Key Plan

A
BL
FOOTING SIZE - L
FOOTING SCHEDULE

QI
Notes
CL COL. = CL FOOTING DIMENSION BOTTOM REINFORCEMENT TOP REINFORCEMENT BOTTOM OF
L W T LONG FOOTING LEVEL 1. ALL DIMENSIONS ARE IN MILLIMETER U.N.O.
2. ALL THE LEVELS ARE IN METER.
MARK (mm) (mm) (mm) SHORT BARS BARS SHORT BARS LONG BARS SIDE BARS FROM 0.00 REMARKS 3. REFER TO THE ARCHITECTURAL DRAWINGS FOR THE RELATION BETWEEN
F1 2700 2400 350 T16-200 T16-200 - - - -1.50 THE BUILDING LEVELS AND THE PROJECT DATUM.
F2 3000 2500 400 T16-150 T16-150 - - - -1.50 4. GENERAL NOTES, STANDARD DETAILS, WATERPROOFING AND MATERIAL
F3 3200 2800 400 T16-150 T16-150 - - - -1.50 PROPERTIES REFER TO DRAWINGS. " S001 - S005"
5. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH THE RELATIVE
F4 3200 3000 400 T16-150 T16-150 - - - -1.50
ARCHITECTURAL, MEP AND CIVIL DRAWINGS. COORDINATE ALL

BOTTOM SHORT BARS


F5 3400 3000 450 T20-200 T20-200 - - - -1.50 PENETRATIONS CONDUTES AND EQUIPMENT REQUIREMENTS.

TOP SHORT BARS


F6 3500 3100 500 T20-200 T20-200 - - - -1.50
F7 3500 3300 500 T20-200 T20-200 - - - -1.50
F8 4000 3500 500 T20-200 T20-200 - - - -1.50
CL COL. = CL FOOTING F9 2300 2300 350 T16-200 T16-200 - - - -1.50
F10 1700 1700 300 T16-200 T16-200 - - - -1.50
F11 2600 2600 350 T16-200 T16-200 - - - -1.50
COLUMN F12 2700 2700 350 T16-200 T16-200 - - - -1.50
FOOTING SIZE - W

F13 400 T16-200 T16-200 T16-200 T16-200 - -1.50 SEE PLAN FOR PLAN DIMENSION AND ADD'L
REINFORCEMENT
A F14 10050 5100 400 T20-200 T20-200 T16-200 T16-200 - -1.80
- F15 8925 4100 350 T16-200 T16-200 T16-200 T16-200 - -1.50
UF1 1900 1600 300 T16-200 T16-200 - - - -1.50
UF2 2300 2000 300 T16-200 T16-200 - - - -1.50
UF3 2500 2200 350 T16-200 T16-200 - - - -1.50
TOP LONG BARS UF4 12175 7300 500 T16-150 T16-150 T16-150 T16-150 -0.50

BOTTOM LONG BARS


NOTE: FOOTINGS ARE ON COLUMN AND WALL CENTERLINES U.N.O.

A ISSUED FOR TENDER RBU BM* AH* 08.03.15

No Revision
Job Project
Drawn Manager Director Date

Note: * indicates signatures on original issue of drawing or last revision of drawing


Conditions of Use. This document may only be used by GHD's client (and any other

TYPICAL FOOTING PLAN person who GHD has agreed can use this document) for the purpose for which it was
prepared and must not be used by any other person or for any other purpose.
SCALE 1 : 25

Master Developper / Owner

Abu Dhabi Airports Company PJSC


Planning & Development
PO Box 94449, Abu Dhabi, U.A.E
T: +971 (0) 2 505 5000
F: +971 (0) 2 575 8300

GRID

Lead Consultant
SLAB REINF.
T= SLAB THICKNESS
T

GHD GLOBAL PTY LTD


3rd Floor, Guardian Tower, Danet Community
COLUMN / WALL TIES (TYP.) PO Box 45921 Abu Dhabi United Arab Emirates
T 971 2 6968700 F 971 2 4472915
COLUMN / WALL VERT. REINFORCEMENT E abumail@ghd.com W www.ghd.com

TOP REINFORCEMENT DOWELS SAME AS COLUMN


VERTICAL REINFORCEMENT Specialist Consultant
REFER TO SCHEDULE

Fire Life Safety, Planning


and Regulatory Specialist
T

500
CONC. COVER
75mm CLEAR

(TYP.)

Specialist Consultant

BOTTOM OF FOOTING
LxW
REFER TO SCHEDULE 30mm PROTECTION SCREED (TYP.) Third Party
BOTTOM REINFORCEMENT LINKS WATER PROOFING MEMBRANE Operational Advisor
AS PER FOOTING SCHEDULE NOT LESS THAN 3 Nos. SUBJECT TO ENGINEER APPROVAL
50mm BLINDING CONCRETE
COMPACTED FORMATION LEVEL TO
HAVE MIN. CBR 5% MIN. 150mm THICK SUB-BASE WELL COMPACTED
IN ACCORDANCE WITH NOTE F10, MIN.
COMPACTION RATIO 98%
Client
ADAC
SECTION A (TYP) U.N.O.
SCALE 1 : 25
Project
MIDFIELD TERMINAL FIRE
STATION
Title

FOOTING SCHEDULE AND


DETAIL
Scale 1 : 25 DO NOT SCALE
Drawn R. BUDUAN Designer R. EDNALINO
Drafting Design
Check Check
Approved
(Project Director)
Date
This Drawing must not be used for Construction unless signed as Approved
Original Size
Drawing No:
A1
DETAIL DESIGN 76-10526- S300 Rev: A
Plot Date: 5/03/2015 10:40:15 PM Cad File No: C:\Users\rbuduan\Documents\76-10526_Midfield Fire Station-Central_rbuduan.rvt