Date: 11-Mar-17
Forman
BLDG Floor Work Description
Incharge Foreman Elect. Sub
Total
Prepration and pulling of power cable for Jockey pump Nestor / Toto /
AMCC from MV-7 to Basment Fire pump room (4C X 50 Sq Shaheen / Aowal / 5 10 15
MM) Mone
CEP
AH Sub Total 5 10 15
6 16 22
Total