INVESTIGACIONES GEOTCNICAS DE CAMPO Y ENSAYOS DE LABORATORIO FASE II

APROVECHAMIENTO HIDROELCTRICO EL CARRIZAL

PERSONAL NO CALIFICADO PERSONAL CALIFICADO COSTOS


ID FECHA ANCHO LARGO PROFUNDIDAD TALUD HORA DE INICIO HORA DE FIN OBSERVACIONES COSTOS PEONES
UTILIZADO UTILIZADO LABORATORISTA

11-Mar 1.5 16 2.2 14 6 1400 787.3090909

13-Mar 1.5 40 1.4 13 6 1300 787.3090909

14-Mar 1.5 15 2 11 6 1100 787.3090909

14-Mar 1.5 30 0.7 0 0

15-Mar 1.5 6 2 5 6 500 787.3090909


GRADERIAS LADO IZQUIERDO 30M DE
16-Mar 9 6 LARGO 900 787.3090909
GRADERIAS LADO IZQUIERDO 35M DE
17-Mar 10 6 LARGO 1000 787.3090909
GRADERIAS LADO DERECHO 20 M DE
20-Mar 5 6 LARGO 500 787.3090909

1000 787.3090909

500 787.3090909

8200 7085.781818 15285.78182 1528.578182 16,814.36

5000 21,814.36 22000

PROF LARGO 3780

2.8 76 10640 63840 3240

10640 29020

74054.4 10364.28571 28

64427.328 22801.42857 78.4

3780 5958.4

3240 41470.464

50

110
INVESTIGACIONES GEOTCNICAS DE CAMPO Y ENSAYOS DE LABORATORIO FASE II
APROVECHAMIENTO HIDROELCTRICO EL CARRIZAL

CANTIDAD DE EXPLOSIONES AL HORA DE


ID FECHA FRENTE DE TRABAJO MAQUINARIA Y EQUIPO UTILIZADO TIPO DE MATERIAL LONGITUD COMBUSTIBLE (LITROS) HORA DE FIN OBSERVACIONES
DA INCIO
INVESTIGACIONES GEOTCNICAS DE CAMPO Y ENSAYOS DE LABORATORIO FASE II
APROVECHAMIENTO HIDROELCTRICO EL CARRIZAL

DIESEL (LITROS)
HORA DE INICIO
PROFUNDIDAD

PROFUNDIDAD

HORA DE FIN

REALIZADOS

N BOLSAS

UTILIZADO
GASOLINA

CEMENTO
TERRENO

ENSAYOS
(LITROS)
TIPO DE
INCIAL

FINAL
ID FECHA MAQUINARIA UBICACIN SONDEO PERSONAL OBSERVACIONES
INVESTIGACIONES GEOTCNICAS DE CAMPO Y ENSAYOS DE LABORATORIO FASE II
APROVECHAMIENTO HIDROELCTRICO EL CARRIZAL

DIESEL (LITROS)
HORA DE INICIO
PROFUNDIDAD

PROFUNDIDAD

HORA DE FIN

ADICIONAL
TERRENO

MAERIAL
TIPO DE
INICIAL

FINAL
ID FECHA MAQUINARIA UBICACIN GALERIA PERSONAL OBSEVACIONES