Calculate Steel Reinforcement and its quantity in Slab, Beams, Columns and Footing

1 RCC drawings so that you can find out the following values from the drawing :
Length of the element :
Cross section:
No of bars
Type of bars
Spacing between the bars.
Lap length ( horizontal/vertical)
Development length
Covers for footing/column/beam/slab.

2 Calculate the cutting length of the bars.


( total length covers on bothside )+ development length.

3 Formula :
W: Weight of reinforcement
N: No of bars
CL: cutting length
U:Unit weight

You can find out Unit weight from charts or from the formula :
U= D*D/162.
lumns and Footing
Unit Weight of Materials Used at Construction Site

S.No Theoretical
Material
Weight in(KG/M)
1 Cement 1440
2 Steel 7850
3 Sand-
Dry 1600
River 1840
4 Stone(basalt) 2850 to 2960
5 Water 1000
6 PCC 2240
7 RCC 2% Steel 2420
8 Bricks 1600 to 1920

9 Brick Masonry 1920


10 Soil(damp) 1760
11 Cement concrete block(solid) 1800

12 Cement Mortar 2080


13 Lime Mortar 1760
14 Lime 640
15 Glass 2530
16 Teak Wood 670 to 830
17 Sal Wood 990
18 Marble mosaic tile

19 Chequered tile
20 Glazed tile15x15cm
21 Marble Stone 2620
22 Granite Stone 2460-2800
23 Coddappa 2720
24 A.C.sheet corrugated 16
25 Bitumen 1040
26 Window frame (simple design)
27 Door Frame
a)30070
b)26x70
Approx Weight at Site in Remarks
Kg Per
50 Bag
d/162 d -dia in mm

50 to 55 farma 1 farma=1.25cft
57 to 63 farma 2 farma=1.25cft
48 to 52 farma metal 12mm to 20mm
1 liter
8.24 to 8.5 Cube mould cube mould size=15x15x15cm

1.9 to 2 no 9x4x2 3/4


4.8 to 4.9 no 9x4x2 3/4

50 to 55 cft Black cotton


18 to 20 cft 30x15x20 cm
10 to 11 no 30x15x20 cm
57 to 62 cft
48 to 52 cft
30 bag
0.9 to 0.95 sft 4mm tk plain
18 to 20 cft
22 to 24 cft
2.8 to 3.2 no 25x25x22mm
4.8 to 5.2 no 30x30x25mm
2.5 to 2.8 no 25x25x22mm
0.20 to 0.25 no 5mm tk
5.1 sft 3/4tk
5.35 sft 3/4tk
6.4 sft 1 1/4tk
1.2 sft
220 Drum 200liter drum
1.9 to2.1 sft

25 to 27 no section 4x2 1/2


24 to 26 no section 4x2 1/2