You are on page 1of 10

Sub-project for Electric Power Development in Thilawa Area under Infra

Development Project in Thilawa Area (Phase)


List of Safety Issues were Improved by Package 2 Contractor

1 Introduction
At the site of pakage 2 was inspected by the Safety Officer of Nippon Koei Co., Ltd.
on Sept 21,2015.

2 Safety Measure were improved by the contractors


The contractors had already improve the safety measure as mention below and attached with

No. Item were improved Taken Action


1 Working at hight
Refer for (2) to (6) (2) Hand rails on workways were provided.
(3) & (4) Workers were use safety harness on all
high place and hand rails were provided.
(5) Ladders with hand rails were provided.
(6) Walkways wide and hand rails were provided
2 Collision accident
Refer for (7) (7) Singnal man and cone/barriers were provided
around the equipment operation area.
3 Rotation equipment accident
Refer for (8) (8) Workers were wear googles, gloves and mask
for avoided injury and sick.
4 Electric shock accident
Refer for (9) and (10) (9) Removed distribution board and properly
installed wires connection were avoid for
electric short accident.
(10) Advised to use ELB (Earth Lekage Breaker)
for all sub-contractors.
5 First Aid
Refer for (11) (11) First aid kits kept in the sub-contractor's
office and timely added consumption items
for in case of workers injured.

Att.: Photos for show safety issues were improved by the Contractors.

Page 1 of 10
Photos to show safety issues after improved by the cont

(1) Re-bars have stored minimum 30cm high above the ground for avoid dirty and rusted.

(2) Hand rails on walk-ways were provided for avoid fall accident of workers.

(3) Workers were use safety harness on all high place and provided hand rails for ladders.

Page 2 of 10
(4) Workers were use safety harness on all high place and provided hand rails.

(5) Stairs with hand rails were provided for all place.

(6) Walk-ways with sufficient wide and hand rails were provided for all crossing place.

Page 3 of 10
(7) Singnal man and safety cones were provided operation area to avoid collision accident to

(8) workers were wear googles, gloves and dust masks for avoid injury and sick of workers.

(9) Distribution board removed and properly connected wire connections were avoid for elect
short accident.

Page 4 of 10
(10) ELB (Earth Leakage Breaker) for all sub-contractors were provided.

(11) First aid kits are keep in the sub-contractor's office and timely added for workers injured.

Page 5 of 10
er Infrastructure

ractor

hed with photos.

ss on all
ded.

provided.

provided

nd masks

erly
d for

reaker)

tor's
on items

Page 6 of 10
contractors.

sted.

ders.

Page 7 of 10
Page 8 of 10
ident to workers.

rkers.

for electeic

Page 9 of 10
injured.

Page 10 of 10