Professional Documents
Culture Documents
Name of Project: Project Management Consultancy forDesign, Supply, Erection, Testing &
Commissioning of 25KV , 50HZ, Single Phase Traction Overhead Equipment, Switching Stations,
Traction Sub Stations, SCADA, General Electrical Services Works along with Signaling&
Telecommunication Works,Civil Engineering Works i.e. Service Buildings, Quarters, Tower Car
Sheds and Other Associated Works between Sections Hospet(Including) - Bellary(Including)-
Guntakal(Including)and Toranagallu(Including) Ranajitpura(Including) and Sidings Comprising
of 138 RKM / 365 TKM of Guntakal Division of South Central Railway and Hubli Division of South
Western Railway, INDIA
2. Name : Ramesh.A
4. Nationality : Indian
6. Education : BE
7. Other Training :
9. Membership in Professional :
Societies
Experience
11. Employment Record : Pls see below
1990 1995 S.Railway, Provision of PTFE AsstDma Sub-ordinate to Was responsible for
MAS Neutral section n / Junior AEE preparation of OHE layout
Divsn and along track Engineer plans, SEDs, CSDs, bonding
feeder in AJJ- &earthing plans etc., for all
SBC main line OHE works done in MAS
near AJJ TSS, Division. Well versed in
Upgradation of pegging plan, foundation
Traction trfo and design, track geometry, points
capacitor bank and crossings, normal and
with series reactor bridge masts, portals / masts
in AJJ TSS, in mail line,, yards and sidings
modifications in
OHE in TNPM Was also responsible for
siding, preparation of PSI layouts for
modification / the modifications in TSS.
removal of
diamond crossing Responsible for obtaining
in TBM suburban CEIG / CEE sanction for
main line, energizing modified OHEs
modifications in Had attended a number of
OHE in attipattu foot plate inspections for
siding, TI siding current collection study
etc.,
1995 2004 S.Railway, MAS Division JE/ SE TA to Sr.DEE / Handled complete
MAS MAS electrification works for
Divsn. electrical general services
over MAS Dn. Construction
wing.
2004 2010 S.Railway, H.O Chief CVI Handled governance of anti-
HO Vigilance corruption in S.Rly
Inspector
(E)
2011 2011 S.Railway MAS SSE(E) Incharge of BBQ Handled complete
MAS Div. AC coaching maintenance of AC coaching
depot stocks, stores and inventories,
manpower and resource
planning, EOG rakes etc.,
11. Employment Record : Pls see below
Jan 2012 May RE / MS VM-KPD section AXEE Subordinate Has been pivotal and driving
2012 152 TKM + 2 TSS (RE)/ MS officer under force for Execution of OHE &
@ VM DEE/RS/VM TSS works of the execution
contractor. Indenting, follow
up and arranging for all OHE
and PSI items, coordination of
line blocks and ensuring no
bursting of the same,
maintenance and scheduling
of 4 wheeler tower wagon,
crane and BFRs
May Dec Tebodin Various greenfield Departme HOD (Electrical Complete EPC & PMC of
2012 2016 Consultan and brown field nt & MEPF requirements for
ts & industrial projects Manager Instrumentation) various industrial projects pan
Engineers pan India (E&I) India.
India Pvt Also as Project manager and
ltd., a QOHSE incharge
Bilfinger
group org
12. Certification:
i. I, the undersigned Certify that, to the best of my knowledge and belief, this bio-data correctly
describes my qualifications, my experience and my-self. I understand that any willful
misstatement described herein may lead to my disqualification or dismissal, if engaged.
ii. I have not been removed by Competent Authority of RVNL from any of the RVNL works without
completing my assignment and shall be available to work with the consultants. In case I leave the
assignment without approval of RVNL or I am removed by RVNL on account of some default,
RVNL would be at liberty to take appropriate action against me including debarment for up to
Three Years.
iii. I am willing to undertake the assignment and ensure my availability for the duration of the
assignment.
a) I have no history of involvement in Vigilance/CBI/Police Case, resulting in major penalty
punishment of removal/dismissal/compulsory retirement or conviction.
b) I have never been debarred from Project Management Consultancy by RVNL.
Or
c) I was debarred from Project Management Consultancy by RVNL for.... years from../../.. to ../../..
And period of debarment is now over.
Ramesh.A
_____________________________
Signature of Proposed Personnel