MANPOWER ALLOCATION ( SHINBO )

Date: 11-Mar-17
Forman
BLDG Floor Work Description
Incharge Foreman Elect. Sub
Total

Prepration and pulling of power cable for Jockey pump Nestor / Toto /
AMCC from MV-7 to Basment Fire pump room (4C X 50 Sq Shaheen / Aowal / 5 10 15
MM) Mone
CEP

AH Sub Total 5 10 15

Shifting and arrangment of mobile scaffold, Tool boxes


Basement and screpe material upto 8am & will be shifted for Rakib / Amirul 1 6 7
cable pulling in CEP building.
TRI

TRI Sub Total 1 6 7

6 16 22
Total