You are on page 1of 2

Department of Education

Region III
Division of Pampanga
District of Apalit
ALAULI ELEMENTARY SCHOOL
Apalit

PROGRAM OF WORK BUDGET COST

Name of REPAIR, IMPROVE AND PAINTING THE SCHOOL FENCE


Project: WITH STEEL MATTING AND CONSTRUCTION OF GATE

Location: ALAULI ELEMENTARY SCHOOL


Alauli, Tabuyuc, Apalit, Pampanga

Appropriation:
Source of Fund: SCHOOL TO SCHOOL PARTNERSHIP (SBM Grant
FY 2016)
Description:

1. ESTIMATED COST OF MATERIALS

Quantit
Unit Description Unit Cost Amount
y
Round Tube (steel) 1 x 1 x
5 Piece P 900.00 P 4.500.00
21
7 Piece Round Tube (steel) 1 x 21 P 450.00 P 3,150.00
10 Piece Square Bar 12 mm P 180.00 P 1,800.00
2 Piece Steel Matting 6 ft. x 20 ft. P 1.200.00 P 2,400.00
10 Piece Flat Bar 1 x 21 P 300.00 P 3,000.00
6 Piece Round Hinges P 40.00 P 240.00
2 Box Welding Rod P 300.00 P 600.00
4 Piece Grinder Disc P 50.00 P 200.00
13 Sack Cement P 230.00 P 2,990.00
1 Elf Sand P 950.00 P 950.00
2 Tin Paint P 1,955.00 P 3,910.00
5 Piece Roller #9 P 85.00 P 425.00
Gallo
2 Paint P 500.00 P 1,000.00
n
TOTAL P 25,165.00

2. LABOR: Volunteerism / Funded by the PTA Officers.


Prepared by:

MONCELITO D.
CASTRO
Head Teacher I
Recommending Approval:

Engr. JAY T. DIWA


Engineer II / Education Facilities

Approved:

LEONARDO D. ZAPANTA, Ed. D., CESO VI


Officer-In-Charge
Office of the Schools Division Superintendent

You might also like