG

2.25

2.20

11.00

KG

KG

2.25

2.00

12.00

KG/M
KG

KG

2.25

2.20

11.00

KG

KG

2.25

2.00

12.00

KG/M
KG

KG

2.25

2.20

11.00

KG

KG

2.25

2.00

12.00

KG/M
KG

KG

2.25

2.20

11.00

KG

KG

2.25

2.00

12.00

2.20

11.00

KG/M
KG

KG

2.25

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 239

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

KG

KG

DIMENSIONES
LARGO ANCHO
ALTO
2.25

2.00

12.00

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

2.25

2.20

11.00

KG

KG

2.25

2.00

12.00

KG/M
KG

KG

2.25

2.20

11.00

KG

KG

2.25

2.00

12.00

KG/M
KG

KG

2.25

2.20

11.00

KG

KG

2.25

2.00

12.00

KG/M
KG

KG

2.25

2.20

11.00

KG

KG

2.25

2.00

12.00

KG/M
KG

KG

2.25

2.20

11.00

KG

KG

2.25

2.00

12.00

KG/M
KG

KG

2.25

2.20

11.00

KG

KG

2.25

2.00

12.00

KG/M
KG

KG

2.25

2.20

11.00

KG

KG

2.25

2.00

12.00

KG/M
KG

KG

2.25

2.20

11.00

KG

KG

2.25

2.00

12.00

KG/M
KG

KG

2.25

2.20

11.00

KG

KG

2.25

2.00

12.00

2.20

11.00

KG/M
KG

KG

2.25

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 240

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

KG

KG

DIMENSIONES
LARGO ANCHO
ALTO
2.25

2.00

12.00

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

2.25

2.20

11.00

KG

KG

2.25

2.00

12.00

KG/M
KG

KG

2.25

2.20

11.00

KG

KG

2.25

2.00

12.00

KG/M
KG

KG

2.25

2.20

11.00

KG

KG

2.25

2.00

12.00

KG/M
KG

KG

2.25

2.00

12.00

KG

KG

2.25

2.20

11.00

KG/M
KG

KG

2.25

2.00

12.00

KG

KG

2.25

2.20

11.00

KG/M
KG

KG

2.25

2.00

12.00

KG

KG

2.25

2.20

11.00

KG/M
KG

KG

2.25

2.00

12.00

KG

KG

2.25

2.20

11.00

0.00
M3

M3

1.85

0.40

0.60

0.44

M3

M3

1.55

0.40

0.60

0.37

M3

M3

1.95

0.40

0.60

0.47

M3

M3

1.85

0.40

0.60

0.44

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 241

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

0.65

0.40

0.60

0.16

M3

M3

1.85

0.40

0.60

0.44

M3

M3

1.55

0.40

0.60

0.37

M3

M3

1.95

0.40

0.60

0.47

M3

M3

1.85

0.40

0.60

0.44

M3

M3

0.65

0.40

0.60

0.16

M3

M3

1.85

0.40

0.60

0.44

M3

M3

1.55

0.40

0.60

0.37

M3

M3

1.95

0.40

0.60

0.47

M3

M3

1.85

0.40

0.60

0.44

M3

M3

0.65

0.40

0.60

0.16

M3

M3

5.15

0.40

0.90

1.85

M3

M3

1.50

0.40

0.30

0.18

M3

M3

0.75

0.40

0.30

0.09

M3

M3

5.15

0.40

0.90

1.85

M3

M3

1.50

0.40

0.30

0.18

M3

M3

0.75

0.40

0.30

0.09

M3

M3

0.90

0.40

0.90

0.32

M3

M3

1.65

0.40

0.30

0.20

M3

M3

0.75

0.40

0.30

0.09

M3

M3

2.15

0.40

0.90

0.77

M3

M3

0.90

0.40

0.30

0.11

M3

M3

0.75

0.40

0.30

0.09

M3

M3

0.90

0.40

0.90

0.32

M3

M3

1.65

0.40

0.30

0.20

M3

M3

0.75

0.40

0.30

0.09

M3

M3

2.15

0.40

0.90

0.77

M3

M3

0.90

0.40

0.30

0.11

M3

M3

0.75

0.40

0.30

0.09

M3

M3

5.15

0.40

0.90

1.85

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 242

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

1.50

0.40

0.30

0.18

M3

M3

0.75

0.40

0.30

0.09

M3

M3

5.15

0.40

0.90

1.85

M3

M3

1.50

0.40

0.30

0.18

M3

M3

0.75

0.40

0.30

0.09
0.00

M3

M3

0.45

0.40

0.60

0.11

M3

M3

1.45

0.40

0.60

0.35

M3

M3

1.45

0.40

0.60

0.35

M3

M3

1.35

0.40

0.60

0.32

M3

M3

1.10

0.40

0.60

0.26

M3

M3

1.10

0.40

0.60

0.26

M3

M3

0.45

0.40

0.60

0.11

M3

M3

1.45

0.40

0.60

0.35

M3

M3

1.45

0.40

0.60

0.35

M3

M3

1.35

0.40

0.60

0.32

M3

M3

1.10

0.40

0.60

0.26

M3

M3

1.10

0.40

0.60

0.26

M3

M3

0.45

0.40

0.60

0.11

M3

M3

1.45

0.40

0.60

0.35

M3

M3

1.45

0.40

0.60

0.35

M3

M3

1.35

0.40

0.60

0.32

M3

M3

1.10

0.40

0.60

0.26

M3

M3

1.10

0.40

0.60

0.26

M3

M3

0.45

0.40

0.60

0.11

M3

M3

1.45

0.40

0.60

0.35

M3

M3

1.45

0.40

0.60

0.35

M3

M3

1.35

0.40

0.60

0.32

M3

M3

1.10

0.40

0.60

0.26

M3

M3

1.10

0.40

0.60

0.26

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 243

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

2.80

0.40

0.90

1.01

M3

M3

1.50

0.40

0.30

0.18

M3

M3

0.75

0.40

0.30

0.09

M3

M3

4.85

0.40

0.90

1.75

M3

M3

0.75

0.40

0.30

0.09

M3

M3

0.75

0.40

0.30

0.09

M3

M3

2.80

0.40

0.90

1.01

M3

M3

1.50

0.40

0.30

0.18

M3

M3

0.75

0.40

0.30

0.09

M3

M3

2.80

0.40

0.90

1.01

M3

M3

1.50

0.40

0.30

0.18

M3

M3

0.75

0.40

0.30

0.09

M3

M3

4.85

0.40

0.90

1.75

M3

M3

0.75

0.40

0.30

0.09

M3

M3

0.75

0.40

0.30

0.09

M3

M3

2.80

0.40

0.90

1.01

M3

M3

1.50

0.40

0.30

0.18

M3

M3

0.75

0.40

0.30

0.09

M3

M3

2.80

0.40

0.90

1.01

M3

M3

1.50

0.40

0.30

0.18

M3

M3

0.75

0.40

0.30

0.09

M3

M3

4.85

0.40

0.90

1.75

M3

M3

0.75

0.40

0.30

0.09

M3

M3

0.75

0.40

0.30

0.09

M3

M3

2.80

0.40

0.90

1.01

M3

M3

1.50

0.40

0.30

0.18

M3

M3

0.75

0.40

0.30

0.09

M3

M3

2.80

0.40

0.90

1.01

M3

M3

1.50

0.40

0.30

0.18

M3

M3

0.75

0.40

0.30

0.09

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 244

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

4.85

0.40

0.90

1.75

M3

M3

0.75

0.40

0.30

0.09

M3

M3

0.75

0.40

0.30

0.09

M3

M3

2.80

0.40

0.90

1.01

M3

M3

1.50

0.40

0.30

0.18

M3

M3

0.75

0.40

0.30

0.09

M3

M3

2.80

0.40

0.90

1.01

M3

M3

1.50

0.40

0.30

0.18

M3

M3

0.75

0.40

0.30

0.09

M3

M3

4.85

0.40

0.90

1.75

M3

M3

0.75

0.40

0.30

0.09

M3

M3

0.75

0.40

0.30

0.09

M3

M3

2.80

0.40

0.90

1.01

M3

M3

1.50

0.40

0.30

0.18

M3

M3

0.75

0.40

0.30

0.09

M3

M3

2.80

0.40

0.90

1.01

M3

M3

1.50

0.40

0.30

0.18

M3

M3

0.75

0.40

0.30

0.09

M3

M3

4.85

0.40

0.90

1.75

M3

M3

0.75

0.40

0.30

0.09

M3

M3

0.75

0.40

0.30

0.09

M3

M3

2.80

0.40

0.90

1.01

M3

M3

1.50

0.40

0.30

0.18

M3

M3

0.75

0.40

0.30

0.09

M3

M3

2.80

0.40

0.90

1.01

M3

M3

1.50

0.40

0.30

0.18

M3

M3

0.75

0.40

0.30

0.09

M3

M3

4.85

0.40

0.90

1.75

M3

M3

0.75

0.40

0.30

0.09

M3

M3

0.75

0.40

0.30

0.09

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 245

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

2.80

0.40

0.90

1.01

M3

M3

1.50

0.40

0.30

0.18

M3

M3

0.75

0.40

0.30

0.09

M3

M3

2.80

0.40

0.90

1.01

M3

M3

1.50

0.40

0.30

0.18

M3

M3

0.75

0.40

0.30

0.09

M3

M3

4.85

0.40

0.90

1.75

M3

M3

0.75

0.40

0.30

0.09

M3

M3

0.75

0.40

0.30

0.09

M3

M3

2.80

0.40

0.90

1.01

M3

M3

1.50

0.40

0.30

0.18

M3

M3

0.75

0.40

0.30

0.09

ON
0.00
M2

M2

1.85

0.60

1.11

M2

M2

1.55

0.60

0.93

M2

M2

1.95

0.60

1.17

M2

M2

1.85

0.60

1.11

M2

M2

0.65

0.60

0.39

M2

M2

1.85

0.60

1.11

M2

M2

1.55

0.60

0.93

M2

M2

1.95

0.60

1.17

M2

M2

1.85

0.60

1.11

M2

M2

0.65

0.60

0.39

M2

M2

1.85

0.60

1.11

M2

M2

1.55

0.60

0.93

M2

M2

1.95

0.60

1.17

M2

M2

1.85

0.60

1.11

M2

M2

0.65

0.60

0.39

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 246

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

5.15

0.90

4.64

M2

M2

1.50

0.30

0.45

M2

M2

0.75

0.30

0.23

M2

M2

5.15

0.90

4.64

M2

M2

1.50

0.30

0.45

M2

M2

0.75

0.30

0.23

M2

M2

0.90

0.90

0.81

M2

M2

1.65

0.30

0.50

M2

M2

0.75

0.30

0.23

M2

M2

2.15

0.90

1.94

M2

M2

0.90

0.30

0.27

M2

M2

0.75

0.30

0.23

M2

M2

0.90

0.90

0.81

M2

M2

1.65

0.30

0.50

M2

M2

0.75

0.30

0.23

M2

M2

2.15

0.90

1.94

M2

M2

0.90

0.30

0.27

M2

M2

0.75

0.30

0.23

M2

M2

5.15

0.90

4.64

M2

M2

1.50

0.30

0.45

M2

M2

0.75

0.30

0.23

M2

M2

5.15

0.90

4.64

M2

M2

1.50

0.30

0.45

M2

M2

0.75

0.30

0.23
0.00

M2

M2

0.45

0.60

0.27

M2

M2

1.45

0.60

0.87

M2

M2

1.45

0.60

0.87

M2

M2

1.35

0.60

0.81

M2

M2

1.10

0.60

0.66

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 247

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

1.10

0.60

0.66

M2

M2

0.45

0.60

0.27

M2

M2

1.45

0.60

0.87

M2

M2

1.45

0.60

0.87

M2

M2

1.35

0.60

0.81

M2

M2

1.10

0.60

0.66

M2

M2

1.10

0.60

0.66

M2

M2

0.45

0.60

0.27

M2

M2

1.45

0.60

0.87

M2

M2

1.45

0.60

0.87

M2

M2

1.35

0.60

0.81

M2

M2

1.10

0.60

0.66

M2

M2

1.10

0.60

0.66

M2

M2

0.45

0.60

0.27

M2

M2

1.45

0.60

0.87

M2

M2

1.45

0.60

0.87

M2

M2

1.35

0.60

0.81

M2

M2

1.10

0.60

0.66

M2

M2

1.10

0.60

0.66

M2

M2

2.80

0.90

2.52

M2

M2

1.50

0.30

0.45

M2

M2

0.75

0.30

0.23

M2

M2

4.85

0.90

4.37

M2

M2

0.75

0.30

0.23

M2

M2

0.75

0.30

0.23

M2

M2

2.80

0.90

2.52

M2

M2

1.50

0.30

0.45

M2

M2

0.75

0.30

0.23

M2

M2

2.80

0.90

2.52

M2

M2

1.50

0.30

0.45

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 248

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

0.75

0.30

0.23

M2

M2

4.85

0.90

4.37

M2

M2

0.75

0.30

0.23

M2

M2

0.75

0.30

0.23

M2

M2

2.80

0.90

2.52

M2

M2

1.50

0.30

0.45

M2

M2

0.75

0.30

0.23

M2

M2

2.80

0.90

2.52

M2

M2

1.50

0.30

0.45

M2

M2

0.75

0.30

0.23

M2

M2

4.85

0.90

4.37

M2

M2

0.75

0.30

0.23

M2

M2

0.75

0.30

0.23

M2

M2

2.80

0.90

2.52

M2

M2

1.50

0.30

0.45

M2

M2

0.75

0.30

0.23

M2

M2

2.80

0.90

2.52

M2

M2

1.50

0.30

0.45

M2

M2

0.75

0.30

0.23

M2

M2

4.85

0.90

4.37

M2

M2

0.75

0.30

0.23

M2

M2

0.75

0.30

0.23

M2

M2

2.80

0.90

2.52

M2

M2

1.50

0.30

0.45

M2

M2

0.75

0.30

0.23

M2

M2

2.80

0.90

2.52

M2

M2

1.50

0.30

0.45

M2

M2

0.75

0.30

0.23

M2

M2

4.85

0.90

4.37

M2

M2

0.75

0.30

0.23

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 249

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

0.75

0.30

0.23

M2

M2

2.80

0.90

2.52

M2

M2

1.50

0.30

0.45

M2

M2

0.75

0.30

0.23

M2

M2

2.80

0.90

2.52

M2

M2

1.50

0.30

0.45

M2

M2

0.75

0.30

0.23

M2

M2

4.85

0.90

4.37

M2

M2

0.75

0.30

0.23

M2

M2

0.75

0.30

0.23

M2

M2

2.80

0.90

2.52

M2

M2

1.50

0.30

0.45

M2

M2

0.75

0.30

0.23

M2

M2

2.80

0.90

2.52

M2

M2

1.50

0.30

0.45

M2

M2

0.75

0.30

0.23

M2

M2

4.85

0.90

4.37

M2

M2

0.75

0.30

0.23

M2

M2

0.75

0.30

0.23

M2

M2

2.80

0.90

2.52

M2

M2

1.50

0.30

0.45

M2

M2

0.75

0.30

0.23

M2

M2

2.80

0.90

2.52

M2

M2

1.50

0.30

0.45

M2

M2

0.75

0.30

0.23

M2

M2

4.85

0.90

4.37

M2

M2

0.75

0.30

0.23

M2

M2

0.75

0.30

0.23

M2

M2

2.80

0.90

2.52

M2

M2

1.50

0.30

0.45

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 250

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

M2

M2

DIMENSIONES
LARGO ANCHO
ALTO
0.75

0.30

LONG.

SUB TOTAL
AREA
VOL.
0.23

RADO 60
KG/M
KG

KG

2.25

24.75

3.00

KG

KG

2.25

23.75

3.00

KG

KG

0.60

2.05

191.00

KG/M
KG

KG

2.25

24.75

3.00

KG

KG

2.25

23.75

3.00

KG

KG

0.60

2.05

191.00

KG/M
KG

KG

2.25

24.75

3.00

KG

KG

2.25

23.75

3.00

KG

KG

0.60

2.05

191.00

KG/M
KG

KG

2.25

10.85

4.00

KG

KG

2.25

10.15

4.00

KG

KG

0.60

2.75

60.00

KG/M
KG

KG

2.25

10.85

4.00

KG

KG

2.25

10.15

4.00

KG

KG

0.60

2.75

60.00

KG/M
KG

KG

2.25

10.85

4.00

KG

KG

2.25

10.15

4.00

KG

KG

0.60

2.75

71.00

10.85

4.00

KG/M
KG

KG

2.25

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 251

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

2.25

10.15

4.00

KG

KG

0.60

2.75

71.00

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

2.25

10.85

4.00

KG

KG

2.25

10.15

4.00

KG

KG

0.60

2.75

60.00

KG/M
KG

KG

2.25

10.85

4.00

KG

KG

2.25

10.15

4.00

KG

KG

0.60

2.75

60.00

KG/M
KG

KG

2.25

29.25

3.00

KG

KG

2.25

27.95

3.00

KG

KG

0.60

2.75

225.00

KG/M
KG

KG

2.25

29.25

3.00

KG

KG

2.25

27.95

3.00

KG

KG

0.60

2.75

225.00

KG/M
KG

KG

2.25

29.25

3.00

KG

KG

2.25

27.95

3.00

KG

KG

0.60

2.75

225.00

KG/M
KG

KG

2.25

29.25

3.00

KG

KG

2.25

27.95

3.00

KG

KG

0.60

2.75

225.00

KG/M
KG

KG

2.25

22.00

3.00

KG

KG

2.25

21.00

3.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 252

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

KG

KG

DIMENSIONES
LARGO ANCHO
ALTO
0.60

2.75

225.00

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

2.25

22.00

3.00

KG

KG

2.25

21.00

3.00

KG

KG

0.60

2.75

225.00

KG/M
KG

KG

2.25

22.00

3.00

KG

KG

2.25

21.00

3.00

KG

KG

0.60

2.75

225.00

KG/M
KG

KG

2.25

22.00

3.00

KG

KG

2.25

21.00

3.00

KG

KG

0.60

2.75

225.00

KG/M
KG

KG

2.25

22.00

3.00

KG

KG

2.25

21.00

3.00

KG

KG

0.60

2.75

225.00

KG/M
KG

KG

2.25

22.00

3.00

KG

KG

2.25

21.00

3.00

KG

KG

0.60

2.75

225.00

KG/M
KG

KG

2.25

22.00

3.00

KG

KG

2.25

21.00

3.00

KG

KG

0.60

2.75

225.00

KG/M
KG

KG

2.25

22.00

3.00

KG

KG

2.25

21.00

3.00

KG

KG

0.60

2.75

225.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 253

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

0.40

0.60

5.40

1.30

M3

M3

0.30

0.40

5.40

0.65

M3

M3

0.40

0.60

5.40

1.30

M3

M3

0.40

0.45

5.40

0.97

M3

M3

0.30

0.40

5.40

0.65

M3

M3

0.40

0.60

5.40

1.30

M3

M3

0.40

0.45

5.40

0.97

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.30

0.40

3.85

0.46

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.40

0.45

3.85

0.69

M3

M3

0.30

0.40

3.85

0.46

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.40

0.45

3.85

0.69

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.30

0.40

3.85

0.46

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.40

0.45

3.85

0.69

M3

M3

0.30

0.40

3.85

0.46

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.40

0.45

3.85

0.69

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.30

0.40

3.85

0.46

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 254

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.40

0.45

3.85

0.69

M3

M3

0.30

0.40

3.85

0.46

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.40

0.45

3.85

0.69

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.30

0.40

3.85

0.46

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.40

0.45

3.85

0.69

M3

M3

0.30

0.40

3.85

0.46

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.40

0.45

3.85

0.69

M3

M3

0.40

0.60

5.40

1.30

M3

M3

0.40

0.60

5.40

1.30

M3

M3

0.40

0.60

5.40

1.30

M3

M3

0.40

0.60

5.40

1.30

M3

M3

0.40

0.60

5.40

1.30

M3

M3

0.40

0.60

5.40

1.30

M3

M3

0.40

0.60

5.40

1.30

M3

M3

0.40

0.60

5.40

1.30

M3

M3

0.30

0.40

5.40

0.65

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.40

0.60

3.85

0.92

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 255

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.30

0.40

3.85

0.46

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.30

0.40

3.85

0.46

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.40

0.60

3.85

0.92

M3

M3

0.30

0.40

3.85

0.46

M3

M3

0.40

0.60

5.00

1.20

M3

M3

0.40

0.60

5.00

1.20

M3

M3

0.40

0.60

5.00

1.20

M3

M3

0.40

0.60

5.00

1.20

M3

M3

0.40

0.60

5.00

1.20

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 256

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

0.40

0.60

5.00

1.20

M3

M3

0.40

0.60

5.00

1.20

M3

M3

0.40

0.60

5.00

1.20

M3

M3

0.30

0.40

5.00

0.60

M2

M2

5.40

2.00

10.80

M2

M2

5.40

1.40

7.56

M2

M2

5.40

2.00

10.80

M2

M2

5.40

1.70

9.18

M2

M2

5.40

1.40

7.56

M2

M2

5.40

2.00

10.80

M2

M2

5.40

1.70

9.18

0.00
M2

M2

3.85

2.00

7.70

M2

M2

3.85

1.40

5.39

M2

M2

3.85

2.00

7.70

M2

M2

3.85

1.70

6.55

M2

M2

3.85

1.40

5.39

M2

M2

3.85

2.00

7.70

M2

M2

3.85

1.70

6.55
0.00

M2

M2

3.85

2.00

7.70

M2

M2

3.85

1.40

5.39

M2

M2

3.85

2.00

7.70

M2

M2

3.85

1.70

6.55

M2

M2

3.85

1.40

5.39

M2

M2

3.85

2.00

7.70

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 257

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

M2

M2

DIMENSIONES
LARGO ANCHO
ALTO
3.85

LONG.
1.70

SUB TOTAL
AREA
VOL.
6.55
0.00

M2

M2

3.85

2.00

7.70

M2

M2

3.85

1.40

5.39

M2

M2

3.85

2.00

7.70

M2

M2

3.85

1.70

6.55

M2

M2

3.85

1.40

5.39

M2

M2

3.85

2.00

7.70

M2

M2

3.85

1.70

6.55
0.00

M2

M2

3.85

2.00

7.70

M2

M2

3.85

1.40

5.39

M2

M2

3.85

2.00

7.70

M2

M2

3.85

1.70

6.55

M2

M2

3.85

1.40

5.39

M2

M2

3.85

2.00

7.70

M2

M2

3.85

1.70

6.55
0.00
0.00

M2

M2

5.40

2.00

10.80

M2

M2

5.40

2.00

10.80

M2

M2

5.40

2.00

10.80

M2

M2

5.40

2.00

10.80

M2

M2

5.40

2.00

10.80

M2

M2

5.40

2.00

10.80

M2

M2

5.40

2.00

10.80

M2

M2

5.40

2.00

10.80

M2

M2

5.40

1.40

7.56
0.00

M2

M2

3.85

2.00

7.70

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 258

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

3.85

2.00

7.70

M2

M2

3.85

2.00

7.70

M2

M2

3.85

2.00

7.70

M2

M2

3.85

2.00

7.70

M2

M2

3.85

2.00

7.70

M2

M2

3.85

2.00

7.70

M2

M2

3.85

2.00

7.70

M2

M2

3.85

1.40

5.39
0.00

M2

M2

3.85

2.00

7.70

M2

M2

3.85

2.00

7.70

M2

M2

3.85

2.00

7.70

M2

M2

3.85

2.00

7.70

M2

M2

3.85

2.00

7.70

M2

M2

3.85

2.00

7.70

M2

M2

3.85

2.00

7.70

M2

M2

3.85

2.00

7.70

M2

M2

3.85

1.40

5.39
0.00

M2

M2

3.85

2.00

7.70

M2

M2

3.85

2.00

7.70

M2

M2

3.85

2.00

7.70

M2

M2

3.85

2.00

7.70

M2

M2

3.85

2.00

7.70

M2

M2

3.85

2.00

7.70

M2

M2

3.85

2.00

7.70

M2

M2

3.85

2.00

7.70

M2

M2

3.85

1.40

5.39
0.00

M2

M2

5.00

2.00

10.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 259

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

5.00

2.00

10.00

M2

M2

5.00

2.00

10.00

M2

M2

5.00

2.00

10.00

M2

M2

5.00

2.00

10.00

M2

M2

5.00

2.00

10.00

M2

M2

5.00

2.00

10.00

M2

M2

5.00

2.00

10.00

M2

M2

5.00

1.40

7.00

KG/M
KG

KG

4.00

6.60

10.00

KG

KG

0.60

2.15

52.00

M2

M2

KG/M

KG

KG

2.25

6.60

6.00

KG

KG

0.60

1.55

52.00

M2

M2

KG/M

KG

KG

4.00

6.60

10.00

KG

KG

0.60

2.15

52.00

M2

M2

KG/M

KG

KG

2.25

6.60

6.00

KG

KG

0.60

1.85

52.00

M2

M2

KG/M

KG

KG

2.25

6.60

6.00

KG

KG

0.60

1.55

52.00

M2

M2

KG/M

KG

KG

4.00

6.60

10.00

KG

KG

0.60

2.15

52.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 260

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

M2

M2

KG/M

KG

KG

2.25

6.60

6.00

KG

KG

0.60

1.85

52.00

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

2.25

4.55

6.00

KG

KG

0.60

1.55

32.00

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

2.25

4.55

6.00

KG

KG

0.60

1.85

32.00

M2

M2

KG/M

KG

KG

2.25

4.55

6.00

KG

KG

0.60

1.55

32.00

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

2.25

4.55

6.00

KG

KG

0.60

1.85

32.00

KG/M
KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 261

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

2.25

4.55

6.00

KG

KG

0.60

1.55

32.00

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

2.25

4.55

6.00

KG

KG

0.60

1.85

32.00

M2

M2

KG/M

KG

KG

2.25

4.55

6.00

KG

KG

0.60

1.55

32.00

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

2.25

4.55

6.00

KG

KG

0.60

1.85

32.00

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

2.25

4.55

6.00

KG

KG

0.60

1.55

32.00

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

2.25

4.55

6.00

KG

KG

0.60

1.85

32.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 262

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

M2

M2

KG/M

KG

KG

2.25

4.55

6.00

KG

KG

0.60

1.55

32.00

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

2.25

4.55

6.00

KG

KG

0.60

1.85

32.00

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

2.25

4.55

6.00

KG

KG

0.60

1.55

32.00

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

2.25

4.55

6.00

KG

KG

0.60

1.85

32.00

M2

M2

KG/M

KG

KG

2.25

4.55

6.00

KG

KG

0.60

1.55

32.00

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

2.25

4.55

6.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 263

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

0.60

1.85

32.00

M2

M2

KG/M

KG

KG

4.00

6.60

10.00

KG

KG

0.60

2.15

52.00

M2

M2

KG/M

KG

KG

4.00

6.60

10.00

KG

KG

0.60

2.15

52.00

M2

M2

KG/M

KG

KG

4.00

6.60

10.00

KG

KG

0.60

2.15

52.00

M2

M2

KG/M

KG

KG

4.00

6.60

10.00

KG

KG

0.60

2.15

52.00

M2

M2

KG/M

KG

KG

4.00

6.60

10.00

KG

KG

0.60

2.15

52.00

M2

M2

KG/M

KG

KG

4.00

6.60

10.00

KG

KG

0.60

2.15

52.00

M2

M2

KG/M

KG

KG

4.00

6.60

10.00

KG

KG

0.60

2.15

52.00

M2

M2

KG/M

KG

KG

4.00

6.60

10.00

KG

KG

0.60

2.15

52.00

M2

M2

KG/M

KG

KG

4.00

6.60

10.00

KG

KG

0.60

2.15

52.00

LONG.

SUB TOTAL
AREA
VOL.

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 264

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

LONG.

SUB TOTAL
AREA
VOL.

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 265

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

LONG.

SUB TOTAL
AREA
VOL.

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 266

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

4.00

4.55

10.00

KG

KG

0.60

2.15

32.00

M2

M2

KG/M

KG

KG

4.00

5.70

10.00

KG

KG

0.60

2.15

38.00

M2

M2

KG/M

KG

KG

4.00

5.70

10.00

LONG.

SUB TOTAL
AREA
VOL.

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 267

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

0.60

M2

M2

KG/M

KG

KG

KG

LONG.

SUB TOTAL
AREA
VOL.

2.15

38.00

4.00

5.70

10.00

KG

0.60

2.15

38.00

M2

M2

KG/M

KG

KG

4.00

5.70

10.00

KG

KG

0.60

2.15

38.00

M2

M2

KG/M

KG

KG

4.00

5.70

10.00

KG

KG

0.60

2.15

38.00

M2

M2

KG/M

KG

KG

4.00

5.70

10.00

KG

KG

0.60

2.15

38.00

M2

M2

KG/M

KG

KG

4.00

5.70

10.00

KG

KG

0.60

2.15

38.00

M2

M2

KG/M

KG

KG

4.00

5.70

10.00

KG

KG

0.60

2.15

38.00

M2

M2

KG/M

KG

KG

4.00

5.00

10.00

KG

KG

0.60

2.15

32.00

M3

M3

0.15

0.25

3.20

0.12

M3

M3

0.15

0.23

3.20

0.11

M3

M3

0.15

0.18

3.20

0.09

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 268

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

0.30

0.25

3.20

0.24

M3

M3

0.13

0.34

3.20

0.14

M3

M3

0.15

0.33

3.20

0.16

M3

M3

0.15

0.25

3.60

0.14

M3

M3

0.15

0.23

3.60

0.12

M3

M3

0.15

0.18

3.60

0.10

M3

M3

0.30

0.25

3.60

0.27

M3

M3

0.13

0.34

3.60

0.16

M3

M3

0.15

0.33

3.60

0.18

M3

M3

0.15

0.25

3.60

0.14

M3

M3

0.15

0.23

3.60

0.12

M3

M3

0.15

0.18

3.60

0.10

M3

M3

0.30

0.25

3.60

0.27

M3

M3

0.13

0.34

3.60

0.16

M3

M3

0.15

0.33

3.60

0.18

M3

M3

0.15

0.25

3.60

0.14

M3

M3

0.15

0.23

3.60

0.12

M3

M3

0.15

0.18

3.60

0.10

M3

M3

0.30

0.25

3.60

0.27

M3

M3

0.13

0.34

3.60

0.16

M3

M3

0.15

0.33

3.60

0.18

M3

M3

0.15

0.25

3.60

0.14

M3

M3

0.15

0.23

3.60

0.12

M3

M3

0.15

0.18

3.60

0.10

M3

M3

0.30

0.25

3.60

0.27

M3

M3

0.13

0.34

3.60

0.16

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 269

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

0.15

0.33

3.60

0.18

M3

M3

0.15

0.25

3.20

0.12

M3

M3

0.30

0.25

3.20

0.24

M3

M3

0.15

0.25

3.60

0.14

M3

M3

0.30

0.25

3.60

0.27

M3

M3

0.15

0.25

3.60

0.14

M3

M3

0.30

0.25

3.60

0.27

M3

M3

0.15

0.25

3.60

0.14

M3

M3

0.30

0.25

3.60

0.27

M3

M3

0.15

0.25

4.60

0.17

M3

M3

0.25

0.40

4.60

0.46

M2

M2

3.20

0.50

1.60

M2

M2

3.20

0.46

1.47

M2

M2

3.20

0.36

1.15

M2

M2

3.20

0.50

1.60

M2

M2

3.20

0.94

3.01

M2

M2

3.20

0.66

2.11

TAS

0.00
M2

M2

3.60

0.50

1.80

M2

M2

3.60

0.46

1.66

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 270

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

3.60

0.36

1.30

M2

M2

3.60

0.50

1.80

M2

M2

3.60

0.94

3.38

M2

M2

3.60

0.66

2.38
0.00

M2

M2

3.60

0.50

1.80

M2

M2

3.60

0.46

1.66

M2

M2

3.60

0.36

1.30

M2

M2

3.60

0.50

1.80

M2

M2

3.60

0.94

3.38

M2

M2

3.60

0.66

2.38
0.00

M2

M2

3.60

0.50

1.80

M2

M2

3.60

0.46

1.66

M2

M2

3.60

0.36

1.30

M2

M2

3.60

0.50

1.80

M2

M2

3.60

0.94

3.38

M2

M2

3.60

0.66

2.38
0.00

M2

M2

3.60

0.50

1.80

M2

M2

3.60

0.46

1.66

M2

M2

3.60

0.36

1.30

M2

M2

3.60

0.50

1.80

M2

M2

3.60

0.94

3.38

M2

M2

3.60

0.66

2.38
0.00
0.00

M2

M2

3.20

0.50

1.60

M2

M2

3.20

0.50

1.60
0.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 271

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

3.60

0.50

1.80

M2

M2

3.60

0.50

1.80
0.00

M2

M2

3.60

0.50

1.80

M2

M2

3.60

0.50

1.80
0.00

M2

M2

3.60

0.50

1.80

M2

M2

3.60

0.50

1.80
0.00

M2

M2

4.60

0.50

2.30

M2

M2

4.60

0.50

2.30

KG/M
KG

KG

0.60

6.00

4.60

KG

KG

0.25

1.20

28.00

KG

KG

KG/M

KG

KG

0.60

6.00

4.60

KG

KG

0.25

1.20

28.00

KG

KG

KG/M

KG

KG

0.60

6.00

4.60

KG

KG

0.25

1.20

28.00

KG

KG

KG/M

KG

KG

0.60

6.00

4.60

KG

KG

0.25

1.50

28.00

KG

KG

KG/M

KG

KG

0.60

6.00

4.60

KG

KG

0.25

1.35

28.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 272

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

KG/M

KG

KG

0.60

6.00

4.60

KG

KG

0.25

1.35

28.00

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

0.60

6.00

4.20

KG

KG

0.25

1.20

23.00

KG

KG

KG/M

KG

KG

0.60

6.00

4.20

KG

KG

0.25

1.20

23.00

KG

KG

KG/M

KG

KG

0.60

6.00

4.20

KG

KG

0.25

1.20

23.00

KG

KG

KG/M

KG

KG

0.60

6.00

4.20

KG

KG

0.25

1.50

23.00

KG

KG

KG/M

KG

KG

0.60

6.00

4.20

KG

KG

0.25

1.35

23.00

KG

KG

KG/M

KG

KG

0.60

6.00

4.20

KG

KG

0.25

1.35

23.00

KG/M
KG

KG

0.60

6.00

4.20

KG

KG

0.25

1.20

23.00

KG

KG

KG/M

KG

KG

0.60

6.00

4.20

KG

KG

0.25

1.20

23.00

KG

KG

KG/M

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 273

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

0.60

6.00

4.20

KG

KG

0.25

1.20

23.00

KG

KG

KG/M

KG

KG

0.60

6.00

4.20

KG

KG

0.25

1.50

23.00

KG

KG

KG/M

KG

KG

0.60

6.00

4.20

KG

KG

0.25

1.35

23.00

KG

KG

KG/M

KG

KG

0.60

6.00

4.20

KG

KG

0.25

1.35

23.00

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

0.60

6.00

4.20

KG

KG

0.25

1.20

23.00

KG

KG

KG/M

KG

KG

0.60

6.00

4.20

KG

KG

0.25

1.20

23.00

KG

KG

KG/M

KG

KG

0.60

6.00

4.20

KG

KG

0.25

1.20

23.00

KG

KG

KG/M

KG

KG

0.60

6.00

4.20

KG

KG

0.25

1.50

23.00

KG

KG

KG/M

KG

KG

0.60

6.00

4.20

KG

KG

0.25

1.35

23.00

KG

KG

KG/M

KG

KG

0.60

6.00

4.20

KG

KG

0.25

1.35

23.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 274

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

0.60

6.00

4.20

KG

KG

0.25

1.20

23.00

KG

KG

KG/M

KG

KG

0.60

6.00

4.20

KG

KG

0.25

1.20

23.00

KG

KG

KG/M

KG

KG

0.60

6.00

4.20

KG

KG

0.25

1.20

23.00

KG

KG

KG/M

KG

KG

0.60

6.00

4.20

KG

KG

0.25

1.50

23.00

KG

KG

KG/M

KG

KG

0.60

6.00

4.20

KG

KG

0.25

1.35

23.00

KG

KG

KG/M

KG

KG

0.60

6.00

4.20

KG

KG

0.25

1.35

23.00

KG

KG

KG/M

KG

KG

0.60

6.00

4.60

KG

KG

0.25

1.20

28.00

KG

KG

KG/M

KG

KG

0.60

6.00

4.60

KG

KG

0.25

1.50

28.00

KG

KG

KG/M

KG

KG

0.60

6.00

4.20

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 275

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

0.25

1.20

28.00

KG

KG

KG/M

KG

KG

0.60

6.00

4.20

KG

KG

0.25

1.50

28.00

KG

KG

KG/M

KG

KG

0.60

6.00

4.20

KG

KG

0.25

1.20

28.00

KG

KG

KG/M

KG

KG

0.60

6.00

4.20

KG

KG

0.25

1.50

28.00

KG

KG

KG/M

KG

KG

0.60

6.00

4.20

KG

KG

0.25

1.20

28.00

KG

KG

KG/M

KG

KG

0.60

6.00

4.20

KG

KG

0.25

1.50

28.00

KG

KG

KG/M

KG

KG

0.60

6.00

5.60

KG

KG

0.25

1.20

34.00

KG

KG

KG/M

KG

KG

0.60

6.00

5.60

KG

KG

0.25

1.50

34.00

LONG.

SUB TOTAL
AREA
VOL.

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 276

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

4.70

0.25

0.50

0.59

M3

M3

3.40

0.25

0.50

0.43

M3

M3

3.90

0.25

0.50

0.49

M3

M3

3.75

0.25

0.50

0.47

M3

M3

3.50

0.25

0.50

0.44

M3

M3

3.40

0.25

0.50

0.43

M3

M3

3.90

0.25

0.50

0.49

M3

M3

3.75

0.25

0.50

0.47

M3

M3

3.50

0.25

0.50

0.44

M3

M3

0.70

0.25

0.50

0.09

M3

M3

4.70

0.25

0.50

0.59

M3

M3

3.40

0.25

0.50

0.43

M3

M3

1.65

0.25

0.50

0.21

M3

M3

3.75

0.25

0.50

0.47

M3

M3

3.50

0.25

0.50

0.44

M3

M3

7.40

0.40

0.60

1.78

M3

M3

2.00

0.40

0.60

0.48

M3

M3

7.40

0.40

0.60

1.78

M3

M3

2.00

0.40

0.60

0.48

M3

M3

3.60

0.40

0.60

0.86

M3

M3

7.40

0.40

0.60

1.78

M3

M3

2.00

0.40

0.60

0.48

M3

M3

7.40

0.40

0.60

1.78

M3

M3

2.00

0.40

0.60

0.48

M3

M3

7.40

0.40

0.50

1.48

M3

M3

2.00

0.40

0.50

0.40

M3

M3

5.60

0.20

0.20

0.22

M3

M3

3.90

0.20

0.20

0.16

M3

M3

4.70

0.25

0.50

0.59

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 277

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

3.40

0.25

0.50

0.43

M3

M3

3.90

0.25

0.50

0.49

M3

M3

3.75

0.25

0.50

0.47

M3

M3

3.50

0.25

0.50

0.44

M3

M3

3.40

0.25

0.50

0.43

M3

M3

3.90

0.25

0.50

0.49

M3

M3

3.75

0.25

0.50

0.47

M3

M3

3.50

0.25

0.50

0.44

M3

M3

0.70

0.25

0.50

0.09

M3

M3

4.70

0.25

0.50

0.59

M3

M3

3.40

0.25

0.50

0.43

M3

M3

1.65

0.25

0.50

0.21

M3

M3

3.75

0.25

0.50

0.47

M3

M3

3.50

0.25

0.50

0.44

M3

M3

7.40

0.40

0.60

1.78

M3

M3

2.00

0.40

0.60

0.48

M3

M3

7.40

0.40

0.60

1.78

M3

M3

2.00

0.40

0.60

0.48

M3

M3

3.60

0.40

0.60

0.86

M3

M3

7.40

0.40

0.60

1.78

M3

M3

2.00

0.40

0.60

0.48

M3

M3

7.40

0.40

0.60

1.78

M3

M3

2.00

0.40

0.60

0.48

M3

M3

7.40

0.40

0.50

1.48

M3

M3

2.00

0.40

0.50

0.40

M3

M3

5.60

0.20

0.20

0.22

M3

M3

3.90

0.20

0.20

0.16

M3

M3

2.64

0.25

0.50

0.33

M3

M3

4.70

0.25

0.50

0.59

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 278

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

3.40

0.25

0.50

0.43

M3

M3

3.90

0.25

0.50

0.49

M3

M3

3.75

0.25

0.50

0.47

M3

M3

3.50

0.25

0.50

0.44

M3

M3

2.64

0.25

0.50

0.33

M3

M3

4.70

0.25

0.50

0.59

M3

M3

3.40

0.25

0.50

0.43

M3

M3

3.90

0.25

0.50

0.49

M3

M3

3.75

0.25

0.50

0.47

M3

M3

3.50

0.25

0.50

0.44

M3

M3

0.70

0.25

0.50

0.09

M3

M3

4.70

0.25

0.50

0.59

M3

M3

3.40

0.25

0.50

0.43

M3

M3

1.65

0.25

0.50

0.21

M3

M3

3.75

0.25

0.50

0.47

M3

M3

3.50

0.25

0.50

0.44

M3

M3

7.40

0.40

0.50

1.48

M3

M3

2.00

0.40

0.50

0.40

M3

M3

2.40

0.40

0.50

0.48

M3

M3

7.40

0.40

0.60

1.78

M3

M3

2.00

0.40

0.60

0.48

M3

M3

2.40

0.40

0.60

0.58

M3

M3

7.40

0.40

0.60

1.78

M3

M3

2.00

0.40

0.60

0.48

M3

M3

2.40

0.40

0.60

0.58

M3

M3

3.60

0.40

0.60

0.86

M3

M3

7.40

0.40

0.60

1.78

M3

M3

2.00

0.40

0.60

0.48

M3

M3

7.40

0.40

0.60

1.78

M3

M3

2.00

0.40

0.60

0.48

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 279

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

7.40

0.40

0.50

1.48

M3

M3

2.00

0.40

0.50

0.40

M3

M3

9.50

0.20

0.20

0.38

M3

M3

2.64

0.20

0.20

0.11

M3

M3

4.70

0.20

0.20

0.19

M3

M3

3.40

0.20

0.20

0.14

M3

M3

2.64

0.20

0.20

0.11

M3

M3

4.70

0.20

0.20

0.19

M3

M3

3.90

0.20

0.20

0.16

M3

M3

2.64

0.25

0.50

0.33

M3

M3

4.70

0.25

0.50

0.59

M3

M3

3.40

0.25

0.50

0.43

M3

M3

3.90

0.25

0.50

0.49

M3

M3

3.75

0.25

0.50

0.47

M3

M3

3.50

0.25

0.50

0.44

M3

M3

2.64

0.25

0.50

0.33

M3

M3

4.70

0.25

0.50

0.59

M3

M3

3.40

0.25

0.50

0.43

M3

M3

3.90

0.25

0.50

0.49

M3

M3

3.75

0.25

0.50

0.47

M3

M3

3.50

0.25

0.50

0.44

M3

M3

0.70

0.25

0.50

0.09

M3

M3

4.70

0.25

0.50

0.59

M3

M3

3.40

0.25

0.50

0.43

M3

M3

1.65

0.25

0.50

0.21

M3

M3

3.75

0.25

0.50

0.47

M3

M3

3.50

0.25

0.50

0.44

M3

M3

7.40

0.40

0.50

1.48

M3

M3

2.00

0.40

0.50

0.40

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 280

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

2.40

0.40

0.50

0.48

M3

M3

7.40

0.40

0.60

1.78

M3

M3

2.00

0.40

0.60

0.48

M3

M3

2.40

0.40

0.60

0.58

M3

M3

7.40

0.40

0.60

1.78

M3

M3

2.00

0.40

0.60

0.48

M3

M3

2.40

0.40

0.60

0.58

M3

M3

3.60

0.40

0.60

0.86

M3

M3

7.40

0.40

0.60

1.78

M3

M3

2.00

0.40

0.60

0.48

M3

M3

7.40

0.40

0.60

1.78

M3

M3

2.00

0.40

0.60

0.48

M3

M3

7.40

0.40

0.50

1.48

M3

M3

2.00

0.40

0.50

0.40

M3

M3

9.50

0.20

0.20

0.38

M3

M3

2.64

0.20

0.20

0.11

M3

M3

4.70

0.20

0.20

0.19

M3

M3

3.40

0.20

0.20

0.14

M3

M3

2.64

0.20

0.20

0.11

M3

M3

4.70

0.20

0.20

0.19

M3

M3

3.90

0.20

0.20

0.16

M3

M3

0.70

0.25

0.40

0.07

M3

M3

4.70

0.25

0.40

0.47

M3

M3

3.40

0.25

0.40

0.34

M3

M3

3.90

0.25

0.40

0.39

M3

M3

3.75

0.25

0.40

0.38

M3

M3

3.50

0.25

0.40

0.35

M3

M3

0.70

0.25

0.40

0.07

M3

M3

4.70

0.25

0.40

0.47

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 281

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

3.40

0.25

0.40

0.34

M3

M3

3.90

0.25

0.40

0.39

M3

M3

3.75

0.25

0.40

0.38

M3

M3

3.50

0.25

0.40

0.35

M3

M3

3.40

0.25

0.40

0.34

M3

M3

3.90

0.25

0.40

0.39

M3

M3

3.75

0.25

0.40

0.38

M3

M3

3.50

0.25

0.40

0.35

M3

M3

0.70

0.25

0.40

0.07

M3

M3

4.70

0.25

0.40

0.47

M3

M3

3.40

0.25

0.40

0.34

M3

M3

3.90

0.25

0.40

0.39

M3

M3

3.75

0.25

0.40

0.38

M3

M3

3.50

0.25

0.40

0.35

M3

M3

7.40

0.40

0.50

1.48

M3

M3

2.00

0.40

0.50

0.40

M3

M3

0.70

0.40

0.50

0.14

M3

M3

7.40

0.40

0.50

1.48

M3

M3

2.00

0.40

0.50

0.40

M3

M3

0.70

0.40

0.50

0.14

M3

M3

3.30

0.40

0.50

0.66

M3

M3

2.00

0.40

0.50

0.40

M3

M3

0.70

0.40

0.50

0.14

M3

M3

3.30

0.40

0.50

0.66

M3

M3

2.00

0.40

0.50

0.40

M3

M3

0.70

0.40

0.50

0.14

M3

M3

3.30

0.40

0.50

0.66

M3

M3

2.00

0.40

0.50

0.40

M3

M3

3.30

0.40

0.50

0.66

M3

M3

2.00

0.40

0.50

0.40

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 282

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

11.90

0.20

0.20

0.48

M3

M3

0.70

0.20

0.20

0.03

M3

M3

4.70

0.20

0.20

0.19

M3

M3

3.40

0.20

0.20

0.14

M3

M3

3.90

0.20

0.20

0.16

M3

M3

0.70

0.20

0.20

0.03

M3

M3

4.70

0.20

0.20

0.19

M3

M3

3.27

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.00

0.25

0.50

0.38

M3

M3

3.00

0.25

0.50

0.38

M3

M3

2.90

0.25

0.50

0.36

M3

M3

1.20

0.25

0.50

0.15

M3

M3

2.63

0.30

0.20

0.16

M3

M3

3.27

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.00

0.25

0.50

0.38

M3

M3

3.00

0.25

0.50

0.38

M3

M3

2.90

0.25

0.50

0.36

M3

M3

1.20

0.25

0.50

M3

M3

2.63

0.30

0.20

0.16

M3

M3

3.27

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 283

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.00

0.25

0.50

0.38

M3

M3

3.00

0.25

0.50

0.38

M3

M3

2.90

0.25

0.50

0.36

M3

M3

1.20

0.25

0.50

M3

M3

3.27

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.00

0.25

0.50

0.38

M3

M3

3.00

0.25

0.50

0.38

M3

M3

2.90

0.25

0.50

0.36

M3

M3

1.20

0.25

0.50

0.15

M3

M3

5.05

0.40

0.50

1.01

M3

M3

6.35

0.40

0.50

1.27

M3

M3

5.05

0.40

0.50

1.01

M3

M3

5.05

0.40

0.60

1.21

M3

M3

6.35

0.40

0.60

1.52

M3

M3

5.05

0.40

0.60

1.21

M3

M3

5.05

0.40

0.60

1.21

M3

M3

6.35

0.40

0.60

1.52

M3

M3

5.05

0.40

0.60

1.21

M3

M3

5.05

0.40

0.60

1.21

M3

M3

6.35

0.40

0.60

1.52

M3

M3

5.05

0.40

0.60

1.21

M3

M3

5.05

0.40

0.60

1.21

M3

M3

1.80

0.40

0.60

0.43

M3

M3

1.80

0.40

0.60

0.43

M3

M3

5.05

0.40

0.60

1.21

M3

M3

5.05

0.40

0.60

1.21

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 284

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

6.35

0.40

0.60

1.52

M3

M3

5.05

0.40

0.60

1.21

M3

M3

5.05

0.40

0.60

1.21

M3

M3

6.35

0.40

0.60

1.52

M3

M3

5.05

0.40

0.60

1.21

M3

M3

5.05

0.40

0.50

1.01

M3

M3

6.35

0.40

0.50

1.27

M3

M3

5.05

0.40

0.50

1.01

M3

M3

6.10

0.20

0.20

0.24

M3

M3

18.85

0.20

0.20

0.75

M3

M3

15.00

0.20

0.20

0.60

M3

M3

3.27

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.00

0.25

0.50

0.38

M3

M3

3.00

0.25

0.50

0.38

M3

M3

2.90

0.25

0.50

0.36

M3

M3

1.20

0.25

0.50

0.15

M3

M3

2.63

0.30

0.20

0.16

M3

M3

3.27

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.00

0.25

0.50

0.38

M3

M3

3.00

0.25

0.50

0.38

M3

M3

2.90

0.25

0.50

0.36

M3

M3

1.20

0.25

0.50

M3

M3

2.63

0.30

0.20

0.16

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 285

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

3.27

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.00

0.25

0.50

0.38

M3

M3

3.00

0.25

0.50

0.38

M3

M3

2.90

0.25

0.50

0.36

M3

M3

1.20

0.25

0.50

M3

M3

3.27

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.00

0.25

0.50

0.38

M3

M3

3.00

0.25

0.50

0.38

M3

M3

2.90

0.25

0.50

0.36

M3

M3

1.20

0.25

0.50

0.15

M3

M3

5.05

0.40

0.50

1.01

M3

M3

6.35

0.40

0.50

1.27

M3

M3

5.05

0.40

0.50

1.01

M3

M3

5.05

0.40

0.60

1.21

M3

M3

6.35

0.40

0.60

1.52

M3

M3

5.05

0.40

0.60

1.21

M3

M3

5.05

0.40

0.60

1.21

M3

M3

6.35

0.40

0.60

1.52

M3

M3

5.05

0.40

0.60

1.21

M3

M3

5.05

0.40

0.60

1.21

M3

M3

6.35

0.40

0.60

1.52

M3

M3

5.05

0.40

0.60

1.21

M3

M3

5.05

0.40

0.60

1.21

M3

M3

1.80

0.40

0.60

0.43

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 286

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

1.80

0.40

0.60

0.43

M3

M3

5.05

0.40

0.60

1.21

M3

M3

5.05

0.40

0.60

1.21

M3

M3

6.35

0.40

0.60

1.52

M3

M3

5.05

0.40

0.60

1.21

M3

M3

5.05

0.40

0.60

1.21

M3

M3

6.35

0.40

0.60

1.52

M3

M3

5.05

0.40

0.60

1.21

M3

M3

5.05

0.40

0.50

1.01

M3

M3

6.35

0.40

0.50

1.27

M3

M3

5.05

0.40

0.50

1.01

M3

M3

6.10

0.20

0.20

0.24

M3

M3

18.85

0.20

0.20

0.75

M3

M3

15.00

0.20

0.20

0.60

M3

M3

3.27

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.00

0.25

0.50

0.38

M3

M3

3.00

0.25

0.50

0.38

M3

M3

2.90

0.25

0.50

0.36

M3

M3

1.20

0.25

0.50

0.15

M3

M3

2.63

0.30

0.20

0.16

M3

M3

3.27

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.00

0.25

0.50

0.38

M3

M3

3.00

0.25

0.50

0.38

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 287

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

2.90

0.25

0.50

0.36

M3

M3

1.20

0.25

0.50

M3

M3

2.63

0.30

0.20

0.16

M3

M3

3.27

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.00

0.25

0.50

0.38

M3

M3

3.00

0.25

0.50

0.38

M3

M3

2.90

0.25

0.50

0.36

M3

M3

1.20

0.25

0.50

M3

M3

3.27

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.00

0.25

0.50

0.38

M3

M3

3.00

0.25

0.50

0.38

M3

M3

2.90

0.25

0.50

0.36

M3

M3

1.20

0.25

0.50

0.15

M3

M3

5.05

0.40

0.50

1.01

M3

M3

6.35

0.40

0.50

1.27

M3

M3

5.05

0.40

0.50

1.01

M3

M3

5.05

0.40

0.60

1.21

M3

M3

6.35

0.40

0.60

1.52

M3

M3

5.05

0.40

0.60

1.21

M3

M3

5.05

0.40

0.60

1.21

M3

M3

6.35

0.40

0.60

1.52

M3

M3

5.05

0.40

0.60

1.21

M3

M3

5.05

0.40

0.60

1.21

M3

M3

6.35

0.40

0.60

1.52

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 288

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

5.05

0.40

0.60

1.21

M3

M3

5.05

0.40

0.60

1.21

M3

M3

1.80

0.40

0.60

0.43

M3

M3

1.80

0.40

0.60

0.43

M3

M3

5.05

0.40

0.60

1.21

M3

M3

5.05

0.40

0.60

1.21

M3

M3

6.35

0.40

0.60

1.52

M3

M3

5.05

0.40

0.60

1.21

M3

M3

5.05

0.40

0.60

1.21

M3

M3

6.35

0.40

0.60

1.52

M3

M3

5.05

0.40

0.60

1.21

M3

M3

5.05

0.40

0.50

1.01

M3

M3

6.35

0.40

0.50

1.27

M3

M3

5.05

0.40

0.50

1.01

M3

M3

6.10

0.20

0.20

0.24

M3

M3

18.85

0.20

0.20

0.75

M3

M3

15.00

0.20

0.20

0.60

M3

M3

3.27

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.00

0.25

0.50

0.38

M3

M3

3.00

0.25

0.50

0.38

M3

M3

2.90

0.25

0.50

0.36

M3

M3

1.20

0.25

0.50

0.15

M3

M3

2.63

0.30

0.20

0.16

M3

M3

3.27

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 289

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.00

0.25

0.50

0.38

M3

M3

3.00

0.25

0.50

0.38

M3

M3

2.90

0.25

0.50

0.36

M3

M3

1.20

0.25

0.50

M3

M3

2.63

0.30

0.20

0.16

M3

M3

3.27

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.00

0.25

0.50

0.38

M3

M3

3.00

0.25

0.50

0.38

M3

M3

2.90

0.25

0.50

0.36

M3

M3

1.20

0.25

0.50

M3

M3

3.27

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.00

0.25

0.50

0.38

M3

M3

3.00

0.25

0.50

0.38

M3

M3

2.90

0.25

0.50

0.36

M3

M3

1.20

0.25

0.50

0.15

M3

M3

5.05

0.40

0.50

1.01

M3

M3

6.35

0.40

0.50

1.27

M3

M3

5.05

0.40

0.50

1.01

M3

M3

5.05

0.40

0.60

1.21

M3

M3

6.35

0.40

0.60

1.52

M3

M3

5.05

0.40

0.60

1.21

M3

M3

5.05

0.40

0.60

1.21

M3

M3

6.35

0.40

0.60

1.52

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 290

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

5.05

0.40

0.60

1.21

M3

M3

5.05

0.40

0.60

1.21

M3

M3

6.35

0.40

0.60

1.52

M3

M3

5.05

0.40

0.60

1.21

M3

M3

5.05

0.40

0.60

1.21

M3

M3

1.80

0.40

0.60

0.43

M3

M3

1.80

0.40

0.60

0.43

M3

M3

5.05

0.40

0.60

1.21

M3

M3

5.05

0.40

0.60

1.21

M3

M3

6.35

0.40

0.60

1.52

M3

M3

5.05

0.40

0.60

1.21

M3

M3

5.05

0.40

0.60

1.21

M3

M3

6.35

0.40

0.60

1.52

M3

M3

5.05

0.40

0.60

1.21

M3

M3

5.05

0.40

0.50

1.01

M3

M3

6.35

0.40

0.50

1.27

M3

M3

5.05

0.40

0.50

1.01

M3

M3

6.10

0.20

0.20

0.24

M3

M3

18.85

0.20

0.20

0.75

M3

M3

15.00

0.20

0.20

0.60

M3

M3

3.27

0.25

0.40

0.33

M3

M3

3.30

0.25

0.40

0.33

M3

M3

3.30

0.25

0.40

0.33

M3

M3

3.30

0.25

0.40

0.33

M3

M3

3.00

0.25

0.40

0.30

M3

M3

3.00

0.25

0.40

0.30

M3

M3

2.90

0.25

0.40

0.29

M3

M3

1.20

0.25

0.40

0.12

M3

M3

3.27

0.25

0.50

0.41

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 291

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.30

0.25

0.50

0.41

M3

M3

3.00

0.25

0.50

0.38

M3

M3

3.00

0.25

0.50

0.38

M3

M3

2.90

0.25

0.50

0.36

M3

M3

1.20

0.25

0.50

0.15

M3

M3

5.05

0.40

0.50

1.01

M3

M3

6.35

0.40

0.50

1.27

M3

M3

5.05

0.40

0.50

1.01

M3

M3

5.05

0.40

0.50

1.01

M3

M3

6.35

0.40

0.50

1.27

M3

M3

5.05

0.40

0.50

1.01

M3

M3

6.10

0.20

0.20

0.24

M3

M3

18.85

0.20

0.20

0.75

0.00
0.00
M2

M2

4.70

1.25

5.88

M2

M2

3.40

1.25

4.25

M2

M2

3.90

1.25

4.88

M2

M2

3.75

1.25

4.69

M2

M2

3.50

1.25

4.38

M2

M2

3.40

1.25

4.25

M2

M2

3.90

1.25

4.88

M2

M2

3.75

1.25

4.69

M2

M2

3.50

1.25

4.38

M2

M2

0.70

1.25

0.88

M2

M2

4.70

1.25

5.88

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 292

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

3.40

1.25

4.25

M2

M2

1.65

1.25

2.06

M2

M2

3.75

1.25

4.69

M2

M2

3.50

1.25

4.38

M2

M2

7.40

1.60

11.84

M2

M2

2.00

1.60

3.20

M2

M2

7.40

1.60

11.84

M2

M2

2.00

1.60

3.20

M2

M2

3.60

1.60

5.76

M2

M2

7.40

1.60

11.84

M2

M2

2.00

1.60

3.20

M2

M2

7.40

1.60

11.84

M2

M2

2.00

1.60

3.20

M2

M2

7.40

1.40

10.36

M2

M2

2.00

1.40

2.80

M2

M2

5.60

0.60

3.36

M2

M2

3.90

0.60

2.34

M2

M2

-0.20

12.20

-2.44

M2

M2

-0.20

13.20

-2.64

M2

M2

-0.20

12.90

-2.58

M2

M2

-0.20

12.40

-2.48

M2

M2

-0.20

22.30

-4.46

M2

M2

-0.20

15.00

-3.00

M2

M2

-0.20

11.20

-2.24

M2

M2

-0.20

23.00

-4.60

M2

M2

-0.20

22.50

-4.50

M2

M2

M2

M2

4.70

1.25

5.88

M2

M2

3.40

1.25

4.25

M2

M2

3.90

1.25

4.88

0.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 293

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

3.75

1.25

4.69

M2

M2

3.50

1.25

4.38

M2

M2

3.40

1.25

4.25

M2

M2

3.90

1.25

4.88

M2

M2

3.75

1.25

4.69

M2

M2

3.50

1.25

4.38

M2

M2

0.70

1.25

0.88

M2

M2

4.70

1.25

5.88

M2

M2

3.40

1.25

4.25

M2

M2

1.65

1.25

2.06

M2

M2

3.75

1.25

4.69

M2

M2

3.50

1.25

4.38

M2

M2

7.40

1.60

11.84

M2

M2

2.00

1.60

3.20

M2

M2

7.40

1.60

11.84

M2

M2

2.00

1.60

3.20

M2

M2

3.60

1.60

5.76

M2

M2

7.40

1.60

11.84

M2

M2

2.00

1.60

3.20

M2

M2

7.40

1.60

11.84

M2

M2

2.00

1.60

3.20

M2

M2

7.40

1.40

10.36

M2

M2

2.00

1.40

2.80

M2

M2

5.60

0.60

3.36

M2

M2

3.90

0.60

2.34

M2

M2

-0.20

12.20

-2.44

M2

M2

-0.20

13.20

-2.64

M2

M2

-0.20

12.90

-2.58

M2

M2

-0.20

12.40

-2.48

M2

M2

-0.20

22.30

-4.46

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 294

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

-0.20

15.00

-3.00

M2

M2

-0.20

11.20

-2.24

M2

M2

-0.20

23.00

-4.60

M2

M2

-0.20

22.50

-4.50

M2

M2

M2

M2

2.64

1.25

3.30

M2

M2

4.70

1.25

5.88

M2

M2

3.40

1.25

4.25

M2

M2

3.90

1.25

4.88

M2

M2

3.75

1.25

4.69

M2

M2

3.50

1.25

4.38

M2

M2

2.64

1.25

3.30

M2

M2

4.70

1.25

5.88

M2

M2

3.40

1.25

4.25

M2

M2

3.90

1.25

4.88

M2

M2

3.75

1.25

4.69

M2

M2

3.50

1.25

4.38

M2

M2

0.70

1.25

0.88

M2

M2

4.70

1.25

5.88

M2

M2

3.40

1.25

4.25

M2

M2

1.65

1.25

2.06

M2

M2

3.75

1.25

4.69

M2

M2

3.50

1.25

4.38

M2

M2

7.40

1.40

10.36

M2

M2

2.00

1.40

2.80

M2

M2

2.40

1.40

3.36

M2

M2

7.40

1.60

11.84

M2

M2

2.00

1.60

3.20

M2

M2

2.40

1.60

3.84

M2

M2

7.40

1.60

11.84

0.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 295

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

2.00

1.60

3.20

M2

M2

2.40

1.60

3.84

M2

M2

3.60

1.60

5.76

M2

M2

7.40

1.60

11.84

M2

M2

2.00

1.60

3.20

M2

M2

7.40

1.60

11.84

M2

M2

2.00

1.60

3.20

M2

M2

7.40

1.40

10.36

M2

M2

2.00

1.40

2.80

M2

M2

9.50

0.60

5.70

M2

M2

2.64

0.60

1.58

M2

M2

4.70

0.60

2.82

M2

M2

3.40

0.60

2.04

M2

M2

2.64

0.60

1.58

M2

M2

4.70

0.60

2.82

M2

M2

3.90

0.60

2.34

M2

M2

-0.20

12.20

-2.44

M2

M2

-0.20

13.20

-2.64

M2

M2

-0.20

12.90

-2.58

M2

M2

-0.20

12.40

-2.48

M2

M2

-0.20

22.30

-4.46

M2

M2

-0.20

15.00

-3.00

M2

M2

-0.20

11.20

-2.24

M2

M2

-0.20

23.00

-4.60

M2

M2

-0.20

22.50

-4.50

M2

M2

-0.20

9.10

-1.82

M2

M2

-0.20

13.80

-2.76

M2

M2

-0.20

11.20

-2.24

M2

M2

-0.20

9.75

-1.95

M2

M2

-0.20

14.80

-2.96

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 296

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

-0.20

11.05

-2.21

M2

M2

-0.20

16.60

-3.32

M2

M2

M2

M2

2.64

1.25

3.30

M2

M2

4.70

1.25

5.88

M2

M2

3.40

1.25

4.25

M2

M2

3.90

1.25

4.88

M2

M2

3.75

1.25

4.69

M2

M2

3.50

1.25

4.38

M2

M2

2.64

1.25

3.30

M2

M2

4.70

1.25

5.88

M2

M2

3.40

1.25

4.25

M2

M2

3.90

1.25

4.88

M2

M2

3.75

1.25

4.69

M2

M2

3.50

1.25

4.38

M2

M2

0.70

1.25

0.88

M2

M2

4.70

1.25

5.88

M2

M2

3.40

1.25

4.25

M2

M2

1.65

1.25

2.06

M2

M2

3.75

1.25

4.69

M2

M2

3.50

1.25

4.38

M2

M2

7.40

1.40

10.36

M2

M2

2.00

1.40

2.80

M2

M2

2.40

1.40

3.36

M2

M2

7.40

1.60

11.84

M2

M2

2.00

1.60

3.20

M2

M2

2.40

1.60

3.84

M2

M2

7.40

1.60

11.84

M2

M2

2.00

1.60

3.20

M2

M2

2.40

1.60

3.84

0.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 297

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

3.60

1.60

5.76

M2

M2

7.40

1.60

11.84

M2

M2

2.00

1.60

3.20

M2

M2

7.40

1.60

11.84

M2

M2

2.00

1.60

3.20

M2

M2

7.40

1.40

10.36

M2

M2

2.00

1.40

2.80

M2

M2

9.50

0.60

5.70

M2

M2

2.64

0.60

1.58

M2

M2

4.70

0.60

2.82

M2

M2

3.40

0.60

2.04

M2

M2

2.64

0.60

1.58

M2

M2

4.70

0.60

2.82

M2

M2

3.90

0.60

2.34

M2

M2

-0.20

12.20

-2.44

M2

M2

-0.20

13.20

-2.64

M2

M2

-0.20

12.90

-2.58

M2

M2

-0.20

12.40

-2.48

M2

M2

-0.20

22.30

-4.46

M2

M2

-0.20

15.00

-3.00

M2

M2

-0.20

11.20

-2.24

M2

M2

-0.20

23.00

-4.60

M2

M2

-0.20

22.50

-4.50

M2

M2

-0.20

9.10

-1.82

M2

M2

-0.20

13.80

-2.76

M2

M2

-0.20

11.20

-2.24

M2

M2

-0.20

9.75

-1.95

M2

M2

-0.20

14.80

-2.96

M2

M2

-0.20

11.05

-2.21

M2

M2

-0.20

16.60

-3.32

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 298

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

0.00

M2

M2

0.70

1.05

0.74

M2

M2

4.70

1.05

4.94

M2

M2

3.40

1.05

3.57

M2

M2

3.90

1.05

4.10

M2

M2

3.75

1.05

3.94

M2

M2

3.50

1.05

3.68

M2

M2

0.70

1.05

0.74

M2

M2

4.70

1.05

4.94

M2

M2

3.40

1.05

3.57

M2

M2

3.90

1.05

4.10

M2

M2

3.75

1.05

3.94

M2

M2

3.50

1.05

3.68

M2

M2

3.40

1.05

3.57

M2

M2

3.90

1.05

4.10

M2

M2

3.75

1.05

3.94

M2

M2

3.50

1.05

3.68

M2

M2

0.70

1.05

0.74

M2

M2

4.70

1.05

4.94

M2

M2

3.40

1.05

3.57

M2

M2

3.90

1.05

4.10

M2

M2

3.75

1.05

3.94

M2

M2

3.50

1.05

3.68

M2

M2

7.40

1.40

10.36

M2

M2

2.00

1.40

2.80

M2

M2

0.70

1.40

0.98

M2

M2

7.40

1.40

10.36

M2

M2

2.00

1.40

2.80

M2

M2

0.70

1.40

0.98

M2

M2

3.30

1.40

4.62

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 299

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

2.00

1.40

2.80

M2

M2

0.70

1.40

0.98

M2

M2

3.30

1.40

4.62

M2

M2

2.00

1.40

2.80

M2

M2

0.70

1.40

0.98

M2

M2

3.30

1.40

4.62

M2

M2

2.00

1.40

2.80

M2

M2

3.30

1.40

4.62

M2

M2

2.00

1.40

2.80

M2

M2

11.90

0.60

7.14

M2

M2

0.70

0.60

0.42

M2

M2

4.70

0.60

2.82

M2

M2

3.40

0.60

2.04

M2

M2

3.90

0.60

2.34

M2

M2

0.70

0.60

0.42

M2

M2

4.70

0.60

2.82

M2

M2

-0.20

2.00

-0.40

M2

M2

-0.20

10.40

-2.08

M2

M2

-0.20

7.80

-1.56

M2

M2

-0.20

8.80

-1.76

M2

M2

-0.20

6.40

-1.28

M2

M2

-0.20

14.80

-2.96

M2

M2

-0.20

12.20

-2.44

M2

M2

-0.20

13.20

-2.64

M2

M2

-0.20

12.90

-2.58

M2

M2

-0.20

12.40

-2.48

M2

M2

-0.20

16.50

-3.30

M2

M2

-0.20

24.90

-4.98

M2

M2

-0.20

14.20

-2.84

M2

M2

-0.20

11.50

-2.30

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 300

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

-0.20

14.90

-2.98

M2

M2

-0.20

14.40

-2.88

M2

M2

0.00

M2

M2

0.00

M2

M2

3.27

1.25

4.09

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.00

1.25

3.75

M2

M2

3.00

1.25

3.75

M2

M2

2.90

1.25

3.63

M2

M2

1.20

1.25

1.50

M2

M2

2.63

0.70

1.84

M2

M2

3.27

1.25

4.09

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.00

1.25

3.75

M2

M2

3.00

1.25

3.75

M2

M2

2.90

1.25

3.63

M2

M2

1.20

1.25

1.50

M2

M2

2.63

0.70

1.84

M2

M2

3.27

1.25

4.09

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.00

1.25

3.75

M2

M2

3.00

1.25

3.75

M2

M2

2.90

1.25

3.63

M2

M2

1.20

1.25

1.50

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 301

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

3.27

1.25

4.09

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.00

1.25

3.75

M2

M2

3.00

1.25

3.75

M2

M2

2.90

1.25

3.63

M2

M2

1.20

1.25

1.50

M2

M2

5.05

1.40

7.07

M2

M2

6.35

1.40

8.89

M2

M2

5.05

1.40

7.07

M2

M2

5.05

1.60

8.08

M2

M2

6.35

1.60

10.16

M2

M2

5.05

1.60

8.08

M2

M2

5.05

1.60

8.08

M2

M2

6.35

1.60

10.16

M2

M2

5.05

1.60

8.08

M2

M2

5.05

1.60

8.08

M2

M2

6.35

1.60

10.16

M2

M2

5.05

1.60

8.08

M2

M2

5.05

1.60

8.08

M2

M2

1.80

1.60

2.88

M2

M2

1.80

1.60

2.88

M2

M2

5.05

1.60

8.08

M2

M2

5.05

1.60

8.08

M2

M2

6.35

1.60

10.16

M2

M2

5.05

1.60

8.08

M2

M2

5.05

1.60

8.08

M2

M2

6.35

1.60

10.16

M2

M2

5.05

1.60

8.08

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 302

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

5.05

1.40

7.07

M2

M2

6.35

1.40

8.89

M2

M2

5.05

1.40

7.07

M2

M2

6.10

0.60

3.66

M2

M2

18.85

0.60

11.31

M2

M2

15.00

0.60

9.00

M2

M2

-0.20

13.50

-2.70

M2

M2

-0.20

14.70

-2.94

M2

M2

-0.20

13.50

-2.70

M2

M2

-0.20

17.30

-3.46

M2

M2

-0.20

18.50

-3.70

M2

M2

-0.20

17.30

-3.46

M2

M2

-0.20

17.50

-3.50

M2

M2

-0.20

18.70

-3.74

M2

M2

-0.20

17.50

-3.50

M2

M2

-0.20

17.50

-3.50

M2

M2

-0.20

18.70

-3.74

M2

M2

-0.20

17.50

-3.50

M2

M2

-0.20

18.05

-3.61

M2

M2

-0.20

10.85

-2.17

M2

M2

-0.20

10.85

-2.17

M2

M2

-0.20

18.05

-3.61

M2

M2

-0.20

18.15

-3.63

M2

M2

-0.20

10.85

-2.17

M2

M2

-0.20

10.85

-2.17

M2

M2

-0.20

18.15

-3.63

M2

M2

-0.20

18.15

-3.63

M2

M2

-0.20

19.35

-3.87

M2

M2

-0.20

18.15

-3.63

M2

M2

-0.20

18.05

-3.61

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 303

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

-0.20

19.25

-3.85

M2

M2

-0.20

18.05

-3.61

M2

M2

-0.20

17.95

-3.59

M2

M2

M2

M2

3.27

1.25

4.09

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.00

1.25

3.75

M2

M2

3.00

1.25

3.75

M2

M2

2.90

1.25

3.63

M2

M2

1.20

1.25

1.50

M2

M2

2.63

0.70

1.84

M2

M2

3.27

1.25

4.09

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.00

1.25

3.75

M2

M2

3.00

1.25

3.75

M2

M2

2.90

1.25

3.63

M2

M2

1.20

1.25

1.50

M2

M2

2.63

0.70

1.84

M2

M2

3.27

1.25

4.09

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.00

1.25

3.75

M2

M2

3.00

1.25

3.75

M2

M2

2.90

1.25

3.63

M2

M2

1.20

1.25

1.50

0.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 304

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

3.27

1.25

4.09

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.00

1.25

3.75

M2

M2

3.00

1.25

3.75

M2

M2

2.90

1.25

3.63

M2

M2

1.20

1.25

1.50

M2

M2

5.05

1.40

7.07

M2

M2

6.35

1.40

8.89

M2

M2

5.05

1.40

7.07

M2

M2

5.05

1.40

7.07

M2

M2

6.35

1.40

8.89

M2

M2

5.05

1.40

7.07

M2

M2

5.05

1.40

7.07

M2

M2

6.35

1.40

8.89

M2

M2

5.05

1.40

7.07

M2

M2

5.05

1.40

7.07

M2

M2

6.35

1.40

8.89

M2

M2

5.05

1.40

7.07

M2

M2

5.05

1.40

7.07

M2

M2

1.80

1.40

2.52

M2

M2

1.80

1.40

2.52

M2

M2

5.05

1.40

7.07

M2

M2

5.05

1.40

7.07

M2

M2

6.35

1.40

8.89

M2

M2

5.05

1.40

7.07

M2

M2

5.05

1.40

7.07

M2

M2

6.35

1.40

8.89

M2

M2

5.05

1.40

7.07

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 305

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

5.05

1.40

7.07

M2

M2

6.35

1.40

8.89

M2

M2

5.05

1.40

7.07

M2

M2

6.10

0.60

3.66

M2

M2

18.85

0.60

11.31

M2

M2

15.00

0.60

9.00

M2

M2

-0.20

13.50

-2.70

M2

M2

-0.20

14.70

-2.94

M2

M2

-0.20

13.50

-2.70

M2

M2

-0.20

17.30

-3.46

M2

M2

-0.20

18.50

-3.70

M2

M2

-0.20

17.30

-3.46

M2

M2

-0.20

17.50

-3.50

M2

M2

-0.20

18.70

-3.74

M2

M2

-0.20

17.50

-3.50

M2

M2

-0.20

17.50

-3.50

M2

M2

-0.20

18.70

-3.74

M2

M2

-0.20

17.50

-3.50

M2

M2

-0.20

18.05

-3.61

M2

M2

-0.20

10.85

-2.17

M2

M2

-0.20

10.85

-2.17

M2

M2

-0.20

18.05

-3.61

M2

M2

-0.20

18.15

-3.63

M2

M2

-0.20

10.85

-2.17

M2

M2

-0.20

10.85

-2.17

M2

M2

-0.20

18.15

-3.63

M2

M2

-0.20

18.15

-3.63

M2

M2

-0.20

19.35

-3.87

M2

M2

-0.20

18.15

-3.63

M2

M2

-0.20

18.05

-3.61

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 306

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

-0.20

19.25

-3.85

M2

M2

-0.20

18.05

-3.61

M2

M2

-0.20

17.95

-3.59

M2

M2

M2

M2

3.27

1.25

4.09

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.00

1.25

3.75

M2

M2

3.00

1.25

3.75

M2

M2

2.90

1.25

3.63

M2

M2

1.20

1.25

1.50

M2

M2

2.63

0.70

1.84

M2

M2

3.27

1.25

4.09

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.00

1.25

3.75

M2

M2

3.00

1.25

3.75

M2

M2

2.90

1.25

3.63

M2

M2

1.20

1.25

1.50

M2

M2

2.63

0.70

1.84

M2

M2

3.27

1.25

4.09

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.00

1.25

3.75

M2

M2

3.00

1.25

3.75

M2

M2

2.90

1.25

3.63

M2

M2

1.20

1.25

1.50

0.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 307

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

3.27

1.25

4.09

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.00

1.25

3.75

M2

M2

3.00

1.25

3.75

M2

M2

2.90

1.25

3.63

M2

M2

1.20

1.25

1.50

M2

M2

5.05

1.40

7.07

M2

M2

6.35

1.40

8.89

M2

M2

5.05

1.40

7.07

M2

M2

5.05

1.60

8.08

M2

M2

6.35

1.60

10.16

M2

M2

5.05

1.60

8.08

M2

M2

5.05

1.60

8.08

M2

M2

6.35

1.60

10.16

M2

M2

5.05

1.60

8.08

M2

M2

5.05

1.60

8.08

M2

M2

6.35

1.60

10.16

M2

M2

5.05

1.60

8.08

M2

M2

5.05

1.60

8.08

M2

M2

1.80

1.60

2.88

M2

M2

1.80

1.60

2.88

M2

M2

5.05

1.60

8.08

M2

M2

5.05

1.60

8.08

M2

M2

6.35

1.60

10.16

M2

M2

5.05

1.60

8.08

M2

M2

5.05

1.60

8.08

M2

M2

6.35

1.60

10.16

M2

M2

5.05

1.60

8.08

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 308

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

5.05

1.40

7.07

M2

M2

6.35

1.40

8.89

M2

M2

5.05

1.40

7.07

M2

M2

6.10

0.60

3.66

M2

M2

18.85

0.60

11.31

M2

M2

15.00

0.60

9.00

M2

M2

-0.20

13.50

-2.70

M2

M2

-0.20

14.70

-2.94

M2

M2

-0.20

13.50

-2.70

M2

M2

-0.20

17.30

-3.46

M2

M2

-0.20

18.50

-3.70

M2

M2

-0.20

17.30

-3.46

M2

M2

-0.20

17.50

-3.50

M2

M2

-0.20

18.70

-3.74

M2

M2

-0.20

17.50

-3.50

M2

M2

-0.20

17.50

-3.50

M2

M2

-0.20

18.70

-3.74

M2

M2

-0.20

17.50

-3.50

M2

M2

-0.20

18.05

-3.61

M2

M2

-0.20

10.85

-2.17

M2

M2

-0.20

10.85

-2.17

M2

M2

-0.20

18.05

-3.61

M2

M2

-0.20

18.15

-3.63

M2

M2

-0.20

10.85

-2.17

M2

M2

-0.20

10.85

-2.17

M2

M2

-0.20

18.15

-3.63

M2

M2

-0.20

18.15

-3.63

M2

M2

-0.20

19.35

-3.87

M2

M2

-0.20

18.15

-3.63

M2

M2

-0.20

18.05

-3.61

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 309

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

-0.20

19.25

-3.85

M2

M2

-0.20

18.05

-3.61

M2

M2

-0.20

17.95

-3.59

M2

M2

M2

M2

3.27

1.25

4.09

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.00

1.25

3.75

M2

M2

3.00

1.25

3.75

M2

M2

2.90

1.25

3.63

M2

M2

1.20

1.25

1.50

M2

M2

2.63

0.70

1.84

M2

M2

3.27

1.25

4.09

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.00

1.25

3.75

M2

M2

3.00

1.25

3.75

M2

M2

2.90

1.25

3.63

M2

M2

1.20

1.25

1.50

M2

M2

2.63

0.70

1.84

M2

M2

3.27

1.25

4.09

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.00

1.25

3.75

M2

M2

3.00

1.25

3.75

M2

M2

2.90

1.25

3.63

M2

M2

1.20

1.25

1.50

0.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 310

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

3.27

1.25

4.09

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.00

1.25

3.75

M2

M2

3.00

1.25

3.75

M2

M2

2.90

1.25

3.63

M2

M2

1.20

1.25

1.50

M2

M2

5.05

1.40

7.07

M2

M2

6.35

1.40

8.89

M2

M2

5.05

1.40

7.07

M2

M2

5.05

1.40

7.07

M2

M2

6.35

1.40

8.89

M2

M2

5.05

1.40

7.07

M2

M2

5.05

1.40

7.07

M2

M2

6.35

1.40

8.89

M2

M2

5.05

1.40

7.07

M2

M2

5.05

1.40

7.07

M2

M2

6.35

1.40

8.89

M2

M2

5.05

1.40

7.07

M2

M2

5.05

1.40

7.07

M2

M2

1.80

1.40

2.52

M2

M2

1.80

1.40

2.52

M2

M2

5.05

1.40

7.07

M2

M2

5.05

1.40

7.07

M2

M2

6.35

1.40

8.89

M2

M2

5.05

1.40

7.07

M2

M2

5.05

1.40

7.07

M2

M2

6.35

1.40

8.89

M2

M2

5.05

1.40

7.07

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 311

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

5.05

1.40

7.07

M2

M2

6.35

1.40

8.89

M2

M2

5.05

1.40

7.07

M2

M2

6.10

0.60

3.66

M2

M2

18.85

0.60

11.31

M2

M2

15.00

0.60

9.00

M2

M2

-0.20

13.50

-2.70

M2

M2

-0.20

14.70

-2.94

M2

M2

-0.20

13.50

-2.70

M2

M2

-0.20

17.30

-3.46

M2

M2

-0.20

18.50

-3.70

M2

M2

-0.20

17.30

-3.46

M2

M2

-0.20

17.50

-3.50

M2

M2

-0.20

18.70

-3.74

M2

M2

-0.20

17.50

-3.50

M2

M2

-0.20

17.50

-3.50

M2

M2

-0.20

18.70

-3.74

M2

M2

-0.20

17.50

-3.50

M2

M2

-0.20

18.05

-3.61

M2

M2

-0.20

10.85

-2.17

M2

M2

-0.20

10.85

-2.17

M2

M2

-0.20

18.05

-3.61

M2

M2

-0.20

18.15

-3.63

M2

M2

-0.20

10.85

-2.17

M2

M2

-0.20

10.85

-2.17

M2

M2

-0.20

18.15

-3.63

M2

M2

-0.20

18.15

-3.63

M2

M2

-0.20

19.35

-3.87

M2

M2

-0.20

18.15

-3.63

M2

M2

-0.20

18.05

-3.61

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 312

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

-0.20

19.25

-3.85

M2

M2

-0.20

18.05

-3.61

M2

M2

-0.20

17.95

-3.59

M2

M2

M2

M2

3.27

1.05

3.43

M2

M2

3.30

1.05

3.47

M2

M2

3.30

1.05

3.47

M2

M2

3.30

1.05

3.47

M2

M2

3.00

1.05

3.15

M2

M2

3.00

1.05

3.15

M2

M2

2.90

1.05

3.05

M2

M2

1.20

1.05

1.26

M2

M2

3.27

1.25

4.09

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.30

1.25

4.13

M2

M2

3.00

1.25

3.75

M2

M2

3.00

1.25

3.75

M2

M2

2.90

1.25

3.63

M2

M2

1.20

1.25

1.50

M2

M2

5.05

1.40

7.07

M2

M2

6.35

1.40

8.89

M2

M2

5.05

1.40

7.07

M2

M2

5.05

1.40

7.07

M2

M2

6.35

1.40

8.89

M2

M2

5.05

1.40

7.07

M2

M2

6.10

0.20

0.20

0.60

0.15

M2

M2

18.85

0.20

0.20

0.60

0.45

M2

M2

-0.20

17.95

-3.59

0.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 313

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

1.60

25.60

KG

KG

1.60

1.70

KG

KG

1.60

3.30

KG

KG

1.60

3.00

KG

KG

1.60

3.00

KG

KG

1.60

3.00

KG

KG

1.60

1.70

KG

KG

1.60

24.30

KG

KG

1.60

2.70

KG

KG

1.60

1.40

KG

KG

1.60

1.40

KG

KG

1.60

1.40

KG

KG

1.60

1.80

KG

KG

0.60

1.65

KG/M
KG

KG

1.60

18.80

KG

KG

1.60

1.70

KG

KG

1.60

3.00

KG

KG

1.60

3.00

KG

KG

1.60

3.00

KG

KG

1.60

1.70

KG

KG

1.60

18.10

KG

KG

1.60

1.40

KG

KG

1.60

1.40

KG

KG

1.60

1.40

KG

KG

1.60

1.80

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 314

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

KG

KG

DIMENSIONES
LARGO ANCHO
ALTO
0.60

LONG.

SUB TOTAL
AREA
VOL.

103.00

KG/M
KG

KG

1.60

11.55

KG

KG

1.60

1.70

KG

KG

1.60

3.30

KG

KG

1.60

2.00

KG

KG

1.60

10.85

KG

KG

1.60

2.70

KG

KG

1.60

1.40

KG

KG

1.60

10.85

KG

KG

1.60

3.00

KG

KG

1.60

3.00

KG

KG

1.60

1.70

KG

KG

1.60

12.05

KG

KG

1.60

1.40

KG

KG

1.60

1.80

KG

KG

0.60

1.65

KG/M
KG

KG

4.00

13.45

KG

KG

4.00

2.30

KG

KG

4.00

4.30

KG

KG

4.00

12.75

KG

KG

4.00

4.20

KG

KG

0.60

2.15

KG/M
KG

KG

4.00

13.45

KG

KG

4.00

2.30

KG

KG

4.00

4.30

KG

KG

4.00

12.75

KG

KG

4.00

4.20

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 315

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

KG

KG

DIMENSIONES
LARGO ANCHO
ALTO
0.60

LONG.

SUB TOTAL
AREA
VOL.

2.15

KG/M
KG

KG

4.00

5.60

KG

KG

4.00

5.60

KG

KG

0.60

2.15

KG/M
KG

KG

4.00

13.45

KG

KG

4.00

2.30

KG

KG

4.00

4.30

KG

KG

4.00

12.75

KG

KG

4.00

4.20

KG

KG

0.60

2.15

KG/M
KG

KG

4.00

13.45

KG

KG

4.00

2.30

KG

KG

4.00

4.30

KG

KG

4.00

12.75

KG

KG

4.00

4.20

KG

KG

0.60

2.15

KG/M
KG

KG

4.00

13.45

KG

KG

4.00

2.30

KG

KG

4.00

4.30

KG

KG

4.00

12.75

KG

KG

4.00

4.20

KG

KG

0.60

1.95

KG/M
KG

KG

1.00

7.40

KG

KG

1.00

7.40

KG

KG

0.60

0.95

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 316

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

1.00

5.30

KG

KG

1.00

5.30

KG

KG

0.60

0.95

KG/M
KG

KG

1.60

25.60

KG

KG

1.60

1.70

KG

KG

1.60

3.30

KG

KG

1.60

3.00

KG

KG

1.60

3.00

KG

KG

1.60

3.00

KG

KG

1.60

1.70

KG

KG

1.60

24.30

KG

KG

1.60

2.70

KG

KG

1.60

1.40

KG

KG

1.60

1.40

KG

KG

1.60

1.40

KG

KG

1.60

1.80

KG

KG

0.60

1.65

KG/M
KG

KG

1.60

18.80

KG

KG

1.60

1.70

KG

KG

1.60

3.00

KG

KG

1.60

3.00

KG

KG

1.60

3.00

KG

KG

1.60

1.70

KG

KG

1.60

18.10

KG

KG

1.60

1.40

KG

KG

1.60

1.40

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 317

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

1.60

1.40

KG

KG

1.60

1.80

KG

KG

0.60

103.00

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

1.60

11.55

KG

KG

1.60

1.70

KG

KG

1.60

3.30

KG

KG

1.60

2.00

KG

KG

1.60

10.85

KG

KG

1.60

2.70

KG

KG

1.60

1.40

KG

KG

1.60

10.85

KG

KG

1.60

3.00

KG

KG

1.60

3.00

KG

KG

1.60

1.70

KG

KG

1.60

12.05

KG

KG

1.60

1.40

KG

KG

1.60

1.80

KG

KG

0.60

1.65

KG/M
KG

KG

4.00

13.45

KG

KG

4.00

2.30

KG

KG

4.00

4.30

KG

KG

4.00

12.75

KG

KG

4.00

4.20

KG

KG

0.60

2.15

KG/M
KG

KG

4.00

13.45

KG

KG

4.00

2.30

KG

KG

4.00

4.30

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 318

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

4.00

12.75

KG

KG

4.00

4.20

KG

KG

0.60

2.15

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

4.00

5.60

KG

KG

4.00

5.60

KG

KG

0.60

2.15

KG/M
KG

KG

4.00

13.45

KG

KG

4.00

2.30

KG

KG

4.00

4.30

KG

KG

4.00

12.75

KG

KG

4.00

4.20

KG

KG

0.60

2.15

KG/M
KG

KG

4.00

13.45

KG

KG

4.00

2.30

KG

KG

4.00

4.30

KG

KG

4.00

12.75

KG

KG

4.00

4.20

KG

KG

0.60

2.15

KG/M
KG

KG

4.00

13.45

KG

KG

4.00

2.30

KG

KG

4.00

4.30

KG

KG

4.00

12.75

KG

KG

4.00

4.20

KG

KG

0.60

1.95

KG/M
KG

KG

1.00

7.40

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 319

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

1.00

7.40

KG

KG

0.60

0.95

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

1.00

5.30

KG

KG

1.00

5.30

KG

KG

0.60

0.95

KG/M
KG

KG

1.60

28.07

KG

KG

1.60

4.55

KG

KG

1.60

3.30

KG

KG

1.60

3.00

KG

KG

1.60

3.00

KG

KG

1.60

3.00

KG

KG

1.60

1.70

KG

KG

1.60

26.75

KG

KG

1.60

3.55

KG

KG

1.60

2.70

KG

KG

1.60

1.40

KG

KG

1.60

1.40

KG

KG

1.60

1.40

KG

KG

1.60

1.80

KG

KG

0.60

1.65

KG/M
KG

KG

1.60

28.07

KG

KG

1.60

4.55

KG

KG

1.60

3.30

KG

KG

1.60

3.00

KG

KG

1.60

3.00

KG

KG

1.60

3.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 320

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

1.60

1.70

KG

KG

1.60

26.75

KG

KG

1.60

3.55

KG

KG

1.60

2.70

KG

KG

1.60

1.40

KG

KG

1.60

1.40

KG

KG

1.60

1.40

KG

KG

1.60

1.80

KG

KG

0.60

1.65

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

1.60

11.55

KG

KG

1.60

1.70

KG

KG

1.60

3.30

KG

KG

1.60

2.00

KG

KG

1.60

10.85

KG

KG

1.60

2.70

KG

KG

1.60

1.40

KG

KG

1.60

10.85

KG

KG

1.60

3.00

KG

KG

1.60

3.00

KG

KG

1.60

1.70

KG

KG

1.60

12.05

KG

KG

1.60

1.40

KG

KG

1.60

1.80

KG

KG

0.60

1.65

KG/M
KG

KG

4.00

15.85

KG

KG

4.00

2.30

KG

KG

4.00

4.30

KG

KG

4.00

15.15

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 321

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

4.00

4.20

KG

KG

0.60

1.95

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

4.00

15.85

KG

KG

4.00

2.30

KG

KG

4.00

4.30

KG

KG

4.00

15.15

KG

KG

4.00

4.20

KG

KG

0.60

1.95

KG/M
KG

KG

4.00

15.85

KG

KG

4.00

2.30

KG

KG

4.00

4.30

KG

KG

4.00

15.15

KG

KG

4.00

4.20

KG

KG

0.60

1.95

KG/M
KG

KG

4.00

5.60

KG

KG

4.00

5.60

KG

KG

0.60

2.15

KG/M
KG

KG

4.00

13.45

KG

KG

4.00

2.30

KG

KG

4.00

4.30

KG

KG

4.00

12.75

KG

KG

4.00

4.20

KG

KG

0.60

2.15

KG/M
KG

KG

4.00

13.45

KG

KG

4.00

2.30

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 322

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

4.00

4.30

KG

KG

4.00

12.75

KG

KG

4.00

4.20

KG

KG

0.60

2.15

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

4.00

13.45

KG

KG

4.00

2.30

KG

KG

4.00

4.30

KG

KG

4.00

12.75

KG

KG

4.00

4.20

KG

KG

0.60

1.95

KG/M
KG

KG

1.00

11.65

KG

KG

1.00

11.65

KG

KG

0.60

0.95

KG/M
KG

KG

1.00

14.20

KG

KG

1.00

14.20

KG

KG

0.60

0.95

KG/M
KG

KG

1.00

5.30

KG

KG

1.00

5.30

KG

KG

0.60

0.95

KG/M
KG

KG

1.60

28.07

KG

KG

1.60

4.55

KG

KG

1.60

3.30

KG

KG

1.60

3.00

KG

KG

1.60

3.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 323

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

1.60

3.00

KG

KG

1.60

1.70

KG

KG

1.60

26.75

KG

KG

1.60

3.55

KG

KG

1.60

2.70

KG

KG

1.60

1.40

KG

KG

1.60

1.40

KG

KG

1.60

1.40

KG

KG

1.60

1.80

KG

KG

0.60

1.65

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

1.60

28.07

KG

KG

1.60

4.55

KG

KG

1.60

3.30

KG

KG

1.60

3.00

KG

KG

1.60

3.00

KG

KG

1.60

3.00

KG

KG

1.60

1.70

KG

KG

1.60

26.75

KG

KG

1.60

3.55

KG

KG

1.60

2.70

KG

KG

1.60

1.40

KG

KG

1.60

1.40

KG

KG

1.60

1.40

KG

KG

1.60

1.80

KG

KG

0.60

1.65

KG/M
KG

KG

1.60

11.55

KG

KG

1.60

1.70

KG

KG

1.60

3.30

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 324

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

1.60

2.00

KG

KG

1.60

10.85

KG

KG

1.60

2.70

KG

KG

1.60

1.40

KG

KG

1.60

10.85

KG

KG

1.60

3.00

KG

KG

1.60

3.00

KG

KG

1.60

1.70

KG

KG

1.60

12.05

KG

KG

1.60

1.40

KG

KG

1.60

1.80

KG

KG

0.60

1.65

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

4.00

15.85

KG

KG

4.00

2.30

KG

KG

4.00

4.30

KG

KG

4.00

15.15

KG

KG

4.00

4.20

KG

KG

0.60

1.95

KG/M
KG

KG

4.00

15.85

KG

KG

4.00

2.30

KG

KG

4.00

4.30

KG

KG

4.00

15.15

KG

KG

4.00

4.20

KG

KG

0.60

1.95

KG/M
KG

KG

4.00

15.85

KG

KG

4.00

2.30

KG

KG

4.00

4.30

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 325

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

4.00

15.15

KG

KG

4.00

4.20

KG

KG

0.60

1.95

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

4.00

5.60

KG

KG

4.00

5.60

KG

KG

0.60

2.15

KG/M
KG

KG

4.00

13.45

KG

KG

4.00

2.30

KG

KG

4.00

4.30

KG

KG

4.00

12.75

KG

KG

4.00

4.20

KG

KG

0.60

2.15

KG/M
KG

KG

4.00

13.45

KG

KG

4.00

2.30

KG

KG

4.00

4.30

KG

KG

4.00

12.75

KG

KG

4.00

4.20

KG

KG

0.60

2.15

KG/M
KG

KG

4.00

13.45

KG

KG

4.00

2.30

KG

KG

4.00

4.30

KG

KG

4.00

12.75

KG

KG

4.00

4.20

KG

KG

0.60

1.95

KG/M
KG

KG

1.00

11.65

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 326

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

1.00

11.65

KG

KG

0.60

0.95

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

1.00

14.20

KG

KG

1.00

14.20

KG

KG

0.60

0.95

KG/M
KG

KG

1.00

5.30

KG

KG

1.00

5.30

KG

KG

0.60

0.95

KG/M
KG

KG

1.60

25.45

KG

KG

1.60

1.70

KG

KG

1.60

3.30

KG

KG

1.60

3.00

KG

KG

1.60

3.00

KG

KG

1.60

3.00

KG

KG

1.60

1.70

KG

KG

1.60

24.45

KG

KG

1.60

2.70

KG

KG

1.60

1.40

KG

KG

1.60

1.40

KG

KG

1.60

1.40

KG

KG

1.60

1.80

KG

KG

0.60

1.45

KG/M
KG

KG

1.60

25.45

KG

KG

1.60

1.70

KG

KG

1.60

3.30

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 327

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

1.60

3.00

KG

KG

1.60

3.00

KG

KG

1.60

3.00

KG

KG

1.60

1.70

KG

KG

1.60

24.45

KG

KG

1.60

2.70

KG

KG

1.60

1.40

KG

KG

1.60

1.40

KG

KG

1.60

1.40

KG

KG

1.60

1.80

KG

KG

0.60

1.45

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

1.60

5.60

KG

KG

1.60

5.60

KG

KG

0.60

1.45

KG

KG

1.60

12.75

KG

KG

1.60

12.75

KG

KG

0.60

1.45

KG/M
KG

KG

1.60

12.25

KG

KG

1.60

12.25

KG

KG

0.60

1.45

KG

KG

1.60

12.75

KG

KG

1.60

12.75

KG

KG

0.60

1.45

KG/M
KG

KG

4.00

14.15

KG

KG

4.00

2.30

KG

KG

4.00

4.30

KG

KG

4.00

13.45

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 328

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

4.00

4.20

KG

KG

0.60

1.95

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

4.00

14.15

KG

KG

4.00

2.30

KG

KG

4.00

4.30

KG

KG

4.00

13.45

KG

KG

4.00

4.20

KG

KG

0.60

1.95

KG/M
KG

KG

4.00

5.60

KG

KG

4.00

5.60

KG

KG

0.60

1.95

KG

KG

4.00

5.30

KG

KG

4.00

5.30

KG

KG

0.60

1.95

KG/M
KG

KG

4.00

5.60

KG

KG

4.00

5.60

KG

KG

0.60

1.95

KG

KG

4.00

5.30

KG

KG

4.00

5.30

KG

KG

0.60

1.95

KG/M
KG

KG

4.00

5.60

KG

KG

4.00

5.60

KG

KG

0.60

1.95

KG

KG

4.00

4.60

KG

KG

4.00

4.60

KG

KG

0.60

1.95

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 329

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

4.00

5.60

KG

KG

4.00

5.60

KG

KG

0.60

1.95

KG

KG

4.00

4.60

KG

KG

4.00

4.60

KG

KG

0.60

1.95

KG/M
KG

KG

1.00

14.20

KG

KG

1.00

14.20

KG

KG

0.60

0.95

KG/M
KG

KG

1.00

16.55

KG

KG

1.00

16.55

KG

KG

0.60

0.95

KG/M
KG

KG

1.00

7.60

KG

KG

1.00

7.60

KG

KG

0.60

0.95

KG/M
KG

KG

1.60

29.60

KG

KG

1.60

29.60

KG

KG

0.60

1.65

KG/M
KG

KG

1.60

29.60

KG

KG

1.60

29.60

KG

KG

0.60

1.65

KG/M

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 330

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

1.60

29.60

KG

KG

1.60

29.60

KG

KG

0.60

1.65

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

1.60

29.60

KG

KG

1.60

29.60

KG

KG

0.60

1.65

KG/M
KG

KG

4.00

21.10

KG

KG

4.00

2.30

KG

KG

4.00

4.20

KG

KG

4.00

4.20

KG

KG

4.00

2.30

KG

KG

4.00

20.40

KG

KG

4.00

2.40

KG

KG

4.00

3.00

KG

KG

4.00

2.40

KG

KG

0.60

1.95

KG/M
KG

KG

4.00

21.10

KG

KG

4.00

2.30

KG

KG

4.00

4.20

KG

KG

4.00

4.20

KG

KG

4.00

2.30

KG

KG

4.00

20.40

KG

KG

4.00

2.40

KG

KG

4.00

3.00

KG

KG

4.00

2.40

KG

KG

0.60

2.15

KG/M

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 331

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

4.00

21.10

KG

KG

4.00

2.30

KG

KG

4.00

4.20

KG

KG

4.00

4.20

KG

KG

4.00

2.30

KG

KG

4.00

20.40

KG

KG

4.00

2.40

KG

KG

4.00

3.00

KG

KG

4.00

2.40

KG

KG

0.60

2.15

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

4.00

21.10

KG

KG

4.00

2.30

KG

KG

4.00

4.20

KG

KG

4.00

4.20

KG

KG

4.00

2.30

KG

KG

4.00

20.40

KG

KG

4.00

2.40

KG

KG

4.00

3.00

KG

KG

4.00

2.40

KG

KG

0.60

2.15

KG/M
KG

KG

4.00

10.30

KG

KG

4.00

10.30

KG

KG

0.60

2.15

KG

KG

4.00

10.30

KG

KG

4.00

10.30

KG

KG

0.60

2.15

KG/M
KG

KG

4.00

21.10

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 332

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

4.00

2.30

KG

KG

4.00

4.20

KG

KG

4.00

4.20

KG

KG

4.00

2.30

KG

KG

4.00

20.40

KG

KG

4.00

2.40

KG

KG

4.00

3.00

KG

KG

4.00

2.40

KG

KG

0.60

2.15

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

4.00

21.10

KG

KG

4.00

2.30

KG

KG

4.00

4.20

KG

KG

4.00

4.20

KG

KG

4.00

2.30

KG

KG

4.00

20.40

KG

KG

4.00

2.40

KG

KG

4.00

3.00

KG

KG

4.00

2.40

KG

KG

0.60

2.15

KG/M
KG

KG

4.00

21.10

KG

KG

4.00

2.30

KG

KG

4.00

4.20

KG

KG

4.00

4.20

KG

KG

4.00

2.30

KG

KG

4.00

20.40

KG

KG

4.00

2.40

KG

KG

4.00

3.00

KG

KG

4.00

2.40

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 333

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

KG

KG

DIMENSIONES
LARGO ANCHO
ALTO
0.60

LONG.

SUB TOTAL
AREA
VOL.

1.95

KG/M
KG

KG

1.00

21.10

KG

KG

1.00

21.10

KG

KG

0.60

0.95

KG/M
KG

KG

1.00

21.10

KG

KG

1.00

21.10

KG

KG

0.60

0.95

KG/M
KG

KG

1.00

7.60

KG

KG

1.00

7.60

KG

KG

0.60

0.95

KG/M
KG

KG

1.00

4.80

KG

KG

1.00

4.80

KG

KG

0.60

0.95

KG/M
KG

KG

1.00

4.80

KG

KG

1.00

4.80

KG

KG

0.60

0.95

KG/M
KG

KG

1.60

29.60

KG

KG

1.60

29.60

KG

KG

0.60

1.65

KG/M
KG

KG

1.60

29.60

KG

KG

1.60

29.60

KG

KG

0.60

1.65

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 334

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

1.60

29.60

KG

KG

1.60

29.60

KG

KG

0.60

1.65

KG/M
KG

KG

1.60

29.60

KG

KG

1.60

29.60

KG

KG

0.60

1.65

KG/M
KG

KG

4.00

21.10

KG

KG

4.00

2.30

KG

KG

4.00

4.20

KG

KG

4.00

4.20

KG

KG

4.00

2.30

KG

KG

4.00

20.40

KG

KG

4.00

2.40

KG

KG

4.00

3.00

KG

KG

4.00

2.40

KG

KG

0.60

1.95

KG/M
KG

KG

4.00

21.10

KG

KG

4.00

2.30

KG

KG

4.00

4.20

KG

KG

4.00

4.20

KG

KG

4.00

2.30

KG

KG

4.00

20.40

KG

KG

4.00

2.40

KG

KG

4.00

3.00

KG

KG

4.00

2.40

KG

KG

0.60

2.15

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 335

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

4.00

21.10

KG

KG

4.00

2.30

KG

KG

4.00

4.20

KG

KG

4.00

4.20

KG

KG

4.00

2.30

KG

KG

4.00

20.40

KG

KG

4.00

2.40

KG

KG

4.00

3.00

KG

KG

4.00

2.40

KG

KG

0.60

2.15

KG/M
KG

KG

4.00

21.10

KG

KG

4.00

2.30

KG

KG

4.00

4.20

KG

KG

4.00

4.20

KG

KG

4.00

2.30

KG

KG

4.00

20.40

KG

KG

4.00

2.40

KG

KG

4.00

3.00

KG

KG

4.00

2.40

KG

KG

0.60

2.15

KG/M
KG

KG

4.00

10.30

KG

KG

4.00

10.30

KG

KG

0.60

2.15

KG

KG

4.00

10.30

KG

KG

4.00

10.30

KG

KG

0.60

2.15

KG/M

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 336

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

4.00

21.10

KG

KG

4.00

2.30

KG

KG

4.00

4.20

KG

KG

4.00

4.20

KG

KG

4.00

2.30

KG

KG

4.00

20.40

KG

KG

4.00

2.40

KG

KG

4.00

3.00

KG

KG

4.00

2.40

KG

KG

0.60

2.15

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

4.00

21.10

KG

KG

4.00

2.30

KG

KG

4.00

4.20

KG

KG

4.00

4.20

KG

KG

4.00

2.30

KG

KG

4.00

20.40

KG

KG

4.00

2.40

KG

KG

4.00

3.00

KG

KG

4.00

2.40

KG

KG

0.60

2.15

KG/M
KG

KG

4.00

21.10

KG

KG

4.00

2.30

KG

KG

4.00

4.20

KG

KG

4.00

4.20

KG

KG

4.00

2.30

KG

KG

4.00

20.40

KG

KG

4.00

2.40

KG

KG

4.00

3.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 337

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

4.00

2.40

KG

KG

0.60

1.95

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

1.00

21.10

KG

KG

1.00

21.10

KG

KG

0.60

0.95

KG/M
KG

KG

1.00

21.10

KG

KG

1.00

21.10

KG

KG

0.60

0.95

KG/M
KG

KG

1.00

7.60

KG

KG

1.00

7.60

KG

KG

0.60

0.95

KG/M
KG

KG

1.00

4.80

KG

KG

1.00

4.80

KG

KG

0.60

0.95

KG/M
KG

KG

1.00

4.80

KG

KG

1.00

4.80

KG

KG

0.60

0.95

KG/M
KG

KG

1.60

29.60

KG

KG

1.60

29.60

KG

KG

0.60

1.65

KG/M
KG

KG

1.60

29.60

KG

KG

1.60

29.60

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 338

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

KG

KG

DIMENSIONES
LARGO ANCHO
ALTO
0.60

LONG.

SUB TOTAL
AREA
VOL.

1.65

KG/M
KG

KG

1.60

29.60

KG

KG

1.60

29.60

KG

KG

0.60

1.65

KG/M
KG

KG

1.60

29.60

KG

KG

1.60

29.60

KG

KG

0.60

1.65

KG/M
KG

KG

4.00

21.10

KG

KG

4.00

2.30

KG

KG

4.00

4.20

KG

KG

4.00

4.20

KG

KG

4.00

2.30

KG

KG

4.00

20.40

KG

KG

4.00

2.40

KG

KG

4.00

3.00

KG

KG

4.00

2.40

KG

KG

0.60

1.95

KG/M
KG

KG

4.00

21.10

KG

KG

4.00

2.30

KG

KG

4.00

4.20

KG

KG

4.00

4.20

KG

KG

4.00

2.30

KG

KG

4.00

20.40

KG

KG

4.00

2.40

KG

KG

4.00

3.00

KG

KG

4.00

2.40

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 339

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

KG

KG

DIMENSIONES
LARGO ANCHO
ALTO
0.60

LONG.

SUB TOTAL
AREA
VOL.

2.15

KG/M
KG

KG

4.00

21.10

KG

KG

4.00

2.30

KG

KG

4.00

4.20

KG

KG

4.00

4.20

KG

KG

4.00

2.30

KG

KG

4.00

20.40

KG

KG

4.00

2.40

KG

KG

4.00

3.00

KG

KG

4.00

2.40

KG

KG

0.60

2.15

KG/M
KG

KG

4.00

21.10

KG

KG

4.00

2.30

KG

KG

4.00

4.20

KG

KG

4.00

4.20

KG

KG

4.00

2.30

KG

KG

4.00

20.40

KG

KG

4.00

2.40

KG

KG

4.00

3.00

KG

KG

4.00

2.40

KG

KG

0.60

2.15

KG/M
KG

KG

4.00

10.30

KG

KG

4.00

10.30

KG

KG

0.60

2.15

KG

KG

4.00

10.30

KG

KG

4.00

10.30

KG

KG

0.60

2.15

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 340

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

4.00

21.10

KG

KG

4.00

2.30

KG

KG

4.00

4.20

KG

KG

4.00

4.20

KG

KG

4.00

2.30

KG

KG

4.00

20.40

KG

KG

4.00

2.40

KG

KG

4.00

3.00

KG

KG

4.00

2.40

KG

KG

0.60

2.15

KG/M
KG

KG

4.00

21.10

KG

KG

4.00

2.30

KG

KG

4.00

4.20

KG

KG

4.00

4.20

KG

KG

4.00

2.30

KG

KG

4.00

20.40

KG

KG

4.00

2.40

KG

KG

4.00

3.00

KG

KG

4.00

2.40

KG

KG

0.60

2.15

KG/M
KG

KG

4.00

21.10

KG

KG

4.00

2.30

KG

KG

4.00

4.20

KG

KG

4.00

4.20

KG

KG

4.00

2.30

KG

KG

4.00

20.40

KG

KG

4.00

2.40

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 341

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

4.00

3.00

KG

KG

4.00

2.40

KG

KG

0.60

1.95

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

1.00

21.10

KG

KG

1.00

21.10

KG

KG

0.60

0.95

KG/M
KG

KG

1.00

21.10

KG

KG

1.00

21.10

KG

KG

0.60

0.95

KG/M
KG

KG

1.00

7.60

KG

KG

1.00

7.60

KG

KG

0.60

0.95

KG/M
KG

KG

1.00

4.80

KG

KG

1.00

4.80

KG

KG

0.60

0.95

KG/M
KG

KG

1.00

4.80

KG

KG

1.00

4.80

KG

KG

0.60

0.95

KG/M
KG

KG

1.60

29.60

KG

KG

1.60

29.60

KG

KG

0.60

1.65

KG/M
KG

KG

1.60

29.60

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 342

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

1.60

29.60

KG

KG

0.60

1.65

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

1.60

29.60

KG

KG

1.60

29.60

KG

KG

0.60

1.65

KG/M
KG

KG

1.60

29.60

KG

KG

1.60

29.60

KG

KG

0.60

1.65

KG/M
KG

KG

4.00

21.10

KG

KG

4.00

2.30

KG

KG

4.00

4.20

KG

KG

4.00

4.20

KG

KG

4.00

2.30

KG

KG

4.00

20.40

KG

KG

4.00

2.40

KG

KG

4.00

3.00

KG

KG

4.00

2.40

KG

KG

0.60

1.95

KG/M
KG

KG

4.00

21.10

KG

KG

4.00

2.30

KG

KG

4.00

4.20

KG

KG

4.00

4.20

KG

KG

4.00

2.30

KG

KG

4.00

20.40

KG

KG

4.00

2.40

KG

KG

4.00

3.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 343

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

4.00

2.40

KG

KG

0.60

2.15

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

4.00

21.10

KG

KG

4.00

2.30

KG

KG

4.00

4.20

KG

KG

4.00

4.20

KG

KG

4.00

2.30

KG

KG

4.00

20.40

KG

KG

4.00

2.40

KG

KG

4.00

3.00

KG

KG

4.00

2.40

KG

KG

0.60

2.15

KG/M
KG

KG

4.00

21.10

KG

KG

4.00

2.30

KG

KG

4.00

4.20

KG

KG

4.00

4.20

KG

KG

4.00

2.30

KG

KG

4.00

20.40

KG

KG

4.00

2.40

KG

KG

4.00

3.00

KG

KG

4.00

2.40

KG

KG

0.60

2.15

KG/M
KG

KG

4.00

10.30

KG

KG

4.00

10.30

KG

KG

0.60

2.15

KG

KG

4.00

10.30

KG

KG

4.00

10.30

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 344

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

KG

KG

DIMENSIONES
LARGO ANCHO
ALTO
0.60

LONG.

SUB TOTAL
AREA
VOL.

2.15

KG/M
KG

KG

4.00

21.10

KG

KG

4.00

2.30

KG

KG

4.00

4.20

KG

KG

4.00

4.20

KG

KG

4.00

2.30

KG

KG

4.00

20.40

KG

KG

4.00

2.40

KG

KG

4.00

3.00

KG

KG

4.00

2.40

KG

KG

0.60

2.15

KG/M
KG

KG

4.00

21.10

KG

KG

4.00

2.30

KG

KG

4.00

4.20

KG

KG

4.00

4.20

KG

KG

4.00

2.30

KG

KG

4.00

20.40

KG

KG

4.00

2.40

KG

KG

4.00

3.00

KG

KG

4.00

2.40

KG

KG

0.60

2.15

KG/M
KG

KG

4.00

21.10

KG

KG

4.00

2.30

KG

KG

4.00

4.20

KG

KG

4.00

4.20

KG

KG

4.00

2.30

KG

KG

4.00

20.40

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 345

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

4.00

2.40

KG

KG

4.00

3.00

KG

KG

4.00

2.40

KG

KG

0.60

1.95

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

1.00

21.10

KG

KG

1.00

21.10

KG

KG

0.60

0.95

KG/M
KG

KG

1.00

21.10

KG

KG

1.00

21.10

KG

KG

0.60

0.95

KG/M
KG

KG

1.00

7.60

KG

KG

1.00

7.60

KG

KG

0.60

0.95

KG/M
KG

KG

1.00

4.80

KG

KG

1.00

4.80

KG

KG

0.60

0.95

KG/M
KG

KG

1.00

4.80

KG

KG

1.00

4.80

KG

KG

0.60

0.95

KG/M
KG

KG

1.60

29.60

KG

KG

1.60

29.60

KG

KG

0.60

1.65

KG/M

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 346

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

1.60

29.60

KG

KG

1.60

29.60

KG

KG

0.60

1.65

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

4.00

21.10

KG

KG

4.00

2.30

KG

KG

4.00

4.20

KG

KG

4.00

4.20

KG

KG

4.00

2.30

KG

KG

4.00

20.40

KG

KG

4.00

2.40

KG

KG

4.00

3.00

KG

KG

4.00

2.40

KG

KG

0.60

1.95

KG/M
KG

KG

4.00

21.10

KG

KG

4.00

2.30

KG

KG

4.00

4.20

KG

KG

4.00

4.20

KG

KG

4.00

2.30

KG

KG

4.00

20.40

KG

KG

4.00

2.40

KG

KG

4.00

3.00

KG

KG

4.00

2.40

KG

KG

0.60

1.95

KG/M
KG

KG

1.00

21.10

KG

KG

1.00

21.10

KG

KG

0.60

0.95

KG/M

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 347

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

1.00

7.60

KG

KG

1.00

7.60

KG

KG

0.60

0.95

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

1.00

4.80

KG

KG

1.00

4.80

KG

KG

0.60

0.95

KG/M
KG

KG

1.00

4.80

KG

KG

1.00

4.80

KG

KG

0.60

0.95

M3

M3

6.65

0.30

0.25

0.50

M3

M3

52.00

0.15

0.25

1.95

M3

M3

6.65

0.30

0.25

0.50

M3

M3

52.00

0.15

0.25

1.95

M3

M3

6.65

0.30

0.25

0.50

M3

M3

52.00

0.15

0.25

1.95

M3

M3

6.65

0.30

0.25

0.50

M3

M3

52.00

0.15

0.25

1.95

M3

M3

6.65

0.30

0.25

0.50

M3

M3

52.00

0.15

0.25

1.95

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 348

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

6.40

0.30

0.25

0.48

M3

M3

120.00

0.15

0.25

4.50

M3

M3

6.40

0.30

0.25

0.48

M3

M3

120.00

0.15

0.25

4.50

M3

M3

6.40

0.30

0.25

0.48

M3

M3

120.00

0.15

0.25

4.50

M3

M3

6.40

0.30

0.25

0.48

M3

M3

120.00

0.15

0.25

4.50

M3

M3

6.40

0.30

0.25

0.48

M3

M3

120.00

0.15

0.25

4.50

0.00
0.00
M2

M2

6.65

0.25

1.66

M2

M2

52.00

0.25

13.00

M2

M2

M2

M2

6.65

0.25

1.66

M2

M2

52.00

0.25

13.00

M2

M2

M2

M2

6.65

0.25

1.66

M2

M2

52.00

0.25

13.00

M2

M2

M2

M2

0.00

0.00

0.00
6.65

0.25

1.66

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 349

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO
52.00

0.25

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

13.00

M2

M2

M2

M2

6.65

0.25

1.66

M2

M2

52.00

0.25

13.00

M2

M2

0.00

M2

M2

0.00

M2

M2

6.40

0.25

1.60

M2

M2

120.00

0.25

30.00

M2

M2

M2

M2

6.40

0.25

1.60

M2

M2

120.00

0.25

30.00

M2

M2

M2

M2

6.40

0.25

1.60

M2

M2

120.00

0.25

30.00

M2

M2

M2

M2

6.40

0.25

1.60

M2

M2

120.00

0.25

30.00

M2

M2

M2

M2

6.40

0.25

1.60

M2

M2

120.00

0.25

30.00

0.00

0.00

0.00

0.00

0.00

KG/M
KG

KG

1.00

7.20

KG

KG

0.25

1.20

28.00

KG/M
KG

KG

1.00

52.55

KG

KG

0.25

1.20

260.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 350

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

1.00

7.20

KG

KG

0.25

1.20

28.00

KG/M
KG

KG

1.00

52.55

KG

KG

0.25

1.20

260.00

KG/M
KG

KG

1.00

7.20

KG

KG

0.25

1.20

28.00

KG/M
KG

KG

1.00

52.55

KG

KG

0.25

1.20

260.00

KG/M
KG

KG

1.00

7.20

KG

KG

0.25

1.20

28.00

KG/M
KG

KG

1.00

52.55

KG

KG

0.25

1.20

260.00

KG/M
KG

KG

1.00

7.20

KG

KG

0.25

1.20

28.00

KG/M
KG

KG

1.00

52.55

KG

KG

0.25

1.20

260.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 351

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

1.00

7.00

KG

KG

0.25

1.20

35.00

KG/M
KG

KG

1.00

120.55

KG

KG

0.25

1.20

600.00

KG/M
KG

KG

1.00

7.00

KG

KG

0.25

1.20

35.00

KG/M
KG

KG

1.00

120.55

KG

KG

0.25

1.20

600.00

KG/M
KG

KG

1.00

7.00

KG

KG

0.25

1.20

35.00

KG/M
KG

KG

1.00

120.55

KG

KG

0.25

1.20

600.00

KG/M
KG

KG

1.00

7.00

KG

KG

0.25

1.20

35.00

KG/M
KG

KG

1.00

120.55

KG

KG

0.25

1.20

600.00

KG/M
KG

KG

1.00

7.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 352

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

KG

KG

DIMENSIONES
LARGO ANCHO
ALTO
0.25

1.20

LONG.

SUB TOTAL
AREA
VOL.

35.00

KG/M
KG

KG

1.00

120.55

KG

KG

0.25

1.20

M3

M3

9.20

9.20

M3

M3

10.55

10.55

M3

M3

10.15

10.15

M3

M3

9.45

9.45

M3

M3

26.35

26.35

M3

M3

14.05

14.05

M3

M3

6.55

6.55

M3

M3

29.10

29.10

M3

M3

27.15

27.15

M3

M3

1.85

1.85

600.00

0.00
M3

M3

9.20

9.20

M3

M3

10.55

10.55

M3

M3

10.15

10.15

M3

M3

9.45

9.45

M3

M3

26.35

26.35

M3

M3

14.05

14.05

M3

M3

6.55

6.55

M3

M3

29.10

29.10

M3

M3

27.15

27.15

M3

M3

1.85

1.85

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 353

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.
0.00

M3

M3

9.20

9.20

M3

M3

10.55

10.55

M3

M3

10.15

10.15

M3

M3

9.45

9.45

M3

M3

26.35

26.35

M3

M3

14.05

14.05

M3

M3

6.55

6.55

M3

M3

29.10

29.10

M3

M3

27.15

27.15

M3

M3

1.85

1.85

M3

M3

5.20

5.20

M3

M3

10.35

10.35

M3

M3

7.50

7.50

M3

M3

5.85

5.85

M3

M3

12.70

12.70

M3

M3

6.95

6.95

M3

M3

16.95

16.95
0.00

M3

M3

9.20

9.20

M3

M3

10.55

10.55

M3

M3

10.15

10.15

M3

M3

9.45

9.45

M3

M3

26.35

26.35

M3

M3

14.05

14.05

M3

M3

6.55

6.55

M3

M3

29.10

29.10

M3

M3

27.15

27.15

M3

M3

1.85

1.85

M3

M3

5.20

5.20

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 354

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

10.35

10.35

M3

M3

7.50

7.50

M3

M3

5.85

5.85

M3

M3

12.70

12.70

M3

M3

6.95

6.95

M3

M3

16.95

16.95
0.00

M3

M3

0.25

0.25

M3

M3

2.40

2.40

M3

M3

1.70

1.70

M3

M3

2.00

2.00

M3

M3

1.40

1.40

M3

M3

12.70

12.70

M3

M3

9.20

9.20

M3

M3

10.55

10.55

M3

M3

10.15

10.15

M3

M3

9.50

9.50

M3

M3

3.90

3.90

M3

M3

36.45

36.45

M3

M3

12.60

12.60

M3

M3

7.60

7.60

M3

M3

13.90

13.90

M3

M3

13.00

13.00
0.00
0.00

M3

M3

5.75

5.75

M3

M3

6.35

6.35

M3

M3

5.75

5.75

M3

M3

16.70

16.70

M3

M3

18.45

18.45

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 355

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

16.70

16.70

M3

M3

17.25

17.25

M3

M3

19.05

19.05

M3

M3

17.25

17.25

M3

M3

17.25

17.25

M3

M3

19.05

19.05

M3

M3

17.25

17.25

M3

M3

18.80

18.80

M3

M3

6.15

6.15

M3

M3

6.15

6.15

M3

M3

18.80

18.80

M3

M3

19.10

19.10

M3

M3

6.15

6.15

M3

M3

6.15

6.15

M3

M3

19.10

19.10

M3

M3

19.10

19.10

M3

M3

21.10

21.10

M3

M3

19.10

19.10

M3

M3

18.80

18.80

M3

M3

20.75

20.75

M3

M3

18.80

18.80

M3

M3

17.10

17.10
0.00

M3

M3

5.75

5.75

M3

M3

6.35

6.35

M3

M3

5.75

5.75

M3

M3

16.70

16.70

M3

M3

18.45

18.45

M3

M3

16.70

16.70

M3

M3

17.25

17.25

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 356

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

19.05

19.05

M3

M3

17.25

17.25

M3

M3

17.25

17.25

M3

M3

19.05

19.05

M3

M3

17.25

17.25

M3

M3

18.80

18.80

M3

M3

6.15

6.15

M3

M3

6.15

6.15

M3

M3

18.80

18.80

M3

M3

19.10

19.10

M3

M3

6.15

6.15

M3

M3

6.15

6.15

M3

M3

19.10

19.10

M3

M3

19.10

19.10

M3

M3

21.10

21.10

M3

M3

19.10

19.10

M3

M3

18.80

18.80

M3

M3

20.75

20.75

M3

M3

18.80

18.80

M3

M3

17.10

17.10
0.00

M3

M3

5.75

5.75

M3

M3

6.35

6.35

M3

M3

5.75

5.75

M3

M3

16.70

16.70

M3

M3

18.45

18.45

M3

M3

16.70

16.70

M3

M3

17.25

17.25

M3

M3

19.05

19.05

M3

M3

17.25

17.25

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 357

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

17.25

17.25

M3

M3

19.05

19.05

M3

M3

17.25

17.25

M3

M3

18.80

18.80

M3

M3

6.15

6.15

M3

M3

6.15

6.15

M3

M3

18.80

18.80

M3

M3

19.10

19.10

M3

M3

6.15

6.15

M3

M3

6.15

6.15

M3

M3

19.10

19.10

M3

M3

19.10

19.10

M3

M3

21.10

21.10

M3

M3

19.10

19.10

M3

M3

18.80

18.80

M3

M3

20.75

20.75

M3

M3

18.80

18.80

M3

M3

17.10

17.10
0.00

M3

M3

5.75

5.75

M3

M3

6.35

6.35

M3

M3

5.75

5.75

M3

M3

16.70

16.70

M3

M3

18.45

18.45

M3

M3

16.70

16.70

M3

M3

17.25

17.25

M3

M3

19.05

19.05

M3

M3

17.25

17.25

M3

M3

17.25

17.25

M3

M3

19.05

19.05

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 358

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M3

M3

17.25

17.25

M3

M3

18.80

18.80

M3

M3

6.15

6.15

M3

M3

6.15

6.15

M3

M3

18.80

18.80

M3

M3

19.10

19.10

M3

M3

6.15

6.15

M3

M3

6.15

6.15

M3

M3

19.10

19.10

M3

M3

19.10

19.10

M3

M3

21.10

21.10

M3

M3

19.10

19.10

M3

M3

18.80

18.80

M3

M3

20.75

20.75

M3

M3

18.80

18.80

M3

M3

17.10

17.10
0.00

M3

M3

17.10

M2

M2

M2

M2

M2

M2

9.20

M2

M2

10.55

M2

M2

10.15

M2

M2

9.45

M2

M2

26.35

M2

M2

14.05

M2

M2

6.55

M2

M2

29.10

17.10

GERADA

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 359

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

27.15

M2

M2

1.85

M2

M2

M2

M2

9.20

M2

M2

10.55

M2

M2

10.15

M2

M2

9.45

M2

M2

26.35

M2

M2

14.05

M2

M2

6.55

M2

M2

29.10

M2

M2

27.15

M2

M2

1.85

M2

M2

M2

M2

9.20

M2

M2

10.55

M2

M2

10.15

M2

M2

9.45

M2

M2

26.35

M2

M2

14.05

M2

M2

6.55

M2

M2

29.10

M2

M2

27.15

M2

M2

1.85

M2

M2

5.20

M2

M2

10.35

M2

M2

7.50

M2

M2

5.85

M2

M2

12.70

M2

M2

6.95

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 360

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

16.95

M2

M2

M2

M2

9.20

M2

M2

10.55

M2

M2

10.15

M2

M2

9.45

M2

M2

26.35

M2

M2

14.05

M2

M2

6.55

M2

M2

29.10

M2

M2

27.15

M2

M2

1.85

M2

M2

5.20

M2

M2

10.35

M2

M2

7.50

M2

M2

5.85

M2

M2

12.70

M2

M2

6.95

M2

M2

16.95

M2

M2

M2

M2

0.25

M2

M2

2.40

M2

M2

1.70

M2

M2

2.00

M2

M2

1.40

M2

M2

12.70

M2

M2

9.20

M2

M2

10.55

M2

M2

10.15

M2

M2

9.50

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 361

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

3.90

M2

M2

36.45

M2

M2

12.60

M2

M2

7.60

M2

M2

13.90

M2

M2

13.00

M2

M2

M2

M2

M2

M2

5.75

M2

M2

6.35

M2

M2

5.75

M2

M2

16.70

M2

M2

18.45

M2

M2

16.70

M2

M2

17.25

M2

M2

19.05

M2

M2

17.25

M2

M2

17.25

M2

M2

19.05

M2

M2

17.25

M2

M2

18.80

M2

M2

6.15

M2

M2

6.15

M2

M2

18.80

M2

M2

19.10

M2

M2

6.15

M2

M2

6.15

M2

M2

19.10

M2

M2

19.10

M2

M2

21.10

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 362

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

19.10

M2

M2

18.80

M2

M2

20.75

M2

M2

18.80

M2

M2

17.10

M2

M2

M2

M2

5.75

M2

M2

6.35

M2

M2

5.75

M2

M2

16.70

M2

M2

18.45

M2

M2

16.70

M2

M2

17.25

M2

M2

19.05

M2

M2

17.25

M2

M2

17.25

M2

M2

19.05

M2

M2

17.25

M2

M2

18.80

M2

M2

6.15

M2

M2

6.15

M2

M2

18.80

M2

M2

19.10

M2

M2

6.15

M2

M2

6.15

M2

M2

19.10

M2

M2

19.10

M2

M2

21.10

M2

M2

19.10

M2

M2

18.80

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 363

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

20.75

M2

M2

18.80

M2

M2

17.10

M2

M2

5.75

M2

M2

6.35

M2

M2

5.75

M2

M2

16.70

M2

M2

18.45

M2

M2

16.70

M2

M2

17.25

M2

M2

19.05

M2

M2

17.25

M2

M2

17.25

M2

M2

19.05

M2

M2

17.25

M2

M2

18.80

M2

M2

6.15

M2

M2

6.15

M2

M2

18.80

M2

M2

19.10

M2

M2

6.15

M2

M2

6.15

M2

M2

19.10

M2

M2

19.10

M2

M2

21.10

M2

M2

19.10

M2

M2

18.80

M2

M2

20.75

M2

M2

18.80

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 364

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

M2

M2

17.10

M2

M2

5.75

M2

M2

6.35

M2

M2

5.75

M2

M2

16.70

M2

M2

18.45

M2

M2

16.70

M2

M2

17.25

M2

M2

19.05

M2

M2

17.25

M2

M2

17.25

M2

M2

19.05

M2

M2

17.25

M2

M2

18.80

M2

M2

6.15

M2

M2

6.15

M2

M2

18.80

M2

M2

19.10

M2

M2

6.15

M2

M2

6.15

M2

M2

19.10

M2

M2

19.10

M2

M2

21.10

M2

M2

19.10

M2

M2

18.80

M2

M2

20.75

M2

M2

18.80

M2

M2

17.10

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 365

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

M2

DIMENSIONES
LARGO ANCHO
ALTO

M2

LONG.

SUB TOTAL
AREA
VOL.
17.10

KG/M
KG

KG

1.00

18.00

KG

KG

1.00

17.70

KG

KG

0.25

16.55

KG

KG

0.25

0.30

KG

KG

1.00

4.80

KG

KG

1.00

4.80

KG

KG

0.25

4.20

KG

KG

0.25

0.30

KG

KG

1.00

11.95

KG

KG

1.00

11.65

KG

KG

0.25

10.50

KG

KG

0.25

0.30

82.00

21.00

53.00

KG/M
KG

KG

1.00

18.00

KG

KG

1.00

17.70

KG

KG

0.25

16.55

KG

KG

0.25

0.30

KG

KG

1.00

4.80

KG

KG

1.00

4.80

KG

KG

0.25

4.20

KG

KG

0.25

0.30

KG

KG

1.00

11.95

KG

KG

1.00

11.65

KG

KG

0.25

10.50

KG

KG

0.25

0.30

82.00

21.00

53.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 366

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

1.00

13.30

KG

KG

1.00

13.00

KG

KG

0.25

11.85

KG

KG

0.25

0.30

KG

KG

1.00

26.45

KG

KG

1.00

25.85

KG

KG

0.25

24.15

KG

KG

0.25

0.30

KG

KG

1.00

4.80

KG

KG

1.00

4.80

KG

KG

0.25

4.20

KG

KG

0.25

0.30

KG

KG

1.00

11.95

KG

KG

1.00

11.65

KG

KG

0.25

10.50

KG

KG

0.25

0.30

59.00

120.00

21.00

53.00

KG/M
KG

KG

1.00

13.30

KG

KG

1.00

13.00

KG

KG

0.25

11.85

KG

KG

0.25

0.30

KG

KG

1.00

26.45

KG

KG

1.00

25.85

KG

KG

0.25

24.15

KG

KG

0.25

0.30

KG

KG

1.00

4.80

KG

KG

1.00

4.80

KG

KG

0.25

4.20

KG

KG

0.25

0.30

59.00

120.00

21.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 367

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

1.00

11.95

KG

KG

1.00

11.65

KG

KG

0.25

10.50

KG

KG

0.25

0.30

LONG.

SUB TOTAL
AREA
VOL.

53.00

KG/M
KG

KG

0.60

15.75

KG

KG

0.60

15.45

KG

KG

0.25

14.30

KG

KG

0.25

0.30

KG

KG

1.00

26.25

KG

KG

1.00

25.65

KG

KG

0.25

23.95

KG

KG

0.25

0.30

KG

KG

1.00

4.80

KG

KG

1.00

4.80

KG

KG

0.25

4.20

KG

KG

0.25

0.30

KG

KG

1.00

11.95

KG

KG

1.00

11.65

KG

KG

0.25

10.50

KG

KG

0.25

0.30

72.00

120.00

21.00

53.00

KG/M
KG

KG

1.00

28.80

KG

KG

1.00

28.20

KG

KG

0.25

26.50

KG

KG

0.25

0.30

KG

KG

1.00

31.80

KG

KG

1.00

31.20

KG

KG

0.25

29.50

132.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 368

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

0.25

0.30

KG

KG

1.00

13.15

KG

KG

1.00

12.85

KG

KG

0.25

11.70

KG

KG

0.25

0.30

KG

KG

1.00

12.20

KG

KG

1.00

11.90

KG

KG

0.25

10.75

KG

KG

0.25

0.30

LONG.

SUB TOTAL
AREA
VOL.

148.00

58.00

58.00

KG/M
KG

KG

1.00

28.80

KG

KG

1.00

28.20

KG

KG

0.25

26.50

KG

KG

0.25

0.30

KG

KG

1.00

31.80

KG

KG

1.00

31.20

KG

KG

0.25

29.50

KG

KG

0.25

0.30

KG

KG

1.00

13.15

KG

KG

1.00

12.85

KG

KG

0.25

11.70

KG

KG

0.25

0.30

KG

KG

1.00

12.20

KG

KG

1.00

11.90

KG

KG

0.25

10.75

KG

KG

0.25

0.30

132.00

148.00

58.00

58.00

KG/M
KG

KG

1.00

28.80

KG

KG

1.00

28.20

KG

KG

0.25

26.50

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 369

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

0.25

0.30

KG

KG

1.00

31.80

KG

KG

1.00

31.20

KG

KG

0.25

29.50

KG

KG

0.25

0.30

KG

KG

1.00

13.15

KG

KG

1.00

12.85

KG

KG

0.25

11.70

KG

KG

0.25

0.30

KG

KG

1.00

12.20

KG

KG

1.00

11.90

KG

KG

0.25

10.75

KG

KG

0.25

0.30

LONG.

SUB TOTAL
AREA
VOL.

132.00

148.00

58.00

58.00

KG/M
KG

KG

1.00

28.80

KG

KG

1.00

28.20

KG

KG

0.25

26.50

KG

KG

0.25

0.30

KG

KG

1.00

31.80

KG

KG

1.00

31.20

KG

KG

0.25

29.50

KG

KG

0.25

0.30

KG

KG

1.00

13.15

KG

KG

1.00

12.85

KG

KG

0.25

11.70

KG

KG

0.25

0.30

KG

KG

1.00

12.20

KG

KG

1.00

11.90

KG

KG

0.25

10.75

KG

KG

0.25

0.30

132.00

148.00

58.00

58.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 370

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

1.00

4.00

KG

KG

1.00

4.00

KG

KG

0.25

3.40

KG

KG

0.25

0.30

UND

UND

UND

UND

UND

UND

9.20

9.20

UND

UND

10.55

10.55

UND

UND

10.15

10.15

UND

UND

9.45

9.45

UND

UND

26.35

26.35

UND

UND

14.05

14.05

UND

UND

6.55

6.55

UND

UND

29.10

29.10

UND

UND

27.15

27.15

UND

UND

1.85

1.85

UND

UND

UND

UND

9.20

9.20

UND

UND

10.55

10.55

UND

UND

10.15

10.15

UND

UND

9.45

9.45

UND

UND

26.35

26.35

UND

UND

14.05

14.05

UND

UND

6.55

6.55

UND

UND

29.10

29.10

UND

UND

27.15

27.15

UND

UND

1.85

1.85

17.00

SA ALIGERADA

0.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 371

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

UND

UND

0.00

UND

UND

9.20

9.20

UND

UND

10.55

10.55

UND

UND

10.15

10.15

UND

UND

9.45

9.45

UND

UND

26.35

26.35

UND

UND

14.05

14.05

UND

UND

6.55

6.55

UND

UND

29.10

29.10

UND

UND

27.15

27.15

UND

UND

1.85

1.85

UND

UND

5.20

5.20

UND

UND

10.35

10.35

UND

UND

7.50

7.50

UND

UND

5.85

5.85

UND

UND

12.70

12.70

UND

UND

6.95

6.95

UND

UND

16.95

16.95

UND

UND

UND

UND

9.20

9.20

UND

UND

10.55

10.55

UND

UND

10.15

10.15

UND

UND

9.45

9.45

UND

UND

26.35

26.35

UND

UND

14.05

14.05

UND

UND

6.55

6.55

UND

UND

29.10

29.10

UND

UND

27.15

27.15

UND

UND

1.85

1.85

UND

UND

5.20

5.20

0.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 372

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

UND

UND

10.35

10.35

UND

UND

7.50

7.50

UND

UND

5.85

5.85

UND

UND

12.70

12.70

UND

UND

6.95

6.95

UND

UND

16.95

16.95

UND

UND

UND

UND

0.25

0.25

UND

UND

2.40

2.40

UND

UND

1.70

1.70

UND

UND

2.00

2.00

UND

UND

1.40

1.40

UND

UND

12.70

12.70

UND

UND

9.20

9.20

UND

UND

10.55

10.55

UND

UND

10.15

10.15

UND

UND

9.50

9.50

UND

UND

3.90

3.90

UND

UND

36.45

36.45

UND

UND

12.60

12.60

UND

UND

7.60

7.60

UND

UND

13.90

13.90

UND

UND

13.00

13.00

UND

UND

0.00

UND

UND

0.00

UND

UND

5.75

5.75

UND

UND

6.35

6.35

UND

UND

5.75

5.75

UND

UND

16.70

16.70

UND

UND

18.45

18.45

0.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 373

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

UND

UND

16.70

16.70

UND

UND

17.25

17.25

UND

UND

19.05

19.05

UND

UND

17.25

17.25

UND

UND

17.25

17.25

UND

UND

19.05

19.05

UND

UND

17.25

17.25

UND

UND

18.80

18.80

UND

UND

6.15

6.15

UND

UND

6.15

6.15

UND

UND

18.80

18.80

UND

UND

19.10

19.10

UND

UND

6.15

6.15

UND

UND

6.15

6.15

UND

UND

19.10

19.10

UND

UND

19.10

19.10

UND

UND

21.10

21.10

UND

UND

19.10

19.10

UND

UND

18.80

18.80

UND

UND

20.75

20.75

UND

UND

18.80

18.80

UND

UND

17.10

17.10

UND

UND

UND

UND

5.75

5.75

UND

UND

6.35

6.35

UND

UND

5.75

5.75

UND

UND

16.70

16.70

UND

UND

18.45

18.45

UND

UND

16.70

16.70

UND

UND

17.25

17.25

0.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 374

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

UND

UND

19.05

19.05

UND

UND

17.25

17.25

UND

UND

17.25

17.25

UND

UND

19.05

19.05

UND

UND

17.25

17.25

UND

UND

18.80

18.80

UND

UND

6.15

6.15

UND

UND

6.15

6.15

UND

UND

18.80

18.80

UND

UND

19.10

19.10

UND

UND

6.15

6.15

UND

UND

6.15

6.15

UND

UND

19.10

19.10

UND

UND

19.10

19.10

UND

UND

21.10

21.10

UND

UND

19.10

19.10

UND

UND

18.80

18.80

UND

UND

20.75

20.75

UND

UND

18.80

18.80

UND

UND

17.10

17.10

UND

UND

UND

UND

5.75

5.75

UND

UND

6.35

6.35

UND

UND

5.75

5.75

UND

UND

16.70

16.70

UND

UND

18.45

18.45

UND

UND

16.70

16.70

UND

UND

17.25

17.25

UND

UND

19.05

19.05

UND

UND

17.25

17.25

0.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 375

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

UND

UND

17.25

17.25

UND

UND

19.05

19.05

UND

UND

17.25

17.25

UND

UND

18.80

18.80

UND

UND

6.15

6.15

UND

UND

6.15

6.15

UND

UND

18.80

18.80

UND

UND

19.10

19.10

UND

UND

6.15

6.15

UND

UND

6.15

6.15

UND

UND

19.10

19.10

UND

UND

19.10

19.10

UND

UND

21.10

21.10

UND

UND

19.10

19.10

UND

UND

18.80

18.80

UND

UND

20.75

20.75

UND

UND

18.80

18.80

UND

UND

17.10

17.10

UND

UND

UND

UND

5.75

5.75

UND

UND

6.35

6.35

UND

UND

5.75

5.75

UND

UND

16.70

16.70

UND

UND

18.45

18.45

UND

UND

16.70

16.70

UND

UND

17.25

17.25

UND

UND

19.05

19.05

UND

UND

17.25

17.25

UND

UND

17.25

17.25

UND

UND

19.05

19.05

0.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 376

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

UND

UND

17.25

17.25

UND

UND

18.80

18.80

UND

UND

6.15

6.15

UND

UND

6.15

6.15

UND

UND

18.80

18.80

UND

UND

19.10

19.10

UND

UND

6.15

6.15

UND

UND

6.15

6.15

UND

UND

19.10

19.10

UND

UND

19.10

19.10

UND

UND

21.10

21.10

UND

UND

19.10

19.10

UND

UND

18.80

18.80

UND

UND

20.75

20.75

UND

UND

18.80

18.80

UND

UND

17.10

17.10

UND

UND

UND

UND

0.00
17.10

17.10

0.00
M3

M3

1.00

0.15

4.20

0.63

M3

M3

1.00

0.15

4.20

0.63

M3

M3

0.70

0.15

4.20

0.44

M3

M3

1.40

0.15

4.20

0.88
0.00

M3

M3

0.70

0.15

3.85

0.40

M3

M3

1.40

0.15

3.85

0.81

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 377

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.
0.00

M3

M3

0.70

0.15

3.85

0.40

M3

M3

1.40

0.15

3.85

0.81
0.00

M3

M3

0.70

0.15

3.85

0.40

M3

M3

1.40

0.15

3.85

0.81
0.00

M3

M3

0.70

0.15

3.85

0.40

M3

M3

1.40

0.15

3.85

0.81

0.00
M3

M3

4.20

2.30

9.66

M3

M3

4.20

2.30

9.66

M3

M3

4.20

1.70

7.14

M3

M3

4.20

3.10

13.02
0.00

M3

M3

3.85

1.70

6.55

M3

M3

3.85

3.10

11.94
0.00

M3

M3

3.85

1.70

6.55

M3

M3

3.85

3.10

11.94
0.00

M3

M3

3.85

1.70

6.55

M3

M3

3.85

3.10

11.94
0.00

M3

M3

3.85

1.70

6.55

M3

M3

3.85

3.10

11.94

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 378

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

0.60

5.00

KG

KG

0.60

1.40

KG/M
KG

KG

0.60

5.00

KG

KG

0.60

1.40

KG/M
KG

KG

0.60

5.00

KG

KG

0.60

1.10

KG/M
KG

KG

0.60

5.00

KG

KG

0.60

1.80

KG/M
KG

KG

0.60

3.85

KG

KG

0.60

1.10

KG/M
KG

KG

0.60

3.85

KG

KG

0.60

1.80

KG/M
KG

KG

0.60

3.85

KG

KG

0.60

1.10

KG/M
KG

KG

0.60

3.85

KG

KG

0.60

1.80

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 379

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

0.60

3.85

KG

KG

0.60

1.10

KG/M
KG

KG

0.60

3.85

KG

KG

0.60

1.80

KG/M
KG

KG

0.60

3.85

KG

KG

0.60

1.10

KG/M
KG

KG

0.60

3.85

KG

KG

0.60

1.80

0.00
M3

M3

0.20

8.40

1.68

M3

M3

2.00

2.70

5.40

M3

M3

4.20

1.90

7.98
0.00

M3

M3

3.85

1.90

7.32
0.00

M3

M3

3.85

1.90

7.32
0.00

M3

M3

3.85

1.90

7.32
0.00

M3

M3

3.85

1.90

7.32

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 380

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

0.00
0.00
M2

M2

0.20

12.50

2.50

M2

M2

2.00

26.00

52.00

M2

M2

4.20

19.00

79.80

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

M2

0.20

8.40

1.68

M2

M2

3.85

19.00

73.15

0.00
3.85

19.00

73.15
0.00

3.85

19.00

73.15
0.00

3.85

19.00

73.15
0.00

KG/M
KG

KG

1.60

5.40

KG

KG

1.60

3.20

KG

KG

1.60

5.40

KG

KG

1.60

3.20

KG/M
KG

KG

1.60

2.60

KG

KG

1.60

2.60

KG

KG

1.60

5.20

KG

KG

1.60

5.20

KG/M

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 381

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

1.60

7.40

KG

KG

1.60

7.40

KG

KG

1.60

9.40

KG

KG

1.60

9.40

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

1.60

4.45

KG

KG

1.60

4.45

KG

KG

1.60

9.40

KG

KG

1.60

9.40

KG/M
KG

KG

1.60

4.45

KG

KG

1.60

4.45

KG

KG

1.60

9.40

KG

KG

1.60

9.40

KG/M
KG

KG

1.60

4.45

KG

KG

1.60

4.45

KG

KG

1.60

9.40

KG

KG

1.60

9.40

KG/M
KG

KG

1.60

4.45

KG

KG

1.60

4.45

KG

KG

1.60

9.40

KG

KG

1.60

9.40

KG/M
KG

KG

1.60

5.40

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 382

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

KG

KG

1.60

3.20

KG

KG

1.60

5.40

KG

KG

1.60

3.20

M3

M3

0.20

21.00

4.20

M3

M3

3.50

4.10

14.35

M3

M3

0.20

21.00

4.20

M2

M2

0.20

21.30

4.26

M2

M2

3.50

21.30

74.55

M2

M2

3.50

19.70

68.95

M2

M2

0.20

21.30

4.26

M2

M2

0.00

KG/M
KG

KG

1.60

9.25

KG

KG

1.60

3.80

KG

KG

1.60

9.25

KG

KG

1.60

3.80

KG/M

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 383

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

1.60

4.70

KG

KG

1.60

24.40

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

1.60

9.25

KG

KG

1.60

3.80

KG

KG

1.60

9.25

KG

KG

1.60

3.80

M3

M3

0.20

13.75

2.75

M3

M3

1.40

2.84

3.98

M3

M3

0.20

13.75

2.75

M2

M2

0.20

15.00

3.00

M2

M2

1.40

15.00

21.00

M2

M2

1.40

13.40

18.76

M2

M2

0.20

15.00

3.00

M2

M2

0.00

KG/M
KG

KG

1.00

4.90

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 384

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

KG

KG

1.00

3.80

KG

KG

1.00

4.90

KG

KG

1.00

3.80

LONG.

SUB TOTAL
AREA
VOL.

KG/M
KG

KG

1.00

2.30

KG

KG

1.00

17.25

KG/M
KG

KG

1.00

4.90

KG

KG

1.00

3.80

KG

KG

1.00

4.90

KG

KG

1.00

3.80

M3

M3

2.20

2.20

0.60

2.90

M3

M3

3.10

3.80

0.60

7.07

M3

M3

2.75

3.90

0.60

6.44

KG

KG

1.00

2.20

KG

KG

1.00

2.20

KG

KG

1.00

3.10

KG

KG

1.00

3.80

KG

KG

1.00

2.75

KG

KG

1.00

3.90

10KG/CM2

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 385

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

9.60

9.60

9.25

9.25

SUB TOTAL
AREA
VOL.

0.00
M

0.45

0.45

1.10

1.10

1.70

1.70

2.30

2.30

2.95

2.95
0.00

2.55

2.55

2.85

2.85

3.35

3.35
0.00

0.33

0.33

UND

UND

0.00

UND

UND

0.00

UND

UND

0.00

UND

UND

6.00

UND

UND

12.00

UND

UND

8.00

UND

UND

12.00

UND

UND

4.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 386

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

PIE

PIE

2.80

3.28

9.18

PIE

PIE

5.05

3.28

16.56

UND

UND

0.00

UND

UND

0.00

UND

UND

36.00

36.00

UND

UND

32.00

32.00

UND

UND

116.00

116.00

26.30

26.30

9.60

9.60

UND

UND

8.00

UND

UND

18.00

26.40

26.40

26.40

26.40

3.90

3.90

SUB TOTAL
AREA
VOL.

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 387

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

UND

UND

4.00

UND

UND

2.00

M2

M2

1.55

0.35

M2

M2

1.75

0.30

M2

M2

1.20

M3

M3

1.55

3.70

2.00

7.40

3.70

2.00

7.40

2.00

SUB TOTAL
AREA
VOL.

1.09

0.53
1.20

0.30

0.05

0.02

14.80
M2

M2

1.80

3.70

6.66

M2

M2

1.80

3.70

6.66

UND

UND

M3

M3

1.80

3.70

0.10

KG

KG

3.90

0.60

9.00

KG

KG

2.00

0.60

17.00

0.67

SUMA=
M

3.70

2.00

7.40

1.80

2.00

3.60

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 388

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

11.00
M

1.80

1.80

3.70

2.00

7.40

1.80

2.00

3.60
11.00

PZA.

PZA.

2.00

UND

UND

10.00

UND

UND

23.00

4.00

UND

UND

23.00

4.00

23.00

0.90

20.70

23.00

0.25

5.75

UND

UND

23.00

4.00

23.00

2.00

4.00

4.00

4.00
SUMA=

4.00

7.40

4.00

16.00
7.40
23.40

4.00

3.00

7.40

3.00

4.00

48.00
22.20

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 389

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

70.20
M

PZA.

PZA.

GLB

GLB

21.00

21.00

1.00

O HERRAMIENTAS Y ANDAMIO)
GLB

GLB

1.00

M2

M2

1.40

3.10

3.10

0.60

0.60

UND

UND

8.00

80.00

3.80

16.00

M2

M2

3.00

12.70

0.40

0.56

60.80

1.65

4.95
12.70

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 390

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

3.00

0.90

26.00

23.40

3.80

4.00

15.20

6.30

2.00

12.60

SUB TOTAL
AREA
VOL.

3.00

27.80
M

3.80

2.00

4.00

30.40

6.30

3.00

2.00

37.80

40.00

26.00

0.65

94.20
M

3.80

2.00

4.00

30.40

6.30

4.00

2.00

50.40
80.80

3.80

2.00

4.00

30.40

6.30

4.00

2.00

50.40
80.80

M2

M2

0.90

0.65

12.00

7.02

1.00

0.35

8.00

2.80

1.20

0.35

8.00

3.36
SUMA=

21.00

13.18

21.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 391

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO
19.00

LONG.

SUB TOTAL
AREA
VOL.

19.00
40.00

PZA.

PZA.

3.10

3.10

19.60

19.60

M2

M2

3.10

GLB

GLB

6.70

20.77
1.00

O HERRAMIENTAS Y ANDAMIO)
GLB

GLB

1.00

M2

M2

1.40

3.10

3.10

0.60

0.60

UND

UND

8.00

60.00

4.10

12.00

0.40

0.56

49.20

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 392

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

M2

M2

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

1.50

2.75

4.13

3.40

2.75

9.35
SUMA=

SUB TOTAL
AREA
VOL.

5.60

2.00

11.20

9.55

2.00

19.10

13.48

30.30
M

2.45

5.00

12.25

1.30

2.00

2.60

3.20

2.00

6.40
21.25

0.90

28.00

25.20

4.20

4.00

16.80

5.55

5.55

9.25

9.25
31.60

4.20

2.00

4.00

33.60

5.55

3.00

16.65

9.25

3.00

27.75

0.65

44.00

28.60
106.60

4.20
5.55

2.00

4.00

33.60

4.00

22.20

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 393

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO
9.25

4.00

LONG.

SUB TOTAL
AREA
VOL.

37.00
92.80

4.20

2.00

4.00

33.60

5.55

4.00

22.20

9.25

4.00

37.00
92.80

M2

M2

0.90

0.65

12.00

7.02

1.00

0.35

4.00

1.40

1.25

0.35

8.00

3.50

1.30

0.35

8.00

3.64
SUMA=

15.00

15.00

17.00

17.00

15.50

15.50

15.56

47.50
PZA.

PZA.

2.75

2.75

22.40

22.40

M2

M2

2.75

GLB

GLB

8.45

23.24
1.00

O HERRAMIENTAS Y ANDAMIO)

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 394

METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE


ERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

GLB

GLB

DIMENSIONES
LARGO ANCHO
ALTO

LONG.

SUB TOTAL
AREA
VOL.

1.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 395

B TOTAL
KG.

TOTAL

#REF!

#REF!

#REF!

2011.37

2011.37

#REF!

#REF!

4043.55

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 396

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 397

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 398

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 399

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 400

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 401

B TOTAL
KG.

TOTAL

2825.65

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 402

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 403

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 404

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 405

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 406

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 407

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 408

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 409

B TOTAL
KG.

TOTAL

418.61

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 410

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 411

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 412

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 413

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 414

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 415

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 416

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 417

B TOTAL
KG.

TOTAL

178.12

379.47

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 418

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 419

B TOTAL
KG.

TOTAL

7845.40

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 420

B TOTAL
KG.

TOTAL

709.96

220.50

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 421

B TOTAL
KG.

TOTAL

26.19

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 422

B TOTAL
KG.

TOTAL

0.84

2.10

93.37

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 423

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 424

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 425

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 426

B TOTAL
KG.

TOTAL

11.64

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 427

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 428

B TOTAL
KG.

TOTAL

72.98

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 429

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 430

B TOTAL
KG.

TOTAL

682.61

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 431

B TOTAL
KG.

TOTAL

84.95

158.10

209.51

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 432

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 433

B TOTAL
KG.

TOTAL

5878.69
0.00
54.45
54.00
54.45
54.00
54.45
54.00
54.45
54.00
54.45
54.00
54.45
54.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 434

B TOTAL
KG.

TOTAL

103.95
99.00
103.95
99.00
103.95
99.00
103.95
99.00
103.95
99.00
103.95
99.00
159.64
148.50

112.61
108.00
112.61
108.00
112.61

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 435

B TOTAL
KG.

TOTAL

108.00
112.61
108.00
54.45
54.00
54.45
54.00
54.45
54.00
54.45
54.00
54.45
54.00
54.45
54.00
54.45
54.00
54.45
54.00
54.45

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 436

B TOTAL
KG.

TOTAL

54.00
54.45
54.00
54.45
54.00
54.45
54.00
54.45
54.00
54.45
54.00
54.45
54.00
54.45
54.00
54.45
54.00
54.45
54.00
54.45

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 437

B TOTAL
KG.

TOTAL

54.00
54.45
54.00
54.45
54.00
54.45
54.00
54.00
54.45
54.00
54.45
54.00
54.45
54.00
54.45

59.80

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 438

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 439

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 440

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 441

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 442

B TOTAL
KG.

TOTAL

149.49

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 443

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 444

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 445

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 446

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 447

B TOTAL
KG.

TOTAL

11772.62
0.00
0.00
167.06
160.31
234.93
0.00
167.06
160.31
234.93
0.00
167.06
160.31
234.93
0.00
97.65
91.35
99.00
0.00
97.65
91.35
99.00
0.00
97.65
91.35
117.15
0.00
97.65

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 448

B TOTAL
KG.

TOTAL

91.35
117.15
0.00
97.65
91.35
99.00
0.00
97.65
91.35
99.00
0.00
0.00
197.44
188.66
371.25
0.00
197.44
188.66
371.25
0.00
197.44
188.66
371.25
0.00
197.44
188.66
371.25
0.00
148.50
141.75

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 449

B TOTAL
KG.

TOTAL

371.25
0.00
148.50
141.75
371.25
0.00
148.50
141.75
371.25
0.00
148.50
141.75
371.25
0.00
148.50
141.75
371.25
0.00
148.50
141.75
371.25
0.00
148.50
141.75
371.25
0.00
148.50
141.75
371.25

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 450

B TOTAL
KG.

TOTAL

72.23

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 451

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 452

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 453

B TOTAL
KG.

TOTAL

635.69

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 454

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 455

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 456

B TOTAL
KG.

TOTAL

17211.92
0.00
0.00
0.00
264.00
67.08
0.00
89.10
48.36
0.00
264.00
67.08
0.00
89.10
57.72
0.00
89.10
48.36
0.00
264.00
67.08

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 457

B TOTAL
KG.

TOTAL

0.00
89.10
57.72
0.00
0.00
182.00
41.28
0.00
61.43
29.76
0.00
182.00
41.28
0.00
61.43
35.52
0.00
61.43
29.76
0.00
182.00
41.28
0.00
61.43
35.52
0.00
0.00
182.00
41.28
0.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 458

B TOTAL
KG.

TOTAL

61.43
29.76
0.00
182.00
41.28
0.00
61.43
35.52
0.00
61.43
29.76
0.00
182.00
41.28
0.00
61.43
35.52
0.00
0.00
182.00
41.28
0.00
61.43
29.76
0.00
182.00
41.28
0.00
61.43
35.52

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 459

B TOTAL
KG.

TOTAL

0.00
61.43
29.76
0.00
182.00
41.28
0.00
61.43
35.52
0.00
0.00
182.00
41.28
0.00
61.43
29.76
0.00
182.00
41.28
0.00
61.43
35.52
0.00
61.43
29.76
0.00
182.00
41.28
0.00
61.43

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 460

B TOTAL
KG.

TOTAL

35.52
0.00
0.00
0.00
264.00
67.08
0.00
264.00
67.08
0.00
264.00
67.08
0.00
264.00
67.08
0.00
264.00
67.08
0.00
264.00
67.08
0.00
264.00
67.08
0.00
264.00
67.08
0.00
264.00
67.08

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 461

B TOTAL
KG.

TOTAL

0.00
0.00
182.00
41.28
0.00
182.00
41.28
0.00
182.00
41.28
0.00
182.00
41.28
0.00
182.00
41.28
0.00
182.00
41.28
0.00
182.00
41.28
0.00
182.00
41.28
0.00
182.00
41.28
0.00
0.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 462

B TOTAL
KG.

TOTAL

182.00
41.28
0.00
182.00
41.28
0.00
182.00
41.28
0.00
182.00
41.28
0.00
182.00
41.28
0.00
182.00
41.28
0.00
182.00
41.28
0.00
182.00
41.28
0.00
182.00
41.28
0.00
0.00
182.00
41.28

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 463

B TOTAL
KG.

TOTAL

0.00
182.00
41.28
0.00
182.00
41.28
0.00
182.00
41.28
0.00
182.00
41.28
0.00
182.00
41.28
0.00
182.00
41.28
0.00
182.00
41.28
0.00
182.00
41.28
0.00
0.00
228.00
49.02
0.00
228.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 464

B TOTAL
KG.

TOTAL

49.02
0.00
228.00
49.02
0.00
228.00
49.02
0.00
228.00
49.02
0.00
228.00
49.02
0.00
228.00
49.02
0.00
228.00
49.02
0.00
200.00
41.28

6.92

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 465

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 466

B TOTAL
KG.

TOTAL

78.79

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 467

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 468

B TOTAL
KG.

TOTAL

958.95
0.00
0.00
0.00
16.56
8.40
0.00
16.56
8.40
0.00
16.56
8.40
0.00
16.56
10.50
0.00
16.56
9.45

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 469

B TOTAL
KG.

TOTAL

0.00
16.56
9.45
0.00
0.00
15.12
6.90
0.00
15.12
6.90
0.00
15.12
6.90
0.00
15.12
8.63
0.00
15.12
7.76
0.00
15.12
7.76
0.00
0.00
15.12
6.90
0.00
15.12
6.90
0.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 470

B TOTAL
KG.

TOTAL

15.12
6.90
0.00
15.12
8.63
0.00
15.12
7.76
0.00
15.12
7.76
0.00
0.00
15.12
6.90
0.00
15.12
6.90
0.00
15.12
6.90
0.00
15.12
8.63
0.00
15.12
7.76
0.00
15.12
7.76

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 471

B TOTAL
KG.

TOTAL

0.00
0.00
15.12
6.90
0.00
15.12
6.90
0.00
15.12
6.90
0.00
15.12
8.63
0.00
15.12
7.76
0.00
15.12
7.76
0.00
0.00
16.56
8.40
0.00
16.56
10.50
0.00
15.12

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 472

B TOTAL
KG.

TOTAL

8.40
0.00
15.12
10.50
0.00
15.12
8.40
0.00
15.12
10.50
0.00
15.12
8.40
0.00
15.12
10.50
0.00
20.16
10.20
0.00
20.16
12.75

287.06

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 473

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 474

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 475

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 476

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 477

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 478

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 479

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 480

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 481

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 482

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 483

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 484

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 485

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 486

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 487

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 488

B TOTAL
KG.

TOTAL

1737.62

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 489

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 490

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 491

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 492

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 493

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 494

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 495

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 496

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 497

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 498

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 499

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 500

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 501

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 502

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 503

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 504

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 505

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 506

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 507

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 508

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 509

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 510

B TOTAL
KG.

TOTAL

16878.64

40.96
2.72
5.28
4.80
4.80
4.80
2.72
38.88
4.32
2.24
2.24
2.24
2.88
0.99
0.00
30.08
2.72
4.80
4.80
4.80
2.72
28.96
2.24
2.24
2.24
2.88

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 511

B TOTAL
KG.

TOTAL

61.80
0.00
18.48
2.72
5.28
3.20
17.36
4.32
2.24
17.36
4.80
4.80
2.72
19.28
2.24
2.88
0.99
0.00
53.80
9.20
17.20
51.00
16.80
1.29
53.80
9.20
17.20
51.00
16.80

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 512

B TOTAL
KG.

TOTAL

1.29
22.40
22.40
1.29
53.80
9.20
17.20
51.00
16.80
1.29
53.80
9.20
17.20
51.00
16.80
1.29
53.80
9.20
17.20
51.00
16.80
1.17
7.40
7.40
0.57

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 513

B TOTAL
KG.

TOTAL

5.30
5.30
0.57

40.96
2.72
5.28
4.80
4.80
4.80
2.72
38.88
4.32
2.24
2.24
2.24
2.88
0.99
0.00
30.08
2.72
4.80
4.80
4.80
2.72
28.96
2.24
2.24

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 514

B TOTAL
KG.

TOTAL

2.24
2.88
61.80
0.00
18.48
2.72
5.28
3.20
17.36
4.32
2.24
17.36
4.80
4.80
2.72
19.28
2.24
2.88
0.99
0.00
53.80
9.20
17.20
51.00
16.80
1.29
53.80
9.20
17.20

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 515

B TOTAL
KG.

TOTAL

51.00
16.80
1.29
22.40
22.40
1.29
53.80
9.20
17.20
51.00
16.80
1.29
53.80
9.20
17.20
51.00
16.80
1.29
53.80
9.20
17.20
51.00
16.80
1.17
7.40

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 516

B TOTAL
KG.

TOTAL

7.40
0.57
5.30
5.30
0.57

44.91
7.28
5.28
4.80
4.80
4.80
2.72
42.80
5.68
4.32
2.24
2.24
2.24
2.88
0.99
44.91
7.28
5.28
4.80
4.80
4.80

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 517

B TOTAL
KG.

TOTAL

2.72
42.80
5.68
4.32
2.24
2.24
2.24
2.88
0.99
0.00
18.48
2.72
5.28
3.20
17.36
4.32
2.24
17.36
4.80
4.80
2.72
19.28
2.24
2.88
0.99
63.40
9.20
17.20
60.60

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 518

B TOTAL
KG.

TOTAL

16.80
1.17
0.00
63.40
9.20
17.20
60.60
16.80
1.17
63.40
9.20
17.20
60.60
16.80
1.17
22.40
22.40
1.29
53.80
9.20
17.20
51.00
16.80
1.29
53.80
9.20

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 519

B TOTAL
KG.

TOTAL

17.20
51.00
16.80
1.29
53.80
9.20
17.20
51.00
16.80
1.17
11.65
11.65
0.57
14.20
14.20
0.57
5.30
5.30
0.57

44.91
7.28
5.28
4.80
4.80

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 520

B TOTAL
KG.

TOTAL

4.80
2.72
42.80
5.68
4.32
2.24
2.24
2.24
2.88
0.99
44.91
7.28
5.28
4.80
4.80
4.80
2.72
42.80
5.68
4.32
2.24
2.24
2.24
2.88
0.99
0.00
18.48
2.72
5.28

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 521

B TOTAL
KG.

TOTAL

3.20
17.36
4.32
2.24
17.36
4.80
4.80
2.72
19.28
2.24
2.88
0.99
63.40
9.20
17.20
60.60
16.80
1.17
0.00
63.40
9.20
17.20
60.60
16.80
1.17
63.40
9.20
17.20

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 522

B TOTAL
KG.

TOTAL

60.60
16.80
1.17
22.40
22.40
1.29
53.80
9.20
17.20
51.00
16.80
1.29
53.80
9.20
17.20
51.00
16.80
1.29
53.80
9.20
17.20
51.00
16.80
1.17
11.65

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 523

B TOTAL
KG.

TOTAL

11.65
0.57
14.20
14.20
0.57
5.30
5.30
0.57

40.72
2.72
5.28
4.80
4.80
4.80
2.72
39.12
4.32
2.24
2.24
2.24
2.88
0.87
40.72
2.72
5.28

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 524

B TOTAL
KG.

TOTAL

4.80
4.80
4.80
2.72
39.12
4.32
2.24
2.24
2.24
2.88
0.87
8.96
8.96
0.87
20.40
20.40
0.87
19.60
19.60
0.87
20.40
20.40
0.87
56.60
9.20
17.20
53.80

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 525

B TOTAL
KG.

TOTAL

16.80
1.17
56.60
9.20
17.20
53.80
16.80
1.17
22.40
22.40
1.17
21.20
21.20
1.17
22.40
22.40
1.17
21.20
21.20
1.17
22.40
22.40
1.17
18.40
18.40
1.17

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 526

B TOTAL
KG.

TOTAL

22.40
22.40
1.17
18.40
18.40
1.17
14.20
14.20
0.57
16.55
16.55
0.57
7.60
7.60
0.57

47.36
47.36
0.99
47.36
47.36
0.99

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 527

B TOTAL
KG.

TOTAL

47.36
47.36
0.99
47.36
47.36
0.99
84.40
9.20
16.80
16.80
9.20
81.60
9.60
12.00
9.60
1.17
84.40
9.20
16.80
16.80
9.20
81.60
9.60
12.00
9.60
1.29

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 528

B TOTAL
KG.

TOTAL

84.40
9.20
16.80
16.80
9.20
81.60
9.60
12.00
9.60
1.29
84.40
9.20
16.80
16.80
9.20
81.60
9.60
12.00
9.60
1.29
41.20
41.20
1.29
41.20
41.20
1.29
84.40

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 529

B TOTAL
KG.

TOTAL

9.20
16.80
16.80
9.20
81.60
9.60
12.00
9.60
1.29
84.40
9.20
16.80
16.80
9.20
81.60
9.60
12.00
9.60
1.29
84.40
9.20
16.80
16.80
9.20
81.60
9.60
12.00
9.60

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 530

B TOTAL
KG.

TOTAL

1.17
21.10
21.10
0.57
21.10
21.10
0.57
7.60
7.60
0.57
4.80
4.80
0.57
4.80
4.80
0.57

47.36
47.36
0.99
47.36
47.36
0.99

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 531

B TOTAL
KG.

TOTAL

47.36
47.36
0.99
47.36
47.36
0.99
84.40
9.20
16.80
16.80
9.20
81.60
9.60
12.00
9.60
1.17
84.40
9.20
16.80
16.80
9.20
81.60
9.60
12.00
9.60
1.29

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 532

B TOTAL
KG.

TOTAL

84.40
9.20
16.80
16.80
9.20
81.60
9.60
12.00
9.60
1.29
84.40
9.20
16.80
16.80
9.20
81.60
9.60
12.00
9.60
1.29
41.20
41.20
1.29
41.20
41.20
1.29

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 533

B TOTAL
KG.

TOTAL

84.40
9.20
16.80
16.80
9.20
81.60
9.60
12.00
9.60
1.29
84.40
9.20
16.80
16.80
9.20
81.60
9.60
12.00
9.60
1.29
84.40
9.20
16.80
16.80
9.20
81.60
9.60
12.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 534

B TOTAL
KG.

TOTAL

9.60
1.17
21.10
21.10
0.57
21.10
21.10
0.57
7.60
7.60
0.57
4.80
4.80
0.57
4.80
4.80
0.57

47.36
47.36
0.99
47.36
47.36

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 535

B TOTAL
KG.

TOTAL

0.99
47.36
47.36
0.99
47.36
47.36
0.99
84.40
9.20
16.80
16.80
9.20
81.60
9.60
12.00
9.60
1.17
84.40
9.20
16.80
16.80
9.20
81.60
9.60
12.00
9.60

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 536

B TOTAL
KG.

TOTAL

1.29
84.40
9.20
16.80
16.80
9.20
81.60
9.60
12.00
9.60
1.29
84.40
9.20
16.80
16.80
9.20
81.60
9.60
12.00
9.60
1.29
41.20
41.20
1.29
41.20
41.20
1.29

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 537

B TOTAL
KG.

TOTAL

84.40
9.20
16.80
16.80
9.20
81.60
9.60
12.00
9.60
1.29
84.40
9.20
16.80
16.80
9.20
81.60
9.60
12.00
9.60
1.29
84.40
9.20
16.80
16.80
9.20
81.60
9.60

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 538

B TOTAL
KG.

TOTAL

12.00
9.60
1.17
21.10
21.10
0.57
21.10
21.10
0.57
7.60
7.60
0.57
4.80
4.80
0.57
4.80
4.80
0.57

47.36
47.36
0.99
47.36

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 539

B TOTAL
KG.

TOTAL

47.36
0.99
47.36
47.36
0.99
47.36
47.36
0.99
84.40
9.20
16.80
16.80
9.20
81.60
9.60
12.00
9.60
1.17
84.40
9.20
16.80
16.80
9.20
81.60
9.60
12.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 540

B TOTAL
KG.

TOTAL

9.60
1.29
84.40
9.20
16.80
16.80
9.20
81.60
9.60
12.00
9.60
1.29
84.40
9.20
16.80
16.80
9.20
81.60
9.60
12.00
9.60
1.29
41.20
41.20
1.29
41.20
41.20

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 541

B TOTAL
KG.

TOTAL

1.29
84.40
9.20
16.80
16.80
9.20
81.60
9.60
12.00
9.60
1.29
84.40
9.20
16.80
16.80
9.20
81.60
9.60
12.00
9.60
1.29
84.40
9.20
16.80
16.80
9.20
81.60

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 542

B TOTAL
KG.

TOTAL

9.60
12.00
9.60
1.17
21.10
21.10
0.57
21.10
21.10
0.57
7.60
7.60
0.57
4.80
4.80
0.57
4.80
4.80
0.57

47.36
47.36
0.99

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 543

B TOTAL
KG.

TOTAL

47.36
47.36
0.99
84.40
9.20
16.80
16.80
9.20
81.60
9.60
12.00
9.60
1.17
84.40
9.20
16.80
16.80
9.20
81.60
9.60
12.00
9.60
1.17
21.10
21.10
0.57

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 544

B TOTAL
KG.

TOTAL

7.60
7.60
0.57
4.80
4.80
0.57
4.80
4.80
0.57

37.14

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 545

B TOTAL
KG.

TOTAL

231.31

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 546

B TOTAL
KG.

TOTAL

2321.00

7.20
8.40
52.55
78.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 547

B TOTAL
KG.

TOTAL

7.20
8.40
52.55
78.00

7.20
8.40
52.55
78.00

7.20
8.40
52.55
78.00

7.20
8.40
52.55
78.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 548

B TOTAL
KG.

TOTAL

7.00
10.50
120.55
180.00

7.00
10.50
120.55
180.00

7.00
10.50
120.55
180.00

7.00
10.50
120.55
180.00

7.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 549

B TOTAL
KG.

TOTAL

10.50
120.55
180.00

2520.80

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 550

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 551

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 552

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 553

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 554

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 555

B TOTAL
KG.

TOTAL

2520.80

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 556

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 557

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 558

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 559

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 560

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 561

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 562

B TOTAL
KG.

TOTAL

1488.51

18.00
17.70
4.14
6.15
4.80
4.80
1.05
1.58
11.95
11.65
2.63
3.98
18.00
17.70
4.14
6.15
4.80
4.80
1.05
1.58
11.95
11.65
2.63
3.98

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 563

B TOTAL
KG.

TOTAL

13.30
13.00
2.96
4.43
26.45
25.85
6.04
9.00
4.80
4.80
1.05
1.58
11.95
11.65
2.63
3.98
13.30
13.00
2.96
4.43
26.45
25.85
6.04
9.00
4.80
4.80
1.05
1.58

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 564

B TOTAL
KG.

TOTAL

11.95
11.65
2.63
3.98
9.45
9.27
3.58
5.40
26.25
25.65
5.99
9.00
4.80
4.80
1.05
1.58
11.95
11.65
2.63
3.98

28.80
28.20
6.63
9.90
31.80
31.20
7.38

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 565

B TOTAL
KG.

TOTAL

11.10
13.15
12.85
2.93
4.35
12.20
11.90
2.69
4.35
28.80
28.20
6.63
9.90
31.80
31.20
7.38
11.10
13.15
12.85
2.93
4.35
12.20
11.90
2.69
4.35
28.80
28.20
6.63

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 566

B TOTAL
KG.

TOTAL

9.90
31.80
31.20
7.38
11.10
13.15
12.85
2.93
4.35
12.20
11.90
2.69
4.35
28.80
28.20
6.63
9.90
31.80
31.20
7.38
11.10
13.15
12.85
2.93
4.35
12.20
11.90
2.69
4.35

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 567

B TOTAL
KG.

TOTAL

4.00
4.00
0.85
1.28
2520.80

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 568

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 569

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 570

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 571

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 572

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 573

B TOTAL
KG.

TOTAL

7.43

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 574

B TOTAL
KG.

TOTAL

113.40

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 575

B TOTAL
KG.

TOTAL

40.86

0.00
3.00
0.84
0.00
3.00
0.84
0.00
3.00
0.66
0.00
3.00
1.08
0.00
2.31
0.66
0.00
2.31
1.08
0.00
2.31
0.66
0.00
2.31
1.08

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 576

B TOTAL
KG.

TOTAL

0.00
2.31
0.66
0.00
2.31
1.08
0.00
2.31
0.66
0.00
2.31
1.08

44.32

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 577

B TOTAL
KG.

TOTAL

428.58

311.04

0.00
8.64
5.12
8.64
5.12
0.00
4.16
4.16
8.32
8.32
0.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 578

B TOTAL
KG.

TOTAL

11.84
11.84
15.04
15.04
0.00
7.12
7.12
15.04
15.04
0.00
7.12
7.12
15.04
15.04
0.00
7.12
7.12
15.04
15.04
0.00
7.12
7.12
15.04
15.04
0.00
8.64

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 579

B TOTAL
KG.

TOTAL

5.12
8.64
5.12

22.75

152.02

130.08

14.80
6.08
14.80
6.08

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 580

B TOTAL
KG.

TOTAL

7.52
39.04
14.80
6.08
14.80
6.08

9.48

45.76

54.35

4.90

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 581

B TOTAL
KG.

TOTAL

3.80
4.90
3.80
2.30
17.25
4.90
3.80
4.90
3.80

16.41

17.95
2.20
2.20
3.10
3.80
2.75
3.90

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 582

B TOTAL
KG.

TOTAL

8UND
36.10

6.00
12.00
8.00
12.00
4.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 583

B TOTAL
KG.

TOTAL

8.00
18.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 584

B TOTAL
KG.

TOTAL

4.00
2.00

1.00

21.06
20.40
41.46

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 585

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 586

B TOTAL
KG.

TOTAL

1.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 587

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 588

B TOTAL
KG.

TOTAL

1.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 589

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 590

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 591

B TOTAL
KG.

TOTAL

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 1

HOJA DE METRADO DE I
PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALD

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

01
01.03
01.03.01
01.03.01.01
01.03.01.01.01

DESCRIPCION

UND

MODULO A
INSTALACIONES SANITARIAS
SISTEMA AGUA DE LLUVIA
COLUMNETA PARA SOPORTE DE TUBERIAS
CONCRETO EN COLUMNETAS F'C=175 KG/CM2

M3

Concreto en columnetas
01.03.01.01.02

ENCOFRADO Y DESENCOFRADO EN COLUMNETAS

6
M2

Encofrado y desencofrado en columnetas


01.03.01.02
01.03.01.02.01

BAJANTE DE AGUA PLUVIAL


CANALETA DE PLANCHA GALVANIZADA 1/32" SEGN
DISEO

Canaleta de Plancha
01.03.01.02.02

TUBERIA DE BAJADA PVC SAP DIAMETRO 4"

6
M

Tuberia de Bajada
01.03.01.02.03

TUBERIA DE BAJADA PVC SAP DIAMETRO 3"

6
M

Tuberia de Bajada
01.03.01.02.04

CODO PVC SAP 4"X90

6
UND

Codo PVC SAP 4"X90


01.03.01.02.05

CODO PVC SAP 3"X90

6
UND

Codo PVC SAP 3"X90


01.03.01.02.06

CANT

ABRAZADERA PARA MONTANTE DE PVC - SAP


Abrazadera para montante

6
UND
6

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 2

HOJA DE METRADO DE I
PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALD

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

01.03.01.02.07

DESCRIPCION

REDUCCION PVC SAP 4"-3"

UND

UND

Reduccion PVC SAP 4"-3"


01.03.02
01.03.02.01
01.03.02.01.01

CANT

APARATOS Y ACCESORIOS SANITARIOS


APARATOS SANITARIOS
INODORO TANQUE BAJO COLOR BLANCO, CON
ACCESORIOS COMPLETOS

UND

PRIMER PISO
SS. HH.

16

SEGUNDO PISO
SS. HH.

00.00.00.00.01

URINARIO DE PARED DE COLOR BLANCO, CON


ACCESORIOS COMPLETOS

UND

PRIMER PISO
SS. HH.

SEGUNDO PISO
SS. HH.

01.03.02.01.02

LAVATORIO DE ACERO INOXIDABLE, CON


ACCESORIOS COMPLETOS

UND

PRIMER PISO
Afuera

33

Cocina Tipo

18

SEGUNDO PISO
Afuera

23

Cocina Tipo

12

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 3

HOJA DE METRADO DE I
PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALD

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

01.03.02.01.03

DESCRIPCION

COLOCACION DE APARATOS SANITARIOS

UND

CANT

UND

PRIMER PISO
Colocacion de aparatos sanitarios
01.03.03

SISTEMA DE DESAGUE

01.03.03.01

SALIDAS DE DESAGUE

01.03.03.01.01

SALIDA DE DESAGE EN PVC 2"

116.00

PTO

Lavatorio de acero
01.03.03.01.02

SALIDA DE SUMIDERO DE BRONCE DE 2"

6
PTO

Salida de sumideros de bronce


01.03.03.01.03

SALIDA DE VENTILACION DE PVC 2"

6
PTO

Salida de ventilacin
01.03.03.02
01.03.03.02.01

REDES DE DISTRIBUCION
RED DE DISTRIBUCION TUBERIA PVC SAL 2"

Tuberia PVC SAL


01.03.03.02.02

RED DE DISTRIBUCION TUBERIA PVC SAL 4"

6
M

Tuberia PVC SAL


01.03.03.03
01.03.03.03.01

ACCESORIO DE REDES
YEE PVC SAL PARA DESAGE 4"

UND

YEE PVC SAL


01.03.03.03.02

YEE PVC SAL PARA DESAGE 4" A 2"

6
UND

YEE PVC SAL


01.03.03.03.03

CODO PVC SAL PARA DESAGE 4"X90

6
UND

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 4

HOJA DE METRADO DE I
PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALD

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

DESCRIPCION

UND

CODO PVC SAL


01.03.03.03.04

CODO PVC SAL PARA DESAGE 4"X45

6
UND

CODO PVC SAL


01.03.03.03.05

CODO PVC SAL PARA DESAGE 2"X90

6
UND

CODO PVC SAL


01.03.03.03.06

REDUCCION PVC SAL 4" A 2"

6
UND

REDUCCION PVC SAL


01.03.03.03.07

TRAMPA PVC SAL "P" PARA DESAGE 2"

6
UND

TRAMPA PVC SAL


01.03.03.04
01.03.03.04.01

ADITAMENTO VARIOS
SUMIDERO DE BRONCE 2"

UND

Sumidero de bronce
01.03.03.04.02

SOMBRERO DE VENTILACION PVC 2"

6
UND

Sombreros de ventilacin
01.03.04
01.03.04.01
01.03.04.01.01

SISTEMA DE AGUA FRIA Y CONTRA INCENDIO


SALIDA DE AGUA FRIA
SALIDA DE AGUA FRIA CON TUBERIA PVC SAP DE 3/4" PTO
Salida de agua fra

01.03.04.02
01.03.04.02.01

CANT

REDES DE DISTRIBUCION
RED DE DISTRIBUCION TUBERIA PVC SAP 3/4"
Tuberia PVC SAP

M
6

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 5

HOJA DE METRADO DE I
PROYECTO:

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO D


AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALD

ESPECIALIDAD:
FECHA:
HECHO POR:

INSTALCIONES SANITARIAS
NOVIEMBRE 2016
CONSTRUCTORA JARAMILLO INGENIEROS S.A.C.

CODIGO

01.03.04.02.02

DESCRIPCION

RED DE DISTRIBUCION TUBERIA PVC SAP 1/2"

UND

Tuberia PVC SAP


01.03.04.03
01.03.04.03.01

ACCESORIO DE REDES
CODO PVC SAP PARA AGUA 1/2"

UND

Codo PVC SAP


01.03.04.03.02

CODO PVC SAP PARA AGUA 3/4"

6
UND

Codo PVC SAP


01.03.04.03.03

TEE PVC SAP PARA AGUA 1/2"

6
UND

TEE PVC SAP


01.03.04.03.04

TEE PVC SAP PARA AGUA 3/4"

6
UND

TEE PVC SAP


01.03.04.04
01.03.04.04.01

LLAVES VALVULAS
VALVULA DE COMPUERTA DE BRONCE U/R DE 1/2"

UND

Valvula de compuerta
01.03.04.04.02

VALVULA DE COMPUERTA DE BRONCE U/R DE 3/4"

6
UND

Valvula de compuerta
01.03.04.04.03

CANT

GRIFO PARA TUBERIA DE 1/2"


Grifo para tuberia

6
UND
6

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 6

DE METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS Y


ACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

0.25

CANT.

SUB TOTAL
LONG.
AREA

0.25

25.00

1.00

0.25

1.50

4.00

24.00

21.00

126.00

6.00

6.00

6.00

25.00

150.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 7

DE METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS Y


ACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

CANT.

6.00

16.00

8.00

4.00

2.00

33.00

18.00

23.00

12.00

SUB TOTAL
LONG.
AREA

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 8

DE METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS Y


ACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

CANT.

SUB TOTAL
LONG.
AREA

1.00

116.00

0.25

1.00

25.00

150.00

1.00

25.00

150.00

0.25

1.00

0.25

1.00

0.25

0.25

25.00

25.00

25.00

0.25

150.00

25.00

25.00

150.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 9

DE METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS Y


ACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

CANT.

SUB TOTAL
LONG.
AREA

1.00

25.00

150.00

1.00

25.00

150.00

1.00

25.00

150.00

1.00

25.00

150.00

1.00

25.00

150.00

0.25

1.00

0.25

0.25

25.00

0.25

0.25

25.00

0.25

25.00

25.00

150.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 10

DE METRADO DE INSTALACIONES SANITARIAS

TURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS Y


ACIONAL HERMILIO VALDIZAN - HUANUCO

NIEROS S.A.C.

N VECES N ELEMENTOS

DIMENSIONES
LARGO ANCHO
ALTO

1.00

0.25

1.00

0.25

1.00

0.25

1.00

0.25

25.00

0.25

150.00

25.00

25.00

0.25

150.00

25.00

25.00

0.25

150.00

25.00

25.00

0.25

CANT.

SUB TOTAL
LONG.
AREA

150.00

25.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 11

SUB TOTAL
VOL.

KG.

TOTAL

9.38
9.38
150.00

1.50

24.00

126.00

6.00

6.00

6.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 12

SUB TOTAL
VOL.

KG.

TOTAL

6.00

24.00

6.00

86.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 13

SUB TOTAL
VOL.

KG.

TOTAL

116.00

9.38
9.38
150.00

150.00

9.38
9.38
150.00

9.38
9.38
150.00

150.00

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 14

SUB TOTAL
VOL.

KG.

TOTAL

150.00

150.00

150.00

150.00

9.38
9.38
150.00

9.38
9.38

9.38
9.38

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO

Metrado de Estructuras Pgina 15

SUB TOTAL
VOL.

KG.

TOTAL

150.00

9.38
9.38
150.00

9.38
9.38
150.00

9.38
9.38
150.00

9.38
9.38

CONSTRUCCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DEL CENTRO DE ESTUDIOS INFORMATICOS, CENTRO DE IDIOMAS


Y AUDITORIO DE LA UNIVERSIDAD NACIONAL HERMILIO VALDIZAN - HUANUCO