Summary Of Bill Of Quantities For SEPTIC TANKS

Project : Tana belese housing development project


Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Enterprise
Contractor: Awoke Ayana B.C
Location:-Fendika

Item Sub total (birr )


No. Description Contract Executed
3.0 SEPTIC TANK
3.1 Excavation & earth work. 236,484.96 227,048.05
3.2 Concrete Work 656,466.20 392,292.81
3.3 Masonry work 846,014.62 676,284.65
3.4 Block work 160,559.23 0.00
3.5 Plastering work 135,841.66 50,966.37
3.6 Pipe Installation work 38,781.60 0.00

pLL U` /Grand Total /


Prepared by:- Checked by:-
Contractor :-.. Implementing Agent. Consultant
EPTIC TANKS

:-.-04/475
Contract No.
-05
Statement No.
Site Name: Main Town

Page no. __

Total / Birr/
Contract Executed

2,074,148.28 1,346,591.88
Approved by:-
Consultant
BILL O

Project : Tana belese housing development project


Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Enterpr


Item No.

3
3.1
3.01

3.02

3.03

3.04

3.06
3.07

3.08

3.2.01

3.2.02
3.2.03

3.04

3.2.05

3.2.06

3.3.01

3.4.01

3.5.01
3.6.01
3.6.02
3.6.03

Prepared by:-
Contractor :-..
BILL OF QUANT

ect : Tana belese housing development project


nt: FDRE Sugare Coorporation
l. Agency:ANRS Construction & Housing Dev. Aegency
sultant:Road And Building Design & Construction Supervision Works Enterprise

Description

Septick Tank
Excavation & Earth Work
Clear and remove top soil to an avarage depth of 200mm.

Pit excavation in ordinary soil to for septic tank to adepth not exceeding 1500mm.

Ditto as item 3.02 but to a depth exceeding 1500mm but not exceeding 3000mm.

Ditto as item 3.02 but to a depth exceeding 3000mm but not exceeding 4500mm.

Fill around stone masonry retaining wall in non expansive excavated material from the
site well rolled and compacted in layers not exceeding 200mm thick.
Load and cart away surplus excavated material to an appropriate tip.
250mm thick basaltic stone hardcore well rolled, consolidated and blinded with
crushed stone.
TOTAL CARRED TO SUMMARY-----------
3.2.0 CONCRETE WORK
50mm lean concrete qulity C-5, with minimum cement content of 150kg/m3,of
concrete:
a) Under bottom slab
Reinforced concrete quality C-25,360 kg of cement/m3 filled in to form work and
vibrated around rod reinforcement (Formwork and reinforcement measured
separately)
a) In RC bottom slab
c) Top slab
b) In RC man hole cover
Size : 700 x 700x 80mm
Ribbed slab for suspended top slab made of 60 mm thick RC concrete slab in C-25,
80x120 mm one way concrete girder with c/c spacing of 600mm ,including 220x520
mm hollow concrete ribbed block all according to structural detail drawing.
Pre-cast elements (PB1) to the size of 4200x120x80mm.made of
0.0403m3/beam.Price includes mould,reinforcement bar placed in position and
welded.
(a) Dia 6mm plain bar (2.16pcs )
(b) Dia 10 mm deformed bar ( 0.37pc )
(c) Dia 12 mm deformed bar ( 0.73pc )
to be placed in position.
Provide, cut and fix in position sawn structural wood or steel formwork which ever is
appropriate.
a) In RC bottom slab
b) Top slab
f) In RC man hole cover
Size : 700 x 700x 80mm
Mild steel reinforcement according to structural drawings. Price includes cutting,
bending, placing in position, tying wire and concrete spacers.
a) Dia 6mm diformed bar
b) Dia 8mm diformed bar
c) Dia 10 mm deformed bar
d) Dia 12 mm deformed bar
TOTAL CARRED TO SUMMARY-----------
3.3.0 MASONRY WORKS
600mm thick Trychatic or equivalent stone masonry retaining wall below ground level
bedded in cement mortar mix (1:3) and one side left for plastering.

a) For retaining wall


TOTAL CARRED TO SUMMARY-----------
3.4.0 BLOCK WORK
250mm thick brick partition wall,bedded in cement mortar (1:3).Price shall inclde
mortar bed.
TOTAL CARRED TO SUMMARY-----------
3.5.0 PLASTERING
Apply two coats of plastering in cement mortar (1:3). Price shall include pre-cleaning
and preparation of the surface.
a) To internal Brick wall surfaces.
b) To Internal stone masonry wall surfaces.
TOTAL CARRED TO SUMMARY-----------
3.6.0 PIPE WORK
Supply and install
Dia.200mm uPVC elbow
Dia.200mm uPVC Tee
Dia.110mm uPVC vent pipe
TOTAL CARRED TO SUMMARY-----------

pared by:- Checke


tractor :-..
OF QUANTITY

Contractor: Kest Construction


Site Name: Main Town
Work Type:Septic Tanks

(Amount)
Unit
Unite Rate
Contract Executed (Contract birr)

m2 700.00 411.48 10.47 7329.00

m3 618.00 422.15 58.02 35856.36

m3 618.00 422.15 71.21 44007.78

m3 423.26 97.91 0.00

m3 63.60 390.44 16.85 1071.66


m3 1936.00 1349.85 76.56 148220.16

m3 243.08 69.20 0.00


236,484.96

m2 700.00 243.08 97.89 68523.00

m3 82.40 36.46 2851.77 234985.85


m3 24.41 2851.77 0.00

No 30.00 6.00 109.79 3293.80


M2 499.08 0.00

Pcs 978.50

M2 412.00 29.68 135.94 56007.28


M2 408.00 116.23 135.94 55463.52

M2 4.00 2.24 135.94 543.76

kg 750.00 35.47
kg 1819.90 35.47 0.00
Kg 5500.00 1488.52 35.47 195085.00
Kg 1200.00 1599.93 35.47 42564.00
656,466.20

M3 536.40 428.79 1577.21 846014.62


846,014.62

m2 187.44 856.59 160559.23


160,559.23

M2 374.88 117.02 43867.00


M2 786.00 435.55 117.02 91974.66
135,841.66
pcs 80.00 0.00 484.77 38781.60
pcs 0.00 484.77 0.00
pcs 20.00 0.00
38,781.60

Checked by:- Approved by:-


Implementing Agent. Consultant
nstruction

Page no. __


(Executed
birr)

4308.20

24492.85

30060.95

41441.63

6578.89
103344.40

16821.14
227,048.05

23795.10

103981.24
69618.84

658.76
4034.70
15800.31

304.51

0.00
64551.97
52797.98
56749.42
392,292.81

676284.65
676,284.65

0.00
0.00

0.00
50966.37
50,966.37
0.00
0.00
0.00
0.00

Consultant
Project : Tana belese housing development project
Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Ent

Size
No (L/W/D) Quantity Description
3 SEPTIC TANK
3.1 Excavation & Earth Work
12.60
6.70 3.01. Clear and remove top soil to an avarage depth
84.42 m2 Net total

11.10
3.02. Pit excavation in ordinary soil to for septic tank
5.20 not exceeding 1500mm.
1.50
86.58 m3 Net total

11.10
3.03. Ditto as item 3.02, but to a depth exceeding 15
5.20 not exceeding 3000mm.
1.50
86.58 m3 Net total

11.10
3.04. Ditto as item 3.02 but to a depth exceeding 30
5.20 not exceeding 4500mm.
1.80
103.90 m3 Net total

3.05.Fill around stone masonary retaining wall in non


excavated material from the site well rolled and copa
layers not exceeding 200mm thick
3.05.Fill around stone masonary retaining wall in non
excavated material from the site well rolled and copa
layers not exceeding 200mm thick

Total fill Volume around Retaining masonary wall is the Pit


Minus the Sum Volume of Masonary Wall,Bottom Slab & H
Septic Tank Volume;Vf=Vp-(Vm +Vs h+Vst)

Pit Volume:Vp=L*W*H
11.10 Length L=
5.20 Width W=
4.80 Height H=
277.06 m3

a-Masonary wall Volume:Vm=see result on the ne


83.88
83.88 m3
b-Slab & Hard core Volume:Vsh=L*W*H
10.60 Length L=
4.70 Width W=
0.45 Height H=
22.42 m3
c-Septic tank Volume:Vst=L*W*H
8.60 Length L=
2.70 Width W=
4.35 Height H=
101.01 m3

69.75 m3 Net total

3.07 Load and cart away surplus excavated mate


appropriate tip.

84.42 From site clearing


0.20
16.88 m3
From pit excavation(Pit Volume)
277.06
277.06 m3

293.94 m3 Net total

3.08 250mm thick basaltic stone hardcore well rolled


consolidated and blinded with crushed stone.

10.60 Length L=
4.70 Width W=
49.82 m2

Prepared by:-
Contractor :-
Project : Tana belese housing development project
Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Ent

Size
No (L/W/D) Quantity Description

c) In RC grade beam

26.60 Total Length L=


1 0.20 Width W=
5.32 m2
d) In RC scum board

2.70 Length L=
2 0.30 Width W=
1.62 m2

2.70 Length L=
1 0.20 Width W=
0.54 m2

2.16 m2 Net total


e) In RC cross beam

2.70 Length L=
2 0.05 Width W=
0.27 m2

2.70 Length L=
1 0.20 Width W=
0.54 m2

0.81 m2 Net total

29.99 m2 Net total to BOQ for top slab

f) In RC manhole cover
0.70 L=0.70m, H=0.08m
4 0.08 2
0.45 m2

3.2.06 Mild steel reinforcement according to structur

a) Dia 8mm deformed bar


382.17 kg
b) Dia 10mm deformed bar
487.63 kg
c) Dia 12mm deformed bar
287.71 kg

3.3.0 MASONRY WORKS


3.3.1 Trychatic or equivalent stone masonry retaining
ground level bedded in cement mortar mix (1:3) an
left for plastering.
Volume of masonary work( V)

V=Volume of Trapezoidal section part + Volume of Quarter Pyrami


corners of the septic tank

Prepared by:
Contractor :-
Takeoff Sheet

g Dev. Aegency
nstruction Supervision Works Enterprise

Size
Description No (L/W/D)
3 SEPTIC TANK
on & Earth Work

nd remove top soil to an avarage depth of 200mm. 10.60


1 4.70

vation in ordinary soil to for septic tank to adepth


g 1500mm.

10.60
4.70
0.15
item 3.02, but to a depth exceeding 1500mm but
g 3000mm.

8.40
2.70
0.15
item 3.02 but to a depth exceeding 3000mm but
g 4500mm.
0.70
0.70
2 0.15

nd stone masonary retaining wall in non expansive


aterial from the site well rolled and copacted in
eeding 200mm thick
nd stone masonary retaining wall in non expansive
aterial from the site well rolled and copacted in
eeding 200mm thick

me around Retaining masonary wall is the Pit Volume


Volume of Masonary Wall,Bottom Slab & Hard core and 24.20
olume;Vf=Vp-(Vm +Vs h+Vst) 0.50
Vp=L*W*H 0.20
11.1m =0.25+L+0.25

5.2m =0.25+W+0.25

4.8m =Hm+0.45

3.70
Deduction Volume 0.30
wall Volume:Vm=see result on the next page 1 0.20

rd core Volume:Vsh=L*W*H
10.6m =L 4.70
4.7m =W 0.20
0.45m 1 0.20

k Volume:Vst=L*W*H
8.6m =A-(0.5+0.5)

2.7m =B-(0.5+0.5)

4.35m =Hm 1.00


2 1.00

and cart away surplus excavated material to an 30.60


appropriate tip.
1 0.20
cavation(Pit Volume) 8.40
1 2.70

0.70

thick basaltic stone hardcore well rolled, 2 0.70


and blinded with crushed stone.

10.6m =L

4.7m =W

Checked by:-
Consultant
Takeoff Sheet

g Dev. Aegency
nstruction Supervision Works Enterprise

Size
Description No (L/W/D)

26.6m=2*(A+B))

0.2m 26.60
0.75
4.35
For scum board sides
2.7m =B-(0.5+0.5)

0.3m 0.50
0.50
For scum board bottom 4 4.35
2.7m =B-(0.5+0.5)

0.2m

1.00
1.00
1/3 4.35

For cross beam sides


2.7m =B-(0.5+0.5)

0.05m

For cross beam bottom 2.70


2.7m =B-(0.5+0.5) 0.50
0.2m 1 2.50
o BOQ for top slab

2.70
2 2.50

22.60
eel reinforcement according to structural drawing
4.35
eformed bar

deformed bar 0.50


2 2.50
deformed bar

NRY WORKS
c or equivalent stone masonry retaining wall below
bedded in cement mortar mix (1:3) and one side
ring.

1.00
0 1.00
W id th :W

1.00
0 1.00
W
2.00
n part + Volume of Quarter Pyramid at four
s of the septic tank 2 1.00

Checked by:
Consultant
Contractor: Kest Construction
Site Name: Main Town
Work Type: Septic Tank-06
Page no. __

Quantity Description
3.2 Concrete Work
3.2.1 5cm thick lean concrete,C-5

a) Under bottom slab


Length L= 10.6m =L
Width W= 4.7m =W
49.82 m2

3.2.2 Reinforced concrete quality C-25

a) In RC bottom slab
Length L= 10.6m =L
Width W= 4.7m =W
Thickness t= 0.15m
7.47 m3
b) In RC top slab
Length L= 8.4m =A-(0.5+0.2+0.5)
Width W= 2.7m =B-(0.5+0.5)
Thickness t= 0.15m
3.40 m3
Deduct for manhole
L=0.70m , W=0.70m ,H=0.15m

0.15 m3
3.26 m3 Net total

c) In RC grade beam
Total Length L= 24.2m =2*((A-0.2)+(B-0.5-0.5))
Width W= 0.5m
Thickness t= 0.2m
2.42 m3

d) In RC scum board
Length L= 3.7m=B
Width W= 0.3m
Thickness t= 0.2m
0.22 m3

e) In RC cross beam
Length L= 4.7m=B+0.5+0.5
Width W= 0.2m
Thickness t= 0.2m
0.19 m3

6.09 m3 Net total to BOQ for top slab

f) In RC manhole cover

2.00 pcs
3.25 Provide, cut & fix in position formwork
a)To RC bottom slab
Total Length L= 30.6m =2*(L+W)
Width W= 0.2m
6.12 m2
b) In RC top slab
Length L= 8.4m =A-(0.5+0.2+0.5)
Width W= 2.7m =B-(0.5+0.5)
22.68 m2

Deduct for manhole


L=0.70m , W=0.70m

0.98 m2

21.70 m2 Net total

Approved by:-
Implementing Agent...
Contractor: Kest Construction
Site Name: Main Town
Work Type: Septic Tank-06
Page no. __

Quantity Description

a) Retaing wall

For trapezoidal section: V=L*Wavg*H


Total Length L= 26.6m=2*(A+B))
Width average Wavg= 0.75m=1/2(0.5+Wm)

Height H= 4.35m
86.78 m3
Deduct for prism: V=L*W*H
Width W=Length L=0.5m
Height H= 4.35m

4.35 m3
For pyramid:V=1/3*L*W*H
Width W=Length L= 1m=2*C

Height H= 4.35m

1.45 m3

83.88 m3 Net total

b) Partition wall:V=L*W*H
Length L= 2.7m =B-(0.5+0.5)
Width W= 0.5m
Height H= 2.5m
3.38 m3

87.26 m3 Net total to BOQ for masonary work

3.5.0 PLASTERING
a) Partition wall surfaces.
Length L= 2.7m =B-(0.5+0.5)
Height H= 2.5m
13.50 m2

b) Internal masonary surface


Total Length L= 22.6m=2*(A-1+B-1)
Height H= 4.35m
98.31 m
2

Deduct for partition wall


Width W= 0.5m
Height H= 2.5m
2.50

95.81 m2 Net total

109.31 m3 Net total to BOQ for masonary wall plastering

3.6.0 PIPE WORK


Supply and Install

3.6.01 Dia. 200mm uPVC elbow

0.00 pcs

3.6.02 Dia. 200mm uPVC Tee


0.00 pcs

3.6.03 Dia 110mm uPVC Vent Pipe with vent cup

4.00 m

Approved by:
Implementing Agent...
n

5
2)+(B-0.5-0.5))
n
all plastering
Takeoff Sheet
Project : Tana belese housing development project
Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works E

Bar Schedule
Dimensions L
Location Ref. No. &W(m) Shape

Main
Reinforcment: L= 10.55
Bottom Slab

Main
Reinforcment: W= 4.65

Main
Reinforcment: L= 9.35

Top Slab Main


Reinforcment: W= 3.65

Deduction for
manhole 0.70

Main
Reinforcment: L= 9.35

Grade Beam Main


Reinforcment: W= 3.65

Stirrup 0.45

Main
Reinforcment: W= 3.65
Cross Beam

Stirrup 0.15

Main
Reinforcment: W= 3.65
Scum Board Beam

Stirrup 0.25
Main
Reinforcment: L= 0.65
Man hole cover

Main
Reinforcment: W= 0.65
Total Length
Weight per m
Total weight, k

Prepared by:- Checked by:-


Contractor :-. Consultant.
Takeoff Sheet
Contractor: Kest Construction
Site Name: Main Town
Work Type-Bar Schedule of ST-6
Supervision Works Enterprise Page no. __

Dia. Length No. of No. of Length for Diameter


(mm) (m) Bars Mem. 6 8 10 12 14

8 10.55 32 1 337.60

8 4.65 72 1 334.80

10 19.04 20 1 380.80

10 7.64 58 1 443.12

10 1.40 6 -4 -33.60

12 18.90 5 2 189.00

12 7.50 5 2 75.00

8 1.34 88 2 235.84

12 7.50 4 1 30.00

8 0.74 26 1 19.24

12 7.50 4 1 30.00

8 0.94 26 1 24.44
8 0.65 6 2 7.80

8 0.65 6 2 7.80
Total Length 0.00 967.52 790.32 324.00 0.00
Weight per m. 0.222 0.395 0.617 0.888 1.208
Total weight, kg. 0.00 382.17 487.63 287.71 0.00

Approved by:-
. Implementing Agent...
Work Type-Bar Schedule of ST-6

Remark
Project : Tana belese housing development project
Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Ent

Size
No (L/W/D) Quantity Description
3 SEPTIC TANK
3.1 Excavation & Earth Work
11.50
6.30 3.01. Clear and remove top soil to an avarage depth
72.45 m2 Net total

10.00
3.02. Pit excavation in ordinary soil to for septic tank
4.80 not exceeding 1500mm.
1.50
72.00 m3 Net total

10.00
3.03. Ditto as item 3.02, but to a depth exceeding 15
4.80 not exceeding 3000mm.
1.50
72.00 m3 Net total

10.00
3.04. Ditto as item 3.02 but to a depth exceeding 30
4.80 not exceeding 4500mm.
1.75
84.00 m3 Net total

3.05.Fill around stone masonary retaining wall in non


excavated material from the site well rolled and copa
layers not exceeding 200mm thick
3.05.Fill around stone masonary retaining wall in non
excavated material from the site well rolled and copa
layers not exceeding 200mm thick

Total fill Volume around Retaining masonary wall is the Pit


Minus the Sum Volume of Masonary Wall,Bottom Slab & H
Septic Tank Volume;Vf=Vp-(Vm +Vs h+Vst)

Pit Volume:Vp=L*W*H
10.00 Length L=
4.80 Width W=
4.75 Height H=
228.00 m3

a-Masonary wall Volume:Vm=see result on the ne


73.24
73.24 m3
b-Slab & Hard core Volume:Vsh=L*W*H
9.50 Length L=
4.30 Width W=
0.45 Height H=
18.38 m3
c-Septic tank Volume:Vst=L*W*H
7.50 Length L=
2.30 Width W=
4.30 Height H=
74.18 m3

62.20 m3 Net total

3.07 Load and cart away surplus excavated mate


appropriate tip.

72.45 From site clearing


0.20
14.49 m3
From pit excavation(Pit Volume)
228.00
228.00 m3

242.49 m3 Net total

3.08 250mm thick basaltic stone hardcore well rolled


consolidated and blinded with crushed stone.

9.50 Length L=
4.30 Width W=
40.85 m2

Prepared by:-
Contractor :-
Project : Tana belese housing development project
Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Ent

Size
No (L/W/D) Quantity Description

c) In RC grade beam

23.60 Total Length L=


1 0.20 Width W=
4.72 m2
d) In RC scum board

2.30 Length L=
2 0.30 Width W=
1.38 m2

2.30 Length L=
1 0.20 Width W=
0.46 m2

1.84 m2 Net total


e) In RC cross beam

2.30 Length L=
2 0.05 Width W=
0.23 m2

2.30 Length L=
1 0.20 Width W=
0.46 m2

0.69 m2 Net total

23.06 m2 Net total to BOQ for top slab

f) In RC manhole cover
0.70 L=0.70m, H=0.08m
4 0.08 2
0.45 m2

3.2.06 Mild steel reinforcement according to structur

a) Dia 8mm deformed bar


323.42 kg
b) Dia 10mm deformed bar
366.92 kg
c) Dia 12mm deformed bar
255.39 kg

3.3.0 MASONRY WORKS


3.3.1 Trychatic or equivalent stone masonry retaining
ground level bedded in cement mortar mix (1:3) an
left for plastering.
Volume of masonary work( V)

V=Volume of Trapezoidal section part + Volume of Quarter Pyrami


corners of the septic tank

Prepared by:
Contractor :-
Takeoff Sheet

g Dev. Aegency
nstruction Supervision Works Enterprise

Size
Description No (L/W/D)
3 SEPTIC TANK
on & Earth Work

nd remove top soil to an avarage depth of 200mm. 9.50


1 4.30

vation in ordinary soil to for septic tank to adepth


g 1500mm.

9.50
4.30
0.15
item 3.02, but to a depth exceeding 1500mm but
g 3000mm.

7.30
2.30
0.15
item 3.02 but to a depth exceeding 3000mm but
g 4500mm.
0.70
0.70
2 0.15

nd stone masonary retaining wall in non expansive


aterial from the site well rolled and copacted in
eeding 200mm thick
nd stone masonary retaining wall in non expansive
aterial from the site well rolled and copacted in
eeding 200mm thick

me around Retaining masonary wall is the Pit Volume


Volume of Masonary Wall,Bottom Slab & Hard core and 21.20
olume;Vf=Vp-(Vm +Vs h+Vst) 0.50
Vp=L*W*H 0.20
10m =0.25+L+0.25

4.8m =0.25+W+0.25

4.75m =Hm+0.45

3.30
Deduction Volume 0.30
wall Volume:Vm=see result on the next page 1 0.20

rd core Volume:Vsh=L*W*H
9.5m =L 4.30
4.3m =W 0.20
0.45m 1 0.20

k Volume:Vst=L*W*H
7.5m =A-(0.5+0.5)

2.3m =B-(0.5+0.5)

4.3m =Hm 1.00


2 1.00

and cart away surplus excavated material to an 27.60


appropriate tip.
1 0.20
cavation(Pit Volume) 7.30
1 2.30

0.70

thick basaltic stone hardcore well rolled, 2 0.70


and blinded with crushed stone.

9.5m =L

4.3m =W

Checked by:-
Consultant
Takeoff Sheet

g Dev. Aegency
nstruction Supervision Works Enterprise

Size
Description No (L/W/D)

23.6m=2*(A+B))

0.2m 23.60
0.75
4.30
For scum board sides
2.3m =B-(0.5+0.5)

0.3m 0.50
0.50
For scum board bottom 4 4.30
2.3m =B-(0.5+0.5)

0.2m

1.00
1.00
1/3 4.30

For cross beam sides


2.3m =B-(0.5+0.5)

0.05m

For cross beam bottom 2.30


2.3m =B-(0.5+0.5) 0.50
0.2m 1 2.30
o BOQ for top slab

2.30
2 2.30

19.60
eel reinforcement according to structural drawing
4.30
eformed bar

deformed bar 0.50


2 2.30
deformed bar

NRY WORKS
c or equivalent stone masonry retaining wall below
bedded in cement mortar mix (1:3) and one side
ring.

1.00
0 1.00
W id th :W

1.00
0 1.00
W
2.00
n part + Volume of Quarter Pyramid at four
s of the septic tank 2 1.00

Checked by:
Consultant
Contractor: Kest Construction
Site Name: Main Town
Work Type: Septic Tank-06
Page no. __

Quantity Description
3.2 Concrete Work
3.2.1 5cm thick lean concrete,C-5

a) Under bottom slab


Length L= 9.5m =L
Width W= 4.3m =W
40.85 m2

3.2.2 Reinforced concrete quality C-25

a) In RC bottom slab
Length L= 9.5m =L
Width W= 4.3m =W
Thickness t= 0.15m
6.13 m3
b) In RC top slab
Length L= 7.3m =A-(0.5+0.2+0.5)
Width W= 2.3m =B-(0.5+0.5)
Thickness t= 0.15m
2.52 m3
Deduct for manhole
L=0.70m , W=0.70m ,H=0.15m

0.15 m3
2.37 m3 Net total

c) In RC grade beam
Total Length L= 21.2m =2*((A-0.2)+(B-0.5-0.5))
Width W= 0.5m
Thickness t= 0.2m
2.12 m3

d) In RC scum board
Length L= 3.3m=B
Width W= 0.3m
Thickness t= 0.2m
0.20 m3

e) In RC cross beam
Length L= 4.3m=B+0.5+0.5
Width W= 0.2m
Thickness t= 0.2m
0.17 m3

4.86 m3 Net total to BOQ for top slab

f) In RC manhole cover

2.00 pcs
3.25 Provide, cut & fix in position formwork
a)To RC bottom slab
Total Length L= 27.6m =2*(L+W)
Width W= 0.2m
5.52 m2
b) In RC top slab
Length L= 7.3m =A-(0.5+0.2+0.5)
Width W= 2.3m =B-(0.5+0.5)
16.79 m2

Deduct for manhole


L=0.70m , W=0.70m

0.98 m2

15.81 m2 Net total

Approved by:-
Implementing Agent...
Contractor: Kest Construction
Site Name: Main Town
Work Type: Septic Tank-06
Page no. __

Quantity Description

a) Retaing wall

For trapezoidal section: V=L*Wavg*H


Total Length L= 23.6m=2*(A+B))
Width average Wavg= 0.75m=1/2(0.5+Wm)

Height H= 4.3m
76.11 m3
Deduct for prism: V=L*W*H
Width W=Length L=0.5m
Height H= 4.3m

4.30 m3
For pyramid:V=1/3*L*W*H
Width W=Length L= 1m=2*C

Height H= 4.3m

1.43 m3

73.24 m3 Net total

b) Partition wall:V=L*W*H
Length L= 2.3m =B-(0.5+0.5)
Width W= 0.5m
Height H= 2.3m
2.65 m3

75.89 m3 Net total to BOQ for masonary work

3.5.0 PLASTERING
a) Partition wall surfaces.
Length L= 2.3m =B-(0.5+0.5)
Height H= 2.3m
10.58 m2

b) Internal masonary surface


Total Length L= 19.6m=2*(A-1+B-1)
Height H= 4.3m
84.28 m
2

Deduct for partition wall


Width W= 0.5m
Height H= 2.3m
2.30

81.98 m2 Net total

92.56 m3 Net total to BOQ for masonary wall plastering

3.6.0 PIPE WORK


Supply and Install

3.6.01 Dia. 200mm uPVC elbow

0.00 pcs

3.6.02 Dia. 200mm uPVC Tee


0.00 pcs

3.6.03 Dia 110mm uPVC Vent Pipe with vent cup

4.00 m

Approved by:
Implementing Agent...
n

5
2)+(B-0.5-0.5))
n
all plastering
Takeoff Sheet
Project : Tana belese housing development project
Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works E

Bar Schedule
Dimensions L
Location Ref. No. &W(m) Shape

Main
Reinforcment: L= 9.45
Bottom Slab

Main
Reinforcment: W= 4.25

Main
Reinforcment: L= 8.25

Top Slab Main


Reinforcment: W= 3.25

Deduction for
manhole 0.70

Main
Reinforcment: L= 8.25

Grade Beam Main


Reinforcment: W= 3.25

Stirrup 0.45

Main
Reinforcment: W= 3.25
Cross Beam

Stirrup 0.15

Main
Reinforcment: W= 3.25
Scum Board Beam

Stirrup 0.25
Main
Reinforcment: L= 0.65
Man hole cover

Main
Reinforcment: W= 0.65
Total Length
Weight per m
Total weight, k

Prepared by:- Checked by:-


Contractor :-. Consultant.
Takeoff Sheet
Contractor: Kest Construction
Site Name: Main Town
Work Type-Bar Schedule of ST-6
Supervision Works Enterprise Page no. __

Dia. Length No. of No. of Length for Diameter


(mm) (m) Bars Mem. 6 8 10 12 14

8 9.45 30 1 283.50

8 4.25 64 1 272.00

10 16.84 17 1 286.28

10 6.84 50 1 342.00

10 1.40 6 -4 -33.60

12 16.70 5 2 167.00

12 6.70 5 2 67.00

8 1.34 78 2 209.04

12 6.70 4 1 26.80

8 0.74 23 1 17.02

12 6.70 4 1 26.80

8 0.94 23 1 21.62
8 0.65 6 2 7.80

8 0.65 6 2 7.80
Total Length 0.00 818.78 594.68 287.60 0.00
Weight per m. 0.222 0.395 0.617 0.888 1.208
Total weight, kg. 0.00 323.42 366.92 255.39 0.00

Approved by:-
. Implementing Agent...
Work Type-Bar Schedule of ST-6

Remark
Project : Tana belese housing development project
Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Ent

Size
No (L/W/D) Quantity Description
3 SEPTIC TANK
3.1 Excavation & Earth Work
11.50
6.30 3.01. Clear and remove top soil to an avarage depth
72.45 m2 Net total

10.00
3.02. Pit excavation in ordinary soil to for septic tank
4.80 not exceeding 1500mm.
1.50
72.00 m3 Net total

10.00
3.03. Ditto as item 3.02, but to a depth exceeding 15
4.80 not exceeding 3000mm.
1.50
72.00 m3 Net total

10.00
3.04. Ditto as item 3.02 but to a depth exceeding 30
4.80 not exceeding 4500mm.
0.95
45.60 m3 Net total

3.05.Fill around stone masonary retaining wall in non


excavated material from the site well rolled and copa
layers not exceeding 200mm thick
3.05.Fill around stone masonary retaining wall in non
excavated material from the site well rolled and copa
layers not exceeding 200mm thick

Total fill Volume around Retaining masonary wall is the Pit


Minus the Sum Volume of Masonary Wall,Bottom Slab & H
Septic Tank Volume;Vf=Vp-(Vm +Vs h+Vst)

Pit Volume:Vp=L*W*H
10.00 Length L=
4.80 Width W=
3.95 Height H=
189.60 m3

a-Masonary wall Volume:Vm=see result on the ne


59.62
59.62 m3
b-Slab & Hard core Volume:Vsh=L*W*H
9.50 Length L=
4.30 Width W=
0.45 Height H=
18.38 m3
c-Septic tank Volume:Vst=L*W*H
7.50 Length L=
2.30 Width W=
3.50 Height H=
60.38 m3

51.23 m3 Net total

3.07 Load and cart away surplus excavated mate


appropriate tip.

72.45 From site clearing


0.20
14.49 m3
From pit excavation(Pit Volume)
189.60
189.60 m3

204.09 m3 Net total

3.08 250mm thick basaltic stone hardcore well rolled


consolidated and blinded with crushed stone.

9.50 Length L=
4.30 Width W=
40.85 m2

Prepared by:-
Contractor :-
Project : Tana belese housing development project
Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Ent

Size
No (L/W/D) Quantity Description

c) In RC grade beam

23.60 Total Length L=


1 0.20 Width W=
4.72 m2
d) In RC scum board

2.30 Length L=
2 0.30 Width W=
1.38 m2

2.30 Length L=
1 0.20 Width W=
0.46 m2

1.84 m2 Net total


e) In RC cross beam

2.30 Length L=
2 0.05 Width W=
0.23 m2

2.30 Length L=
1 0.20 Width W=
0.46 m2

0.69 m2 Net total

23.06 m2 Net total to BOQ for top slab

f) In RC manhole cover
0.70 L=0.70m, H=0.08m
4 0.08 2
0.45 m2

3.2.06 Mild steel reinforcement according to structur

a) Dia 8mm deformed bar


323.42 kg
b) Dia 10mm deformed bar
366.92 kg
c) Dia 12mm deformed bar
255.39 kg

3.3.0 MASONRY WORKS


3.3.1 Trychatic or equivalent stone masonry retaining
ground level bedded in cement mortar mix (1:3) an
left for plastering.
Volume of masonary work( V)

V=Volume of Trapezoidal section part + Volume of Quarter Pyrami


corners of the septic tank

Prepared by:
Contractor :-
Takeoff Sheet

g Dev. Aegency
nstruction Supervision Works Enterprise

Size
Description No (L/W/D)
3 SEPTIC TANK
on & Earth Work

nd remove top soil to an avarage depth of 200mm. 9.50


1 4.30

vation in ordinary soil to for septic tank to adepth


g 1500mm.

9.50
4.30
0.15
item 3.02, but to a depth exceeding 1500mm but
g 3000mm.

7.30
2.30
0.15
item 3.02 but to a depth exceeding 3000mm but
g 4500mm.
0.70
0.70
2 0.15

nd stone masonary retaining wall in non expansive


aterial from the site well rolled and copacted in
eeding 200mm thick
nd stone masonary retaining wall in non expansive
aterial from the site well rolled and copacted in
eeding 200mm thick

me around Retaining masonary wall is the Pit Volume


Volume of Masonary Wall,Bottom Slab & Hard core and 21.20
olume;Vf=Vp-(Vm +Vs h+Vst) 0.50
Vp=L*W*H 0.20
10m =0.25+L+0.25

4.8m =0.25+W+0.25

3.95m =Hm+0.45

3.30
Deduction Volume 0.30
wall Volume:Vm=see result on the next page 1 0.20

rd core Volume:Vsh=L*W*H
9.5m =L 4.30
4.3m =W 0.20
0.45m 1 0.20

k Volume:Vst=L*W*H
7.5m =A-(0.5+0.5)

2.3m =B-(0.5+0.5)

3.5m =Hm 1.00


2 1.00

and cart away surplus excavated material to an 27.60


appropriate tip.
1 0.20
cavation(Pit Volume) 7.30
1 2.30

0.70

thick basaltic stone hardcore well rolled, 2 0.70


and blinded with crushed stone.

9.5m =L

4.3m =W

Checked by:-
Consultant
Takeoff Sheet

g Dev. Aegency
nstruction Supervision Works Enterprise

Size
Description No (L/W/D)

23.6m=2*(A+B))

0.2m 23.60
0.75
3.50
For scum board sides
2.3m =B-(0.5+0.5)

0.3m 0.50
0.50
For scum board bottom 4 3.50
2.3m =B-(0.5+0.5)

0.2m

1.00
1.00
1/3 3.50

For cross beam sides


2.3m =B-(0.5+0.5)

0.05m

For cross beam bottom 2.30


2.3m =B-(0.5+0.5) 0.50
0.2m 1 2.30
o BOQ for top slab

2.30
2 2.30

19.60
eel reinforcement according to structural drawing
3.50
eformed bar

deformed bar 0.50


2 2.30
deformed bar

NRY WORKS
c or equivalent stone masonry retaining wall below
bedded in cement mortar mix (1:3) and one side
ring.

1.00
0 1.00
W id th :W

1.00
0 1.00
W
2.00
n part + Volume of Quarter Pyramid at four
s of the septic tank 2 1.00

Checked by:
Consultant
Contractor: Kest Construction
Site Name: Main Town
Work Type: Septic Tank-06
Page no. __

Quantity Description
3.2 Concrete Work
3.2.1 5cm thick lean concrete,C-5

a) Under bottom slab


Length L= 9.5m =L
Width W= 4.3m =W
40.85 m2

3.2.2 Reinforced concrete quality C-25

a) In RC bottom slab
Length L= 9.5m =L
Width W= 4.3m =W
Thickness t= 0.15m
6.13 m3
b) In RC top slab
Length L= 7.3m =A-(0.5+0.2+0.5)
Width W= 2.3m =B-(0.5+0.5)
Thickness t= 0.15m
2.52 m3
Deduct for manhole
L=0.70m , W=0.70m ,H=0.15m

0.15 m3
2.37 m3 Net total

c) In RC grade beam
Total Length L= 21.2m =2*((A-0.2)+(B-0.5-0.5))
Width W= 0.5m
Thickness t= 0.2m
2.12 m3

d) In RC scum board
Length L= 3.3m=B
Width W= 0.3m
Thickness t= 0.2m
0.20 m3

e) In RC cross beam
Length L= 4.3m=B+0.5+0.5
Width W= 0.2m
Thickness t= 0.2m
0.17 m3

4.86 m3 Net total to BOQ for top slab

f) In RC manhole cover

2.00 pcs
3.25 Provide, cut & fix in position formwork
a)To RC bottom slab
Total Length L= 27.6m =2*(L+W)
Width W= 0.2m
5.52 m2
b) In RC top slab
Length L= 7.3m =A-(0.5+0.2+0.5)
Width W= 2.3m =B-(0.5+0.5)
16.79 m2

Deduct for manhole


L=0.70m , W=0.70m

0.98 m2

15.81 m2 Net total

Approved by:-
Implementing Agent...
Contractor: Kest Construction
Site Name: Main Town
Work Type: Septic Tank-06
Page no. __

Quantity Description

a) Retaing wall

For trapezoidal section: V=L*Wavg*H


Total Length L= 23.6m=2*(A+B))
Width average Wavg= 0.75m=1/2(0.5+Wm)

Height H= 3.5m
61.95 m3
Deduct for prism: V=L*W*H
Width W=Length L=0.5m
Height H= 3.5m

3.50 m3
For pyramid:V=1/3*L*W*H
Width W=Length L= 1m=2*C

Height H= 3.5m

1.17 m3

59.62 m3 Net total

b) Partition wall:V=L*W*H
Length L= 2.3m =B-(0.5+0.5)
Width W= 0.5m
Height H= 2.3m
2.65 m3

62.26 m3 Net total to BOQ for masonary work

3.5.0 PLASTERING
a) Partition wall surfaces.
Length L= 2.3m =B-(0.5+0.5)
Height H= 2.3m
10.58 m2

b) Internal masonary surface


Total Length L= 19.6m=2*(A-1+B-1)
Height H= 3.5m
68.60 m
2

Deduct for partition wall


Width W= 0.5m
Height H= 2.3m
2.30

66.30 m2 Net total

76.88 m3 Net total to BOQ for masonary wall plastering

3.6.0 PIPE WORK


Supply and Install

3.6.01 Dia. 200mm uPVC elbow

0.00 pcs

3.6.02 Dia. 200mm uPVC Tee


0.00 pcs

3.6.03 Dia 110mm uPVC Vent Pipe with vent cup

4.00 m

Approved by:
Implementing Agent...
n

5
2)+(B-0.5-0.5))
n
all plastering
Takeoff Sheet
Project : Tana belese housing development project
Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works E

Bar Schedule
Dimensions L
Location Ref. No. &W(m) Shape

Main
Reinforcment: L= 9.45
Bottom Slab

Main
Reinforcment: W= 4.25

Main
Reinforcment: L= 8.25

Top Slab Main


Reinforcment: W= 3.25

Deduction for
manhole 0.70

Main
Reinforcment: L= 8.25

Grade Beam Main


Reinforcment: W= 3.25

Stirrup 0.45

Main
Reinforcment: W= 3.25
Cross Beam

Stirrup 0.15

Main
Reinforcment: W= 3.25
Scum Board Beam

Stirrup 0.25
Main
Reinforcment: L= 0.65
Man hole cover

Main
Reinforcment: W= 0.65
Total Length
Weight per m
Total weight, k

Prepared by:- Checked by:-


Contractor :-. Consultant.
Takeoff Sheet
Contractor: Kest Construction
Site Name: Main Town
Work Type-Bar Schedule of ST-6
Supervision Works Enterprise Page no. __

Dia. Length No. of No. of Length for Diameter


(mm) (m) Bars Mem. 6 8 10 12 14

8 9.45 30 1 283.50

8 4.25 64 1 272.00

10 16.84 17 1 286.28

10 6.84 50 1 342.00

10 1.40 6 -4 -33.60

12 16.70 5 2 167.00

12 6.70 5 2 67.00

8 1.34 78 2 209.04

12 6.70 4 1 26.80

8 0.74 23 1 17.02

12 6.70 4 1 26.80

8 0.94 23 1 21.62
8 0.65 6 2 7.80

8 0.65 6 2 7.80
Total Length 0.00 818.78 594.68 287.60 0.00
Weight per m. 0.222 0.395 0.617 0.888 1.208
Total weight, kg. 0.00 323.42 366.92 255.39 0.00

Approved by:-
. Implementing Agent...
Work Type-Bar Schedule of ST-6

Remark
Project : Tana belese housing development project
Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Ent

Size
No (L/W/D) Quantity Description
3 SEPTIC TANK
3.1 Excavation & Earth Work
12.60
7.40 3.01. Clear and remove top soil to an avarage depth
93.24 m2 Net total

11.10
3.02. Pit excavation in ordinary soil to for septic tank
5.90 not exceeding 1500mm.
1.50
98.24 m3 Net total

11.10
3.03. Ditto as item 3.02, but to a depth exceeding 15
5.90 not exceeding 3000mm.
1.50
98.24 m3 Net total

11.10
3.04. Ditto as item 3.02 but to a depth exceeding 30
5.90 not exceeding 4500mm.
0.95
62.22 m3 Net total

3.05.Fill around stone masonary retaining wall in non


excavated material from the site well rolled and copa
layers not exceeding 200mm thick
3.05.Fill around stone masonary retaining wall in non
excavated material from the site well rolled and copa
layers not exceeding 200mm thick

Total fill Volume around Retaining masonary wall is the Pit


Minus the Sum Volume of Masonary Wall,Bottom Slab & H
Septic Tank Volume;Vf=Vp-(Vm +Vs h+Vst)

Pit Volume:Vp=L*W*H
11.10 Length L=
5.90 Width W=
3.95 Height H=
258.69 m3

a-Masonary wall Volume:Vm=see result on the ne


86.31
86.31 m3
b-Slab & Hard core Volume:Vsh=L*W*H
10.60 Length L=
5.40 Width W=
0.45 Height H=
25.76 m3
c-Septic tank Volume:Vst=L*W*H
7.50 Length L=
2.30 Width W=
3.50 Height H=
60.38 m3

86.24 m3 Net total

3.07 Load and cart away surplus excavated mate


appropriate tip.

93.24 From site clearing


0.20
18.65 m3
From pit excavation(Pit Volume)
258.69
258.69 m3

277.33 m3 Net total

3.08 250mm thick basaltic stone hardcore well rolled


consolidated and blinded with crushed stone.

10.60 Length L=
5.40 Width W=
57.24 m2

Prepared by:-
Contractor :-
Project : Tana belese housing development project
Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Ent

Size
No (L/W/D) Quantity Description

c) In RC grade beam

23.60 Total Length L=


1 0.20 Width W=
4.72 m2
d) In RC scum board

2.30 Length L=
2 0.30 Width W=
1.38 m2

2.30 Length L=
1 0.20 Width W=
0.46 m2

1.84 m2 Net total


e) In RC cross beam

2.30 Length L=
2 0.05 Width W=
0.23 m2

2.30 Length L=
1 0.20 Width W=
0.46 m2

0.69 m2 Net total

23.06 m2 Net total to BOQ for top slab

f) In RC manhole cover
0.70 L=0.70m, H=0.08m
4 0.08 2
0.45 m2

3.2.06 Mild steel reinforcement according to structur

a) Dia 8mm deformed bar


410.34 kg
b) Dia 10mm deformed bar
0.00 kg
c) Dia 12mm deformed bar
580.50 kg
990.84
3.3.0 MASONRY WORKS
3.3.1 Trychatic or equivalent stone masonry retaining
ground level bedded in cement mortar mix (1:3) an
left for plastering.
Volume of masonary work( V)

V=Volume of Trapezoidal section part + Volume of Quarter Pyrami


corners of the septic tank

Prepared by:
Contractor :-
Takeoff Sheet

g Dev. Aegency
nstruction Supervision Works Enterprise

Size
Description No (L/W/D)
3 SEPTIC TANK
on & Earth Work

nd remove top soil to an avarage depth of 200mm. 10.60


1 5.40

vation in ordinary soil to for septic tank to adepth


g 1500mm.

10.60
5.40
0.15
item 3.02, but to a depth exceeding 1500mm but
g 3000mm.

7.30
2.30
0.15
item 3.02 but to a depth exceeding 3000mm but
g 4500mm.
0.70
0.70
2 0.15

nd stone masonary retaining wall in non expansive


aterial from the site well rolled and copacted in
eeding 200mm thick
nd stone masonary retaining wall in non expansive
aterial from the site well rolled and copacted in
eeding 200mm thick

me around Retaining masonary wall is the Pit Volume


Volume of Masonary Wall,Bottom Slab & Hard core and 21.20
olume;Vf=Vp-(Vm +Vs h+Vst) 0.50
Vp=L*W*H 0.20
11.1m =0.25+L+0.25

5.9m =0.25+W+0.25

3.95m =Hm+0.45

3.30
Deduction Volume 0.30
wall Volume:Vm=see result on the next page 1 0.20

rd core Volume:Vsh=L*W*H
10.6m =L 4.30
5.4m =W 0.20
0.45m 1 0.20

k Volume:Vst=L*W*H
7.5m =A-(0.5+0.5)

2.3m =B-(0.5+0.5)

3.5m =Hm 1.00


2 1.00

and cart away surplus excavated material to an 32.00


appropriate tip.
1 0.20
cavation(Pit Volume) 7.30
1 2.30

0.70

thick basaltic stone hardcore well rolled, 2 0.70


and blinded with crushed stone.

10.6m =L

5.4m =W

Checked by:-
Consultant
Takeoff Sheet

g Dev. Aegency
nstruction Supervision Works Enterprise

Size
Description No (L/W/D)

23.6m=2*(A+B))

0.2m 23.60
1.03
3.50
For scum board sides
2.3m =B-(0.5+0.5)

0.3m 0.50
0.50
For scum board bottom 4 3.50
2.3m =B-(0.5+0.5)

0.2m

2.10
2.10
1/3 3.50

For cross beam sides


2.3m =B-(0.5+0.5)

0.05m

For cross beam bottom 2.30


2.3m =B-(0.5+0.5) 0.50
0.2m 1 2.30
o BOQ for top slab

2.30
2 2.30

19.60
eel reinforcement according to structural drawing
3.50
eformed bar

deformed bar 0.50


2 2.30
deformed bar

NRY WORKS
c or equivalent stone masonry retaining wall below
bedded in cement mortar mix (1:3) and one side
ring.

1.00
0 1.00
W id th :W

1.00
0 1.00
W
2.00
n part + Volume of Quarter Pyramid at four
s of the septic tank 2 1.00

Checked by:
Consultant
Contractor: Kest Construction
Site Name: Main Town
Work Type: Septic Tank-06
Page no. __

Quantity Description
3.2 Concrete Work
3.2.1 5cm thick lean concrete,C-5

a) Under bottom slab


Length L= 10.6m =L
Width W= 5.4m =W
57.24 m2

3.2.2 Reinforced concrete quality C-25

a) In RC bottom slab
Length L= 10.6m =L
Width W= 5.4m =W
Thickness t= 0.15m
8.59 m3
b) In RC top slab
Length L= 7.3m =A-(0.5+0.2+0.5)
Width W= 2.3m =B-(0.5+0.5)
Thickness t= 0.15m
2.52 m3
Deduct for manhole
L=0.70m , W=0.70m ,H=0.15m

0.15 m3
2.37 m3 Net total

c) In RC grade beam
Total Length L= 21.2m =2*((A-0.2)+(B-0.5-0.5))
Width W= 0.5m
Thickness t= 0.2m
2.12 m3

d) In RC scum board
Length L= 3.3m=B
Width W= 0.3m
Thickness t= 0.2m
0.20 m3

e) In RC cross beam
Length L= 4.3m=B+0.5+0.5
Width W= 0.2m
Thickness t= 0.2m
0.17 m3

4.86 m3 Net total to BOQ for top slab

f) In RC manhole cover

2.00 pcs
3.25 Provide, cut & fix in position formwork
a)To RC bottom slab
Total Length L= 32m =2*(L+W)
Width W= 0.2m
6.40 m2
b) In RC top slab
Length L= 7.3m =A-(0.5+0.2+0.5)
Width W= 2.3m =B-(0.5+0.5)
16.79 m2

Deduct for manhole


L=0.70m , W=0.70m

0.98 m2

15.81 m2 Net total

Approved by:-
Implementing Agent...
Contractor: Kest Construction
Site Name: Main Town
Work Type: Septic Tank-06
Page no. __

Quantity Description

a) Retaing wall

For trapezoidal section: V=L*Wavg*H


Total Length L= 23.6m=2*(A+B))
Width average Wavg= 1.025m=1/2(0.5+Wm)

Height H= 3.5m
84.67 m3
Deduct for prism: V=L*W*H
Width W=Length L=0.5m
Height H= 3.5m

3.50 m3
For pyramid:V=1/3*L*W*H
Width W=Length L= 2.1m=2*C

Height H= 3.5m

5.15 m3

86.31 m3 Net total

b) Partition wall:V=L*W*H
Length L= 2.3m =B-(0.5+0.5)
Width W= 0.5m
Height H= 2.3m
2.65 m3

88.96 m3 Net total to BOQ for masonary work

3.5.0 PLASTERING
a) Partition wall surfaces.
Length L= 2.3m =B-(0.5+0.5)
Height H= 2.3m
10.58 m2

b) Internal masonary surface


Total Length L= 19.6m=2*(A-1+B-1)
Height H= 3.5m
68.60 m
2

Deduct for partition wall


Width W= 0.5m
Height H= 2.3m
2.30

66.30 m2 Net total

76.88 m3 Net total to BOQ for masonary wall plastering

3.6.0 PIPE WORK


Supply and Install

3.6.01 Dia. 200mm uPVC elbow

0.00 pcs

3.6.02 Dia. 200mm uPVC Tee


0.00 pcs

3.6.03 Dia 110mm uPVC Vent Pipe with vent cup

4.00 m

Approved by:
Implementing Agent...
n

5
2)+(B-0.5-0.5))
n
all plastering
Takeoff Sheet
Project : Tana belese housing development project
Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works E

Bar Schedule
Dimensions L
Location Ref. No. &W(m) Shape

Main
Reinforcment: L= 10.55
Bottom Slab

Main
Reinforcment: W= 5.35

Main
Reinforcment: L= 8.25

Top Slab Main


Reinforcment: W= 3.25

Deduction for
manhole 0.70

Main
Reinforcment: L= 8.25

Grade Beam Main


Reinforcment: W= 3.25

Stirrup 0.45

Main
Reinforcment: W= 3.25
Cross Beam

Stirrup 0.15

Main
Reinforcment: W= 3.25
Scum Board Beam

Stirrup 0.25
Main
Reinforcment: L= 0.65
Man hole cover

Main
Reinforcment: W= 0.65
Total Length
Weight per m
Total weight, k

Prepared by:- Checked by:-


Contractor :-. Consultant.
Takeoff Sheet
Contractor: Kest Construction
Site Name: Main Town
Work Type-Bar Schedule of ST-6
Supervision Works Enterprise Page no. __

Dia. Length No. of No. of Length for Diameter


(mm) (m) Bars Mem. 6 8 10 12 14

8 10.55 37 1 390.35

8 5.35 72 1 385.20

12 16.84 10 1 168.40

12 6.84 33 1 225.72

12 1.40 5 -4 -28.00

12 16.70 5 2 167.00

12 6.70 5 2 67.00

8 1.34 78 2 209.04

12 6.70 4 1 26.80

8 0.74 23 1 17.02

12 6.70 4 1 26.80

8 0.94 23 1 21.62
8 0.65 6 2 7.80

8 0.65 6 2 7.80
Total Length 0.00 1,038.83 0.00 653.72 0.00
Weight per m. 0.222 0.395 0.617 0.888 1.208
Total weight, kg. 0.00 410.34 0.00 580.50 0.00

Approved by:-
. Implementing Agent...
Work Type-Bar Schedule of ST-6

Remark
Project : Tana belese housing development project
Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Ent

Size
No (L/W/D) Quantity Description
3 SEPTIC TANK
3.1 Excavation & Earth Work
11.70
7.60 3.01. Clear and remove top soil to an avarage depth
88.92 m2 Net total

10.20
3.02. Pit excavation in ordinary soil to for septic tank
6.10 not exceeding 1500mm.
1.50
93.33 m3 Net total

10.20
3.03. Ditto as item 3.02, but to a depth exceeding 15
6.10 not exceeding 3000mm.
1.50
93.33 m3 Net total

10.20
3.04. Ditto as item 3.02 but to a depth exceeding 30
6.10 not exceeding 4500mm.
2.05
127.55 m3 Net total

3.05.Fill around stone masonary retaining wall in non


excavated material from the site well rolled and copa
layers not exceeding 200mm thick
3.05.Fill around stone masonary retaining wall in non
excavated material from the site well rolled and copa
layers not exceeding 200mm thick

Total fill Volume around Retaining masonary wall is the Pit


Minus the Sum Volume of Masonary Wall,Bottom Slab & H
Septic Tank Volume;Vf=Vp-(Vm +Vs h+Vst)

Pit Volume:Vp=L*W*H
10.20 Length L=
6.10 Width W=
5.05 Height H=
314.21 m3

a-Masonary wall Volume:Vm=see result on the ne


112.62
112.62 m3
b-Slab & Hard core Volume:Vsh=L*W*H
9.70 Length L=
5.60 Width W=
0.45 Height H=
24.44 m3
c-Septic tank Volume:Vst=L*W*H
6.10 Length L=
2.00 Width W=
4.60 Height H=
56.12 m3

121.02 m3 Net total

3.07 Load and cart away surplus excavated mate


appropriate tip.

88.92 From site clearing


0.20
17.78 m3
From pit excavation(Pit Volume)
314.21
314.21 m3

332.00 m3 Net total

3.08 250mm thick basaltic stone hardcore well rolled


consolidated and blinded with crushed stone.

9.70 Length L=
5.60 Width W=
54.32 m2

Prepared by:-
Contractor :-
Project : Tana belese housing development project
Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works Ent

Size
No (L/W/D) Quantity Description

c) In RC grade beam

20.20 Total Length L=


1 0.20 Width W=
4.04 m2
d) In RC scum board

2.00 Length L=
2 0.30 Width W=
1.20 m2

2.00 Length L=
1 0.20 Width W=
0.40 m2

1.60 m2 Net total


e) In RC cross beam

2.00 Length L=
2 0.05 Width W=
0.20 m2

2.00 Length L=
1 0.20 Width W=
0.40 m2

0.60 m2 Net total

17.06 m2 Net total to BOQ for top slab

f) In RC manhole cover
0.70 L=0.70m, H=0.08m
4 0.08 2
0.45 m2

3.2.06 Mild steel reinforcement according to structur

a) Dia 8mm deformed bar


380.56 kg
b) Dia 10mm deformed bar
267.06 kg
c) Dia 12mm deformed bar
220.93 kg

3.3.0 MASONRY WORKS


3.3.1 Trychatic or equivalent stone masonry retaining
ground level bedded in cement mortar mix (1:3) an
left for plastering.
Volume of masonary work( V)

V=Volume of Trapezoidal section part + Volume of Quarter Pyrami


corners of the septic tank

Prepared by:
Contractor :-
Takeoff Sheet

g Dev. Aegency
nstruction Supervision Works Enterprise

Size
Description No (L/W/D)
3 SEPTIC TANK
on & Earth Work

nd remove top soil to an avarage depth of 200mm. 9.70


1 5.60

vation in ordinary soil to for septic tank to adepth


g 1500mm.

9.70
5.60
0.15
item 3.02, but to a depth exceeding 1500mm but
g 3000mm.

5.90
2.00
0.15
item 3.02 but to a depth exceeding 3000mm but
g 4500mm.
0.70
0.70
2 0.15

nd stone masonary retaining wall in non expansive


aterial from the site well rolled and copacted in
eeding 200mm thick
nd stone masonary retaining wall in non expansive
aterial from the site well rolled and copacted in
eeding 200mm thick

me around Retaining masonary wall is the Pit Volume


Volume of Masonary Wall,Bottom Slab & Hard core and 17.80
olume;Vf=Vp-(Vm +Vs h+Vst) 0.50
Vp=L*W*H 0.20
10.2m =0.25+L+0.25

6.1m =0.25+W+0.25

5.05m =Hm+0.45

3.00
Deduction Volume 0.30
wall Volume:Vm=see result on the next page 1 0.20

rd core Volume:Vsh=L*W*H
9.7m =L 4.00
5.6m =W 0.20
0.45m 1 0.20

k Volume:Vst=L*W*H
6.1m =A-(0.5+0.5)

2m =B-(0.5+0.5)

4.6m =Hm 1.00


2 1.00

and cart away surplus excavated material to an 30.60


appropriate tip.
1 0.20
cavation(Pit Volume) 5.90
1 2.00

0.70

thick basaltic stone hardcore well rolled, 2 0.70


and blinded with crushed stone.

9.7m =L

5.6m =W

Checked by:-
Consultant
Takeoff Sheet

g Dev. Aegency
nstruction Supervision Works Enterprise

Size
Description No (L/W/D)

20.2m=2*(A+B))

0.2m 20.20
1.15
4.60
For scum board sides
2m =B-(0.5+0.5)

0.3m 0.50
0.50
For scum board bottom 4 4.60
2m =B-(0.5+0.5)

0.2m

2.60
2.60
1/3 4.60

For cross beam sides


2m =B-(0.5+0.5)

0.05m

For cross beam bottom 2.00


2m =B-(0.5+0.5) 0.50
0.2m 1 1.80
o BOQ for top slab

2.00
2 1.80

16.20
eel reinforcement according to structural drawing
4.60
eformed bar

deformed bar 0.50


2 1.80
deformed bar

NRY WORKS
c or equivalent stone masonry retaining wall below
bedded in cement mortar mix (1:3) and one side
ring.

1.00
0 1.00
W id th :W

1.00
0 1.00
W
2.00
n part + Volume of Quarter Pyramid at four
s of the septic tank 2 1.00

Checked by:
Consultant
Contractor: Kest Construction
Site Name: Main Town
Work Type: Septic Tank-06
Page no. __

Quantity Description
3.2 Concrete Work
3.2.1 5cm thick lean concrete,C-5

a) Under bottom slab


Length L= 9.7m =L
Width W= 5.6m =W
54.32 m2

3.2.2 Reinforced concrete quality C-25

a) In RC bottom slab
Length L= 9.7m =L
Width W= 5.6m =W
Thickness t= 0.15m
8.15 m3
b) In RC top slab
Length L= 5.9m =A-(0.5+0.2+0.5)
Width W= 2m =B-(0.5+0.5)
Thickness t= 0.15m
1.77 m3
Deduct for manhole
L=0.70m , W=0.70m ,H=0.15m

0.15 m3
1.62 m3 Net total

c) In RC grade beam
Total Length L= 17.8m =2*((A-0.2)+(B-0.5-0.5))
Width W= 0.5m
Thickness t= 0.2m
1.78 m3

d) In RC scum board
Length L= 3m=B
Width W= 0.3m
Thickness t= 0.2m
0.18 m3

e) In RC cross beam
Length L= 4m=B+0.5+0.5
Width W= 0.2m
Thickness t= 0.2m
0.16 m3

3.74 m3 Net total to BOQ for top slab

f) In RC manhole cover

2.00 pcs
3.25 Provide, cut & fix in position formwork
a)To RC bottom slab
Total Length L= 30.6m =2*(L+W)
Width W= 0.2m
6.12 m2
b) In RC top slab
Length L= 5.9m =A-(0.5+0.2+0.5)
Width W= 2m =B-(0.5+0.5)
11.80 m2

Deduct for manhole


L=0.70m , W=0.70m

0.98 m2

10.82 m2 Net total

Approved by:-
Implementing Agent...
Contractor: Kest Construction
Site Name: Main Town
Work Type: Septic Tank-06
Page no. __

Quantity Description

a) Retaing wall

For trapezoidal section: V=L*Wavg*H


Total Length L= 20.2m=2*(A+B))
Width average Wavg= 1.15m=1/2(0.5+Wm)

Height H= 4.6m
106.86 m3
Deduct for prism: V=L*W*H
Width W=Length L=0.5m
Height H= 4.6m

4.60 m3
For pyramid:V=1/3*L*W*H
Width W=Length L= 2.6m=2*C

Height H= 4.6m

10.37 m3

112.62 m3 Net total

b) Partition wall:V=L*W*H
Length L= 2m =B-(0.5+0.5)
Width W= 0.5m
Height H= 1.8m
1.80 m3

114.42 m3 Net total to BOQ for masonary work

3.5.0 PLASTERING
a) Partition wall surfaces.
Length L= 2m =B-(0.5+0.5)
Height H= 1.8m
7.20 m2

b) Internal masonary surface


Total Length L= 16.2m=2*(A-1+B-1)
Height H= 4.6m
74.52 m
2

Deduct for partition wall


Width W= 0.5m
Height H= 1.8m
1.80

72.72 m2 Net total

79.92 m3 Net total to BOQ for masonary wall plastering

3.6.0 PIPE WORK


Supply and Install

3.6.01 Dia. 200mm uPVC elbow

0.00 pcs

3.6.02 Dia. 200mm uPVC Tee


0.00 pcs

3.6.03 Dia 110mm uPVC Vent Pipe with vent cup

4.00 m

Approved by:
Implementing Agent...
n

5
2)+(B-0.5-0.5))
n
all plastering
Takeoff Sheet
Project : Tana belese housing development project
Client: FDRE Sugare Coorporation
Impl. Agency:ANRS Construction & Housing Dev. Aegency
Consultant:Road And Building Design & Construction Supervision Works E

Bar Schedule
Dimensions L
Location Ref. No. &W(m) Shape

Main
Reinforcment: L= 9.65
Bottom Slab

Main
Reinforcment: W= 5.55

Main
Reinforcment: L= 6.85

Top Slab Main


Reinforcment: W= 2.95

Deduction for
manhole 0.70

Main
Reinforcment: L= 6.85

Grade Beam Main


Reinforcment: W= 2.95

Stirrup 0.45

Main
Reinforcment: W= 2.95
Cross Beam

Stirrup 0.15

Main
Reinforcment: W= 2.95
Scum Board Beam

Stirrup 0.25
Main
Reinforcment: L= 0.65
Man hole cover

Main
Reinforcment: W= 0.65
Total Length
Weight per m
Total weight, k

Prepared by:- Checked by:-


Contractor :-. Consultant.
Takeoff Sheet
Contractor: Kest Construction
Site Name: Main Town
Work Type-Bar Schedule of ST-6
Supervision Works Enterprise Page no. __

Dia. Length No. of No. of Length for Diameter


(mm) (m) Bars Mem. 6 8 10 12 14

8 9.65 38 1 366.70

8 5.55 66 1 366.30

10 14.04 15 1 210.60

10 6.24 41 1 255.84

10 1.40 6 -4 -33.60

12 13.90 5 2 139.00

12 6.10 5 2 61.00

8 1.34 67 2 179.56

12 6.10 4 1 24.40

8 0.74 21 1 15.54

12 6.10 4 1 24.40

8 0.94 21 1 19.74
8 0.65 6 2 7.80

8 0.65 6 2 7.80
Total Length 0.00 963.44 432.84 248.80 0.00
Weight per m. 0.222 0.395 0.617 0.888 1.208
Total weight, kg. 0.00 380.56 267.06 220.93 0.00

Approved by:-
. Implementing Agent...
Work Type-Bar Schedule of ST-6

Remark