ANALISA SEPTICK TANK DAN PERESAPAN

Bahan

4.000
1.000
57.082
0.380
0.404
0.077
5.000
0.400
4.000
2.000
3.000
1.000
1.000
B
C

Peralatan
0.15

Cincin Beton 70 cm

m3

Penutup Beton
Semen PC
Kerikil
Pasir Urug
Pasir Beton

kg

Ijuk

m
m
bh
bh
bh
kg

Pipa PVC 2"(Pipa Hawa)


Pipa PVC 3" (Pipa Peresapan)
Sambungan Pipa
Elbo
Dop
Lem Pipa
JUMLAH BAHAN

kg

m3
m3

95,000.00
60,000.00
1,120.00
135,000.00
100,000.00
170,000.00
25,000.00
15,000.00
25,000.00
5,000.00
7,500.00
5,000.00
35,000.00

hrg

Alat Bantu

919,720.78

hrg

Upah Kerja

919,720.78

Upah

0.5
D
E
F

bh
bh

Jumlah
Overhead & Profit 10%
Jumlah Total
Dibulatkan

APAN

380,000.00
60,000.00
63,931.91
51,344.14
40,404.00
13,040.73
125,000.00
6,000.00
100,000.00
10,000.00
22,500.00
5,000.00
35,000.00
919,720.78
137,958.12
459,860.39
1,517,539.29
151,753.93
1,669,293.22
1,669,000.00

DAFTAR HARGA BANGUNAN DAN UPAH KERJA KAB.PANGKEP


NO
1

2
3
4

7
8

9
10
11
12
13
14
15

BAHAN / MATERIAL
BAHAN PASANGAN
Batu Kali
Utuh
Batu Pecah 10-15 cm
Batu Pecah 7-10 cm
Batu Pecah 5-7 cm
Batu Pecah 3-5 cm
Batu Pecah 2-3 cm
Batu Pecah 1-2 cm
Batu Pecah 0,5-1 cm
Batu Gunung
Tanah Timbunan
Timbunan Pilihan
Pasir
Pasir Urug
Pasir Pasang
Pasir Beton
Krikil
Krikil Halus
Krikil Kasar
Sirtu
Sirtu disaring
Sirtu tidak disaring
Sirtu Royalti
Kapur Hidrasi
Semen
Semen Putih
Semen @ 50 kg
Semen @ 40 kg
Semen Warna
Batu Merah
Paving Mar-Mar 20x10x3 cm
Paving Blok Beton Cetak
Pecahan Mar-mar
Roster Terawang
Ijuk
Air Kerja

SATUAN

JANUARI 2016

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

128,000.00
184,000.00
215,000.00
242,000.00
265,000.00
300,000.00
300,000.00
400,000.00
125,000.00
50,000.00
90,000.00

M3
M3
M3

Rp
Rp
Rp

M3
M3

KET.

Rp

214.29

100,000.00
120,000.00
170,000.00

Rp

121.43

Rp
Rp

125,000.00
135,000.00

Rp

100.00

M3
M3
M3
M3

Rp
Rp
Rp
Rp

95,000.00
80,000.00
35,000.00
115,500.00

Zak
Zak
Zak
kg
Bj
Bj
Bj
M3
Bh
Kg
Ltr

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

89,200.00
56,000.00
46,000.00
10,000.00
600.00
1,400.00
1,400.00
13,125.00
7,000.00
15,000.00
100.00

Rp
Rp

1,120.00
1,150.00

M3
M3

Rp
Rp

14,000,000.00
16,000,000.00

M3
M3

Rp
Rp

10,000,000.00
16,000,000.00

M3
M3

Rp
Rp

6,000,000.00
6,500,000.00

Rp

4,636.36

Rp

9,000.00

Rp
Rp
Rp

3,350.00
2,900.00
10,000.00

BAHAN KAYU
Kayu Kls I (Ulin)
Balok Gergaji Sawmil
Papan Gergaji Sawmil
Kayu Kls I (Bayam)
Balok Gergaji Sawmil
Papan Gergaji Sawmil
Kayu Kls I (Kumea)
Balok Gergaji Sawmil
Papan Gergaji Sawmil
Kayu Kls II
Balok
Papan
Kayu Kls III
Balok
Papan
Bambu

M3
M3

Rp
Rp

4,500,000.00
5,000,000.00

M3
M3
Btg

Rp
Rp
Rp

2,800,000.00
2,800,000.00
20,000.00

BAHAN LANTAI
Tegel Keramik
Putih 30 x 30
Warna 30 x30 cm
Putih 40 x 40 cm
Warna 40 x 40
- Warna (bermotif)
20 x 25 cm
- Warna
20 x 25 cm
Motif Batu Alam 20 x 40

Dos
Dos
Dos
Dos
Dos
Dos
Dos

Rp
Rp
Rp
Rp
Rp
Rp
Rp

51,000.00
56,000.00
54,500.00
60,000.00
67,000.00
58,000.00
120,000.00

NO

1
2
3
4
5
6
7
8

1
2
3
4
5
6
7
8

11
1
2
3

4
5

BAHAN / MATERIAL
BAHAN KACA
Kaca Bening 3 mm
Kaca Bening 2 mm
Kaca bening
5 mm
Kaca Buram 3 mm
Kaca Buram 2 mm
Riben 3 mm
Riben 5 mm
Rangka nakop lengkap trali
BAHAN LANGIT-LANGIT
Eternit 100 x 100
Tripleks
122 x 224 x 0.9 cm
Gipsum Board
240 x 120 x 0.9 cm
Tepung Gypsum
Calse Board 6 mm
Calsiplank Lebar 20 cm - 4 m (Motif)
Calsiplank Lebar 30 cm - 4 m (Motif)
List Profil
- List profil 5 x 5 cm
- List Profil Gypsum 8 cm
Lem Kayu
BAHAN BESI
Besi Tulangan
Besi Tulangan Polos
Kawat
Kawat Beton
Paku
Paku Biasa (5-10) cm
Paku Biasa (1-4) cm
Paku Asbes
Paku Seng
Paku Skrup 3 1/2"
Paku Skrup 4 1/2"
Paku Skrup Spandek
Paku Skrup Drailing
Paku Payung Berulir
Paku 2 cm
Paku Beton
Paku Nyamuk
Besi Besi Hollow
Hollow untuk Rangka Plafond 4 x 4 cm
Baja Ringan Untuk Atap
Canal C75. 0.75
Reng U
BAHAN ATAP
Atap Aluminium
- Atap Spandek Warna T=0,35 mm
- Nok Spandek Warna T=0,35 mm
Seng Plat

SATUAN

JANUARI 2016

KET.

M2
M2
M2
M2
M2
M2
M2
Set

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

77,100.00
55,100.00
115,000.00
94,500.00
78,700.00
81,300.00
97,100.00
26,200.00

Lbr

Rp

19,000.00

Lbr

Rp

135,000.00

Lbr
Kg
Lbr
M'
M'

Rp
Rp
Rp
Rp
Rp

88,000.00
5,000.00
130,000.00
17,000.00
24,000.00

M'
M'
Kg

Rp
Rp
Rp

7,500.00
15,000.00
13,000.00

Kg

Rp

11,000.00

Kg

Rp

20,000.00

Kg
Kg
Kg
Kg
Kg
Kg
bh
bh
Kg
Dos
Dos
M2

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

17,500.00
18,000.00
35,000.00
23,000.00
18,000.00
55,000.00
500.00
750.00
15,000.00
33,000.00
12,000.00
8,200.00

m1

Rp

7,000.00

m1
m1

Rp
Rp

14,500.00
6,500.00

m1
m1

Rp
Rp
Rp

60,000.00
57,500.00
20,000.00

NO
1

1
2

BAHAN / MATERIAL
BAHAN PENGGANTUNG
Kunci Pintu 2 Slaag
Asahi ( besar )
Penggantung
- Hak Angin ( besar )
- Grendel Jendela
- Grendel Tanam Pintu Ganda
- Engsel Pintu
- Engsel Jendela
- Pegangan Pintu Ganda ( Door Holder )
- Door Closer
BAHAN FINISHING CAT
Cat Tembok
- Avitex
- Metrolite
- Kimex
- Dulux
Cat Kayu
- Glotex
- Avian
- Platone
- ICI
- Vernis
- Meni
- Minyak Cat
Cat Anti Bocor
- Aquaset
- Aquaprof
Cap Atap
- Mutiara
- AGA
- Plamur
- Amplas/Ketas Gosok
- Kuas Cat
- Dempul
- Residu
Minyak Bikisting
BAHAN INSTALASI LISTRIK
Pipa Union Untuk Kabel
-5/8-4m
Kabel Listrik
- Kabel NYM (3x2,5) mm
- Kabel NYM (2x2,5) mm
Lampu TL
- 1x18 w
- 1x14 w
Saklar Phase
- Tunggal Putih
- Tunggal Hitam
- Ganda Putih
- Ganda Hitam
Stok Kontak
- Hitam
- Putih

SATUAN

JANUARI 2016

KET.

bh

Rp

125,000.00

bh
bh
bh
bh
bh
bh
bh

Rp
Rp
Rp
Rp
Rp
Rp
Rp

5,750.00
7,500.00
25,000.00
20,000.00
7,500.00
100,000.00
350,000.00

Kg
Kg
Kg
Kg

Rp
Rp
Rp
Rp

20,000.00
27,000.00
25,000.00
105,000.00

Kg
Kg
Kg
Kg
Ltr
Kg
Kg

Rp
Rp
Rp
Rp
Rp
Rp
Rp

55,000.00
55,000.00
53,000.00
40,000.00
45,000.00
40,000.00
20,000.00

Kg
Kg

Rp
Rp

42,000.00
45,000.00

Kg
Kg
Kg
M
bh
Kg
Ltr
Liter

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

22,000.00
150,000.00
7,000.00
8,000.00
15,000.00
35,000.00
5,000.00
8,500.00

Btg

Rp

9,000.00

m1
m1

Rp
Rp

12,500.00
12,000.00

Bh
Bh

Rp
Rp

40,000.00
30,000.00

Bh
Bh
Bh
Bh

Rp
Rp
Rp
Rp

25,000.00
15,000.00
27,000.00
25,000.00

Bh
Bh

Rp
Rp

20,000.00
25,000.00

Rp

37,500.00

Rp

2,250.00

NO
6

7
8
9
10
11
12
13
14
15
16
17
1
2
3
4
5
6
7
8
9
10
11
12

BAHAN / MATERIAL
Skring Case Lokal Biasa
- Lokal 2 Grup Automatis
- Lokal 3 Grup Biasa
Fitting
Klem Kabel No. 10
Kabel ITC (2x2x0,6)
Klem Kabel No. 12
Inbow Dos
Las Dop
Isolasi
T-Doas 5/8"
Stop Kontak Telpon
Kontak Sambungan
MCB 10 A
UPAH KERJA
Mandor
Kepala Tukang
Tukang
Pekerja/Buruh Tak Terampil
Pekerja/BuruhTerampil
Mekanik Terampil
Mekanik TakTerampil
Operator Trampil
Operator Tak Trampil
Pembantu Operator
Sopir Truk
Pembantu Sopir

SATUAN

JANUARI 2016

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Roll
Bh
Bh
Bh
Bh

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

82,000.00
93,000.00
17,000.00
500.00
14,000.00
500.00
3,700.00
500.00
3,500.00
200.00
45,400.00
6,400.00
50,000.00

Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari
Hari

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

80,000.00
120,000.00
90,000.00
65,000.00
70,000.00
85,000.00
70,000.00
150,000.00
100,000.00
75,000.00
80,000.00
60,000.00

KET.

ANALISA HARGA SATUAN

A.2.2.1.
A. 2.2.1.1

HARGA SATUAN PEKERJAAN PERSIAPAN


Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter

No.
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Jumlah Harga
(Rp)

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.400
70,000.00
0.200
90,000.00
0.020
120,000.00
0.020
80,000.00
JUMLAH TENAGA KERJA

Btng
Kg
m3
m3
m3
Kg
Liter

1.250
5.000
0.005
0.009
0.072
0.060
0.400
JUMLAH HARGA BAHAN

BAHAN
Dolken kayu 8-10/400 cm
Semen Portland
Pasir beton
Koral beton
Kayu 5/7
Paku biasa 2" - 5'
Residu

Koefisien

Harga Satuan
(Rp)

Kode

28,000.00
18,000.00
2,400.00
1,600.00
50,000.00
-

PERALATAN
-

JUMLAH HARGA ALAT


D
E
F

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A. 2.2.1.2

15%

Koefisien

Harga Satuan
(Rp)

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
BAHAN
Dolken kayu 8-10/400 cm
Semen Portland
Seng gelombang
Pasir beton
Koral beton
Kayu 5/7
Paku biasa 2" - 5'
Meni besi

Jumlah Harga
(Rp)

Kode

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.200
0.400
0.020
0.020
JUMLAH TENAGA KERJA

Btng
Kg
Lbr
m3
m3
m3
Kg
Liter

1.250
2.500
1.200
0.005
0.009
0.072
0.060
0.450
JUMLAH HARGA BAHAN

PERALATAN
JUMLAH HARGA ALAT

D
E
F

50,000.00
7,500.00
57,500.00

Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter

No.
A

15% x D

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

15% x D

15%

A. 2.2.1.3

Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1.8 meter

No.
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Jumlah Harga
(Rp)

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.200
0.300
0.020
0.020
JUMLAH TENAGA KERJA

Btng
Kg
m'
m3
m3
Kg

1.000
2.000
25.000
0.005
0.009
0.060
JUMLAH HARGA BAHAN

BAHAN
Dolken kayu 8-10/400 cm
Semen Portland
Kawat duri
Pasir beton
Koral beton
Paku biasa 2" - 5'

Koefisien

Harga Satuan
(Rp)

Kode

PERALATAN
-

JUMLAH HARGA ALAT


D
E
F

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A. 2.2.1.4

15%

Koefisien

Harga Satuan
(Rp)

Pengukuran dan pemasangan 1 m' Bouwplank

No.
A

15% x D

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Jumlah Harga
(Rp)

Kode

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.100
65,000.00
0.100
90,000.00
0.010
120,000.00
0.005
80,000.00
JUMLAH TENAGA KERJA

6,500.00
9,000.00
1,200.00
400.00
17,100.00

m3
Kg
m3

0.012
4,500,000.00
0.020
15,000.00
0.007
2,800,000.00
JUMLAH HARGA BAHAN

54,000.00
300.00
19,600.00
73,900.00

BAHAN
Kayu balok 5/7, Kls. II
Paku 2"-3"
Kayu papan 3/20, Kls. III
PERALATAN

JUMLAH HARGA ALAT


D
E
F

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A. 2.2.1.5

D
E

10%

Koefisien

Harga Satuan
(Rp)

91,000.00
9,100.00
100,100.00

Pembuatan 1 m2 kantor sementara plesteran

No.
A

10% x D

Uraian
TENAGA
Pekerja
Tukang Kayu
Tukang Kayu
Kepala Tukang Kayu
Mandor
BAHAN
Dolken kayu 8-10/400 cm
Kayu
Paku biasa
Besi strip
Semen Portland
Pasir pasang
Pasir beton
Koral beton
Bata merah
Seng plat
Jendela naco
Kaca polos
Kunci tanam
Playwood 4mm

Jumlah Harga
(Rp)

Kode

Satuan

L.01
L.02
L.02
L.03
L.04

OH
OH
OH
OH
OH

2.000
2.000
1.000
0.300
0.050
JUMLAH TENAGA KERJA

Btng
m3
Kg
Kg
Kg
m3
m3
m3
Bh
Lbr
Bh
m2
Bh
Lbr

1.250
0.180
0.080
1.100
35,000
0.150
0.100
0.150
30.000
0.250
0.200
0.080
0.150
0.060
JUMLAH TENAGA KERJA

JUMLAH HARGA ALAT

PERALATAN

Jumlah (A+B+C)
Overhead & Profit

10% x D

10%

Harga Satuan Pekerjaan (D+E)

A. 2.2.1.6

Pembuatan 1 m2 pagar sementara dari rumah jaga (konstruksi kayu)

No.
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Jumlah Harga
(Rp)

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.000
1.500
0.150
0.050
JUMLAH TENAGA KERJA

Btng
m3
Kg
Kg

3.000
0.276
0.700
1.500
JUMLAH HARGA BAHAN

BAHAN
Dolken kayu 8-10/400 cm
kayu
Paku biasa
Seng gelombang

Koefisien

Harga Satuan
(Rp)

Kode

PERALATAN
-

JUMLAH HARGA ALAT


D
E
F

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A. 2.2.1.7

15%

Koefisien

Harga Satuan
(Rp)

Pembuatan 1 m2 gudang semen dan peralatan

No.
A

15% x D

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Jumlah Harga
(Rp)

Kode

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.000
2.000
0.200
0.050
JUMLAH TENAGA KERJA

Btng
m3
Kg
Kg
m3
m3
Lbr
Lbr

1.700
0.210
0.300
10.500
0.030
0.050
1.500
0.250
JUMLAH HARGA BAHAN

BAHAN
Dolken kayu 8-10/400 cm
kayu
Paku biasa
Semen Portland
Pasir beton
Koral beton
Seng gelombang
Seng plat
PERALATAN

JUMLAH HARGA ALAT


D
E
F

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A. 2.2.1.8

15%

Koefisien

Harga Satuan
(Rp)

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
BAHAN
Dolken kayu 8-10/400 cm
kayu
Paku biasa
Semen Portland
Pasir beton
Koral beton
Seng gelombang
Playwood 4 mm

Jumlah Harga
(Rp)

Kode

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.000
2.000
0.200
0.050
JUMLAH TENAGA KERJA

Btng
m3
Kg
Kg
m3
m3
Lbr
Lbr

1.250
0.186
0.300
18.000
0.030
0.050
1.500
1.350
JUMLAH HARGA BAHAN

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Pembuatan 1 m2 bedeng pekerja

No.
A

15% x D

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

15% x D

15%

A. 2.2.1.9

Pembersihan 1 m2 lapangan dan perataan

No.
A

D
E
F

Uraian
TENAGA
Pekerja
Mandor

L.01
L.04

OH
OH

Koefisien

Harga Satuan
(Rp)

Jumlah Harga
(Rp)

1.000
0.050
JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

PERALATAN

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

15% x D

15%

Koefisien

Harga Satuan
(Rp)

Pembuatan 1 m2 steger/ perancah dari bambu

No.

Satuan

BAHAN

A. 2.2.1.10

Kode

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor

Jumlah Harga
(Rp)

Kode

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.000
2.000
0.200
0.050
JUMLAH TENAGA KERJA

Btng
m3

1.250
0.186
JUMLAH HARGA BAHAN

BAHAN
Bambu 6-8/600 cm
Tali ijuk
PERALATAN

JUMLAH HARGA ALAT


D
E
F

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A. 2.2.1.11

15%

Koefisien

Harga Satuan
(Rp)

Uraian
TENAGA
Tukang Kayu
Kepala Tukang Kayu
BAHAN
Kayu papan kelas III
Kayu balok 5/7 kelas III
Paku biasa

Jumlah Harga
(Rp)

Kode

Satuan

L.02
L.03

OH
OH

0.300
0.030
JUMLAH TENAGA KERJA

m3
m3
Kg

1.250
0.186
0.300
JUMLAH HARGA BAHAN

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Pembuatan 1 buah kotak adukan ukuran 40cmx50cmx25cm

No.
A

15% x D

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

15% x D

15%

A. 2.2.1.12

Pembuatan 1 m2 jalan sementara

No.
A

Uraian
TENAGA
Pekerja
Mandor

Jumlah Harga
(Rp)

Satuan

L.01
L.04

OH
OH

1.000
0.005
JUMLAH TENAGA KERJA

m3
m3
m3

0.150
0.090
0.010
JUMLAH HARGA BAHAN

BAHAN
Batu belah
Batu pecah
Pasir pasang

Koefisien

Harga Satuan
(Rp)

Kode

PERALATAN
-

JUMLAH HARGA ALAT


D
E
F

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A. 2.2.1.13

D
E
F

Uraian
TENAGA
Pekerja
Mandor

D
E
F

Harga Satuan
(Rp)

L.01
L.04

OH
OH

13.334
70,000.00
0.666
80,000.00
JUMLAH TENAGA KERJA

933,380.00
53,280.00
986,660.00

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

10% x D

10%

Uraian
TENAGA
Pekerja
Mandor

Kode

Satuan

Koefisien

Harga Satuan
(Rp)

L.01
L.04

OH
OH

6.667
65,000.00
0.333
80,000.00
JUMLAH TENAGA KERJA

986,660.00
98,666.00
1,085,326.00

Jumlah Harga
(Rp)
433,355.00
26,640.00
459,995.00

BAHAN
JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

PERALATAN

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

10% x D

10%

Koefisien

Harga Satuan
(Rp)

459,995.00
45,999.50
505,994.50

Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm


Uraian

TENAGA
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
BAHAN
Kawat jaring

Jumlah Harga
(Rp)

Kode

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.042
0.004
0.002
0.042
JUMLAH TENAGA KERJA

m3

0.143
JUMLAH HARGA BAHAN

PERALATAN
JUMLAH HARGA ALAT

D
E

Jumlah Harga
(Rp)

Pembongkaran 1 m3 dinding tembok bata

No.

Satuan

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A. 2.2.1.15

Kode

PERALATAN

No.

Koefisien

BAHAN

A. 2.2.1.14

15%

Pembongkaran 1 m3 beton bertulang

No.
A

15% x D

Jumlah (A+B+C)
Overhead & Profit

15% x D

15%

Harga Satuan Pekerjaan (D+E)

A. 2.2.1.16

Pembuatan 1 m2 panel beton pracetak 5x50x213 cm

No.
A

Uraian
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang Kayu
Mandor
BAHAN
Panel beton pracetak
Kolom beton pracetak
Semen PC
Pasir beton
Koral

Koefisien

Harga Satuan
(Rp)

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.375
0.125
0.012
0.019
JUMLAH TENAGA KERJA

Lbr
Btng
Kg
m3
m3

0.986
0.525
45.000
0.074
0.146
JUMLAH HARGA BAHAN

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah Harga
(Rp)

Kode

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

15% x D

15%

ANALISA HARGA SATUAN

A.5.1.1. HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


A.5.1.1.1

Pemasangan 1 buah closet duduk/ monoblock'

No.
A

Uraian
TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor

Kode

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

BAHAN
Closet duduk
Perlengkapan

Unit
Ls

Koefisien

Harga Satuan
(Rp)

Jumlah Harga
(Rp)

3.300
76,000.00
1.100
90,000.00
0.010
100,000.00
0.1600
80,000.00
JUMLAH TENAGA KERJA
1.000
0.060
JUMLAH HARGA BAHAN

0
0

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.5.1.1.2

Uraian
TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor
BAHAN
Closet jongkok
Semen portland
Pasir pasang

10% x D

10%

Koefisien

Harga Satuan
(Rp)

Kode

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Unit
Kg
m3

1.000
70,000.00
1.500
90,000.00
0.150
120,000.00
0.1600
80,000.00
JUMLAH TENAGA KERJA
1.000
6.000

363,600.00
36,360.00
399,960.00

Jumlah Harga
(Rp)
70,000.00
135,000.00
18,000.00
12,800.00
235,800.00

110,000.00
1,120.00

110,000.00
6,720.00

0.010
120,000.00
JUMLAH HARGA BAHAN

1,200.00
117,920.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Pemasangan 1 buah closet jongkok porslen

No.
A

PERALATAN
JUMLAH HARGA ALAT

D
E
F

250,800.00
99,000.00
1,000.00
12,800.00
363,600.00

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

10% x D

10%

353,720.00
35,372.00
389,092.00

A.5.1.1.3

Pemasangan 1 buah closet jongkok teraso

No.
A

Uraian
TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.000
70,000.00
1.500
90,000.00
0.150
120,000.00
0.050
80,000.00
JUMLAH TENAGA KERJA

70,000.00
135,000.00
18,000.00
4,000.00
227,000.00

Unit
Kg
m3
Bh

1.000
110,000.00
6.000
1,120.00
0.010
120,000.00
7.000
600.00
JUMLAH HARGA BAHAN

110,000.00
6,720.00
1,200.00
4,200.00
122,120.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.5.1.1.4

10% x D

10%

Koefisien

Harga Satuan
(Rp)

Uraian
TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.000
1.000
0.100
0.050
JUMLAH TENAGA KERJA

Unit
Kg
m3
%

1.000
6.000
0.010
30.000
JUMLAH HARGA BAHAN

PERALATAN

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

15% x D

15%

Koefisien

Harga Satuan
(Rp)

Uraian

TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor
BAHAN
Wastafel
Semen portland
Pasir pasang
Perlengkapan

Jumlah Harga
(Rp)

Kode

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

1.200
1.450
0.150
0.060
JUMLAH TENAGA KERJA

Unit
Kg
m3
%

1.200
6.000
0.010
12.000
JUMLAH HARGA BAHAN

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Pemasangan 1 buah wastafel

No.

Jumlah Harga
(Rp)

Satuan

BAHAN
Urinoir
Semen portland
Pasir pasang
Perlengkapan

A.5.1.1.5

349,120.00
34,912.00
384,032.00

Kode

JUMLAH HARGA ALAT


D
E
F

Pemasangan 1 buah urinoir

No.
A

Jumlah Harga
(Rp)

Satuan

BAHAN
Closet jongkok
Semen portland
Pasir pasang
Bata merah

Koefisien

Harga Satuan
(Rp)

Kode

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

15% x D

15%

A.5.1.1.6

Pemasangan 1 buah bathcuip porselen

No.
A

Uraian
TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor

Jumlah Harga
(Rp)

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.075
0.750
0.075
0.003
JUMLAH TENAGA KERJA

Unit
%

1.000
20.000
JUMLAH HARGA BAHAN

BAHAN
Bathcuip
Perlengkapan

Koefisien

Harga Satuan
(Rp)

Kode

PERALATAN
-

JUMLAH HARGA ALAT


D
E
F

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.5.1.1.7

15%

Koefisien

Harga Satuan
(Rp)

Uraian
TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor

Kode

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

3.000
4.500
0.050
0.900
JUMLAH TENAGA KERJA

Unit
Ls

1.000
0.120
JUMLAH HARGA BAHAN

BAHAN
Bak fibreglass
Perlengkapan

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.5.1.1.8

Uraian
TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor

Kode

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

BAHAN
Bata merah
Semen portland
Pasir pasang
Porselen 11x11
Semen warna

15% x D

15%

Koefisien

Harga Satuan
(Rp)

6.000
3.000
0.300
0.030
JUMLAH TENAGA KERJA

Jumlah Harga
(Rp)
-

150.000
120.000

m3
bh
kg

0.300
360.000
6.000
JUMLAH HARGA BAHAN

PERALATAN

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.5.1.1.9
No.

Bh
Kg

JUMLAH HARGA ALAT


D
E
F

Pemasangan 1 buah bak mandi batu bata vol 0.30 m3

No.
A

Jumlah Harga
(Rp)

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Pemasangan 1 buah bak fibreglass vol 1 m3

No.
A

15% x D

15% x D

15%

Pemasangan 1 buah bak mandi teraso vol 0.30 m3


Uraian

Kode

Satuan

Koefisien

Harga Satuan

Jumlah Harga

No.
A

Uraian
TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor

Kode

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

3.000
4.500
0.050
0.900
JUMLAH TENAGA KERJA

Unit
Ls

1.000
0.120
JUMLAH HARGA BAHAN

BAHAN
Bak fibreglass
Perlengkapan

Koefisien

(Rp)

(Rp)
-

PERALATAN
-

JUMLAH HARGA ALAT


D
E
F

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.5.1.1.10

15% x D

15%

Koefisien

Harga Satuan
(Rp)

Uraian
TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor

Kode

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.300
0.450
0.045
0.015
JUMLAH TENAGA KERJA

Unit
Ls

1.000
0.120
JUMLAH HARGA BAHAN

BAHAN
Bak fibreglass
Perlengkapan

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.5.1.1.11

15% x D

15%

Uraian

Koefisien

Harga Satuan
(Rp)

TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor
BAHAN
Beton 1:2:3
Baja tulangan
Kayu bekisting
Ubin porselen
Perlengkapan

Jumlah Harga
(Rp)

Kode

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

3.500
4.500
0.050
0.018
JUMLAH TENAGA KERJA

m3
Kg
m2
bh
%

0.900
180.000
8.000
500.000
10.000
JUMLAH HARGA BAHAN

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Pemasangan 1 buah bak beton vol 1 m3

No.
A

Jumlah Harga
(Rp)

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Pemasangan 1 buah bak air fibreglass vol 1 m3

No.
A

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

15% x D

15%

A.5.1.1.12

Pemasangan 1 buah bak cuci piring stainlessteel

No.
A

Uraian
TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.030
0.300
0.030
0.015
JUMLAH TENAGA KERJA

Unit
Bh

1.000
1.000
JUMLAH HARGA BAHAN

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.5.1.1.13

Uraian
TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor
BAHAN
Bak cuci piring
Waterdrain
Semen portland
Pasir pasang

15% x D

15%

Koefisien

Harga Satuan
(Rp)

Kode

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Unit
Bh
Kg
m3

0.050
0.500
0.050
0.025
JUMLAH TENAGA KERJA
1.000
1.000
20.000

Jumlah Harga
(Rp)
-

0.050
JUMLAH HARGA BAHAN

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Pemasangan 1 buah bak cuci piring teraso

No.
A

Jumlah Harga
(Rp)

Satuan

BAHAN
Bak cuci piring
Waterdrain

Koefisien

Harga Satuan
(Rp)

Kode

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

15% x D

15%

A.5.1.1.14

Pemasangan 1 buah floor drain

No.
A

Uraian
TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.010
70,000.00
0.100
90,000.00
0.010
120,000.00
0.005
80,000.00
JUMLAH TENAGA KERJA

700.00
9,000.00
1,200.00
400.00
11,300.00

Unit

1.000
25,000.00
JUMLAH HARGA BAHAN

25,000.00
25,000.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.5.1.1.15

15% x D

15%

Uraian
TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor
BAHAN
Bata merah
Sement portland

Kode

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

Koefisien

Harga Satuan
(Rp)

2.160
0.720
0.072
0.011
JUMLAH TENAGA KERJA

36,300.00
5,445.00
41,745.00

Jumlah Harga
(Rp)
-

Bh
Kg

40.000
44.000

Pasir pasang

m3

0.070

Pasir beton

m3

0.060

Kerikil
Baja tulangan

m3
Kg

0.070
1.600
JUMLAH HARGA BAHAN

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm

No.
A

Jumlah Harga
(Rp)

Satuan

BAHAN
Floor drain

Koefisien

Harga Satuan
(Rp)

Kode

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

15% x D

15%

A.5.1.1.16

Pemasangan 1 buah bak kontrol pasangan bata 45x45 tinggi 50 cm

No.
A

Uraian
TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor

Kode

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

BAHAN
Bata merah
Sement portland

Koefisien

Harga Satuan
(Rp)

3.200
1.150
0.011
0.016
JUMLAH TENAGA KERJA
70.000
77.000

Pasir pasang

m3

0.130

Pasir beton

m3

0.090

Kerikil
Baja tulangan

m3
Kg

0.020
2.600
JUMLAH HARGA BAHAN

PERALATAN

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.5.1.1.17

15% x D

15%

Uraian
TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor

Kode

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

BAHAN
Bata merah
Sement portland

Koefisien

Harga Satuan
(Rp)

3.200
1.150
0.011
0.016
JUMLAH TENAGA KERJA

Pasir pasang

m3

0.184

Pasir beton

m3

0.120

Kerikil
Baja tulangan

m3
Kg

0.033
4.850
JUMLAH HARGA BAHAN

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

15% x D

15%

Koefisien

Harga Satuan
(Rp)

Pemasangan 1 m' pipa galvanis diameter "


Uraian

TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor
BAHAN
Pipa galvanis "
Perlengkapan

Jumlah Harga
(Rp)

Kode

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.054
70,000.00
0.090
90,000.00
0.009
120,000.00
0.027
80,000.00
JUMLAH TENAGA KERJA

3,780.00
8,100.00
1,080.00
2,160.00
15,120.00

m'
Ls

1.200
26,500.00
0.350
9,275.00
JUMLAH HARGA BAHAN

31,800.00
3,246.25
35,046.25

PERALATAN
JUMLAH HARGA ALAT

D
E

123.000
114.000

No.

Jumlah Harga
(Rp)

PERALATAN

A.5.1.1.18

Bh
Kg

JUMLAH HARGA ALAT


D
E
F

Pemasangan 1 buah bak kontrol pasangan bata 60x60 tinggi 65 cm

No.
A

Bh
Kg

JUMLAH HARGA ALAT


D
E
F

Jumlah Harga
(Rp)

Jumlah (A+B+C)
Overhead & Profit

15% x D

15%

50,166.25
7,524.94

Harga Satuan Pekerjaan (D+E)

57,691.19

A.5.1.1.19

Pemasangan 1 buah kran diameter " atau "

No.
A

Uraian
TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.010
70,000.00
0.400
90,000.00
0.040
120,000.00
0.005
80,000.00
JUMLAH TENAGA KERJA

700.00
36,000.00
4,800.00
400.00
41,900.00

Bh
Bh

1.000
12,500.00
0.025
3,000.00
JULAH HARGA BAHAN

12,500.00
75.00
12,575.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.5.1.1.20

10% x D

10%

Koefisien

Harga Satuan
(Rp)

Uraian
TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.054
76,000.00
0.090
90,000.00
0.009
100,000.00
0.027
80,000.00
JUMLAH TENAGA KERJA

4,104.00
8,100.00
900.00
2,160.00
15,264.00

m'
Ls

1.200
29,333.33
0.350
10,266.67
JUMLAH HARGA BAHAN

35,200.00
3,593.33
38,793.33

PERALATAN

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

15% x D

15%

Koefisien

Harga Satuan
(Rp)

Uraian

54,057.33
8,108.60
62,165.93

TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor
BAHAN
Pipa galvanis 1"
Perlengkapan

Jumlah Harga
(Rp)

Kode

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.054
70,000.00
0.090
90,000.00
0.009
120,000.00
0.027
80,000.00
JUMLAH TENAGA KERJA

3,780.00
8,100.00
1,080.00
2,160.00
15,120.00

m'
Ls

1.200
39,333.33
0.350
13,766.67
JUMLAH HARGA BAHAN

47,200.00
4,818.33
52,018.33

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Pemasangan 1 m' pipa galvanis diameter 1"

No.

Jumlah Harga
(Rp)

Satuan

BAHAN
Pipa galvanis "
Perlengkapan

A.5.1.1.21

54,475.00
5,447.50
59,922.50

Kode

JUMLAH HARGA ALAT


D
E
F

Pemasangan 1 m' pipa galvanis diameter "

No.
A

Jumlah Harga
(Rp)

Satuan

BAHAN
Kran air
Sealtape

Koefisien

Harga Satuan
(Rp)

Kode

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

15% x D

15%

67,138.33
10,070.75
77,209.08

A.5.1.1.22

Pemasangan 1 m' pipa galvanis diameter 1"

No.
A

Uraian
TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.108
76,000.00
0.180
90,000.00
0.018
100,000.00
0.005
80,000.00
JUMLAH TENAGA KERJA

m'
Ls

1.200
0.350
JUMLAH HARGA BAHAN

BAHAN
Pipa galvanis 1"
Perlengkapan

Koefisien

Harga Satuan
(Rp)

Kode

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.5.1.1.23

26,608.00
3,991.20
30,599.20

15% x D

15%

Uraian

Koefisien

Harga Satuan
(Rp)

TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor

Kode

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.135
76,000.00
0.225
90,000.00
0.023
100,000.00
0.007
80,000.00
JUMLAH TENAGA KERJA

m'
Ls

1.200
0.350
JUMLAH HARGA BAHAN

BAHAN
Pipa galvanis 3"
Perlengkapan

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.5.1.1.24

33,320.00
4,998.00
38,318.00

15% x D

15%

Uraian

Koefisien

Harga Satuan
(Rp)

TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor
BAHAN
Pipa galvanis 4"
Perlengkapan

Kode

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.135
76,000.00
0.225
90,000.00
0.023
100,000.00
0.007
80,000.00
JUMLAH TENAGA KERJA

m'
Ls

1.200
0.350
JUMLAH HARGA BAHAN

Jumlah Harga
(Rp)
10,260.00
20,250.00
2,250.00
560.00
33,320.00
-

PERALATAN
JUMLAH HARGA ALAT

D
E
F

10,260.00
20,250.00
2,250.00
560.00
33,320.00

Pemasangan 1 m' pipa galvanis diameter 4"

No.
A

Jumlah Harga
(Rp)

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Pemasangan 1 m' pipa galvanis diameter 3"

No.
A

8,208.00
16,200.00
1,800.00
400.00
26,608.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah Harga
(Rp)

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

15% x D

15%

33,320.00
4,998.00
38,318.00

A.5.1.1.25

Pemasangan 1 m' pipa PVC tipe AW diameter "

No.
A

Uraian
TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.036
70,000.00
0.060
90,000.00
0.006
120,000.00
0.002
80,000.00
JUMLAH TENAGA KERJA

2,520.00
5,400.00
720.00
160.00
8,800.00

m'
Ls

1.200
4,125.00
0.350
1,443.75
JUMLAH HARGA BAHAN

4,950.00
505.31
5,455.31

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.5.1.1.26

10% x D

10%

Koefisien

Harga Satuan
(Rp)

Uraian
TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.036
70,000.00
0.060
90,000.00
0.006
120,000.00
0.002
80,000.00
JUMLAH TENAGA KERJA

2,520.00
5,400.00
720.00
160.00
8,800.00

m'
Ls

1.200
5,375.00
0.350
1,881.25
JUMLAH HARGA BAHAN

6,450.00
658.44
7,108.44

PERALATAN

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

15% x D

15%

Koefisien

Harga Satuan
(Rp)

Uraian

15,908.44
2,386.27
18,294.70

TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor
BAHAN
Pipa PVC tipe AW diameter 1"
Perlengkapan

Jumlah Harga
(Rp)

Kode

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.036
70,000.00
0.060
90,000.00
0.006
120,000.00
0.002
80,000.00
JUMLAH TENAGA KERJA

2,520.00
5,400.00
720.00
160.00
8,800.00

m'
Ls

1.200
7,500.00
0.350
2,625.00
JUMLAH HARGA BAHAN

9,000.00
918.75
9,918.75

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Pemasangan 1 m' pipa PVC tipe AW diameter 1"

No.

Jumlah Harga
(Rp)

Satuan

BAHAN
Pipa PVC tipe AW diameter "
Perlengkapan

A.5.1.1.27

14,255.31
1,425.53
15,680.84

Kode

JUMLAH HARGA ALAT


D
E
F

Pemasangan 1 m' pipa PVC tipe AW diameter "

No.
A

Jumlah Harga
(Rp)

Satuan

BAHAN
Pipa PVC tipe AW diameter "
Perlengkapan

Koefisien

Harga Satuan
(Rp)

Kode

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

15% x D

15%

18,718.75
2,807.81
21,526.56

A.5.1.1.28

Pemasangan 1 m' pipa PVC tipe AW diameter 1"

No.
A

Uraian
TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.054
70,000.00
0.090
90,000.00
0.009
120,000.00
0.003
80,000.00
JUMLAH TENAGA KERJA

3,780.00
8,100.00
1,080.00
240.00
13,200.00

m'
Ls

1.200
10,000.00
0.350
3,500.00
JUMLAH HARGA BAHAN

12,000.00
1,225.00
13,225.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.5.1.1.29

15% x D

15%

Koefisien

Harga Satuan
(Rp)

Uraian
TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.054
70,000.00
0.090
90,000.00
0.009
120,000.00
0.003
80,000.00
JUMLAH TENAGA KERJA

3,780.00
8,100.00
1,080.00
240.00
13,200.00

m'
Ls

1.200
15,000.00
0.350
5,250.00
JUMLAH HARGA BAHAN

18,000.00
1,837.50
19,837.50

PERALATAN

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

15% x D

15%

Koefisien

Harga Satuan
(Rp)

Uraian

33,037.50
4,955.63
37,993.13

TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor
BAHAN
Pipa PVC tipe AW diameter 2"
Perlengkapan

Jumlah Harga
(Rp)

Kode

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.081
70,000.00
0.135
90,000.00
0.014
120,000.00
0.004
80,000.00
JUMLAH TENAGA KERJA

5,670.00
12,150.00
1,620.00
320.00
19,760.00

m'
Ls

1.200
20,000.00
0.350
7,000.00
JUMLAH HARGA BAHAN

24,000.00
2,450.00
26,450.00

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Pemasangan 1 m' pipa PVC tipe AW diameter 2"

No.

Jumlah Harga
(Rp)

Satuan

BAHAN
Pipa PVC tipe AW diameter 2"
Perlengkapan

A.5.1.1.30

26,425.00
3,963.75
30,388.75

Kode

JUMLAH HARGA ALAT


D
E
F

Pemasangan 1 m' pipa PVC tipe AW diameter 2"

No.
A

Jumlah Harga
(Rp)

Satuan

BAHAN
Pipa PVC tipe AW diameter 1"
Perlengkapan

Koefisien

Harga Satuan
(Rp)

Kode

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

15% x D

15%

46,210.00
6,931.50
53,141.50

A.5.1.1.31

Pemasangan 1 m' pipa PVC tipe AW diameter 3"

No.
A

Uraian
TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.081
70,000.00
0.135
90,000.00
0.014
120,000.00
0.004
80,000.00
JUMLAH TENAGA KERJA

5,670.00
12,150.00
1,620.00
320.00
19,760.00

m'
Ls

1.200
25,000.00
0.350
8,750.00
JUMLAH HARGA BAHAN

30,000.00
3,062.50
33,062.50

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.5.1.1.32

10% x D

10%

Koefisien

Harga Satuan
(Rp)

Uraian
TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.081
70,000.00
0.135
90,000.00
0.014
120,000.00
0.004
80,000.00
JUMLAH TENAGA KERJA

5,670.00
12,150.00
1,620.00
320.00
19,760.00

m'
Ls

1.200
45,000.00
0.350
15,750.00
JUMLAH HARGA BAHAN

54,000.00
5,512.50
59,512.50

PERALATAN

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

15% x D

15%

Koefisien

Harga Satuan
(Rp)

Uraian
TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor

Kode

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

BAHAN
Pipa tanah
Semen portland
Pasir pasang

m'
kg
m3

Pasir urug

m3

0.080
0.040
0.004
0.004
JUMLAH TENAGA KERJA
1.600
35.000
0.014

79,272.50
11,890.88
91,163.38

Jumlah Harga
(Rp)
-

0.014
JUMLAH HARGA BAHAN

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Pemasangan 1 m' pipa air limbah jenis pipa tanah 20 cm

No.

Jumlah Harga
(Rp)

Satuan

BAHAN
Pipa PVC tipe AW diameter 4"
Perlengkapan

A.5.1.1.33

52,822.50
5,282.25
58,104.75

Kode

JUMLAH HARGA ALAT


D
E
F

Pemasangan 1 m' pipa PVC tipe AW diameter 4"

No.
A

Jumlah Harga
(Rp)

Satuan

BAHAN
Pipa PVC tipe AW diameter 3"
Perlengkapan

Koefisien

Harga Satuan
(Rp)

Kode

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

15% x D

15%

A.5.1.1.34

Pemasangan 1 m' pipa air limbah jenis pipa tanah 15 cm

No.
A

Uraian

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.060
0.030
0.003
0.003
JUMLAH TENAGA KERJA

BAHAN
Pipa tanah
Semen portland
Pasir pasang

m'
kg
m3

1.600
0.680
0.013

Pasir urug

m3

0.011
JUMLAH HARGA BAHAN

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.5.1.1.35

15% x D

15%

Koefisien

Harga Satuan
(Rp)

Uraian
TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.140
0.070
0.007
0.007
JUMLAH TENAGA KERJA

m'
m3
kg
m3
m3

1.100
0.027
3.920
0.056
0.024
JUMLAH HARGA BAHAN

PERALATAN

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

15% x D

15%

Koefisien

Harga Satuan
(Rp)

Uraian

TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor
BAHAN
Pipa tanah 30 - 100 cm
Bata merah
Semen portland
Pasir pasang
Pasir urug

Jumlah Harga
(Rp)

Kode

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.380
0.190
0.019
0.019
JUMLAH TENAGA KERJA

m'
m3
kg
m3

1.100
0.550
10.300
0.061
0.069
JUMLAH HARGA BAHAN

m3

PERALATAN
JUMLAH HARGA ALAT

D
E

Pemasangan 1 m' pipa beton 30 - 100 cm

No.

Jumlah Harga
(Rp)

Satuan

BAHAN
Pipa tanah 15 - 20 cm
Bata merah
Semen portland
Pasir pasang
Pasir urug

A.5.1.1.36

Kode

JUMLAH HARGA ALAT


D
E
F

Pemasangan 1 m' pipa beton 15 - 20 cm

No.
A

Jumlah Harga
(Rp)

Satuan

TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor

Koefisien

Harga Satuan
(Rp)

Kode

Jumlah (A+B+C)
Overhead & Profit

15% x D

15%

Harga Satuan Pekerjaan (D+E)

A.5.1.1.36

Pemasangan 1 m' pipa beton 30 - 100 cm

No.
A

Uraian
TENAGA
Pekerja
Tukang batu
Kepala Tukang
Mandor
BAHAN
Pipa tanah 30 - 100 cm
Bata merah
Semen portland
Pasir pasang
Pasir urug

Koefisien

Harga Satuan
(Rp)

Satuan

L.01
L.02
L.03
L.04

OH
OH
OH
OH

0.380
0.190
0.019
0.019
JUMLAH TENAGA KERJA

m'
m3
kg
m3
m3

1.100
0.550
10.300
0.061
0.069
JUMLAH HARGA BAHAN

PERALATAN
JUMLAH HARGA ALAT

D
E
F

Jumlah Harga
(Rp)

Kode

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

15% x D

15%

ANALISA HARGA SATUAN

A.8.4.3. HARGA SATUAN PEKERJAAN PEMASANGAN AKSESORIS PIPA


A.8.4.3.1

Pemasangan 1 buah valve 150 mm

No.
A

D
E
F

Uraian

Satuan

L.01
L.02
L.04

OH
OH
OH

1.429
0.715
0.1430
JUMLAH TENAGA KERJA

BAHAN
Valve 150 mm

bh

1.000
JUMLAH HARGA BAHAN

PERALATAN
Sewa tripot/Tackel dan handle crabe 2T

hari

0.100
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.8.4.3.2

D
E
F

Uraian

D
E

Koefisien

Harga Satuan
(Rp)

Satuan

L.01
L.02
L.04

OH
OH
OH

1.714
0.857
0.171
JUMLAH TENAGA KERJA

BAHAN
Valve 200 mm

bh

1.000
JUMLAH HARGA BAHAN

PERALATAN
Sewa tripot/Tackel dan handle crabe 2T

hari

0.300
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

15% x D

15%

Koefisien

Harga Satuan
(Rp)

Pemasangan 1 buah valve 250 mm

No.

15%

Kode

A.8.4.3.3

15% x D

Pemasangan 1 buah valve 200 mm

No.
A

Koefisien

Harga Satuan
(Rp)

Kode

Uraian

Kode

Satuan

L.01
L.02
L.04

OH
OH
OH

1.714
0.857
0.171
JUMLAH TENAGA KERJA

BAHAN
Valve 250 mm

bh

1.000
JUMLAH HARGA BAHAN

PERALATAN
Sewa tripot/Tackel dan handle crabe 2T

hari

0.400
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit

15% x D

15%

Harga Satuan Pekerjaan (D+E)

A.8.4.3.4

Pemasangan 1 buah valve 300 mm

No.
A

D
E
F

Uraian

Satuan

L.01
L.02
L.04

OH
OH
OH

2.000
1.000
0.200
JUMLAH TENAGA KERJA

BAHAN
Valve 300 mm

bh

1.000
JUMLAH HARGA BAHAN

PERALATAN
Sewa tripot/Tackel dan handle crabe 2T

hari

0.500
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.8.4.3.5

D
E
F

Uraian

D
E
F

Koefisien

Harga Satuan
(Rp)

Satuan

L.01
L.02
L.04

OH
OH
OH

3.429
1.715
0.343
JUMLAH TENAGA KERJA

BAHAN
Valve 400 mm

bh

1.000
JUMLAH HARGA BAHAN

PERALATAN
Sewa tripot/Tackel dan handle crabe 2T

hari

1.000
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

15% x D

15%

Koefisien

Harga Satuan
(Rp)

Pemasangan 1 buah valve 450 mm

No.

15%

Kode

A.8.4.3.6

15% x D

Pemasangan 1 buah valve 400 mm

No.
A

Koefisien

Harga Satuan
(Rp)

Kode

Uraian

Kode

Satuan

L.01
L.02
L.04

OH
OH
OH

3.429
1.715
0.343
JUMLAH TENAGA KERJA

BAHAN
Valve 450 mm

bh

1.000
JUMLAH HARGA BAHAN

PERALATAN
Sewa tripot/Tackel dan handle crabe 2T

hari

1.000
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

15% x D

15%

A.8.4.3.7

Pemasangan 1 buah valve 500 mm

No.
A

D
E
F

Uraian

Satuan

L.01
L.02
L.04

OH
OH
OH

4.000
2.000
0.400
JUMLAH TENAGA KERJA

BAHAN
Valve 500 mm

bh

1.000
JUMLAH HARGA BAHAN

PERALATAN
Sewa tripot/Tackel dan handle crabe 2T

hari

1.000
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.8.4.3.8

D
E
F

Uraian

D
E
F

Koefisien

Harga Satuan
(Rp)

Satuan

L.01
L.02
L.04

OH
OH
OH

1.421
0.711
0.142
JUMLAH TENAGA KERJA

BAHAN
Valve 600 mm

bh

1.000
JUMLAH HARGA BAHAN

PERALATAN
Sewa tripot/Tackel dan handle crabe 2T
Mobil crane =< 3 ton

hari
hari

0.600
0.300
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

15% x D

15%

Koefisien

Harga Satuan
(Rp)

Pemasangan 1 buah valve 700 mm

No.

15%

Kode

A.8.4.3.9

15% x D

Pemasangan 1 buah valve 600 mm

No.
A

Koefisien

Harga Satuan
(Rp)

Kode

Uraian

Kode

Satuan

L.01
L.02
L.04

OH
OH
OH

1.429
0.715
0.143
JUMLAH TENAGA KERJA

BAHAN
Valve 700 mm

bh

1.000
JUMLAH HARGA BAHAN

PERALATAN
Sewa tripot/Tackel dan handle crabe 2T
Mobil crane =< 3 ton

hari
hari

0.500
0.500
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

15% x D

15%

A.8.4.3.10

Pemasangan 1 buah valve 800 mm

No.
A

D
E
F

Uraian

Satuan

L.01
L.02
L.04

OH
OH
OH

1.786
0.893
0.179
JUMLAH TENAGA KERJA

BAHAN
Valve 800 mm

bh

1.000
JUMLAH HARGA BAHAN

PERALATAN
Sewa tripot/Tackel dan handle crabe 2T
Mobil crane =< 3 ton

hari
hari

0.500
0.500
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.8.4.3.11

D
E
F

Uraian

D
E
F

Koefisien

Harga Satuan
(Rp)

Satuan

L.01
L.02
L.04

OH
OH
OH

1.714
0.857
0.171
JUMLAH TENAGA KERJA

BAHAN
Valve 900 mm

bh

1.000
JUMLAH HARGA BAHAN

PERALATAN
Sewa tripot/Tackel dan handle crabe 2T
Mobil crane =< 3 ton

hari
hari

0.750
0.750
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

15% x D

15%

Koefisien

Harga Satuan
(Rp)

Pemasangan 1 buah valve 1000 mm

No.

15%

Kode

A.8.4.3.12

15% x D

Pemasangan 1 buah valve 900 mm

No.
A

Koefisien

Harga Satuan
(Rp)

Kode

Uraian

Kode

Satuan

L.01
L.02
L.04

OH
OH
OH

2.571
1.286
0.257
JUMLAH TENAGA KERJA

BAHAN
Valve 1000 mm

bh

1.000
JUMLAH TENAGA KERJA

PERALATAN
Sewa tripot/Tackel dan handle crabe 2T
Mobil crane =< 3 ton

hari
hari

1.000
1.000
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

10% x D

10%

A.8.4.3.13

Pemasangan 1 buah valve 1100 mm

No.
A

D
E
F

Uraian

Satuan

L.01
L.02
L.04

OH
OH
OH

3.000
1.500
0.300
JUMLAH TENAGA KERJA

BAHAN
Valve 1100 mm

bh

1.000
JUMLAH TENAGA KERJA

PERALATAN
Sewa tripot/Tackel dan handle crabe 2T
Mobil crane =< 3 ton

hari
hari

1.000
1.000
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.8.4.3.14

D
E
F

Uraian

D
E
F

Koefisien

Harga Satuan
(Rp)

Satuan

L.01
L.02
L.04

OH
OH
OH

3.000
1.500
0.300
JUMLAH TENAGA KERJA

BAHAN
Valve 1200 mm

bh

1.000
JUMLAH TENAGA KERJA

PERALATAN
Sewa tripot/Tackel dan handle crabe 2T
Mobil crane =< 3 ton

hari
hari

1.000
1.000
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

10% x D

10%

Koefisien

Harga Satuan
(Rp)

Pemasangan 1 buah Tee 150 mm

No.

10%

Kode

A.8.4.3.15

10% x D

Pemasangan 1 buah valve 1200 mm

No.
A

Koefisien

Harga Satuan
(Rp)

Kode

Uraian

Kode

Satuan

L.01
L.02
L.04

OH
OH
OH

0.106
0.053
0.011
JUMLAH TENAGA KERJA

BAHAN
Tee 150 mm

bh

1.000
JUMLAH TENAGA KERJA

PERALATAN
Sewa tripot/Tackel dan handle crabe 2T

hari

0.028
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

10% x D

10%

A.8.4.3.16

Pemasangan 1 buah Tee 200 mm

No.
A

D
E
F

Uraian

Satuan

L.01
L.02
L.04

OH
OH
OH

0.216
0.108
0.022
JUMLAH TENAGA KERJA

BAHAN
Tee 200 mm

bh

1.000
JUMLAH TENAGA KERJA

PERALATAN
Sewa tripot/Tackel dan handle crabe 2T

hari

0.029
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.8.4.3.17

D
E
F

Uraian

D
E
F

Harga Satuan
(Rp)

L.01
L.02
L.04

OH
OH
OH

0.326
0.163
0.033
JUMLAH TENAGA KERJA

BAHAN
Tee 250 mm

bh

1.000
JUMLAH TENAGA KERJA

PERALATAN
Sewa tripot/Tackel dan handle crabe 2T

hari

0.039
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

10% x D

10%

Koefisien

Harga Satuan
(Rp)

Pemasangan 1 buah Tee 300 mm


Uraian

Kode

Satuan

L.01
L.02
L.04

OH
OH
OH

0.436
0.218
0.044
JUMLAH TENAGA KERJA

BAHAN
Tee 300 mm

bh

1.000
JUMLAH TENAGA KERJA

PERALATAN
Sewa tripot/Tackel dan handle crabe 2T

hari

0.500
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.8.4.3.19
No.

Koefisien

Satuan

No.

10%

Kode

A.8.4.3.18

10% x D

Pemasangan 1 buah Tee 250 mm

No.
A

Koefisien

Harga Satuan
(Rp)

Kode

10% x D

10%

Pemasangan 1 buah Tee 400 mm


Uraian

Kode

Satuan

Koefisien

Harga Satuan

No.
A

D
E
F

Uraian

Kode

Satuan

L.01
L.02
L.04

OH
OH
OH

0.656
0.328
0.066
JUMLAH TENAGA KERJA

BAHAN
Tee 400 mm

bh

1.000
JUMLAH TENAGA KERJA

PERALATAN
Sewa tripot/Tackel dan handle crabe 2T

hari

0.500
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.8.4.3.20

D
E
F

Uraian

D
E
F

Koefisien

Harga Satuan
(Rp)

L.01
L.02
L.04

OH
OH
OH

0.766
0.383
0.077
JUMLAH TENAGA KERJA

BAHAN
Tee 450 mm

bh

1.000
JUMLAH TENAGA KERJA

PERALATAN
Sewa tripot/Tackel dan handle crabe 2T

hari

0.500
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

10% x D

10%

Koefisien

Harga Satuan
(Rp)

Pemasangan 1 buah Tee 500 mm


Uraian

Kode

Satuan

L.01
L.02
L.04

OH
OH
OH

0.876
0.438
0.088
JUMLAH TENAGA KERJA

BAHAN
Tee 500 mm

bh

1.000
JUMLAH TENAGA KERJA

PERALATAN
Sewa tripot/Tackel dan handle crabe 2T

hari

0.600
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.8.4.3.22

10% x D

10%

Harga Satuan
(Rp)

Pemasangan 1 buah Tee 600 mm

No.
A

10%

Satuan

No.

10% x D

Kode

A.8.4.3.21

(Rp)

Pemasangan 1 buah Tee 450 mm

No.
A

Koefisien

Uraian
TENAGA
Pekerja

Kode

Satuan

Koefisien

L.01

OH

1.096

Tukang pipa
Mandor
B

D
E
F

OH
OH

0.548
0.110
JUMLAH TENAGA KERJA

BAHAN
Tee 600 mm

bh

1.000
JUMLAH TENAGA KERJA

PERALATAN
Sewa tripot/Tackel dan handle crabe 2T
Mobile crane =< 3 ton

hari
hari

0.193
0.096
JUMLAH HARGA ALAT

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.8.4.3.23

D
E
F

Uraian

D
E
F

Harga Satuan
(Rp)

L.01
L.02
L.04

OH
OH
OH

1.316
0.658
0.132
JUMLAH TENAGA KERJA

BAHAN
Tee 700 mm

bh

1.000
JUMLAH TENAGA KERJA

PERALATAN
Sewa tripot/Tackel dan handle crabe 2T
Mobile crane =< 3 ton

hari
hari

0.225
0.113
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

10% x D

10%

Koefisien

Harga Satuan
(Rp)

Pemasangan 1 buah Tee 800 mm


Uraian

Kode

Satuan

L.01
L.02
L.04

OH
OH
OH

1.536
0.768
0.154
JUMLAH TENAGA KERJA

BAHAN
Tee 800 mm

bh

1.000
JUMLAH TENAGA KERJA

PERALATAN
Sewa tripot/Tackel dan handle crabe 2T
Mobile crane =< 3 ton

hari
hari

0.257
0.129
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.8.4.3.25

10% x D

10%

Harga Satuan
(Rp)

Pemasangan 1 buah Tee 900 mm

No.
A

Koefisien

Satuan

No.

10%

Kode

A.8.4.3.24

10% x D

Pemasangan 1 buah Tee 700 mm

No.
A

L.02
L.04

Uraian
TENAGA
Pekerja

Kode

Satuan

Koefisien

L.01

OH

1.756

Tukang pipa
Mandor
B

D
E
F

OH
OH

0.878
0.176
JUMLAH TENAGA KERJA

BAHAN
Tee 900 mm

bh

1.000
JUMLAH TENAGA KERJA

PERALATAN
Sewa tripot/Tackel dan handle crabe 2T
Mobile crane =< 3 ton

hari
hari

0.321
0.161
JUMLAH HARGA ALAT

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.8.4.3.26

D
E
F

Uraian

D
E
F

Harga Satuan
(Rp)

L.01
L.02
L.04

OH
OH
OH

1.976
0.988
0.198
JUMLAH TENAGA KERJA

BAHAN
Tee 1000 mm

bh

1.000
JUMLAH TENAGA KERJA

PERALATAN
Sewa tripot/Tackel dan handle crabe 2T
Mobile crane =< 3 ton

hari
hari

0.366
0.183
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

10% x D

10%

Koefisien

Harga Satuan
(Rp)

Pemasangan 1 buah Tee 1100 mm


Uraian

Kode

Satuan

L.01
L.02
L.04

OH
OH
OH

2.196
1.098
0.220
JUMLAH TENAGA KERJA

BAHAN
Tee 1100 mm

bh

1.000
JUMLAH TENAGA KERJA

PERALATAN
Sewa tripot/Tackel dan handle crabe 2T
Mobile crane =< 3 ton

hari
hari

0.386
0.193
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.8.4.3.28

10% x D

10%

Harga Satuan
(Rp)

Pemasangan 1 buah Tee 1200 mm

No.
A

Koefisien

Satuan

No.

10%

Kode

A.8.4.3.27

10% x D

Pemasangan 1 buah Tee 1000 mm

No.
A

L.02
L.04

Uraian
TENAGA
Pekerja

Kode

Satuan

Koefisien

L.01

OH

2.416

Tukang pipa
Mandor
B

D
E
F

L.02
L.04

OH
OH

1.208
0.242
JUMLAH TENAGA KERJA

BAHAN
Tee 1200 mm

bh

1.000
JUMLAH TENAGA KERJA

PERALATAN
Sewa tripot/Tackel dan handle crabe 2T
Mobile crane =< 3 ton

hari
hari

0.450
0.225
JUMLAH HARGA ALAT

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

10% x D

10%

Koefisien

Harga Satuan
(Rp)

A.8.4.4. HARGA SATUAN PEKERJAAN PENYAMBUNGAN PIPA BAARU KE PIPA LAMA


A.8.4.4.1

Penyambungan 1 buah pipa baru ke pipa yang ada 80 mm

No.
A

D
E
F

Uraian

Kode

Satuan

L.01
L.02
L.04

OH
OH
OH

1.466
0.733
0.1470
JUMLAH TENAGA KERJA

BAHAN
Pipa 80 mm

bh

1.000
JUMLAH TENAGA KERJA

PERALATAN
Peralatan potong pipa T2/mekanik/cilinder saw
Sewa genset 1500 watt
Sewa pompa submersible 3m3/h
Sewa tripot/Tackel dan handle crabe 2T

hari
hari
hari
hari

0.606
0.075
0.968
0.865
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.8.4.4.2

D
E
F

10%

Koefisien

Harga Satuan
(Rp)

Penyambungan 1 buah pipa baru ke pipa yang ada 100 mm

No.
A

10% x D

Uraian

Kode

Satuan

L.01
L.02
L.04

OH
OH
OH

1.646
0.823
0.1650
JUMLAH TENAGA KERJA

BAHAN
Pipa 100 mm

bh

1.000
JUMLAH TENAGA KERJA

PERALATAN
Peralatan potong pipa T2/mekanik/cilinder saw
Sewa genset 1500 watt
Sewa pompa submersible 3m3/h
Sewa tripot/Tackel dan handle crabe 2T

hari
hari
hari
hari

0.650
0.159
1.078
0.911
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

10% x D

10%

A.8.4.4.3

Penyambungan 1 buah pipa baru ke pipa yang ada 150 mm

No.
A

D
E
F

Uraian

Satuan

L.01
L.02
L.04

OH
OH
OH

2.096
1.048
0.2100
JUMLAH TENAGA KERJA

BAHAN
Pipa 150 mm

bh

1.000
JUMLAH TENAGA KERJA

PERALATAN
Peralatan potong pipa T2/mekanik/cilinder saw
Sewa genset 1500 watt
Sewa pompa submersible 3m3/h
Sewa tripot/Tackel dan handle crabe 2T

hari
hari
hari
hari

0.760
0.369
1.353
1.026
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.8.4.4.4

D
E
F

Uraian

Koefisien

Harga Satuan
(Rp)

Satuan

L.01
L.02
L.04

OH
OH
OH

2.546
1.273
0.255
JUMLAH TENAGA KERJA

BAHAN
Pipa 200 mm

bh

1.000
JUMLAH TENAGA KERJA

PERALATAN
Peralatan potong pipa T2/mekanik/cilinder saw
Sewa genset 1500 watt
Sewa pompa submersible 3m3/h
Sewa tripot/Tackel dan handle crabe 2T

hari
hari
hari
hari

0.870
0.579
1.628
1.141
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

10% x D

10%

Koefisien

Harga Satuan
(Rp)

Penyambungan 1 buah pipa baru ke pipa yang ada 250 mm

No.

10%

Kode

A.8.4.4.5

10% x D

Penyambungan 1 buah pipa baru ke pipa yang ada 200 mm

No.
A

Koefisien

Harga Satuan
(Rp)

Kode

Uraian

Kode

Satuan

L.01
L.02
L.04

OH
OH
OH

2.996
1.498
0.300
JUMLAH TENAGA KERJA

BAHAN
Pipa 250 mm

bh

1.000
JUMLAH TENAGA KERJA

PERALATAN
Peralatan potong pipa T2/mekanik/cilinder saw
Sewa genset 1500 watt
Sewa pompa submersible 3m3/h

hari
hari
hari

TENAGA
Pekerja
Tukang pipa
Mandor

0.980
0.789
1.903

Sewa tripot/Tackel dan handle crabe 2T

D
E
F

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.8.4.4.6

D
E
F

Uraian

D
E
F

Harga Satuan
(Rp)

OH
OH
OH

3.446
1.723
0.345
JUMLAH TENAGA KERJA

BAHAN
Pipa 300 mm

bh

1.000
JUMLAH TENAGA KERJA

PERALATAN
Peralatan potong pipa T2/mekanik/cilinder saw
Sewa genset 1500 watt
Sewa pompa submersible 3m3/h
Sewa tripot/Tackel dan handle crabe 2T

hari
hari
hari
hari

1.090
0.999
2.178
1.371
JUMLAH HARGA ALAT

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

10% x D

10%

Koefisien

Harga Satuan
(Rp)

Penyambungan 1 buah pipa baru ke pipa yang ada 400 mm


Uraian

Kode

Satuan

L.01
L.02
L.04

OH
OH
OH

4.356
2.173
0.435
JUMLAH TENAGA KERJA

BAHAN
Pipa 400 mm

bh

1.000
JUMLAH TENAGA KERJA

PERALATAN
Peralatan potong pipa T2/mekanik/cilinder saw
Sewa genset 1500 watt
Sewa pompa submersible 3m3/h
Sewa tripot/Tackel dan handle crabe 2T

hari
hari
hari
hari

1.310
1.419
2.728
1.601
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

10% x D

10%

Koefisien

Harga Satuan
(Rp)

Penyambungan 1 buah pipa baru ke pipa yang ada 450 mm

No.

Koefisien

L.01
L.02
L.04

TENAGA
Pekerja
Tukang pipa
Mandor

A.8.4.4.8

10%

Satuan

No.

10% x D

Kode

A.8.4.4.7

1.256
JUMLAH HARGA ALAT

Penyambungan 1 buah pipa baru ke pipa yang ada 300 mm

No.
A

hari

Uraian
TENAGA
Pekerja
Tukang pipa
Mandor
BAHAN

Kode

Satuan

L.01
L.02
L.04

OH
OH
OH

4.796
2.398
0.480
JUMLAH TENAGA KERJA

Pipa 450 mm
C

D
E
F

PERALATAN
Peralatan potong pipa T2/mekanik/cilinder saw
Sewa genset 1500 watt
Sewa pompa submersible 3m3/h
Sewa tripot/Tackel dan handle crabe 2T

D
E
F

Uraian

D
E
F

10%

Koefisien

Harga Satuan
(Rp)

L.01
L.02
L.04

OH
OH
OH

5.246
2.623
0.525
JUMLAH TENAGA KERJA

BAHAN
Pipa 500 mm

bh

1.000
JUMLAH TENAGA KERJA

PERALATAN
Peralatan potong pipa T2/mekanik/cilinder saw
Sewa genset 1500 watt
Sewa pompa submersible 3m3/h
Sewa tripot/Tackel dan handle crabe 2T

hari
hari
hari
hari

1.530
1.839
3.278
1.831
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

10% x D

10%

Koefisien

Harga Satuan
(Rp)

Penyambungan 1 buah pipa baru ke pipa yang ada 600 mm


Uraian

Kode

Satuan

L.01
L.02
L.04

OH
OH
OH

6.146
3.037
0.615
JUMLAH TENAGA KERJA

BAHAN
Pipa 600 mm

bh

1.000
JUMLAH TENAGA KERJA

PERALATAN
Peralatan potong pipa T2/mekanik/cilinder saw
Sewa genset 1500 watt
Sewa pompa submersible 3m3/h
Sewa tripot/Tackel dan handle crabe 2T

hari
hari
hari
hari

1.750
2.259
3.828
2.061
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.8.4.4.11
No.

10% x D

Satuan

No.

1.420
1.629
3.003
1.716
JUMLAH HARGA ALAT

Kode

A.8.4.4.10

hari
hari
hari
hari

Penyambungan 1 buah pipa baru ke pipa yang ada 500 mm

No.

1.000
JUMLAH TENAGA KERJA

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.8.4.4.9

bh

10% x D

10%

Koefisien

Harga Satuan
(Rp)

Penyambungan 1 buah pipa baru ke pipa yang ada 700 mm


Uraian

Kode

Satuan

D
E
F

TENAGA
Pekerja
Tukang pipa
Mandor

OH
OH
OH

7.046
3.523
0.705
JUMLAH TENAGA KERJA

BAHAN
Pipa 700 mm

bh

1.000
JUMLAH TENAGA KERJA

PERALATAN
Peralatan potong pipa T2/mekanik/cilinder saw
Sewa genset 1500 watt
Sewa pompa submersible 3m3/h
Sewa tripot/Tackel dan handle crabe 2T

hari
hari
hari
hari

1.970
2.679
4.378
2.291
JUMLAH HARGA ALAT

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

A.8.4.4.12

D
E
F

10% x D

10%

Koefisien

Harga Satuan
(Rp)

Penyambungan 1 buah pipa baru ke pipa yang ada 800 mm

No.
A

L.01
L.02
L.04

Uraian

Kode

Satuan

L.01
L.02
L.04

OH
OH
OH

7.946
3.973
0.795
JUMLAH TENAGA KERJA

BAHAN
Pipa 800 mm

bh

1.000
JUMLAH TENAGA KERJA

PERALATAN
Peralatan potong pipa T2/mekanik/cilinder saw
Sewa genset 1500 watt
Sewa pompa submersible 3m3/h
Sewa tripot/Tackel dan handle crabe 2T

hari
hari
hari
hari

2.190
3.099
4.928
2.521
JUMLAH HARGA ALAT

TENAGA
Pekerja
Tukang pipa
Mandor

Jumlah (A+B+C)
Overhead & Profit
Harga Satuan Pekerjaan (D+E)

10% x D

10%

NALISA HARGA SATUAN

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga

(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)
-

Jumlah Harga
(Rp)

Jumlah Harga
(Rp)
-

You might also like