You are on page 1of 18

GI CHEMICAL EARTHING ELECTRODE

Technical Specification

Model

MATERIAL

SR502/503
SR802/803

GI
GI

Length
mm
2000/3000
2000/3000

Outer Pipe
Dia.(mm)
50
80

*Also available in other custom Size.

Different name of this produce


1.Chemical Earthing
2. Chemical Earthing electroed
3. maintenance free Earthing electrode
4.safe earthing electrode
5.GI CHEMICAL EARTHING ELECTRODE

Inner Pipe
Dia.(mm)
25
40

Terminal
mm
40X8
65X10

Galvanization
(micron)
80-100
80-100

COPPER BONDED CHEMICAL EARTHIN

Length
mm
2000/3000
2000/3000

Model

MATERIAL

SB502/503
SB802/803

CB*
CB

Outer Pipe
Dia.(mm)
50
80

Inner Pipe
Dia.(mm)
25
40

* CB::-COPPER BONDED FARTHING ELECTRODE


*Also available in other custom Size.

Different name of this produce

5.copper bonded safe earthing electrode


6.copper bonded maintanace free chemical e

CAL EARTHING ELECTRODE

Inner Pipe
Dia.(mm)
25
40

is produce

Terminal Copper Bonding


mm
(micron)
40X8
100-150
65X10
100-150

earthing electrode
anace free chemical earthing

COPPER BONDED EARTHING ROD

Model

MATERIAL

SOR-5/8"
SOR-3/4"
SOR-1"

CB*
CB
CB

Length
mm
2000/3000
2000/3000
2000/3000

* CB::-COPPER BOUNDED FARTHING ELECTRODE

Different name of this produce


1.copper bonded earthing Rod
2.copper coated earthing rod
3.copper earthing rod

EARTHING ROD
Dia.(mm)
14.2
17.2
25

Terminal
AT SUITABLE SIZE

Copper Bonding
(micron)
100-150
100-150
100-150

SOR (SOIL's OHM READUCER) Compound:-

SOR compound is a specially formulated compound having high current conductive & rust Resist
Absorbing & retaining the moisture for long period. It reduces the ohmic value of so
Sor compound will be used around the earth electrodes at the time of installation.
SOR compound is to reduce resistance between electrodes and soil and to create a
that the electrode output is constant. Sor compound use as back fill material.

Different name of this produce


1.back fill compound

ent conductive & rust Resistance property,


s the ohmic value of soil & helps in Faster dissipation of fault current.
e time of installation.
nd soil and to create a low resistance zone arounding the electrode to create a uniform environment s
ll material.

uniform environment so

installation Guideline for SOR Earthing Elec

1. Augur/Drill/Bore a hole oa8/10 inches in diameter to


a suitable depth of 2 or 3 meter (Electrode length)
2. Mix backfill material nicely with dug out soil.
3. Throw handful of compound soil mix into pit.
4. Remove plastic sleeve carefully from electrode.
5. Place naked electrode at center of pit.
6. Refill space around electrode with backfill material in small
quantities.
7. Then pour some water and gently poke around the
pit with a long wooden rod, to allow trapped air to escape.
8. In this manner gradually continue refilling process till
electrode is buried in pit, up to the green patch painted on
top portionof electrode.
9. Ensure that pit is not watery.
10. Pack electrode with compound tightly,so that it stands firmly in pit.
11. Pour a few bucket of water around pit.
12. Test earth resistivity of electrode. If satisfactory, connect it with
equipment.
13. If result is not satisfactory, give some time for electrode system to
ser in soil.
14. Then check ohmic value and connect with equipment.
15. In hard soil conditions, do not mix compound with dug out soil.Use backfill compound only wi

SAFETY MEASURES:-

a. Do not drop earthling electrode in pit.


b. Do not use force to drive electrode into pit.
c. Do not hammer or cut electrode while installing.
d. Remove transparent plastic cover before installation.
e. Ensure that electrode terminal and green color patch are above soil.
f. After installation pour a few buckets of water in and around pit for 18-20 days. This helps syste
g. if soil in pit sinks, fill with mother soil.
h. apply petroleum jelly on terminal and connect with equipment.
i. Ensure that full length of electrode remains buried in soil at all times.

_________________________________________________________________________________________________

Proper installation is the key to successful performance of

SOR Earthing Electrode

ckfill compound only with water as above.

0 days. This helps system to set.

_________________________________________

l performance of the electrode

CPRI APPROVED

You might also like