Professional Documents
Culture Documents
Aziz Yousif
Manan Ghelani
Peipei Li
Riley Rodenburg
Shuhan Li
DESIGN REQUIREMENTS
EXPLICIT REQUIREMENTS
Wash a window with size of 5'x6'
Sponge Mounting
SYSTEM DESIGN 2
CURRENT SYSTEM
STATUS
CURRENT SYSTEM
STATUS
Window Subsystem
PROJECT MANAGEMENT
PROJECT MANAGEMENT
Team Member Responsibilities
PROJECT MANAGEMENT
Timeline
PROJECT MANAGEMENT
Budget
Item Quantity Cost per Item Shipping Cost with Shipping
Brushless Motor Pair 1 $26.50 $3.99 $30.49
Electronic Motor Controller 2 $4.69 $9.38
Tri-Prop 1 $1.69 $1.69
Dual Prop 1 $5.00 $5.00
Accelerometer 1 $17.95 $3.39 $21.34
Arduino Mega 1 $45.95 $4.47 $50.42
Micro Metal Gearmotor 1000:1 4 $25.95 $6.45 $110.25
Micro Metal Gearmotor Bracket Pair 2 $4.99 $9.98
Wheel 80x10mm Pair 2 $9.25 $18.50
Magnetic Encoder Pair 2 $8.95 $17.90
Dual Motor Driver 2 $5.95 $11.90
Snap-Action Switch 6 $0.95 3.95 $9.65
PC Power Supply 1 $49.79 $11.95 $61.74
Parallax Ultrasonic Sensor 1 29.99 $29.99
Sparkfun Ultrasonic Sensor 1 3.95 3.95
Seeed Tech Ultrasonic Sensor 1 15 3.39 18.39
Power HD High-Speed Digital Micro Servo 4 12.95 3.95 55.75
Brushless Motor Pair 1 $26.50 $3.99 $30.49
Electronic Motor Controller 2 $4.69 $9.38
Tri-Prop 2 $1.69 $3.38
$0 $509.57 $1250
PROJECT MANAGEMENT
Risks
Budget
Shipping Time
Personnel Cooperation
Safety (in Machine Shop, for example)
Over-Engineering (Results in a heavy robot)
Questions?