Assessor Information

Assessor Company Name


Date of Assessment
Date of CAP Finalization
Date of Report Submission
Date of CAP In Person Meeting

Facility Information
Facility Name
Facility Address

Key Facility Contact Name


Lead Brand Company
Lead Brand Contact Name
Lead Brand Contact Email
Audit Type/Name
CAP Responder at Facility
Important Criteria/Instructions
Audit Closing Comments

SI No Subheader Question
Structural Safety Programs Is a program in place to ensure that the live loads
for which a floor or roof is or has been designed
will not be exceeded?

Structural System Design Is a clear and redundant load path to resist lateral
loads provided?

Structural System Design Are credible structural design documents


available for review and kept on site?

3
Structural System Construction Have all areas of needed maintenance, including
areas with efflorescence, dampness, standing
water on rooftops, and corrosion been addressed.

Structural System Construction Are any structural elements constructed with


MCAC exposed to rainfall or other sources of
water sealed with a protective coating to prevent
water intrusion?

Structural System Design Have provisions been made in floors or decks for
a concentrated load (such as heavy equipment,
water tanks, stored materials, etc) applied at a
location wherever this load acting upon an
otherwise unloaded floor would produce stresses
greater than those caused by a uniform load?

6
Structural System Construction Are structural steel members free of corrosion,
physical damage or other types of deterioration?

Structural System Construction Are all non-structural elements suspended from,


attached to, or resting atop the structure
adequately anchored and braced to resist
earthquake forces?

Structural Safety Programs Is a designated representative (Factory Load


Manager), who is onsite full time, trained
regarding the structural floor capacity, and serves
as an ongoing vendor resource and monitor of
operational factory floor loadings?

9
Structural Safety Programs Have Load Plans been prepared for each floor
documenting the actual maximum operational
loading that is intended and/or allowable on each
floor.

10

Structural Safety Programs Are Floor Load Plans posted as required?

11

Structural Safety Programs Are areas used for storage of work materials and
work products, clearly marked to indicate the
acceptable loading limits as described in the Load
Plan for that floor?

12
Structural System Design Are Certificates of Occupancy available for
review?

13
Bureau Veritas
1-Mar-14

31-Mar-15

ABONI KNIT WEAR LTD


169-171 Tetulzhora Union, Hemayetpur, Savar, Dhaka, Bangladesh
1. No sign of major structural distress found in this building. Overall factory loading conditions
seem to be satisfactory from visual confirmation. As per the Alliance protocol, the preliminary
stress calculation of typical columns shows satisfactory results for main buildings.
Performance of structural elements seem to be satisfactory. Overall general design
documents as per BNBC 1.9 along with detail design report should be submitted. No reliable
design documents are available for all shed's within the complex and the transmission tower.
2. Existing shed building's as-built drawing are not matching with the existing structural
systems or elements. 3. Posted Floor load plan is available in each floor of the main factory
building. Verify the floor load plan with the actual design considerations from design report.
Storage material data sheet is required to maintain storage area in all floor and shed. 4.
Check the capacity of the building for point loads due to construction of the tower. 5. Some
maintenance work is going on in the top floor of the main building. 6. Two plastic water tanks
each having capacity of 3000 liter capacity is found on the rooftop of 8th floor, and 2 plastic
water tanks each having 1000 liter capacity is found on 6th floor roof top. 7. Immediate
maintenance plan is required as MCAC is used for construction of all structural elements. 8.
Instead of constructing approved RCC 6th floor, factory authority built steel supported tin
shed building, which is currently using as a dining hall 9. Bracing/anchoring is recommended
for all non-structural elements in the whole factory. Check the standard for the height of the
rack and adjust accordingly. 10. The main factory building is designed as three separate
buildings, but it is constructed as a single building. Therefore, the lateral load path is changed
and also its lateral load path is not clear and redundant.

Description Suggested Plan of Action


There is no program that will ensure that the designated load in each floor will not be Develop a program to ensure that all live loads
exceeded for which a floor or roof has been designed for will
not be exceeded. The designated Load Manager
shall oversee this program and ensure it is
enforced.

The main factory building is designed as three separate buildings, but it is constructed as a Have a qualified structural engineer complete
single building. Therefore, the lateral load path is changed and also its lateral load path is not further analysis of the structure and develop a
clear and redundant. remediation plan if required.

A set of structural design document is available on-site for review. However, the design report Have a qualified structural engineer prepare
is not available which is required as per BNBC 2006 clause 1.9.1.1. credible as-built documents based on the
requirements of Part 8 Section 8.19 of the
Alliance Standard.
Standing water have been found at 1st floor north-east corner and dampness has also been Under guidance from a qualified structural
found at 4th floor of the building. Corrosion was also observed in roof top rebars of columns. engineer, address all areas of needed
maintenance by correcting the identified issues.

The roof of the building is of MCAC aggregate but no protective sealing is available. Provide a protective coating at the structural
elements constructed with MCAC exposed to
rainfall or other sources of water. Have protective
coating approved by the Alliance or a qualified
structural engineer. Or provide 2% slope on the
exposed surface to prevent accumulation of
water.

There are 4 plastic water tanks, 2 having capacity of 3 tons and 2 having capacity of 1 ton of Engage a qualified structural engineer to confirm
water storage. Also, transmission tower found in 7th floor roof. There is no analytical and document that provisions have been made to
information on the provision of these additions in the building design. accommodate concentrated loads. If provisions
have not been made, have a qualified structural
engineer develop a remediation plan.
There are signs of corrosion in steel at 6th floor. Complete further testing on areas of deterioration
in order to understand the level of corrosion and
weakening of the member and have a qualified
structural engineer develop a remediation plan.

In the store rooms of ground, 1st, 5th and 6th floors, there are racks which are not braced for Adequately anchor and brace all non-structural
earthquake force. There are 4 plastic water tanks with considerable height which are not elements to resist earthquake forces to comply
braced or anchored properly. with the BNBC and Alliance Standard.

There is no designated representative (Factory Load Manager), who is onsite full time, trained Designate a representative as the Factory Load
regarding the structural floor capacity, and serves as an ongoing vendor resource and Manager. The Factory Owner shall ensure that at
monitor of operational factory floor loadings. least one individual, the Factory Load Manager
who is located onsite full time at the factory, is
trained in calculating operational load
characteristics of the specific factory. The Factory
Load Manager shall serve as an ongoing resource
to RMG vendors and be responsible to ensure that
the factory operational loads do not at any time
exceed the factory floor loading limits as
described on the Floor Loading Plans.
Load Plans includs the actual maximum operational loading that is intended and/or allowable Have a qualified structural engineer develop Floor
on each floor. However, the load plans provided by Aboni Knitwear only includes the existing Loading Plans per the requirements of Part 8
loading condition of the floor. Also, they do not include the scaled layout of workstations, Section 8.20.5.3
operating equipment.

Load plans have been prepared but not as per Alliance standard. Have a qualified structural engineer prepare load
plans including the information required in
Section 8.20 of the Alliance Standard.

Available load plans do not comply with the standard. Loading limits are not mentioned in the Prepare Load Plan as per Alliance Standard.
provided load plans. Provide signage or the appropriate markings at all
areas used for storage to indicate the acceptable
loading limits detailed in the Load Plan.
The Certificate of Occupancy is not available. Provide Certificates of Occupancy for review.
Suggested Deadline Standard Factory CAP Factory CAP
Date Deadline Date
21-Jul-14 Alliance Standard Part 13 Section 13.7 and Part 8 7/Apr/15
Section 8.9.

4-Aug-14 Alliance Standards Part 8 Section 8.17 Design for 31/Mar/15


Lateral Loads and 8.3.3. 2006 BNBC Part 6
Section 1.5

4-Aug-14 Alliance Standard Part 8 Section 8.19 Required 12/May/15


Structural Documentation for New and Existing
Factories
4-Aug-14 Alliance Standard Part 8 Section 8.26 Durability 31/Mar/15
and Maintenance

4-Aug-14 Alliance Standards Part 7 Building Materials 31/Mar/15


Section 7.2 Masonry-chip aggregate concrete
(MCAC).

4-Aug-14 Alliance Standard Part 8 Section 8.13 and 8.14 12/May/15


4-Aug-14 Alliance Standard Part 8 Section 8.26 31/Mar/15

15-Sep-14 Alliance Standards Part 8 Section 8.18 Seismic 31/Mar/15


Bracing of Key Non-Structural Elements and 2006
BNBC Part 6

21-Jul-14 Alliance Standards Part 8 Section 8.9 Factory Load 31/Mar/15


Manager
4-Aug-14 Alliance Standard Part 8 Section 8.10 Floor 28/Apr/15
Loading Plans (Load Plans)

4-Aug-14 Alliance Standard Part 8 Section 8.20.5.3 28/Apr/15

4-Aug-14 Alliance Standard Part 8 Section 8.11 Floor Load 28/Apr/15


Markings
4-Aug-14 Alliance Standard Part 8 Section 8.3 Preliminary 12/May/15
Structural Assessment
Assessor Information
Assessor Company Name
Date of Assessment
Date of CAP Finalization
Date of Report Submission
Date of CAP In Person Meeting

Facility Information
Facility Name
Facility Address

Key Facility Contact Name


Lead Brand Company
Lead Brand Contact Name
Lead Brand Contact Email
Audit Type/Name
CAP Responder at Facility
Important Criteria/Instructions
Audit Closing Comments

SI No Subheader Question
Electrical System Conditions All metal in the building is connected to the
building earthing/grounding system such as metal
rebar in concrete, metal frame of building, or
metal water pipe.

Electrical System Conditions Light fixtures without protective covers are not
installed in storage areas or in any area where
the Inspector of the Factories Rules (1.5.3.5) Part
53 disallows these fixtures.

Emergency Power System Are emergency power switchboards, distribution


boards, and circuits properly identified?

3
Emergency Power System Is the generator room properly rated and
physically separated from the remainder of the
building?

Electrical System Conditions The substation room has the required fire
rating/protection and is physically separated from
the remainder of the building.

Electrical System Maintenance Have workers that operate and maintain the
electrical system received electrical safety
training? Is training documentation on site?

6
Electrical System Conditions Do switchboards and/or distribution boards have
a minimum clearance of 1 m (39 in) in front?

Electrical System Conditions Are all switchboards and/or distribution boards


metal enclosed with a dead front construction?

Electrical System Conditions Are switchboards and/or distribution boards


installed in compliant locations?

9
Electrical System Conditions No circuits are drawn for loads without the
incorporation of a overcurrent protection device
(circuit breaker).

10

Electrical System Conditions Is electrical wiring/cables sized according to


capacity of circuit breakers (No higher rated
circuit breakers with lower rated wiring)?

11

Electrical System Conditions No multi looping of wiring/cables observed at


circuit breakers within switchboards and/or
distribution boards.

12
Emergency Power System Are life safety loads (fire alarm, fire pump,
elevators, emergency lighting, exit signage, etc)
connecting to the emergency power system?

13

Electrical System Conditions Shielding or additional insulation is provided for


wiring exposed to external heat sources.

14

Electrical System Conditions Wiring systems are selected and erected so that
no damage is caused by the ingress of water.

15
Electrical System Conditions Electrical connections at equipment, fixtures, etc
are properly secured.

16

Lightning Protection System The air termination network vertical and


horizontal conductors are appropriately spaced.

17

Lightning Protection System The appropriate number of down conductors are


installed based on the building size.

18
Lightning Protection System The lightning protection ground terminals are
bonded to the building or structure grounding.

19

Electrical System Conditions Are electrical wiring/cables properly identified?

20

Electrical System Conditions Are switchboards and/or distribution boards


provided with physical means to prevent the
installation of more over current devices than
that number for which the panel board was
designed, rated, and listed.

21
Electrical System Maintenance Is the electrical switchgear and panel boards
inspected on an annual basis to ensure that the
equipment is installed in accordance with the
listed ratings?

22

Electrical System Maintenance Are thermographic scans of electrical equipment


completed at least every three years?

23

Electrical System Maintenance Are periodic safety inspections of the electrical


system components completed and documented?

24
Electrical System Conditions Power and telecommunication or antenna cables
are led in separately.

25

Electrical System Conditions Mechanical guards are provided for electrical


equipment and wiring where necessary.

26

Electrical System Conditions Cable joints are through porcelain/PVC connectors


with PIB tape wound around joint.

27
Electrical System Conditions Is all electrical wiring/cable properly terminated
at its point of termination (No un-terminated
wires, lugs are provided at terminals, etc)?

28

Electrical System Conditions Are switchboards and/or distribution boards free


of dust and debris?

29

Electrical System Conditions Each circuit is provided with a dedicated neutral.

30
Electrical System Conditions Lighting fixtures are supported from the structure
and seismic bracing is installed as required.

31

Electrical System Conditions Electrical wiring and conduit is properly


supported.

32

Electrical System Conditions Are all internal components of switchboards


and/or distribution boards properly concealed (No
missing circuit breaker or knockout covers)?

33
Electrical System Conditions Are all switchboards and/or distribution boards
properly grounded (earthed)?

34

Electrical System Conditions Signage indicating the prohibition of light fixtures


without protective covers is installed at required
locations.

35

Electrical System Conditions Required equipment and safety signage is posted


within the room.

36
Emergency Power System Are inspection, maintenance, and testing
procedures of the UPS being completed and
documented?

37

Electrical System Conditions Are electrical insulation mats provided in front of


substation, switchboards and/or distribution
boards?

38

Electrical System Conditions Are meters and other electrical devices


(Ammeter, Voltmeter, PFI Auto Controller, etc)
installed on the main electrical equipment
operational?

39
Electrical System Conditions Phase separators are provided between terminals
on circuit breakers.

40
Bureau Veritas
24-May-14

31-Mar-15

ABONI KNIT WEAR LTD


169-171 Tetulzhora Union,
Hemayetpur, Savar

Savar
Dhaka
Bangladesh

Number of observations were found during Audit,


but following observations were highlighted
during closing meeting: 1. No phase separator on
circuit breaker terminals in LT-A-Ground Floor. 2.
No mechanical guards in between water pumps
and motors (all water pumps in Generator room).
3. Top cover open in Diesel Generator. 4. Need
earthing connection for all inlet and discharge
water pipe line (all metal pipe line). 5. No door
earthing in MDB-8-Ground Floor. 6. Need to
remove combustible materials near MDB-
01(GF/Sewing).

Description Suggested Plan of Action Suggested Deadline


Date
All metal in the building is not connected to the Connect all metal in the building to the building 20-Jul-14
building earthing system such as metal rebar in earthing system such as metal rebar in concrete,
concrete, metal frame of building, or metal water metal frame of building, or metal water pipe.
pipe.

Light fixtures without protective covers are Ensure light fixtures without protective covers are 25-May-14
installed in storage areas. installed in storage areas or in any area where
the Inspector of the Factories Rules (1.5.3.5) Part
Location: Sub Store-1st Floor-Main building, 53 disallows these fixtures.
Storage area-1st Floor-Main building.

Emergency power distribution boards and circuits Ensure proper identification of emergency power 22-Jun-14
are not properly identified. switchboards, distribution boards, and circuits.
Generator room is not properly rated but Ensure the generator room properly rated and 6-Jul-14
physically separated from the remainder of the physically separated from the remainder of the
building. building.

The substation room has no required fire rating Provide adequate fire rating of the substation 20-Jul-14
but physically separated from the remainder of room.
the building.

Workers that operate and maintain the electrical Develop and implement an electrical safety 20-Jul-14
system received electrical safety training but no program. Include key topics such as lock out tag
documentation on site. out procedures, personal protective equipment
requirements, etc. Reference NFPA 70e for
example program requirements.
Distribution boards are not provided with Provide clearance of at least 1 m (39 in) in front 22-Jun-14
adequate clearance. of distribution boards.

Location: SDB-1(New)/4F-4th Floor, MDB-


11(New)/Cutting/3F-3rd Floor, MDB-3/Sewing/2F-
2nd Floor, MDB-2/Sewing/1F-1st Floor, DB-
1/Sewing/GF-Ground Floor.

Distribution boards are metal enclosed with Ensure distribution boards are metal enclosed 22-Jun-14
improper dead front construction. with a dead front construction.

Location: DB-01/Ground Floor.

Switchboards and distribution boards are not Install Switchboards and distribution boards in 20-Jul-14
installed in compliant locations (access limited). compliant locations so that operation is not
hampered due to limited access.
Location: SDB-1(New)/4F-4th Floor, MDB-
11(New)/Cutting/3F-3rd Floor, MDB-3/Sewing/2F-
2nd Floor, MDB-2/Sewing/1F-1st Floor, DB-
1/Sewing/GF-Ground Floor.
Circuits are drawn for loads without the Ensure over current protection device (circuit 6-Jul-14
incorporation of an over current protection device breaker) for each and every loads.
(circuit breaker).

Location: LT-A/GF-Ground Floor, MDB-1/GF-Ground


Floor, SUB-SDB-4/1/Sample/4F-4th Floor, SDB-
5/Cutting/3F-3rd Floor, MDB-2/Sewing/1F-1st
Floor.

Electrical wiring and cables are not sized Consult with a qualified Electrical Engineer and 20-Jul-14
according to capacity of circuit breakers. ensure electrical wiring and cables are sized
according to capacity of circuit breakers. Verify
Location: SUB-SDB-4/1/Sample/4F-4th Floor. existing individual loads do not exceed the cable
and/or breaker rating. Verify total existing loads
do not exceed the panel rating.

Multi looping of cables observed at circuit Remove multi looping of wiring and cables at 20-Jul-14
breakers within distribution boards. circuit breakers within switchboards and
distribution boards.
Location: MDB-6/Sewing/5F-5th Floor, MDB-
3/Sewing/2F-2nd Floor, LT-A/GF-Ground Floor.
Life safety loads (fire alarm, fire pump, Provide emergency power connection for 20-Jul-14
emergency lighting, exit signage) are connected elevator.
to the emergency power system. But elevator is
not connected to emergency power system.

Location: Elevator, Main building.

No additional insulation is provided for wiring Provide Shielding or additional insulation for 6-Jul-14
exposed to external heat sources. wiring exposed to external heat sources.

Location: Generator room, Ground Floor.

Wiring systems are not selected and erected Ensure wiring systems are selected and erected 6-Jul-14
considering the effect of damage caused by so that no damage is caused by the ingress of
ingress of water. water. Provide water proof seal around cable
openings where water entry is possible.
Location: LT-A and LT-B/Ground Floor, REB
incoming cable junction box.
Electrical connections at equipment, fixtures, etc. Ensure electrical connections at equipment, 6-Jul-14
are not properly secured. fixtures, etc. are properly secured.

Location: Grinding machine/5th Floor, Sewing


machine-All Floor.

The air termination network vertical conductors Ensure the air termination network vertical and 6-Jul-14
are not appropriately spaced. Although as built horizontal conductors are appropriately spaced.
electrical drawing (SLD) for lightning protection Consult with qualified electrical engineer and
system was not available to review. Hence the ensure that your system is capable to protect
adequacy and functionality of the system could against lighting.
not be checked.

The appropriate numbers of down conductors are Consult with qualified electrical engineer and 6-Jul-14
not installed based on the building size. Although ensure that your system is capable to protect
as built electrical drawing (SLD) for lightning against lighting.
protection system was not available to review. Ensure appropriate numbers of down conductors
Hence, adequacy and functionality of the system are installed based on the building size.
could not be checked.
The lightning protection ground terminals are not Ensure the lightning protection ground terminals 6-Jul-14
bonded to the building or structure grounding. are bonded to the building or structure grounding.

Electrical wiring and cables are not properly Ensure the means of identification is obtained by 20-Jul-14
identified. separate color coding, marking tape, tagging, or
other approved means.
Location: All switchboards and distribution
boards.

Switchboards and distribution boards are not Ensure distribution boards provided with physical 20-Jul-14
provided with physical means to prevent the means to prevent the installation of more over
installation of more over current devices than current devices than that number for which the
that number for which the panel board was panel board was designed, rated, and listed
designed, rated and listed. following NFPA 70 section 408.54.

Location: All switchboards and distribution


boards.
The electrical switchgear and panel boards are Inspect electrical switchgear and panel boards on 20-Jul-14
not inspected on an annual basis to ensure that an annual basis to ensure that the equipment is
the equipment is installed in accordance with the in good working condition.
listed ratings.

Thermographic scans of electrical equipments Complete thermographic scans at least on a three 20-Jul-14
are not completed. year cycle. Thermographic scans should be
completed in accordance with the Standard for
Infrared Inspection of Electrical Systems &
Rotating Equipment and NFPA70B or a
comparable standard.

No periodic safety inspections of the electrical Establish a periodic inspection program to ensure 20-Jul-14
system components is completed and the electrical systems are free from damage,
documented. debris, dirt, lint, etc. Maintain records concerning
inspections and follow up actions.
Power and telecommunication cables are not led Led telecommunication or antenna cables 20-Jul-14
in separately. separately to the main point of service. Power
and telecommunications cables must have
Location: Throughout of main building. separate entrance.

No mechanical guards are provided for electrical Provide mechanical guards for electrical 22-Jun-14
equipment where necessary. equipment where necessary.

Location: All pumps inside the generator room.

Improper cable joints were found. Ensure cable joints through porcelain/PVC 20-Jul-14
connectors with PIB tape wound around joint.
Location: Air Compressor/1F-1st Floor, Cable
Channel/Sewing/1F-1st Floor, MDB-
Cooling/Generator Room/GF-Ground Floor, MDB-
3/Sewing/2F-2nd Floor, LT-B/GF-Ground Floor,
MDB-4/Cutting/3F-3rd Floor.
Electrical cable is not properly terminated. Ensure all electrical cable properly terminated at 20-Jul-14
its point of termination. Remove un-terminated
Location: MDB-2/1F-1st Floor-Sewing section. wiring cable back to source.

Distribution board is not clean. Ensure distribution boards free of dirt and debris. 22-Jun-14

Location: REB Distribution board, Child care,


Ground Floor.

Each circuit is not provided with a dedicated Provide dedicated neutral for each circuit. 20-Jul-14
neutral.

Location: SDB-2(New)/5F-5th Floor, DB-


6(New)/4F-4th Floor, DB-5(New)/3F-3rd Floor,
MDB-4/Cutting/3F-3rd Floor, MDB-
11(New)/Cutting/3F-3rd Floor, DB-4(New)/2F-2nd
Floor.
Lighting fixtures are not supported properly. Ensure Lighting fixtures are supported from the 22-Jun-14
structure and seismic bracing is installed as
Location: General Floor, Ground Floor. required.

Electrical wiring and conduit are not properly Provide adequate supports for electrical wiring 6-Jul-14
supported. and conduit.

Location: REB incoming cable junction box, Near


MDB-3/Sewing/2F-2nd Floor.

Internal components of distribution boards are Provide covers or blanks to conceal all live 22-Jun-14
not properly concealed. internal components of switchboards and
distribution boards.
Location: MDB-1/Sewing/GF-Ground Floor, DB-
1/Sewing/GF-Ground Floor, MDB-5/Sewing/4F-4th
Floor, MDB-6/Sewing/5F-5th Floor, MDB-
9/Marketing/2F-2nd Floor.
Distribution panel doors are not grounded Provide grounding (earthing) for distribution 20-Jul-14
(earthed). boards as per BNBC section 2.8.1.

Location: MDB-4/Cutting/3F-3rd Floor, MDB-


11(New)/Cutting/3F-3rd Floor, DB-4(New)/2F-2nd
Floor.

No signage indicating the prohibition of light Ensure Signage indicating the prohibition of light 22-Jun-14
fixtures without protective covers is installed at fixtures without protective covers is installed at
required locations. required locations.

Location: Sub Store-1st Floor-Main building,


Storage area-1st Floor-Main building.

Required equipment and safety signage is not Provide required equipment and safety signage 22-Jun-14
posted within the substation room. within the substation room.
Inspection and testing procedures of the UPS are Ensure inspection and testing procedures of the 20-Jul-14
not completed and documented. But UPS are completed and documented.
maintenance documents found on site.

Inadequate electrical insulation mats are Provide adequate electrical insulation mats in 22-Jun-14
provided in front of substation and distribution front of distribution boards.
boards.

Location: SDB-2/5th Floor, DB-6/4th Floor, DB-


5/3rd Floor, DB-4/2nd Floor, LT-A/GF-Ground Floor,
MDB-01/GF-Ground Floor.

Meters and other electrical devices (Ammeter, Ensure meters and other electrical devices 6-Jul-14
Voltmeter, Selector switch) installed on the main installed on the main electrical equipment are
electrical equipment but not operational. operational.

Location: MDB-8(New)/GF, Ground Floor.


Phase separators are not provided between Install phase separators between terminal 6-Jul-14
terminals on circuit breakers. connections at the noted locations.

Location: MDB-REB/Substation Room, LT-A/GF-


Ground Floor, MDB-01/GF-Ground Floor, MDB-
3/2F-2nd Floor, MDB-09/2F-2nd Floor, Breaker for
Meter CKT-Substation room.
Standard Factory CAP Factory CAP
Deadline Date
Alliance Standard Part 10 Section 10.10 Earthing 31/Mar/15

Alliance Standards Part 10 Section 10.15 Naked 31/Mar/15


Lights

NFPA 70 Chapter 7 Article 700.10 Wiring, 28/Apr/15


Emergency System
Alliance Standards Part 10 Section 10.8.4 12/May/15
Generator Room

Alliance Standard Part 3 Section 3.4.2.1.4 26/May/15

Reference NFPA 70e for example 31/Mar/15


Alliance Standards Part 10 Section 10.7 Main 31/Mar/15
Switch, Switchboards and Metal Clad Switchgear

Alliance Standards Part 10 Section 10.7 Main 31/Mar/15


Switch, Switchboards and Metal Clad Switchgear

Alliance Standard Part 10 Section 10.7 Main 31/Mar/15


Switch, Switchboards and Metal Clad Switchgear
Alliance Standards Part 10 Section 10.9 Protection 31/Mar/15
of Circuits

Alliance Standard Part 10 Section 10.3.1 Electrical 31/Mar/15


Connections.

Alliance Standard Part 10 Section 10.3 Electrical 31/Mar/15


Wiring and Cabling
Alliance Standard Part 10 Section 10.8 Standby 26/May/15
Power

Alliance Standards Part 10 Section 10.3.4.2 12/May/15


External heat sources.

Alliance Standards Part 10 Section 10.3.4.3 31/Mar/15


Presence of Water
Alliance Standards Part 10 Section 10.3.1 12/May/15
Electrical Connections

Alliance Standards Part 10 Section 10.11 26/May/15


Lightning Protection

Alliance Standards Part 10 Section 10.11 26/May/15


Lightning Protection
Alliance Standards Part 10 Section 10.11 26/May/15
Lightning Protection

Bangladesh Electricity Rules 1937 Rule 51 and 56 31/Mar/15

Alliance Standards Part 10 Section 10.7 Main 12/May/15


Switch, Switchboards and Metal Clad Switchgear
Alliance Standards Part 10 Section 10.13.8 26/May/15
Electrical Inspections

Alliance Standards Part 10 Section 10.13.8 21/Jul/15


Electrical Inspections

Alliance Standard Part 10 Section 10.13 26/May/15


Inspection and Testing and Part 13 Section 13.6
Housekeeping
Alliance Standards Part 10 Section 10.3.10 26/May/15
Service Entry

Alliance Standard Part 10 Section 10.3 Electrical 31/Mar/15


Wiring and Cabling, 10.6.5 Cables, and 10.7 Main
Switch, Switchboards And Metal Clad Switchgear

Alliance Standards Part 10 Section 10.3.8.4 Cable 31/Mar/15


Joints
Alliance Standards Part 10 Section 10.3.9.2 31/Mar/15
Wiring of Sub-distribution Boards

Alliance Standard Part 10 Section 10.3.9.1 28/Apr/15


Enclosures

Alliance Standards Part 10 Section 10.3 Electrical 31/Mar/15


Wiring and Cabling
Alliance Standards Part 10 Section 10.3.6 Lighting 28/Apr/15
Fittings

Alliance Standard Part 10 Section 10.3.2, 12/May/15


10.3.4.3, and 10.3.5

Alliance Standard Part 10 Section 10.3.9 Sub- 31/Mar/15


Distribution Boards
Alliance Standard Part 10 Section 10.10.2 Circuit 31/Mar/15
and System Earthing

Alliance Standards Part 10 Section 10.15 Naked 28/Apr/15


Lights

Alliance Standard Part 10 Section 10.3.7, Section 28/Apr/15


10.7.3, and 10.13.7, NFPA 70 Chapter 1 Article
110.21, and Bangladesh Electricity Rules of 1937
Rule 46
Alliance Standard Part 13 Section 13.11 12/May/15
NFPA 111 Chapter 8
NFPA 70B Chapter 28

Alliance Standard Part 10 Section 10.13.7 31/Mar/15


Inspection of the Installation.

Alliance Standard 10.13.7 Inspection of the 31/Mar/15


Installation
Alliance Standard Part 10 Section 10.3.1 Electrical 31/Mar/15
Connections
Assessor Information
Assessor Company Name
Date of Assessment
Date of CAP Finalization
Date of Report Submission
Date of CAP In Person Meeting

Facility Information
Facility Name
Facility Address

Key Facility Contact Name


Lead Brand Company
Lead Brand Contact Name
Lead Brand Contact Email
Audit Type/Name
CAP Responder at Facility
Important Criteria/Instructions
Audit Closing Comments

SI No Subheader Question

Fire Protection Systems Trouble or alarm notifications were not indicated


on the fire alarm control panel.

1
Means of Egress Exit access corridors serving an occupant load
exceeding 30 are separated by walls having a
fire-resistance rating of 1 hr.

Means of Egress All doors in a means of egress are of the side-


hinged swinging type.

Means of Egress Doors are not locked in the direction of egress


under any conditions. All hasps, locks, slide bolts,
and other locking devices have been removed
where required.

4
Means of Egress Doors along the path of egress have a minimum
width of 0.8 m (32 in) and have required ratings.

Fire Safety Programs Are the required number of people trained and
certified in fire fighting, first aid, and rescue
training by the appropriate authority.

Fire Protection Construction Are openings and penetrations through rated


walls and/or assemblies protected?

7
Fire Protection Systems Does the building have a Standpipe System?

Fire Protection Construction Are exit enclosures provided with fire-resistive


rated construction barriers?

Fire Protection Systems Does the building have a fire pump?

10
Fire Protection Systems Are notification and initiation devices for the fire
alarm system installed at required locations
based on occupancy type?

11

Fire Protection Construction Are shafts provided with the minimum fire-
resistance rating?

12

Means of Egress Interior exit stairways and ramps terminate at an


exit discharge except where terminating at a
rated exit passageway.

13
Means of Egress Exit discharge is directly to the exterior of the
building, unless the requirements of 6.17.2 are
met, at grade or provides direct access to grade.
Exit discharge shall not reenter a building.

14

Fire Protection Systems Is the fire alarm and detection system monitored
by a central station monitoring service or directly
connected to the Fire Service and Civil Defense?

15

Fire Protection Construction Are separations between hazards provided with


fire-resistive rated construction barriers.

16
Fire Safety Programs Training programs are implemented and
documented in accordance with the Alliance
Safety Training Curriculum.

17

Fire Protection Systems Are fire department connections provided and


clearly identified for the Fire Protection Systems?

18

Fire Safety Programs An emergency evacuation plan has been


developed and communicated to all employees.

19
Means of Egress Illuminated exit signs are placed at entrances to
exits and along the path of egress anywhere the
continuation of egress is not obvious or there is a
change in the direction of the path of travel.

20

Means of Egress All paths of egress are provided with compliant


means of illumination.

21

Means of Egress Occupant loads are posted for every assembly


and production floor in a conspicuous space near
the main point of egress.

22
Means of Egress Every door in a stair enclosure serving more than
5 stories is provided with re-entry unless it meets
the requirements of Alliance Standards Part 6
Section 6.8.3.1.

23

Means of Egress Handrails are provided on both sides of each


stairway. Intermediate handrails are provided
when the stair width exceeds 2.2 m (87 in.).
Handrails are not mounted lower than 760 mm
(30 in.) or higher than 1100 mm (44 in.).

24

Fire Protection Systems Fire extinguishers are inspected, tested, and


maintained as required.

25
Means of Egress Emergency power for means of egress
illumination is verified at least once per year. If
battery operated lights are used, these lights are
tested on a monthly basis. Functional testing of
battery powered lights is provided for a minimum
90 min once per year.

26

Fire Safety Programs Storage areas underneath the cutting tables are
clear of combustibles.

27

Fire Safety Programs A written housekeeping policy is established and


enforced.

28
Fire Protection Construction Certificates of Occupancy for each building have
been issued and are on file.

29

Fire Protection Systems Is signage for the standpipe system installed at


required locations and on required components?

30

Fire Protection Systems Are inspection, maintenance, and testing


procedures of the standpipe and hose system
documented and up to date? Including inspection
and testing of hoses if provided.

31
Fire Safety Programs Fire Department pre-planning has been
completed.

32

Fire Safety Programs A hot-work permit program has been established.

33

Means of Egress Stair designation signs are provided at each floor


entrance from the stair to the floor in English and
Bengali. Signs indicate the name of the stair and
the floor level. Signs are posted adjacent to the
door.

34
Bureau Veritas
24-May-14

31-Mar-15

ABONI KNIT WEAR LTD


169-171 Tetulzhora Union,
Hemayetpur, Savar

Savar
Dhaka
Bangladesh
In the closing meeting, the non-conformities were explained to the factory personnel. The issues are as
follows- Architectural drawings are not available without the signature of IAB member. Construction ratings
are not mentioned. No testing and maintenance records available of all Fire Safety Systems (Fire Alarm, Fire
Pump, Standpipe and Hose System, Smoke Evacuation, etc). Openings in fire barriers are not protected with
fire-resistance materials. Fire rated door, fire-resistant protected opening are not available in the building.
Fire doors are not available in all through the building. Fire rated window are not available where required in
all through the building. Fire barriers are not provided with fire rated opening to separate store in all through
the building. Standpipes (Class-II) are connected with Over Head Water Reservoir (capacity approx. 20000 Ltr
) of adjacent building. At roof hose pressure was 11.25 psi. Water capacity and hose pressure are insufficient in
the main building. Class-II standpipe hose connection (40 mm) installed inside the floor but Class-I standpipe
hose connection (65 mm) not installed at stairwells in each floor level including occupiable roof. No fire
department connections provided in the factory building. Hoses are not of appropriate materials. All nozzles
are fixed type. Dedicated fire pump are not available in the premises. Water for firefighting is insufficient.
Hoses for standpipe system are of appropriate material and properly maintained. Stair designation signs are
provided at each floor entrance from the stair to the floor in English and Bengali. Signs indicate the name of
the stair and the floor level. Signs are posted adjacent to the door in the building. Walking surfaces along the
path of egress are uniformly slip resistant in the main building. All collapsible gates in the path of egress are
not unlocked in the direction of egress under all conditions in the main building. Handrails are not provided
the both side of the stair in the main building. Fire department connections are not available in the premises.

Description

Centralized automatic fire alarm and smoke detection system with control panel is not available. Only stand
alone detectors are available.
On ground floor of main building, an exit access corridor serving an occupant load exceeding 30 is not
separated by walls. It has no separation from the production floor.

All of the doors in the means of egress are collapsible and sliding type and some are open (no door provided).

There are collapsible gates with locking arrangements like hasps, locks, slide bolts at the exit doors but doors
are not locked.
Door widths are more than 0.8m at main building, but all doors along the path of egress (i.e. doors leading to
staircase) are not fire rated doors having a rating of 1.5 hour as required in accordance with section 6.3.1.2.2
and 4.6.

Out of 2,443 people, 120 are trained and certified in fire fighting, first aid, and rescue by the appropriate
authority.

All the openings, penetrations and ducts through rated walls in the assessed buildings were found to be non-
rated. Some major locations are stated below: Store room has non-rated opening along the path of egress on
ground floor of main building. Penetration was observed beside of electric distribution board on 1st floor of
main building and this penetration go through all floors of the building. Similar openings and penetrations are
noticed on different floor of different building.
Height of the highest occupied floor of the main building is 21.34 m (70.00 ft) above grade which is greater
than 10m (33 ft) above grade. Therefore, class III standpipe system needs to be installed throughout the
building as per NFPA 14. There is a class II stand pipe system is installed in the main building. Four class II
standpipe hose connections (40 mm) are installed on the floors. There is no hydraulic calculation for the
installed system. However, on roof, hose pressure found negligible (less than 4.5 bar). Hose diameter and
water capacity are not sufficient. There is no Class-I standpipe hose connection (65 mm) in required stairwells
including occupied roof. Noted that 25 mm plastic hoses are also installed in different location of the premises.

There are 4 stair enclosures in the main building. None of the stair enclosures are fire rated. No fire doors
installed at exits of any floor. Non rated slab opening found in the exit enclosure on 5th floor. Similar non-rated
construction barriers of exit enclosures are noted at different locations of different buildings.

There is no dedicated fire pump in the factory premises to supply water in case of fire incidence as per NFPA
20. A pump is available but not dedicated for firefighting. No hydraulic calculation for installed standpipe are
available.
Standalone detectors are available. Manual switch or pull stations for occupant notification installed at egress
point of production floors.

There are two elevator shafts in the main building. One for passenger lift and one for cargo lift. The passenger
lift has openings inside stair enclosure. The cargo lift has openings towards production floors, which are not fire
rated.

There are 2 nos stair in the utility building. Both of them terminate at ground floor generator room.
In the utility building exit discharge terminate at ground floor generator room..

Automatic fire alarm and detection system control panel is not available in the factory. Currently there is no
monitoring company in Bangladesh. Fire service and civil defense are also not capable of monitoring fire alarm
and detection systems of the factories.

Occupancy separations are not fire rated, and the opening protections are not fire rated, as well. Some major
locations are stated below: Compressor is kept open between production area and idle machine store on 1st
floor. There are openings at walls of production area and machine store of main building. Spot removing rooms
are noticed on different floor and spot lifter(highly flammable gas can) use for spot removing. Spot removing
rooms are not properly fire separated from production floors. Proper separation is not provided on 6th floor of
main building among dining(area more than 75 m2) and store(not accessories occupancy). Kitchen also exist
in 6th floor beside dining room and gas cylinder use for cooking, which is prohibited. Proper separation
required between in process store and production on 3rd floor of main building. Proper separation is required
between store and office on 5th floor of main building. Proper separation required between temporary store
and electrical distribution board on 3rd floor of main building. Proper separation required on 3rd floor of main
building between production and store. These different occupancies need to be fire separated.
No document of any training program in accordance with the Alliance Safety Training Curriculum was found,
but factory authority arranged for some training not following Alliance curriculum .

Fire department (Siamese) inlet connection and outlet connection (pillar hydrant) are not provided to allow fire
department pumper equipment to supplement the fire protection systems.

Workers were aware of the evacuation procedure upon commencing of the alarm. However, no procedure
defining evacuation process was available.
Illuminated exit signs are placed at entrances to exits, but along the path of egress additional exit signs or
directional signs are not provided where there is a change in direction and where the continuation of egress is
not obvious.

All paths of egress are not provided with compliant means of illumination. Ordinary CFL bulbs are used as
emergency lights, which do not provide sufficient illumination as required.

Occupant loads are not posted in a conspicuous space near the main exits or exit access doorways.
The main building is 8 stories, but doors are not provided with re-entry. Stair doors with re-entry are required in
at least 2 floors. Other buildings are not more than 5 stories, therefore re-entry is not required for those
buildings in accordance section- 6.8.3 and 6.8.3.1(a).

None of the stairs have handrails on both sides in every building on the factory premises.

Extinguishers are inspected monthly by factory's staff, but no documents are found in support of (i) annual
maintenance of extinguishers by a servicing agent and (ii) annual testing of nozzle of CO2 extinguisher. These
are required as per NFPA 10.
Record of verifying emergency power for means of egress illumination was found but no record was found for
testing of battery operated lights, which is required as per the Alliance Standard Section 10.12.2.3.

Fabrics are stored underneath the cutting tables of cutting section on 3rd floor of main production building.

Written housekeeping policy is not found as required.


No occupancy certificate are available for any building in the factory premises.

Signage for the available class II standpipe system is not installed.

Inspection, maintenance, and testing procedures of the installed class II standpipe and hose is not
documented and up to date as per NFPA 25.
Fire Department pre-planning has not been completed yet.

Hot-work permit program is not established yet. However, hot-work is not taking place in the factory right now.

Proper stair name or designation is not posted as per Alliance Standard. Floor level and stair designation sign
is not posted in English as well.
Suggested Plan of Action Suggested Deadline Standard Factory CAP
Date
Install a centralized automatic fire alarm and 21-Jul-14 Alliance Standard Part 13 Section 13.10
smoke/heat detection system with control panel Maintenance of Fire Protection Equipment
following the requirement of NFPA 72 throughout
all new and existing buildings and structures.
Provide fire-resistive rated assemblies at the 15-Sep-14 Alliance Standard Part 6 Section 6.3 and Part 4
required exit access corridors. The rated Section 4.5. Does not apply if an automatic
assembly should be approved and/or designed by sprinkler system is installed throughout the
a qualified fire protection engineer. Exit access building.
corridors serving an occupant load exceeding 30
are to be separated by walls having a fire
resistance rating of 1 hr in accordance with 4.5
unless provided with automatic sprinkler
protection throughout the story or building.
Window and glass block assemblies are to be of
tested fire rating following NFPA 257.

Replace all non-compliant doors and frames in 15-Sep-14 Alliance Standards Part 6 Section 6.8 Doors and
the means of egress with doors that are listed, Gates
approved, automatic-closing, side-swinging, fire
rated doors in compatible fire rated frames with
latching panic hardware that open in the direction
of egress.

Remove all hasps, locks, slide bolts, or other 7-Jul-14 Alliance Standards Part 6 Section 6.8 Doors and
locking devices at the noted locations. According Gates
to section 6.8.2.2, doors may be locked where the
latch and lock are disengaged with one motion
where the occupant load does not exceed 49
persons. Turning a door handle and disengaging a
lock is considered two motions.
Provide 1.5 hr fire protective opening assemblies 15-Sep-14 Alliance Standard Part 6 Section 6.5.6 Minimum
in 2 hr rated exit enclosures as per the Alliance Widths. Increased occupant loads will require a
Standard section 4.6. door width greater than 0.8 m.

Train and certify at least 611 people(25% of 8-Dec-14 Alliance Standard Part 13 Human Element
occupant load) in fire fighting, first aid and rescue Programs
training by the proper authority.

Provide opening protectives at all windows and 15-Sep-14 Includes doors, windows, ducts, piping, etc.
other openings on all the fire rated wall across Reference Alliance Standards Part 4 Section 4.6
the entire premises as per section 4.6. If these Opening Protectives and Section 4.7 Penetrations
openings are not required, close these. Protect
the penetrations of fire resistive rated assemblies
with a listed through penetration fire stop system
tested in accordance with ASTM E814.
Install standpipe system at required locations. 15-Sep-14 Does the building have a standpipe system
Standpipe system must comply with NFPA 14. installed where required. Alliance Standard Part 5
Section 5.4.2

Install doors that swing in the direction of egress, 15-Sep-14 Reference Alliance Standards Part 4 Section 4.5
side-swinging, self-closing, non-lockable fire doors Separation
of 1.5 hr rating in all stairwell enclosures of 2 hr
fire-resistive rated construction barriers. Consult
a qualified fire protection engineer to design the
required rated construction barriers.

Install a pump dedicated for firefighting or fire 15-Aug-14 Alliance Standard Part 5 Fire Protection Systems
protection following the requirements of NFPA 20.
Fire pump installation is to be tested for final
acceptance in presence of Alliance and a final
inspection of the installation shall be conducted
by the Alliance prior to final acceptance of the
installation by the Alliance. Acceptance testing of
the installation shall be in accordance with NFPA
20, 22, and 24 testing requirements.
Documentation of all testing shall be submitted to
the Alliance for review prior to final acceptance.
Pull stations at egress points, smoke detectors in 15-Sep-14 Pull stations at egress points, smoke detectors in
air handling equipment, visual and audible air handling equipment, visual and audible
devices must be spaced appropriately based on devices spaced appropriately based on
occupancy type in accordance with NFPA 72. occupancy type. Reference NFPA 72

Protect the openings of shaft enclosure by 27-Nov-14 Reference Alliance Standards Part 4 Section
providing rated opening protectives according to 4.5.7.1 through 4.5.7.3
the Alliance Standard.

Construct required rated walls for the open exit 27-Nov-14 Alliance Standard Part 6 Section 6.14 Exit
passageway. Enclosures
Provide rated exit passage way . i.e Provide 27-Nov-14 Alliance Standard Part 6 Section 6.17 Exit
separation between stairs and generator room Discharge. See Section 16.7.2 and 16.7.3 for
according to Alliance Standard. exceptions.

Arrange for direct connection of the fire alarm 21-Jul-14 Alliance Standard Part 5 Section 5.7.5 Monitoring
system to a central monitoring station or Fire
Service and Civil Defense. Until that time that
monitoring can be set up, arrange a monitoring
system using factory's own central detection
system and personnel. A person shall be assigned
to contact the fire department in the event of fire
alarm activation. An annunciator shall be located
in a constantly attended location (such as a fire
control room) to alert this person.

Provide fire-resistive rated construction barriers 15-Sep-14 Reference Alliance Standards Part 4 Section 4.5
between hazard types following Table 4.4.1 of Separation
Alliance Standard or Table 4.1.1 from BNBC Part
4. Consult a qualified fire protection engineer to
design the required rated construction barrier.
Remove gas cylinder from kitchen.
Impart training in accordance with Alliance Safety 24-Jul-14 Alliance Standards Part 13
Training Curriculum and keep record with proper
documentation.

Install fire department connections where 8-Dec-14 Alliance Standard Part 5 Section 5.5.4 Fire
required and in compliance with the Standard. Department Connections
Fire department (Siamese) inlet connections shall
be provided to allow fire department pumper
equipment to supplement the fire protection
systems. Fire department outlet connections shall
be provided to allow fire department pumper
vehicles to draw water from ground-level or
underground water storage tanks. Connections
shall match the Fire Service and Civil Defense
hose thread standard.

Develop an emergency evacuation plan which 21-Jul-14 Alliance Standards Part 13 Section 13.1 Fire
includes all components required by the Alliance Safety Director
Standards and communicate the plan to all
employees in accordance with Section-13.3.
Install illuminated exit signs at entrances to exits 15-Sep-14 Alliance Standard Part 6 Section 6.11 Exit Signs
and along the path of egress anywhere the
continuation of egress is not obvious or there is a
change in the direction of the path of travel as
per section 6.11.

Install appropriate means of illumination at the 11-Dec-14 Alliance Standards Part 6 Section 6.7 Egress
noted locations. The means of egress paths shall Illumination and Part 10 Section 10.12
be illuminated at all times the building is Illumination of Exit Signs and Means Of Escape
occupied. Illumination shall be a minimum of 10
lux for all corridors, exit doors, and stairways.
Aisles shall be provided with a minimum 2.5 lux.

Post the occupant load for every assembly and 21-Jul-14 Alliance Standards Part 6 Section 6.4.4 Posting of
production floor in a conspicuous space near the Occupant Load
main exit or exit access doorway for the space.
Every door in a stair enclosure serving more than 15-Sep-14 Alliance Standards Part 6 Section 6.8 Doors and
5 stories shall be provided with re-entry unless it Gates
meets the following requirements. Stair doors
may be permitted to be locked from the stair
(ingress) side that prevents re-entry to the floor
provided at least two floors allowing re-entry to
access another exit are provided; there are not
more than 4 stories intervening between re-entry
floors; re-entry is allowed on the top or next to
top level; re-entry doors are identified as such on
the stair side; and locked doors shall be identified
as to the nearest re-entry floors. When the
discharge floor is determined to be a required re-
entry floor using the above requirements, re-
entry does not have to be provided back into the
building on this level.
Provide handrails on both side of each stairway. 8-Dec-14 Alliance Standard Part 6 Section 6.9 Stairs and
Provide intermediate handrail when the stair 6.12 Handrails and Guards
width exceeds 2.2m (87 inches). Provide handrail
of height between the range 865 mm (34 in.) and
965 mm (38 in) as per section 6.9 and 6.12.

Fire extinguishers are to be inspected, tested, and 11-Dec-14 NFPA 10 Chapter 7


maintained in accordance with NFPA 10 Chapter
7.
Develop a testing and maintenance program that 21-Jul-14 Alliance Standards Part 10 Section 10.12
ensures the operation of all exit lights is verified Illumination of Exit Signs and Means Of Escape
at least once per year. If battery-operated lights Lighting
are used, these lights shall be tested on a
monthly basis. Functional testing of battery
powered lights shall be provided for a minimum
90 min once per year.

Remove all combustibles stored underneath the 15-Aug-14 Alliance Standard Part 17 Section 13.7.2 Cutting
cutting tables at the noted locations. tables.

Establish written corporate and plant policies on 2-Mar-15 Alliance Standards Part 13 Section 13.6
housekeeping to ensure scheduled cleaning for Housekeeping
floors, walls, ceilings, and supply and return air
ventilation systems. Promptly reschedule skipped
cleanings. Provide a documented line of authority
for authorizing a cleaning delay and rescheduling.
As a general rule the maximum tolerable deposit
thickness for loose fluffy lint is 13 mm ( in.)
over a maximum of 46.5 m2 (500 ft2). Limit
dense deposits to 6 mm ( in.) and oil saturated
deposits to 3.2 mm ( in.).
Apply to PWD for issuance of occupancy 4-Aug-14 Are certificates of occupancy provided for each
certificate and pursue the matter to expedite. building or ancillary structure?

Install required identification signs at the noted 4-Aug-14 Reference NFPA 14 Chapter 6
locations. Signage must comply with NFPA 14
Chapter 6.

Establish an inspection, maintenance, and testing 8-Dec-14 Reference NFPA 25 Chapter 6 Standpipe and Hose
program for the standpipe and hose system. Systems Table 6.1.1.2
Program must comply with the requirements of
NFPA 25 Chapter 6 Table 6.1.1.2.
Complete fire department pre-planning activities 21-Jul-14 Alliance Standards Part 13 Section 13.1 Fire
with the local Fire Service and Civil Defense in Safety Director
accordance with Section 13.1.1(2).

Develop a hot-work permit program. The program 8-Dec-14 Alliance Standards Part 13 Section 13.4 Hot Work
must comply with the requirements of NFPA 51B. Permit and NFPA 51B

Install signage adjacent to each stair door 21-Jul-14 Alliance Standard Part 6 Section 6.9 Stairs
indicating the stair name and the floor level at
the noted locations as per the Alliance Standard
Section 6.9.
Factory CAP
Deadline Date
28/Apr/15
23/Jun/15

23/Jun/15

14/Apr/15
23/Jun/15

15/Sep/15

23/Jun/15
23/Jun/15

23/Jun/15

23/Jun/15
23/Jun/15

23/Jun/15

23/Jun/15
23/Jun/15

28/Apr/15

23/Jun/15
31/Mar/15

15/Sep/15

28/Apr/15
15/Sep/15

15/Sep/15

28/Apr/15
23/Jun/15

24/Apr/15

15/Sep/15
28/Apr/15

7/Apr/15

15/Sep/15
12/May/15

12/May/15

15/Sep/15
28/Apr/15

15/Sep/15

28/Apr/15