MEDIDAS DE ADOBE
j= 0.02 m h=
l= 0.35 m
cantid= 1/((h+j)x(l+j))
cantid= 17.67565179 UND
cantid= 18. UND por m2
CARTEL DE OBRA
h de muro libre
4.55 m
RESUMEN
adobe 1566 und
acero longitudinal 3/8 12 varillas
acero longitudinal 1/4 9 varillas
alambre 16 10 kg
UBICACION
1 ROSARIO -ENTRADA DERECHA
2 DV ANANEA -ENTRADA DERECHA
3 VILQUECHICO
0.14 m
h de muro libre
4.55 m
6 varillas
5 varillas
6 varillas
4 varillas
36 bolsas
15 bolsas
7 bolsas
12 bolsas
9 bolsas
PLANILLA DE METRADOS BANOS ADMINISTRATIVOS
METRADO
Item DESCRIPCION UND
NV LARGO
01 OBRAS PROVISIONALES
01.01 LADRILLO PANDERETA 0.1X0.15X0.25 M2
MUROS 2 2.65
MUROS 2 4.65
01.02 CIMIENTO M3
2 2.65
2 4.65
01.03 SOBRECIMIENTO M3
2 2.65
2 4.65
01.03 TARRAJEO INTERIOR M2
2 2.65
2 4.65
01.03 PISO DE CEMENTO M2
1 2.65
01.03 COLUMNAS
VARILLAS DE 3/8 UN 10
VARILLAS DE 1/4 UN 13
01.03 VIGAS M2
1 2.65
CEMENTO BOLS 39
LADRILLO UND 920
VARILLAS DE 3/8 VAR 10
VARILLAS DE 1/4 VAR 13
ISTRATIVOS
METRADO
PARCIAL TOTAL
ANCHO ALTURA
36.50
2.5 13.25
2.5 23.25
3.65
0.5 0.5 1.33
0.5 0.5 2.33
0.91
0.25 0.25 0.33
0.25 0.25 0.58
36.50
2.5 13.25
2.5 23.25
35.32
4.65 12.32
10.00
10.00
13.00
12.32
4.65 12.32
MADERA PARA TIJERAL PARA ALAMCEN
SECCION EN PULG.
ELEMENTO LONGITUD ANCHO ALTO AREA M2 N DE VECES
1 1.11 2 4 0.00516 5.00
1 1.11 2 4 0.00516 5.00
1 1.11 2 4 0.00516 5.00
1 1.11 2 4 0.00516 5.00
1 1.11 2 4 0.00516 5.00
1 1.11 2 4 0.00516 5.00
1 1.00 2 4 0.00516 5.00
1 1.00 2 4 0.00516 5.00
1 1.00 2 4 0.00516 5.00
1 1.00 2 4 0.00516 5.00
1 1.00 2 4 0.00516 5.00
1 1.00 2 4 0.00516 5.00
1 1.44 2 3 0.00387 5.00
1 0.96 2 3 0.00387 5.00
1 0.96 2 3 0.00387 5.00
1 0.48 2 3 0.00387 5.00
1 0.48 2 3 5.00
1 1.39 2 3 5.00
1 1.75 2 3 5.00
1 1.39 2 3 5.00
1 1.75 2 3 5.00
LONG. TOTAL 23.26
Cumbrera
Cumbrera
1 .4
VERCART.-04
0.5
VER CART.-02
CANALETA
VER DETAL E
0.5
VER CART.-02
CANALETA
VER DETAL E
LONGITUD VARIABEL
0.50 0.25 0.25 0.50
RA TIJERAL
PARCIAL TOTAL
CANTIDAD
CANTIDAD REQUERIMIENT REQUERIMIENT
CALCULADA
O O
15.00 und 15.00 und 15.00 und
25.00 und
10.00 und 10.00 und 10.00 und
20.00 und 20.00 und 20.00 und
25.00 und
5.00 und 5.00 und 5.00 und
47.00 und 50.00 und 50.00 und 50.00 und
32.00 und
92.40 m2 30.92 und 32.00 und
4.00 und 4.00 und 4.00 und 4.00 und
300 300 300.00 und 300.00 und
2 2 2 kg 2 kg
10.00 und 10.00 und 20.00 und 20.00 und
8.00 und 8.00 und 8.00 und 8.00 und
6.00 und 6.00 und 6.00 und 6.00 und
a
VER CART.-03
VERCART.-04
CANALETA
VER DETAL E
CANALETA
VER DETAL E
0 .2 5 0 .5 0 1.225
1 .4
VER CART.-04
0.5
VER CART.-02
CANALETA
VER DETAL E
0.5
VER CART.-02
CANALETA
VER DETAL E
LONGITUDVARIABEL
0.50 0.25 0.25 0.50
RA TIJERAL
PARCIAL TOTAL
CANTIDAD
CANTIDAD REQUERIMIENT REQUERIMIENT
CALCULADA
O O
24.00 und 24.00 und 24.00 und
64.00 und
40.00 und 40.00 und 40.00 und
40.00 und 40.00 und 40.00 und
72.00 und
32.00 und 32.00 und 32.00 und
200.00 und 200.00 und 200.00 und 200.00 und
100.00 und
267.50 m2 89.52 und 100.00 und
20.00 und 20.00 und 20.00 und 20.00 und
680 680 680.00 und 680.00 und
6.84 7 7 kg 7 kg
36.00 und 36.00 und 36.00 und 36
VER CART.-03
VER CART.-04
CANALETA
VER DETAL E
CANALETA
VER DETAL E
1.025
1.225
0.25 0.50
7.5 1.25
3.00 3.00
3.00 3.00
3.00 3.00
3.00 3.00
3.00
3.00
3.00
3.00
3.00
TOTAL = 9.00 6.00
PARCIAL TOTAL
CANTIDAD
REQUERIMIENT REQUERIMIENT
CALCULADA
O O
9.00 und 9.00 und 9.00 und
6.00 und 6.00 und 6.00 und
7.00 und 7.00 und 7.00 und
5.00 und
5.00 und 5.00 und
4.00 und 4.00 und 4.00 und
300 300.00 und 300.00 und
2 2 kg 2 kg
10.00 und 10.00 und 10
AREA M2 AMBIENTES MODULOS CAMPAMENTO
OFICINA TECNICA
1 PISO
AMBIENTE LARGO ANCHO AREA M2
por m2 metrado
CEMENTO (bolsas) 0.35 164.71
PISO DE CORCHO - 118.95
2 PISO
por m2 metrado
CEMENTO (bolsas) 0.35 19.0675
MADERA MACHIH. 1.05
CLAVO P/MADERA C/C 2 1/2 0.115
2 PISO
por m2 metrado
CEMENTO (bolsas) 0.35 64.57
PISO DE CORCHO - 64.57
OFICINA ADMINISTRATIVA
1 PISO
por m2 metrado
CEMENTO (bolsas) 0.35 106.15
PISO DE CORCHO - 102.80
DORMITORIOS INGENIEROS
por m2 metrado
CEMENTO (bolsas) 0.35 67.35
PISO DE CORCHO - 67.35
LABORATORIO
por m2 metrado
CEMENTO (bolsas) 0.35 100.1
MADERA MACHIH. 1.05 100.1
CLAVO P/MADERA C/C 2 1/2 0.115 100.1
AREA EQUIPOS
por m2 metrado
CEMENTO (bolsas) 0.35 408.83
MADERA MACHIH. 1.05 27.9
CLAVO P/MADERA C/C 2 1/2 0.115 27.9
COCINA - COMEDOR
por m2 metrado
CEMENTO (bolsas) 0.35 214.09
MADERA MACHIH. 1.05 167.958
CLAVO P/MADERA C/C 2 1/2 0.115 167.958
DORMITORIOS OBREROS
por m2 metrado
CEMENTO (bolsas) 0.35 225.94
MADERA MACHIH. 1.05 183.87
CLAVO P/MADERA C/C 2 1/2 0.115 183.87
VIGILANCIA
por m2 metrado
CEMENTO (bolsas) 0.35 7.00
MADERA MACHIH. 1.05 7.00
CLAVO P/MADERA C/C 2 1/2 0.115 7.00
ALMACEN GENERAL
por m2 metrado
CEMENTO (bolsas) 0.35 61
PISOS DE MADERA MACHIHEMBRADA Y CORCHO
CANTIDAD
cantidad de material
57.65 bolsas
118.95 M2
cantidad de material
6.67 bolsas
0 M2
0 KG
cantidad de material
22.60 bolsas
64.57 M2
cantidad de material
37.15 bolsas
102.80 M2
cantidad de material
23.57 bolsas
67.35 M2
cantidad de material
38.05 bolsas
56.85 M2
cantidad de material
54.47 bolsas
123.49 M2
cantidad de material
35.04 bolsas
105.11 M2
11.51 KG
cantidad de material
143.09 bolsas
29.30 M2
3.21 KG
cantidad de material
74.93 bolsas
176.36 M2
19.32 KG
cantidad de material
79.08 bolsas
193.06 M2
21.15 KG
cantidad de material
0.00 bolsas
0.00 M2
cantidad de material
0.00 bolsas
0.00 M2
0.00 KG
cantidad de material
2.45 bolsas
7.35 M2
0.805 KG
cantidad de material
21.35 bolsas
cantidad de material
REQUERIDO
cantidad de material
596.09 bolsas 597 bolsas
534.01 M2 560 m2
55.99 KG 56 kg
511.17 M2 512 m2
AREA PARA CIELO RASO AMB
OFICINA TECNICA
1 PISO
AMBIENTE LARGO ANCHO AREA M2
HALL DE ACCE 2.80 1.70 4.76
OFICINA TECN 10.00 6.50 65.00
OFICINA TECN 8.30 6.50 53.95
SALA DE REU 5.75 6.50 37.38
BAO OF. RES 2.55 1.35 3.44
TOTAL 164.53
2 PISO
ESCALERA Y 6.30 2.55 16.07
PASADIZO 4.50 1.05 4.73
OF. GERENCIA 6.50 4.25 27.63
BAO OF. GER 4.75 0.90 4.28
OF. ALTA GER 36.94 36.94
BAO GER. VI 2.75 1.25 3.44
TOTAL 93.07
OFICINA ADMINISTRATIVA
1 PISO
AMBIENTES LARGO ANCHO AREA M2
OF. ADMINIS 21.8 21.80
BAO OF. AD 3.35 3.35
AREA TECNIC 13.50 6.00 81.00
TOTAL 106.15
DORMITORIOS INGENIEROS
AMBIENTES LARGO ANCHO AREA M2
GERENCIA GEN 13.47 13.47
GERENTE DE 13.47 13.47
GERENCIA VIA 13.47 13.47
ING. RESIDEN 13.47 13.47
SALA DE REU 21.13 21.13
TOTAL 75.01
DORMITORIOS EMPLEADOS
AMBIENTES SIN INC. S.H.
LARGO ANCHO AREA M2
6 DORMITORI 80.58 80.58
1 DORMITORI 21.93 21.93
1 DORMITORI 19.20 19.20
SS.HH. HOMB 23.45 23.45
SS.HH. MUJER 8.50 8.50
TOTAL 153.66
LABORATORIO
AMBIENTE LARGO ANCHO AREA M2
OFICINA LAB 5.15 5.20 26.78
LABORATORIO 5.20 0.00
TOTAL 26.78
AREA EQUIPOS
AMBIENTE LARGO ANCHO AREA M2
OFICINA EQUI 5.25 5.20 27.30
ALAMCEN EQU 75.68 75.68
TALLER AREA 20.35 15.00 305.25
TOTAL 408.23
COCINA - COMEDOR
AMBIENTE LARGO ANCHO AREA M2
COCINA 4.96 9.30 46.13
COMEDOR EM 6.23 9.30 57.94
COMEDOR OB 11.83 9.30 110.02
TOTAL 214.09
DORMITORIOS OBREROS
AMBIENTES LARGO ANCHO AREA M2
9 DORMITORI 3.90 4.50 157.95
1 DORMITORI 5.76 4.50 25.92
AREA SS.HH. 3.75 4.70 17.63
AREA SS.HH. 5.20 4.70 24.44
TOTAL 225.94
TOPICO Y VIGILANCIA
AMBIENTES LARGO ANCHO AREA M2
TOPICO 43.00 0.00
VIGILANCIA 7.00 7.00
0.00
TOTAL 7.00
ALMACEN GENERAL
AMBIENTES LARGO ANCHO AREA M2
ALMACEN GE 2.50 5.00 12.50
TOTAL 12.50
OFICINA TECNICA
1 PISO
por m2 metrado
PLANCHA DE TECKNOPOR (1.20X2.4X 3pulg) 1.05 164.53
PLANCHA DE TRIPLAY (1.83X2.44X4mm) 1.05 164.53
CLAVOS DE P/MADERA DE 2 1/2 0.08 164.53
MADERA 2X3X6.50
por m2 metrado
PLANCHA DE TECKNOPOR (1.20X2.4X 3pulg) 1.05 93.07
PLANCHA DE TRIPLAY (1.83X2.44X4mm) 1.05 93.07
CLAVOS DE P/MADERA DE 2 1/2 0.08 93.07
MADERA 2X3X6.50
OFICINA ADMINISTRATIVA
1 PISO
por m2 metrado
PLANCHA DE TECKNOPOR 1.05 106.15
PLANCHA DE TRIPLAY (1.83X2.44X4mm) 1.05 106.15
CLAVOS DE P/MADERA DE 2 1/2 0.08 106.15
MADERA 2X3X6.50
DORMITORIOS INGENIEROS
por m2 metrado
PLANCHA DE TECKNOPOR 1.05 75.01
PLANCHA DE TRIPLAY (1.83X2.44X4mm) 1.05 75.01
CLAVOS DE P/MADERA DE 2 1/2 0.08 75.01
MADERA 2X3X6.50
por m2 metrado
PLANCHA DE TECKNOPOR 1.05 97.40
PLANCHA DE TRIPLAY (1.83X2.44X4mm) 1.05 97.40
CLAVOS DE P/MADERA DE 2 1/2 0.08 97.40
MADERA 2X3X6.50
DORMITORIOS EMPLEADOS
por m2 metrado
PLANCHA DE TECKNOPOR 1.05 153.66
PLANCHA DE TRIPLAY (1.83X2.44X4mm) 1.05 153.66
CLAVOS DE P/MADERA DE 2 1/2 0.08 153.66
MADERA 2X3X6.50
LABORATORIO
por m2 metrado
PLANCHA DE TECKNOPOR 1.05 26.78
PLANCHA DE TRIPLAY (1.83X2.44X4mm) 1.05 26.78
CLAVOS DE P/MADERA DE 2 1/2 0.08 26.78
MADERA 2X3X6.50
AREA EQUIPOS
por m2 metrado
PLANCHA DE TECKNOPOR 1.05 27.30
PLANCHA DE TRIPLAY (1.83X2.44X4mm) 1.05 27.30
CLAVOS DE P/MADERA DE 2 1/2 0.08 27.30
MADERA 2X3X6.50
COCINA - COMEDOR
por m2 metrado
PLANCHA DE TECKNOPOR 1.05 214.09
PLANCHA DE TRIPLAY (1.83X2.44X4mm) 1.05 214.09
CLAVOS DE P/MADERA DE 2 1/2 0.08 214.09
CAMPANA EXTRACTORA
MADERA 2X3X6.50
DORMITORIOS OBREROS
por m2 metrado
PLANCHA DE TECKNOPOR 1.05 225.94
PLANCHA DE TRIPLAY (1.83X2.44X4mm) 1.05 225.94
CLAVOS DE P/MADERA DE 2 1/2 0.08 225.94
MADERA 2X3X6.50
VIGILANCIA
por m2 metrado
PLANCHA DE TECKNOPOR 1 7.00
PLANCHA DE TRIPLAY (1.83X2.44X4mm) 1.05 7.00
CLAVOS DE P/MADERA DE 2 1/2 0.08 7.00
MADERA 2X3X6.50
ALMACEN GENERAL
por m2 metrado
PLANCHA DE TECKNOPOR 1.05 12.50
PLANCHA DE MADERBA (1.83X2.44X10mm) 1.05 12.50
CLAVOS DE P/MADERA DE 2 1/2 0.08 12.50
MADERA 2X3X6.50
cantidad de material
97.72 m2
97.72 m2
7.45 KG
4.00 UND
cantidad de material
111.46 m2
111.46 m2
8.49 KG
10.00 UND
cantidad de material
78.76 m2
78.76 m2
6.00 KG
11.00 UND
cantidad de material
102.27 m2
102.27 m2
7.79 KG
12.00 UND
cantidad de material
161.34 m2
161.34 m2
12.29 KG
9.00 UND
cantidad de material
28.12 m2
28.12 m2
2.14 KG
9.00 UND
cantidad de material
28.67 m2
28.67 m2
2.18 KG
4.00 UND
cantidad de material
224.79 m2
224.79 m2
17.13 KG
1.00 UND
11.00 UND
cantidad de material
237.23 m2
237.23 m2
18.07 KG
11.00 UND
cantidad de material
0.00 m2
0.00 m2
0.00 KG
0.00 UND
cantidad de material
0.00 m2
0.00 m2
0.00 KG
0.00 UND
cantidad de material
7.00 m2
7.00 m2
0.56 KG
4.00 UND
cantidad de material
13.13 m2
13.13 m2
1.00 KG
5.00 UND
DULOS CAMPAMENTO
cantidad de material
1263.2 m2
1263.2 m2
96.3 KG
99.0 UND
1.0 UND
AREA M2 PAREDES AMBIENTES MODULOS CAMPA
OFICINA TECNICA
1 PISO
AMBIENTES LARGO ALTO AREA M2
PAREDES
RESIDENCIA 10.11 2.60 26.29
SECRETARIA 5.05 2.60 13.13
BAO RESIDEN 7.60 2.60 19.76
HALL Y ESCALE 12.45 2.60 32.37
ESP. SUELOS Y 11.82 2.60 30.73
JEFE OF. TECNI 14.70 2.60 38.22
RECEPCION Y 7.80 2.60 20.28
AIST. OF TECN 12.25 2.60 31.85
SALA DE REUN 22.85 2.60 59.41
SUB TOTAL 272.04
DESCUENTO AREAS VENTANAS
RESIDENCIA 1.95 1.25 2.44
SECRETARIA 2.00 1.25 2.50
BAO RESIDEN 2.55 0.55 1.40
HALL Y ESCALE 2.55 1.25 3.19
ESP. SUELOS Y 2.40 1.25 3.00
JEFE OF. TECNI 3.60 1.25 4.50
RECEPCION Y 2.00 1.25 2.50
AIST. OF TECN 3.60 1.25 4.50
SALA DE REUN 5.20 1.25 6.50
SUB TOTAL 30.53
TOTAL REVESTIMIENTO PAREDES M2 241.51
2 PISO
AMBIENTES LARGO ALTO AREA M2
PAREDES
OF. GERENCIA 19.90 2.50 49.75
OF. GERENCIA 24.20 2.50 60.50
ESCALERA Y HA 13.15 2.50 32.88
PASADIZO 3.75 2.50 9.38
PASADIZO 8.05 1.10 8.86
BAO GERENCI 7.60 2.50 19.00
BAO ALTA GE 7.60 2.50 19.00
SUB TOTAL 89.11
DESCUENTO AREAS VENTANAS
OF. GERENCIA 3.00 1.15 3.45
OF. GERENCIA 1.50 1.15 1.73
BAO GERENCI 2.55 0.55 1.40
BAO ALTA GE 1.00 0.55 0.55
SUB TOTAL 1.95
TOTAL REVESTIMIENTO PAREDES M2 87.15
OFICINAS ADMINISTRATIVAS
AMBIENTES SIN S.H.
LARGO ALTO AREA M2
PAREDES
OF. ADMINIST 18.69 2.60 48.59
OFICINAS TECN 36.63 2.60 95.24
BAO ADMINIS 7.30 2.60 18.98
SUB TOTAL 162.81
DESCUENTO AREAS VENTANAS
OF. ADMINIST 3.50 1.25 4.38
OFICINAS TECN 12.00 1.25 15.00
BAO ADMINIS 2.60 0.55 1.43
SUB TOTAL 20.81
TOTAL REVESTIMIENTO PAREDES M2 142.01
DORMITORIOS INGENIEROS
AMBIENTES LARGO ALTO AREA M2
DORMITORIO G 15.10 2.50 37.75
DORMITORIO G 15.10 2.50 37.75
DORMITORIO G 15.10 2.50 37.75
DORMITORIO R 15.10 2.50 37.75
DORMITORIO A 15.10 2.50 37.75
ING. OF. TECNI 14.27 2.50 35.68
SALA DE REUN 18.67 2.50 46.68
DORMITORIO VI 28.54 2.50 71.35
ING. AMBIENTA 14.27 2.50 35.68
ING. ESTUDIO 14.27 2.50 35.68
BAOS DORM. 69.00 2.50 172.50
SUB TOTAL 397.55
DESCUENTO AREAS VENTANAS
GERENCIA GEN 1.20 1.15 1.38
GERENTE DE P 1.20 1.15 1.38
GERENCIA VIAL 1.20 1.15 1.38
DORMITORIO R 1.20 1.15 1.38
DORMITORIO A 1.20 1.15 1.38
ING. OF. TECNI 1.20 1.15 1.38
SALA DE REUN 1.20 1.50 1.80
DORMITORIO VI 2.40 1.15 2.76
ING. AMBIENTA 1.20 1.15 1.38
ING. ESTUDIO 1.20 1.15 1.38
BAOS DORM. 1.20 1.15 1.38
SUB TOTAL 10.08
TOTAL REVESTIMIENTO PAREDES M2 387.47
DORMITORIOS EMPLEADOS
AMBIENTES LARGO ALTO AREA M2
DORMITORIOS 86.40 2.60 224.64
DORMITORIOS 19.47 2.60 50.62
DORMITORIOS 16.50 2.60 42.90
BAO DORM E 18.67 2.60 48.54
BAO DORM E 11.80 2.60 30.68
SUB TOTAL 397.38
DESCUENTO AREAS VENTANAS
DORMITORIOS 12.60 1.25 15.75
DORMITORIOS 2.40 1.25 3.00
DORMITORIOS 2.05 1.25 2.56
BAO DORM E 1.20 0.55 0.66
BAO DORM E 1.20 0.55 0.66
SUB TOTAL 22.63
TOTAL REVESTIMIENTO PAREDES M2 374.75
LABORATORIO
AMBIENTES LARGO ALTO AREA M2
OFICINA 20.30 2.80 56.84
LABORATORIO 36.70 2.80 102.76
SUB TOTAL 159.60
DESCUENTO AREAS VENTANAS
OFICINA 2.00 1.45 2.90
LABORATORIO 5.50 1.45 7.98
SUB TOTAL 10.88
TOTAL REVESTIMIENTO PAREDES M2 148.73
AREA EQUIPOS
AMBIENTES LARGO ALTO AREA M2
OFICINA 19.50 2.80 54.60
ALMACEN 25.95 2.80 72.66
TALLER 20.35 2.80 56.98
SUB TOTAL 184.24
DESCUENTO AREAS VENTANAS
OFICINA 1.50 1.45 2.18
ALMACEN 0.00
TALLER 0.00
SUB TOTAL 2.18
TOTAL REVESTIMIENTO PAREDES M2 182.07
COCINA COMEDOR
AMBIENTES LARGO ALTO AREA M2
COMEDOR EMP 31.05 2.80 86.94
COCINA 25.30 2.80 70.84
COMEDOR OBR 37.75 2.80 105.70
SUB TOTAL 263.48
DESCUENTO AREAS VENTANAS
COMEDOR EMP 7.00 1.45 10.15
COCINA 4.06 1.45 5.89
COMEDOR OBR 8.00 1.45 11.60
SUB TOTAL 27.64
TOTAL REVESTIMIENTO PAREDES M2 235.84
DORMITORIOS OBREROS
AMBIENTES LARGO ALTO AREA M2
DORMITORIOS 167.72 2.60 436.07
BAO DORMITO 18.90 2.60 49.14
BAO DORMITO 16.00 2.60 41.60
SUB TOTAL 526.81
DESCUENTO AREAS VENTANAS
DORMITORIOS 24.00 1.25 30.00
BAO DORMITO 4.70 0.55 2.59
BAO DORMITO 8.45 0.55 4.65
SUB TOTAL 37.23
TOTAL REVESTIMIENTO PAREDES M2 489.58
TOPICO - VIGILANCIA
AMBIENTES LARGO ALTO AREA M2
TOPICO 27.60 2.50 69.00
VIGILANCIA 10.10 2.50 25.25
SUB TOTAL 94.25
DESCUENTO AREAS VENTANAS
TOPICO 1.20 1.15 1.38
VIGILANCIA 1.00 1.15 1.15
ALMACEN GENERAL
AMBIENTES LARGO ALTO AREA M2
ALMACEN GENE 15.40 2.50 38.50
OFICINA TECNICA
1 PISO
por m2 metrado cantidad de material
yeso (bolsas) 0.4 221.75 88.7002
2 PISO
por m2 metrado cantidad de material
yeso (bolsas) 0.4 49.15 19.661
OFICINAS ADMINISTRATIVAS
por m2 metrado cantidad de material
yeso (bolsas) 0.4 123.03 49.2108
DORMITORIOS INGENIEROS
por m2 metrado cantidad de material
yeso (bolsas) 0.4 214.97 85.988
7740
DORMITORIOS EMPLEADOS
por m2 metrado cantidad de material
yeso (bolsas) 0.4 295.53 118.2118
LABORATORIO
por m2 metrado cantidad de material
yeso (bolsas) 0.4 148.73 59.49
AREA EQUIPOS
por m2 metrado cantidad de material
yeso (bolsas) 0.4 182.07 72.826
COCINA COMEDOR
por m2 metrado cantidad de material
yeso (bolsas) 0.4 235.84 94.3372
DORMITORIOS OBREROS
por m2 metrado cantidad de material
yeso (bolsas) 0.4 398.84 159.5358
DORMITORIOS SUPERVISION - COCINERO
por m2 metrado cantidad de material
yeso (bolsas) 0.4 0
ALMACEN GENERAL
por m2 metrado cantidad de material
yeso (bolsas) 0.4 36.20 14.48
tidad de material
bolsas
tidad de material
bolsas
tidad de material
bolsas
tidad de material
bolsas
tidad de material
bolsas
tidad de material
bolsas
tidad de material
bolsas
tidad de material
bolsas
tidad de material
bolsas
tidad de material
bolsas
tidad de material
bolsas
tidad de material
bolsas
NRIORES
tidad de material
bolsas de 25kg
gln
gln
AREA M2 PAREDES AMBIENTES MODULOS CAMPAMENTO- CONTRAZOCALO DE
OFICINA TECNICA
1 PISO
AMBIENTES LARGO ALTO
PAREDES
OF TECNICA MODULO 1 PISO 65.60 1.00
SUB TOTAL
DESCUENTO AREAS VENTANAS
OF TECNICA MODULO 1 PISO VENT. BAJA 23.55 0.00
OF TECNICA MODULO 1 PISO VENT. ALTA 5.90 0.00
SUB TOTAL
TOTAL REVESTIMIENTO PAREDES M2
2 PISO
AMBIENTES LARGO ALTO
PAREDES
OF TECNICA MODULO 2 PISO 26.15 1.00
BALCON-PASADIZO 2 PISO 8.35 1.00
SUB TOTAL
DESCUENTO AREAS VENTANAS
OF TECNICA MODULO 2 PISO VENT. BAJA 4.50 0.00
OF TECNICA MODULO 2 PISO VENT. ALTA 3.55 0.00
SUB TOTAL
TOTAL REVESTIMIENTO PAREDES M2
OFICINAS ADMINISTRATIVAS
AMBIENTES SIN S.H. LARGO ALTO
PAREDES
OF. ADMINISTRATIVA 47.90 1.00
SUB TOTAL
DESCUENTO AREAS VENTANAS
OF. ADMINISTRATIVA VENT. BAJA 16.00 0.00
OF. ADMINISTRATIVA VENT. ALTA 2.60 0.00
SUB TOTAL
TOTAL REVESTIMIENTO PAREDES M2
DORMITORIOS INGENIEROS
AMBIENTES LARGO ALTO
MODULO GERENCIAS/SALA DE REUNION 61.88 1.00
MODULO INGENIEROS 61.88 1.00
SUB TOTAL
DESCUENTO AREAS PUERTAS Y VENTANAS
MODULO GERENCIAS/SALA DE REUNION - PUE 0.90 0.00
MODULO GERENCIAS/SALA DE REUNION - VENT 6.30 0.00
MODULO GERENCIAS/SALA DE REUNION - VENT 0.50 0.00
MODULO INGENIEROS - PUERTAS 0.90 0.00
MODULO INGENIEROS - VENTANAS BAJAS 1.20 0.00
MODULO INGENIEROS - VENTANAS ALTAS 0.50 0.00
SUB TOTAL
TOTAL REVESTIMIENTO PAREDES M2
DORMITORIOS EMPLEADOS
AMBIENTES LARGO ALTO
MODULO 1 INCL. BAOS 50.16 1.00
MODULO 2 INCL. BAO 50.16 1.00
SUB TOTAL
DESCUENTO AREAS PUERTAS Y VENTANAS
MODULO 1 INCL. BAOS - PUERTAS 4.80 0.00
MODULO 2 INCL. BAOS - PUERTAS 0.90 0.00
MODULO 1 INCL. BAOS - VENTANAS BAJAS 1.20 0.00
MODULO 2 INCL. BAOS - VENTANAS BAJAS 1.20 0.00
MODULO 1 INCL. BAOS - VENTANAS ALTAS 2.70 0.00
MODULO 2 INCL. BAOS - VENTANAS ALTAS 0.60 0.00
SUB TOTAL
TOTAL REVESTIMIENTO PAREDES M2
LABORATORIO
AMBIENTES LARGO ALTO
AREA EQUIPOS
AMBIENTES LARGO ALTO
OFICINA - ALMACEN 59.35 1.00
SUB TOTAL
DESCUENTO AREAS PUERTAS Y VENTANAS
OFICINA - ALMACEN PUERTAS 1.20 0.00
OFICINA - ALMACEN VENTANA 1.50 0.00
SUB TOTAL
TOTAL REVESTIMIENTO PAREDES M2
COCINA COMEDOR
AMBIENTES LARGO ALTO
COCINA - COMEDOR 67.60 1.00
SUB TOTAL
DESCUENTO AREAS PUERTAS Y VENTANAS
COCINA - COMEDOR PUERTAS 6.70 0.00
COCINA - COMEDOR VENTANAS 19.00 0.00
SUB TOTAL
TOTAL REVESTIMIENTO PAREDES M2
DORMITORIOS OBREROS
AMBIENTES LARGO ALTO
DORMITORIOS MODULO 1 INCL BAO 59.80 1.00
DORMITORIOS MODULO 2 INCL BAO 66.42 1.00
SUB TOTAL
DESCUENTO AREAS PUERTAS Y VENTANAS
DORMITORIOS MODULO 1 INCL BAO - PUERT 5.70 0.00
DORMITORIOS MODULO 2 INCL BAO - PUERT 5.70 0.00
DORMITORIOS MODULO 1 INCL BAO - VENT. 1.20 0.00
DORMITORIOS MODULO 1 INCL BAO - VENT. 8.45 0.00
DORMITORIOS MODULO 2 INCL BAO - VENT. 1.20 0.00
DORMITORIOS MODULO 2 INCL BAO - VENT. 4.70 0.00
SUB TOTAL
TOTAL REVESTIMIENTO PAREDES M2
SUB TOTAL
DESCUENTO AREAS PUERTAS Y VENTANAS
DORMITORIO SUPERVISOR, PUERTAS 0.90 0.00
DORMITORIO SUPERVISOR, VENT. BAJA 6.60 0.00
DORMITORIO SUPERVISOR, VENT. ALTA 3.90 0.00
SUB TOTAL
TOTAL REVESTIMIENTO PAREDES M2
SUB TOTAL
TOTAL REVESTIMIENTO PAREDES M2
TOPICO - VIGILANCIA
AMBIENTES LARGO ALTO
TOPICO 0.00 1.00
VIGILANCIA 8.85 1.00
SUB TOTAL
DESCUENTO AREAS PUERTAS
TOPICO 1.20 0.00
VIGILANCIA 1.00 0.00
SUB TOTAL
TOTAL REVESTIMIENTO PAREDES M2
ALMACEN GENERAL
AMBIENTES LARGO ALTO
ALMACEN GENERAL 9.75 1.00
SUB TOTAL
DESCUENTO AREAS PUERTAS
ALMACEN GENERAL 2.00 0.00
SUB TOTAL
TOTAL REVESTIMIENTO PAREDES M2
AREA TOTAL M2 CONTRAZOCALO EXTERIOR DE CEMENTO.
CONTRAZOCALO DE 0.60 M
bolsas POR M CANTIDAD
cemento (bolsas) 0.04 26.534
alambre galvanizado
TO- CONTRAZOCALO DE H= 0.60 M
N VECES AREA M2
1.00 65.60
0.00
65.60
1.00 0.00
1.00 0.00
0.00
0.00
65.60
N VECES AREA M2
1.00 26.15
1.00 8.35
0.00
34.50
1.00 0.00
1.00 0.00
0.00
0.00
34.50
N VECES AREA M2
1.00 47.90
0.00
47.90
1.00 0.00
1.00 0.00
0.00
0.00
47.90
N VECES AREA M2
1.00 61.88
1.00 61.88
0.00
123.76
5.00 0.00
1.00 0.00
4.00 0.00
6.00 0.00
6.00 0.00
6.00 0.00
0.00
0.00
123.76
N VECES AREA M2
1.00 50.16
1.00 50.16
0.00
100.32
1.00 0.00
4.00 0.00
4.00 0.00
4.00 0.00
1.00 0.00
1.00 0.00
0.00
0.00
100.32
N VECES AREA M2
0.00
1.00 54.00
54.00
1.00 0.00
3.00 0.00
0.00
54.00
N VECES AREA M2
1.00 59.35
0.00
59.35
1.00 0.00
1.00 0.00
0.00
0.00
59.35
N VECES AREA M2
1.00 67.60
0.00
67.60
1.00 0.00
1.00 0.00
0.00
0.00
67.60
N VECES AREA M2
1.00 59.80
1.00 66.42
0.00
126.22
1.00 0.00
1.00 0.00
10.00 0.00
1.00 0.00
10.00 0.00
1.00 0.00
0.00
0.00
126.22
N VECES AREA M2
1.00 0.00
0.00
0.00
4.00 0.00
1.00 0.00
1.00 0.00
0.00
0.00
N VECES AREA M2
1.00 0.00
0.00
0.00
1.00 0.00
1.00 0.00
1.00 0.00
0.00
N VECES AREA M2
1.00 0.00
1.00 8.85
8.85
1.00 0.00
1.00 0.00
0.00
8.85
N VECES AREA M2
1.00 9.75
0.00
9.75
1.00 0.00
0.00
0.00
9.75
DE CEMENTO. 663.35
UND
bolsas
AREA PARA VEREDAS CAMPAMENTO
DESCRIPCION LARGO ANCHO N VECES
VEREDAS
INGRESO A CAMPAMENTO, TOPICO 42.94 1.00 1.00
INGRESO A CAMPAMENTO, LADO DERECHO 41.10 1.00 1.00
PERIMETRO OFICINA ADMINISTRATIVA 25.80 1.20 2.00
6.50 1.20 2.00
CONEXION OF. ADMINISTRATIVA - OF. TECN 2.60 1.20 2.00
PERIMETRO OFICINA TECNICA 30.00 1.20 2.00
7.00 1.20 2.00
CONEXION OF. TECNICA - COCINA COMED 4.50 1.20 2.00
PERIMETRO COCINA - COMEDOR 26.40 1.20 1.00
26.40 1.90 1.00
9.80 1.20 2.00
PERIMETRO OF. SUPERVISION - SALA DE DI 21.10 1.20 1.00
6.50 1.20 2.00
PERIMETRO DORM. SUPERVISION - COCINE 10.45 1.20 1.00
10.35 1.20 2.00
8.75 1.20 1.00
CONEXION A LOS DORMITORIOS 38.00 1.20 1.00
DORMITORIOS INGENIEROS 26.92 1.20 4.00
DORMITORIOS EMPLEADOS 20.60 1.20 4.00
DORMITORIOS OBREROS 28.21 1.20 2.00
24.90 1.20 2.00
17.20 1.20 1.00
CONEXION OF. TECNICA - LABORATORIO 9.00 1.20 1.00
PASADIZO ALMACEN, LABORATORIO, EQUIP 61.41 1.20 1.00
bolsas por m2
yeso (bolsas) 0.4
41.10
61.92
15.60
6.24
72.00
16.80
10.80
31.68
50.16
23.52
45.60
129.22
98.88
67.70
59.76
20.64
10.80
73.69
0.00
0.00
836.11
C. TEC. Y ADMINTRACION
VOLUMEN cantidad total
125.4168 382.52124
PUERTA EN CAMPAMENTO
DESCRIPCION LARGO ANCHO N VECES
VEREDAS
DORM OBREROS 2.10 0.90 10.00
2.10 0.90 2.00
2.10 0.70 5.00
EMPLEADOS 2.10 0.90 9.00
2.10 1.20 1.00
2.10 0.70 6.00
INGENIEROS 2.10 0.90 11.00
2.10 0.70 10.00
COMEDOR 2.10 0.90 7.00
2.10 1.20 1.00
DORM. SUPERVISOR 2.10 0.90 2.00
2.10 0.70 2.00
OFC TEC 2.10 1.20 4.00
2.10 0.90 2.00
ADMINISTRACION 2.10 1.20 1.00
2.10 0.90 3.00
2.10 0.70 1.00
2.10 0.70 5.00
ALMACEN 2.10 0.90 2.00
LABORATORIO 2.10 0.90 3.00
EQUIPOS 2.10 0.90 2.00
GUARDIANIA 2.10 0.90 1.00
AREA TOTAL M2 DE VEREDAS
VENTANAS EN CAMPAMENTO
bolsas POR M2 CANTIDAD M2
VENTANAS SISTEMA MODUGLAS 1 195.00
PUERTAS 2.10X0.90 54 UND
PUERTAS 2.10X0.70 29 UND
PUERTAS 2.10X1.20 7 UND
AREA M2
18.90 54.00
3.78
7.35 29.00
17.01
2.52 7.00
8.82
20.79
14.70
13.23
2.52
3.78
2.94
10.08
3.78
2.52
5.67
1.47
7.35
3.78
5.67
3.78
1.89
162.33
TRAMPA DE GRASA PARA COCINA 1.2X1.00X1.00
DESCRIPCION AREA ANCHO ALTO N VECES AREA M2
0.11
0.19
0.17
3.00
0.47
CAMPAMENTO
TOTAL REQ
8
8
AREA DE TANQUE DE ANTIDERRAME DE CAMPAMENTO
DESCRIPCION AREA ANCHO ALTO N VECES AREA M2
TANQUE DE ANTID DE COMBUST.
BASE 2.64 9.6 1 25.34
MURO 0.11 9.6 2 2.19
MURO 0.11 6.5 2 1.48
ESTACIONARIO 56 0.15 1 8.40
SOPORTE 5.75 5.60 1.00 32.20
ACERO 3/8 DE 9M 155.00 1.00 155.00
AREA TOTAL M2 DE TARRAJEO 69.61
3.50
3.50
7.00
NTO
TOTAL REQ
10
AREA DE TARRJEO C/A DE CAMPAMENTO
DESCRIPCION LARGO ANCHO ALTO N VECES
TARRAJEO DE BANOS
OBREROS 5.00 2.60 2.00
5.90 2.60 2.00
5.00 2.60 2.00
5.35 2.60 2.00
EMPLEADOS 5.60 2.60 2.00
4.20 2.60 2.00
AREA TOTAL M2 DE TARRAJEO
26.00
30.68
26.00
27.82
29.12
21.84
161.46
TO
TOTAL REQ
20