Presentation by
D VAIDYANATHAN
SR. GENERAL MANAGER
ITCOT Consultancy and Services Ltd.
Ltd
Chennai
11-12-2009
KEY ASPECTS
2
z SITE
z MACHINE
z GOVT. POLICIES
z ENERGY GENERATION
z PROJECT COST
z FINANCIAL VIABILITY
z RISKS
z ENVIRONMENTAL FACTORS
C-WET - NATIONAL TRAINING PROGRAMME- 2009
SITE
3
z MACHINE CHARACTERISTICS
z CERTIFICATION FOR THE MODELS
CONSIDERED
z PERFORMANCE OF MACHINES WITHIN THE
COUNTRY AND OTHER PLACES
z O & M , SPARES, PAYMENT TERMS, ETC
z CREDIBILITY OF LOCAL COLLABORATOR
z SELECTION THROUGH TENDERING PROESS
z Captive Consumption
5% wheeling charges (HT), 5% Banking Charges
Consuming
C i company should
h ld have
h 26% equity
i ini the
h
generating company and 51% of the units generated is
to be consumed
z Sale Mode
TNEB Rs. 3.39/kWhr
Third
Thi d Party
P t To
T be
b arrived
i d att after
ft other
th stipulated
ti l t d
norms
z Energy
gy Generated to reduce by
y 1% everyy year
y after
10 years.
9 POLICY (Contd.)
z Energy Generation
z Project Cost
z Terms of Finance
z TNERC Policies
z Project Internal Rate of Return (IRR) and Return on
Equity (ROE), and Payback period
z IRR to be significantly higher than cost of capital
z Project on sale mode
z CDM BENEFITS
13 EUROS/TON
0 931 T OF CO2/MWHR
0.931
CDM BENEFITS SHARED AS PER ERC NORMS
z Validation charges
z Registration charges
z Annual Verification charges
g
z UNFCCC charges
z Annual success fee of CDM annual revenue
FINANCIAL INDICATORS OF BASE MODEL
18
Paybac
k
No IRR RoE (Month
. Description (%) (%) s)
Sale mode with IT
1 11.75 17.33 79
benefits
Sale mode with IT
2 13 92
13.92 25 75
25.75 67
& CDM Benefits
z RURAL DEVELOPMENT
z RURAL EMPLOYMENT
z LAND UTILISATION
z ADDING GREEN POWER TO THE GRID/GRID
RELATED ISSUES
z ISSUES NOT SO RELEVANT TO INDIA
BIRD HIT
LANDSCAPE
NOISE
z EFFECT ON RAINFALL
RISKS
24
INVESTOR
z PROJECT COST
z GENERATION
z WIND PERFORMANCE
z GRID AVAILABILITY
z SUSTAINED MACHINE AVAILABILITY
z TARIFF TERMS AND STATE POLICY
TARIFF,
z PAYMENT FROM SEBS
CDM REALISATION
GOVT /SEB
z SUB OPTIMAL USE OF LAND
z POWER QUALITY AND GRID RELATED
ISSUES
z NON-PREDICTABILITY OF AVAILABLE
POWER
z SUB OPTIMAL GENERATION