You are on page 1of 62

Cement Consumption

Grade Bags
M 7.5 3.20
M 10 4.40
M 15 6.60
M 15 (10%
EXT. FOR
BOT. PLUG) 7.26
M 20 8.00
M 20 (FOR
PILE 10%
EXT.) 8.80
M 25 9.00
M 25 (Bored
Pile) 9.90
M 30 9.50
M 35 10.00
M 40 10.50
M 45 11.00
`

Name of Work :- Construction of Ghaduli - Santalpur Road in Kutch & Patan District
Section :- Kunariya - Tagdibet - Dholavira Road Ch :115/950 to 147/048.
Ta : Bhuj, Dist : Bhuj-Kachchh

- R E C AP I T U L AT I O N S -

FOR
Variable Fixed
Items. Items.

BRIDGE PROPER

(A) General Items ------ - 264637.00

(B) Foundations ------ 106648587.00 7754862.00

(C) Substructure ------ 14772273.00 1804395.00

(D) Superstructure ------ - 34221336.00

(E) Fixed Items ------ - 4944135.00

Total Rs. 121420860.00 48989365.00

Total of (V) + (F) Rs. 170410225.00

Add 1% for quality control Rs. 1704102.00

Grand Total Rs. 172114327.00 /-

Say Rs. 172115000 /-


`

Name of Work :- Construction of Ghaduli - Santalpur Road in Kutch & Patan District
Section :- Kunariya - Tagdibet - Dholavira Road Ch :115/950 to 147/048.
Ta : Bhuj, Dist : Bhuj-Kachchh

RECAPITULATION

I) BRIDGE PROPER :
Section (A) General Items Rs. 264637 /-
Section (B) Foundations Rs. 114403449
Section (C) Substructure Rs. 16576668
Section (D) Superstructure Rs. 34221336
Section (E) Fixed Items Rs. 4944135
Total Rs. 170410225 /-

Add 1% for quality control Rs. 1704102 /-

(For bridge proper) Total Rs. 172114327 /-

II) APPROACHES Rs. 0 /-

GRAND TOTAL Rs. 172114327.00 /-

III) Survey and sub-soil inverstigation, hydrology and consultancy services


0.00
Total = 172114327
SAY Rs. 172115000 /-
`
`
E STI MATE

DIVISION
CIRCLE

DISTRICT

SANCTIONED ESTIMATE NO._____________ OF 200 /200

FUND HEAD :

MAJOR HEAD :

MINOR HEAD :

SERVICE HEAD :

DEPARTMENT HEAD :

Construction of Ghaduli - Santalpur Road in Kutch & Patan District Section :- Kunariya - Tagdibet -
Dholavira Road Ch :115/950 to 147/048. Ta : Bhuj, Dist : Bhuj-Kachchh

Estimate for (I) Bridge proper Rs. 172115000 /-


(II) Approachs Rs. 1281100
T O TAL Rs. 173396100 /-

Administratively approved under letter No. _____________


__________________ dated ______________________ Technical sanctioned under
letter No. ______________________________________________________________
dated _____________________

GENERAL DESCRRIPTION
As per separate report
Name of Work :-
Construction of Ghaduli - Santalpur Road in Kutch & Patan District Section :- Kunariya -
Tagdibet - Dholavira Road Ch :115/950 to 147/048. Ta : Bhuj, Dist : Bhuj-
Kachchh

Construction division :-
Circle :-

Estimate for (1) Bridge Proper

::: A B S T R A C T :::

Total Rates
Item Rate Unit 1%L.C. TotalAmount
in Rs.

Section (A) GENERAL ITEMS


Lumpsum.
(1) Clearing the site before commencement & after
completion of the works.

( P-19 / Item No. 106 )


Rs. 20000 Lumpsum. 200 20200 20200 /-

Lumpsum.
(2) Marking out the centre line of the bridge &
various other component structure & complete
lining out & leveling with the theodolites,
levels, including constructing and establishing
necessary bench marks etc. complete as
directed.

( P-19 / Item No. 107 )


Rs. 10000 Lumpsum. 100 10100 10100 /-

100 Sqmt
(3) Constructing temperory sheds for work
establishment and stores on the bridge site.
( P-151 / Item No. 108 )
Rs. 150 Sqmt 1.5 151.5 15150 /-

Lumpsum.
(4) Providing architectural treatment to the bridge as
per detailed drawing or as directed etc.
complete.

( P-19 / Item No. 109 )


Rs. 10000 Lumpsum. 100 10100 10100 /-

2.00 Rmt.
(5) Providing flood gauge marks on substructure as
per design including painting as per
specifications and as may be directed etc.
complete.

( P-350 / Item No. 27002 )


Rs. 100.49 /- Rmt. 1.0049 101.4949 202.99 /-
Total Rates
Item Rate Unit 1%L.C. TotalAmount
in Rs.

(6) 24 Nos.
Providing masonry steps with cement pointing on
approaches on both ends as directed.

( P-350 / Item No. 27003A )


Rs. 138.12 /- No. 1.3812 139.5012 3348.03 /-

(7) 157.00 Sq.mt.


Providing and laying filter media 600 mm thick as
directed at the back of abutments,returns as per
detailed specifications and codal requirements
etc. Complete.

( P-350/ Item No. 27004AA )


Rs. 741.74 /- Sq.mt. 7.4174 749.1574 117617.71 /-

(8) 288.00 Cu.mt.


Providing and filling sand behind abutments and
between side walls of box returns in layers as
directed.

( P-350 / Item No. 27005 )


Rs. 302.25 /- Cu.mt. 3.0225 305.2725 87918.5 /-

Total of (A) Rs. 264637.21 /-


Total Rates
Item Rate Unit 1%L.C. TotalAmount
in Rs.

V FOR F

Section (B) FOUNDATIONS

(09) 0.00 cu.mt. / 439.05 cu.mt.


0.00 cu.mt. / 214.72 cu.mt.
- cu.mt. / - cu.mt.
Excavation for foundation in sand, gravel, clay,
soft, soil and murrum etc. including shoring
strutting and dewatering as necessary and
disposing of the excavated stuff including plants
and equipments and directed and as per
specification.

( P-350 / Item No. 27007 )

FROM TO
a) 0.00 3.00 m. Rs. 306.21 /- cu.mt. 3.0621 309.2721 0 /- 135785.92 /-
b) 3.00 6.00 m. Rs. 358.9 /- cu.mt. 3.589 362.489 0 /- 77835.43 /-
c) 6.00 9.00 m. Rs. 396.29 /- cu.mt. 3.9629 400.2529 0 /- 0 /-

(11) 1 Nos. / 1 Nos.


Diversion of water course, providing cofferdam
and bund or island as may be necessary for
foundation and maintaining the same until
completion of foundation structure as may be
necessary.

( P-351 / Item No. 27011A1 )

wingwalls). - L.S. ----- -/- -/-


i) Pier Nos. 10000 /- 1 No L.S. 100 10100 10100 /- 10000 /-

(12) 129.50 cu.mt. / 14.50 cu.mt.


Providing & filling in foundation (levelling course)
with nominal cement concrete mix M15 including
formwork, vibrating,ramming & curing etc.
complete.

( P-2 / Item No. 12 ) RA-36

a ) For Piers 129.50 cu.mt.


b ) For Abutments 14.50 cu.mt.
Rs. 2783.0 /- cu.mt. 27.83 2810.8 364000 /- 40757 /-
(13) 0.00 cu.mt. / 45.50 cu.mt.
Providing & casting in situ design mix concrete
M30 mix for R.C.C. work in footing including
necessary shuttering,
laying,vibrating,ramming,finishing if necessary
and curing etc. complete.

( P-2 / Item No. 12 ) RA-37


Rs. 3696.5 /- cu.mt. 36.965 3733.44 0 /- 169872 /-

(14) 0.00 Ton / 4.10 Ton

Providing and placing in position deformed bar


reinforcement of grade Fe-415 D for following
items including cutting,bending,hooking,tying
etc. complete as per detailed drawings and
specifications. ( Fusion Bonded Epoxy Coating)

( P-6 / Item No. 38(D) ) RA-38


Rs. 55105 /- Ton 551.05 55656.05 0 /- 228190 /-

(15) 240.00 RM / 240.00 RM


Empty boring through all sorts of strata for
providing 1.20m. Diameter R.C.C. bored piles to
required depth including providing necessary
casing pipes with all plants and equipments
required etc.complete as per specifications.

( P-359/ Item No. 270039 )


Rs. 3327.46 /- RMT 33.275 3360.7346 806576.0 /- 806576 /-

(16) V FOR F
125.27 /-Tonne 6.42 /-Tonne
Providing and installing in position 6 mm thick MS
liner for initial length of cast in situ concrete
piles including cutting, bending, welding,
fabricating, driving, applying protective coating
etc. complete as per drawing and specification
excluding temporary liner if provided.

( P-353 / Item No. 27020A )


Rs. 44247.86 /- Tonne 442.48 44690.34 5598463 /- 287101 /-

(17) 5292.96 cu.mt. / 271.43 cu.mt.


Providing & laying design mix concrete M35 for
R.C.C.bored piles of 1.20 mt. in diameter
including ramming vibrating, curing and finishing
etc. complete.

( P-6 / Item No. 41 ) RA-39


Rs. 4402.00 /- cu.mt. 44.02 4446.02 23532585 /- 1206799 /-
(18) 767.48 Tonne / 54.29 Tonne
Providing and fixing in position steel bar
reinforcement of grade Fe - 415 D (TMT) for
R.C.C. bored piles as per detailed drawings
including cutting,bending,hooking tying welding
and including forming the cage and lowering it in
position etc. complete. ( Fusion Bonded Epoxy
Coating)

( P-6/ Item No. 43 ) RA-40


Rs. 55105 /- Tonne 551.05 55656.05 42714905 /- 3021567 /-

(19) 1.00 No. / 1.00 No.


Load testing of foundation piles including loading
with necessary kentledge or any other suitable
method as directed.
( P-360 / Item No. 27044 )

Rs. 39262.03 /- No 392.62 39654.65 39655 /- 39655 /-

(20) V FOR F
3114.77 cu.mt. / 160.00 cu.mt.
Providing & casting in situ design mix concrete
M30 for R.C.C. pile cap including, necessary
formwork, vibrating, curing etc. complete.

( P-7 / Item No. 45 ) RA-41


Rs. 4220.88 /- cu.mt. 42.209 4263.0888 13278558 /- 682094 /-

(21) 358.20 Tonne / 18.50 Tonne


Providing and fixing in position steel bar
reinforcement of grade Fe - 415 D (TMT) for
R.C.C. pile cap including
cutting,bending,hooking, tying etc. complete as
per detailed drawings and specifications.( Fusion
Bonded Epoxy Coating)

( P-7 / Item No. 47 ) RA-42

Rs. 56121.49 /- Tonne 561.21 56682.70 20303745 /- 1048630 /-

Total of (B) Rs. 106648587 /- 7754862 /-

Total of (V+F) = Rs. 114403449 /- /-


Total Rates
Item Rate Unit 1%L.C. TotalAmount
in Rs.

V FOR F

Section (C) SUBSTRUCTURE

(22) 1364.00 cu.mt./ 138.00 cu.mt.


0.00 cu.mt./ 15.00 cu.mt.
0.00 cu.mt./ 0.00 cu.mt.
Providing & casting in situ Design mix concrete
M30 for R.C.C. work in piers,abutments and
R.C.C. returns with minimum lift of 4.0 mt. as per
drawing including centering shuttering,
Scaffolding where necessary laying, vibrating
curing finishing etc. complete.

( P-9/ Item No. 64) RA-43

a)Height from 0.0 to 5.00 mt. 3923 /- cu.mt. 39.23 3962.23 5404482 546788 /-
a)Height from 5.0 to 10.00 mt. 4141 /- cu.mt. 41.41 4182.41 0 62736 /-
a)Height from 10.0 to 15.00 mt. 4685 /- cu.mt. 46.85 4731.85 0 0 /-

8.00 cu.mt./ 15.00 cu.mt.


(23) Providing and casting in situ design mix concrete
M.30 mix for RCC work in pier cap,abutment
cap,dirt wall including M-35 bed blocks or
pedestals of required size below bearings as per
detailed drawing, shuttering, scaffolding
wherever necessary, laying, vibrating curing and
finishing etc.complete.

( P-10/ Item No. 66B) RA-44

Rs. 3660 /- cu.mt. 36.6 3696.6 29573 /- 55449 /-


164.30 Tonne / 20.00 Tonne
(24)
Providing and placing in position steel bar
reinforcement of grade Fe - 415 D(TMT) for
following items including
cutting,bending,hooking,tying etc. complete as
per detailed drawings and specifications for the
following.( Fusion Bonded Epoxy Coating)

( P-11/ Item No. 69) RA-45


V. F.
(a) For pier arrester - T -
pedestal

(b) For pier 164.21 T -

(c) For Abutment


pedestal,Dirtwal - 20.18 T
arrester
Total 164.21 T 20.18 T
Say 164.30 T 20.00 T
Rs. 56121.49 /- Tonne 561.21 56,682.70 9312968 /- 1133654 /-
Total Rates
Item Rate Unit 1%L.C. TotalAmount
in Rs.

V FOR F

- lump -
(25) Providing & fixing in positiontar paper bearings as
per detailed design and drawings and
specifications etc. complete

Rs. 25000.00 /- cu.cm. 250 25250 25250 /- 0 /-

110.00 Nos.
(26) Providing weep holes in abutments,returns using
10 cm dia. A.C. pipe & C.I. grouting including
cutting, fixing the pipe in required slope position
as directed etc. complete

( P-361/ Item No. 50 A )

Rs. 51.92 /- Nos. 0.5192 52.4392 /- 5768 /-

Total of (C) Rs. 14772273 /- 1804395 /-

Total of (V+F) = Rs. 16576668 /-


Total Rates
Item Rate Unit 1%L.C. TotalAmount
in Rs.

V FOR F

Section (D) SUPERSTRUCTURE

(27) - /- cu.mt. 3820.00 /- cu.mt.


Providing and casting in situ controlled cement M
30 for R.C.C. work in superstructure including
centering shuttering scaffolding, ramming,
vibrating curing and finishing complete.
( P-13/ Item No. 77A) RA-46
For T-beam and slab type superstructure
Rs. 3760 /- cu.mt. 37.6 3797.6 14506832 /-

(28) - Tonne 324.70 Tonne


Providing and fixing in position steel bar
reinforcement of steel grade FE 415 D (TMT)
including cutting ,bending, hooking, tying,
welding etc, complete as per detailed drawing
and specification ( Fusion Bonded Epoxy
Coating)
( P-13 / Item No. 79 B) RA-47
Rs. 59857.32 /- Tonne 598.57 60455.8932 19630029 /-

(29) - Rmt. / 25.20 Rmt.


Providing and laying of a strip seal expansion joint
complete as per drawing and standard
specifications to be installed by the
manufacturer/supplier or their authorised
reoresentative ensuring compliance to the
manufacturer's instructions for installation.

Item no 14.22 page no 79 (S.O.R N.H Division)

Rs. 3319 /- Rmt. 33.19 3352.19 84475 /-

Total of (D) Rs. 34221336 /-


Total Rates
Item Rate Unit 1%L.C. TotalAmount
in Rs.

V FOR F

Section (E) FIXED ITEMS

(30) 432.00 cu.mt.


Providing and casting in situ. Design mix concrete
M30 for average 75 mm thick RCC wearing coat
laid as directed includind temping, vibrating,
finishing, curing and filling in joints with bitumen
etc. complete.

( P-16/ Item No. 91(B)) RA-48


Rs. 4155 /- cu.mt. 41.55 4196.55 1812910 /-

(31) 5.46 cu.mt.


Providing and casting in situ design mix concrete
M30 for RCC kerb including formwork
curing,finishing etc. complete.

( P-17/ Item No. 93(B)) RA-49


Rs. 3857.00 /- cu.mt. 38.57 3895.57 21277 /-

(32) 1700.00 Rmt.


Providing parapet of ordinary cement concrete
M-200 as per detailed drawings with necessary
reainforcement including, shuttering, laying
vibrating and finishing to line and level complete.
(ii) Cast in situ.

(S.O.R It. No. 27096A1, Pg. No. 379)


Rs. 732.97 /- Rmt. 7.3297 740.2997 1258509 /-
(33) 80 Nos.
Providing G.I. 100mm dia water spouts including
necessary iron gratings as per drawings.

( P-380 / Item No. 27098 )

Rs. 597.96 /- Nos. 5.9796 603.9396 48315 /-

2 Nos.
(34) Providing and fixing marble slab including
engraving letters, number painting etc.
complete.
( 75 cm x 60 cm x 4 cm )
( P-381/ Item No. 270101 (A) )
Rs. 946 /- Nos. 9.46 955.46 1911 /-

(35) 21.00 cu.mt.


Providing and casting in situ design mix concrete
M30 for RCC approach slab including form work,
curing, finishing etc. complete.

(Item No.103(B),Pg.19) RA-50


Rs. 4035 /- cu.mt. 40.35 4075.35 85582 /-
Total Rates
Item Rate Unit 1%L.C. TotalAmount
in Rs.

V FOR F
(36) 28.07 Tonne
Providing and fixing in position steel bar
reinforcement of bar grade Fe - 415 D(TMT)
including cutting, bending, hooking, tying etc.
complete as per detailed drawings.( Fusion
Bonded Epoxy Coating)

(Item No.105,Pg.19) RA-51


(1) For R.C.C. wearing coat 25.92 Tonne
(2) For R.C.C. kerb 0.55 Tonne
(3) For R.C.C. approach slab 1.60 Tonne
Total 28.066 Tonne
Rs. 60522.83 /- Tonne 605.23 61128.06 1715631 /-

Total of (E) Rs. 4944135 /-


Name of Work:-
Construction of Ghaduli - Santalpur Road in Kutch & Patan District Section :-
Kunariya - Tagdibet - Dholavira Road Ch :115/950 to 147/048. Ta :
Bhuj, Dist : Bhuj-Kachchh

--:: MEASUREMENTS ::--

(A) GENERAL ITEMS

Item No.

(1) Clearing the site before commencement and after completion of


the work.

- lump -

(2) Marking out centre line of the bridge and various other component
structure and complete lining out and levelling with theodolites,
levels including pillers for lines and levels and establishing
necessary bench marks etc complete as directed.

- lump -

(3) Constructing temperory sheds for work establishment and stores


on the bridge site.

100 SQmt

(4) Providing architectural treatment to the bridge as per detailed drawing


or as directed etc. complete.

- lump -

(5) Providing flood gauge marks on foundation/substructure as per design


including painting as per specifications and as may be directed
etc. complete.

Top R.L.of piercap = 98.4 mt.

Av. G.L. of Pier = 97.20 mt.

Height = 98.4 - 97.20 = 1.20 mt.

Total Qty. = 1.20 x 1 = 1.20 mt.

Say 2.00 mt.

(6) Providing masonry steps with cement pointing on approaches on both


ends as directed.

Road R.L. = 99.425 mt.

Av. G.L. of abutments = 97.00 mt.

Height = 99.425 - 97.00 = 2.43 mt.

No. of steps 2.43 + 1


=( ) x2
0.225

= 12 x 2
= 24 Nos.
Say 24 Nos.
(7) Providing and laying filter media 600 mm thick as directed at the back of
abutments,returns as per detailed specifications and codal requirements
etc. Complete.

Behind Abutment A/L and A/R


Length = 7.20 + 2.00 + 2
= 11.20 Mt. wc+aproch slab

Height = ( 99.425 - 93.80 )- 0.375 = 5.3 Mt.

Qty = 2 x 11.20 x 5.25 = 117.60 Sq.mt. ......(i)

Behind U type Returns Left & Right WC

Height =( 99.425 - 93.8 )- 0.075 = 5.55 mt


Length = 3 mt

Qty = 3 x 6.5 x 2= 39.00 Sq.mt.

Total Qty = 117.60 + 39.00 = 156.60 Sq.mt.

Say 157.00 Sq.mt.

(8) Providing and filling sand behind abutments and between side walls of
box returns in layers as directed.
(a) Behind Abutment A/L and AR

Height = ( 99.425 - 93.80 )- 0.375 = 5.25 Mt.

Width = 1.40 Mt.


Length = 8.40 - 1.20 - 1.2 = 6.00 Mt.

Volume = ( 5.25 x 1.40 x 6.00 ) x2

= 88.20 Cu.mt. (a)

(b) Behind U Type Returns Left & Right

Height =( 99.425 - 93.80 )- 0.075 = 5.55 Mt.


Avg Width = (6.6+5.4)/2 = 6.00 Mt.
Length = 3.00 = 3.00 Mt.
Volume = ( 5.55 x 6.00 x 3.00 ) x2
= 199.80 Cu.mt. (b)

Total Qty = 88.20 + 199.80 = 288.00 Cu.mt.


Say 289.00 Cu.mt.
( B ) FOUNDATION

Item No.

(09) Excavation for foundation in sand,gravel clay,soft soils and murrum


etc. including shoring,strutting and dewatering as necessary and
disposing off the excavated stuff including plants and equipments
as directed and as per specifications.

(a) Abutment Left :-


G.L.= 96.635 mt. Pile cap bottom = 92.00 mt.
Depth of Excavation = 96.64 - 92.00 + 0.075
= 4.71 mt.
Consider,
Depth of Excavation in soft soil = 96.64 - 91.93 = 4.7

Width of excavtion= 5.10 + 0.00 = 5.10 mt.


Length of excavation= 8.70 + 0.00 = 8.70 mt.

(1) Qty. for 0.0 mt. to 3.0 mt. ht.

Qty. = 8.70 x 5.10 x 3.00


= 133.11 Cu.mt.
(2) Qty. for 3.0 mt. to 6.0 mt. ht.

Qty. = 8.70 x 5.10 x 1.710


= 75.87 Cu.mt.

(b) Abutment Right :-


G.L.= 96.30 mt. Pile cap bottom = 92.00 mt.
Depth of Excavation = 96.30 - 92.00 + 0.075
= 4.38 mt.
Consider,
Depth of Excavation in soft soil = 96.30 - 91.93 = 4.375

Width of excavtion= 5.30 + 0.00 = 5.30 mt.


Length of excavation= 8.90 + 0.00 = 8.90 mt.

(1) Qty. for 0.0 mt. to 3.0 mt. ht.

Qty. = 8.90 x 5.30 x 3.00


= 141.51 Cu.mt.
(2) Qty. for 3.0 mt. to 6.0 mt. ht.

Qty. = 8.90 x 5.30 x 1.375


= 64.86 Cu.mt.

\Qty of excavation for abutments for 0 to 3.00 mt. depth


= 133.11 + 141.51
= 274.62 Cu.mt. ..(F1)

Qty of excavation for abutments for 3.00 to 6.00 mt. depth


= 75.87 + 64.86
= 140.73 Cu.mt. ..(F2)
(b) U type return :-

Left & Right return

Total depth of excavation = Avg. G.L. of Return - Bottom R.L. of Foundation


= 96.2 - 92.00 + 0.15
= 4.35 mt
.
Length of excavation = 3 + 0.15 = 3.15 mt
Width of excavation = 8.4 + 0.3 = 8.70 mt

(1) Qty. for 0.0 mt. to 3.0 mt. ht.

Qty. = 3.15 x 8.70 x 3.00 x 2


= 164.43 Cu.mt.

(2) Qty. for 3.0 mt. to 6.0 mt. ht.

Qty. = 3.15 x 8.70 x 1.35 x 2


= 73.99 Cu.mt.

\Qty of excavation for Box Returns for 0 to 3.00 mt. depth


= 164.43
= 164.43 Cu.mt. ..(F1)

\Qty of excavation for abutments for 3.00 to 6.00 mt. depth


= 73.99
= 73.99 Cu.mt. ..(F2)
Total excavation for Abutment and Box returens

0 mt to 3 mt = 274.62 + 164.43 = 439.1


Say = 439.1 Cu.mt. (F1)

3 mt to 6 mt = 140.73 + 73.99 = 214.72


Say = 214.72 Cu.mt. ..(F2)
(c) For Piers:-

For Pier P1-P39

AVG G.L.= 94.100 mt. pile cap bottom = 92.00 mt.


Depth of Excavation = 94.10 - 92.00 + 0.075
= 2.175 mt.

Consider,
Depth of Excavation in soft soil = 94.10 - 91.93 = 2.175

Width of excavtion= 5.10 + 0.00 = 5.10 mt.


Length of excavation= 8.70 + 0.00 = 8.70 mt.

Qty. for 0.0 mt. to 3.0 mt. ht.

Qty. = 8.70 x 5.10 x 2.175 x 39


= 3763.69 Cu.mt. ..(V1)

Total Qty. for 0.0 mt. to 3.0 mt. depth = 3763.69


= 3763.69 Cu.mt. .....(V)

(11) Diversion of water course providing cofferdam and and bund or island as
may be necessary for foundation and maintaining the same until
completion of foundation structure as may be necessary

(A) For piers

1 Nos.

(B) For abutments

1 Nos.
(12) Providing & filling in foundation (levelling course) with nominal cement
concrete mix using slag cement M-15 including formwork,vibrating,ramming & curing etc.
complete.

(a) Below Abutments pile cap A/L & A/R

Qty. = 5.10 x 8.70 x 0.075 x 2.00


= 6.66 Cu.mt.

(b) Below U type return Left & Right

Qty. = 8.40 x 3.00 x 0.150 x 1.00 x 2.00


= 7.56 Cu.mt.

Total for Abutment and box return = 6.66 + 7.56


= 14.22
Say 14.50 Cu.mt. ..(F)

(d) for pier

For Pier P1-P39 (Pile Foundation)

Qty. =( 5.10 x 8.70 x 0.075 ) x 39

Total qnty = 129.78 Cu.mt.

Say 129.50 Cu.mt. ..(V)

(13) Providing & casting in situ design mix concrete using slag cement M30 mix for R.C.C.
work in footing including necessary shuttering, laying,vibrating,ramming,finishing if
necessary and curing etc. complete.

For U type return Left & Right

Width of footing = 8.4 mt


Length of footing = 3 mt
Thickness of footing = 0.9 mt

qnty = 8.40 x 3 x 0.9 x 2


= 45.36 Cu.mt Cu.mt. ..(F1)

Say = 45.50 Cu.mt. ..(F)


(14) Providing and placing in position deformed bar reinforcement of grade Fe-415D for
following items including cutting,bending,hooking,tying etc. complete as per detailed
drawings and specifications. ( Fusion Bonded Epoxy Coating)

(A) For U type return

(b) For Box return footing A/R @ 105 Kg / cu.mt.

\Qty. of steel = 45.50 x 105


1000
= 4.78 T

Say 4.10 T .....(F)

(15) Empty boring through all sorts of strata for providing 1.20m. Diameter R.C.C. bored
piles to required depth including providing necessary casing pipes with all plants and
equipments required etc.complete as per specifications.

(a) For abutment

For abutment A/L & A/R

Cut of Level of Pile = 92.00

FRL of pile = 72.00

Hence Length of pile = 20.00 mt.

Number of pile = 6 x 2 = 12 Nos

Total length of pile = 20.00 x 12 = 240 mt .(F1)

Total Qty for Abutment = = 240.0


say 240.0 mt .(F)

(b) For Pier

Pier P1,P2
Cut of Level of Pile = 92.00
FRL = 72.00
Hence Length of pile = 20.00

Number of pile = 6 x 2 = 12 Nos

Total length of pile = 20.00 x 12 = 240 mt .(V1)

Total Qty for Pier = 240 mt


say 240.0 mt ....(V)
(16) Providing and installing in position 6 mm thick MS liner for initial length of cast in situ
concrete piles including cutting, bending, welding, fabricating, driving, applying
protective coating etc. complete as per drawing and specification excluding temporary
liner if provided.

(a) For abutment

abutment A/L & A/R

Cut of Level of Pile = 92.00

SRL of abut = 89.00

Weight per mt length = 3.14 /4 x (1.212^2 - 1.2^2) x 7850


178.45 kg/mt

Hence Length of pile = 3.00 mt.


Number of pile = 6 x 2 = 12 Nos

Total length of pile = 3.00 x 12 = 36 mt

Hence weight of liner = 178.45 x 36 = 6424.22 kg


= 6.4242 T
Total for abutment = = 6.42422

say 6.4 T .(F)

(b) For pier

For pier P1-P39


Cut of Level of Pile = 92.00

SRL of pier = 89.00

Weight per mt length = 3.14 /4 x (1.212^2 - 1.2^2) x 7850


178.45 kg/mt

Hence Length of pile = 3.00 mt.


Number of pile = 6 x 39 = 234 Nos

Total length of pile = 3.00 x 234 = 702 mt

Hence weight of liner = 178.45 x 702 = 125272.34 kg


= 125.272 T

Total for piers = 125.2723 T


say 125.27 T .(V)
(17) Providing & laying design mix concrete using slag cement M35 for R.C.C.bored piles of
1.20 mt. in diameter including ramming vibrating, curing and finishing etc. complete.

(a) For abutment

For abutment A/L & A/R

Cut of Level of Pile = 92.00

FRL of pile = 72.00

Hence Length of pile = 20.00 mt.

Number of pile = 6 x 2 = 12 Nos

Total length of pile = 20.00 x 12 = 240 mt

Area of pile = 3.14 / 4 x 1.2 x 1.2 = 1.13 mt2

Qty of pile = 1.13 x 240.00


= 271.43 mt3

Total qnty of pile for abutment = = 271.43 mt3


say = 271.43 mt3(F)
(b) For Pier

Pier P1 -P39

Cut of Level of Pile = 92.00

FRL of Pile = 72.00


Hence Length of pile = 20.00

Number of pile = 6 x 39 = 234 Nos

Total length of pile = 20.00 x 234 = 4680 mt

Area of pile = 3.14 / 4 x 1.2 x 1.2 = 1.13 Sq mt

Qty of pile = 1.13 x 4680.00


= 5292.96 Cmt
Total qnty of pile for Pier = = 5292.96 mt3
say = 5292.96 mt3(V)
(18) Providing and fixing in position steel bar reinforcement of grade Fe - 415D(TMT) for
R.C.C. bored piles as per detailed drawings including cutting,bending,hooking tying
welding and including forming the cage and lowering it in position etc. complete.
( Fusion Bonded Epoxy Coating)

(a) For abutment A/L & A/R 200 Kg / cu.mt.

\Qty. of steel = 271.43 x 200


1000
= 54.29 T .(F)

(b) For Pier 145 Kg / cu.mt.


\Qty. of steel = 5292.96 x 145
1000
= 767.48 T .(V)

(19) Load testing of foundation piles including loading with necessary kentledge or any
other suitable method as directed.
(a) For abutment A/L & A/R 1 No .(F)
(b) For Pier 1 No .(V)

(20) Providing & casting in situ design mix concrete M30 for R.C.C. pile cap including,
necessary formwork, vibrating, curing etc. complete.

(a) For abutment A/L & A/R

Length of pile cap = 8.7 mt


width of pile cap = 5.1 mt
height of pile cap = 1.8 mt

quantity of concrete = 8.7 x 5.1 x 1.8 x 2


= 159.732
Say 160 mt3 .(F)

(b) For Pier P1-P39


Length of pile cap = 8.7 mt
width of pile cap = 5.1 mt
height of pile cap = 1.8 mt

quantity of concrete = 8.7 x 5.1 x 1.8 x 39


= 3114.77 mt 3
.(V)
(21) Providing and fixing in position steel bar reinforcement of grade Fe - 415 D (TMT) for
R.C.C. pile cap including cutting,bending,hooking, tying etc. complete as per
detailed drawings and specifications.( Fusion Bonded Epoxy Coating)

(a) For abutment A/L & A/R 115 Kg / cu.mt.

\Qty. of steel = 159.73 x 115


1000
= 18.37 T
Say 18.50 T .(F)
(b) For Pier 115 Kg / cu.mt.

\Qty. of steel = 3114.77 x 115


1000
= 358.20 T
Say 358.20 T .(V)
( C ) SUBSTRUCTURE

Item No.

(22) Providing & casting in situ Design mix concrete using slag cement M30 for R.C.C.
work in piers,abutments and R.C.C. returns with minimum lift of 4.0 mt. as per
drawing including centering shuttering, Scaffolding where necessary laying,
vibrating curing finishing etc. complete.

(A) For piers


For Pier P1-P39

Height = 97.8 - 94.00 = 3.800

Area of Pier
7.5 x 1.10 +p /4 x 1.1 2
A = 9.20 m2

\Quantity of concrete for 0.0 mt. to 5.0 mt. height


= 3.800 x 9.20 x 39
= 1363.42 cu.mt. ..(V1)

Total Qnty for 0 to 5 mt = = 1363.4


say 1364.00 cu.mt. ..(V)

(B) For Abutment A/L

Height = 97.8 - 94.50 = 3.300


Area of abutment
1.1 x 8.40
A = 9.24 m2

\Quantity of concrete for 0.0 mt. to 5.0 mt. height


= 3.300 x 9.24 x 1
= 30.49 cu.mt. ..(F1)
For return wall
Height = 99.425 - 93.30 = 6.125

Area of Return wall


0.9 x 2.00
A = 1.80 m2

\Quantity of concrete for 0.0 mt. to 5.0 mt. height


= 5.000 x 1.80 x 2 x 1
= 18.00 cu.mt. ..(F1)

\Quantity of concrete for 5.0 mt. to 10.0 mt. height


= 1.125 x 1.80 x 2 x 1
= 4.05 cu.mt. ..(F2)
(C) For Abutment A/R

Height = 97.80 - 94.00 = 3.800

Area of abutment
1.1 x 8.40
A = 9.24 m2

\Quantity of concrete for 0.0 mt. to 5.0 mt. height


= 3.800 x 9.24 x 1
= 35.11 cu.mt. ..(F1)

For return wall


Height = 99.425 - 93.30 = 6.125

Area of Return wall


0.9 x 2.00
A = 1.80 m2

\Quantity of concrete for 0.0 mt. to 5.0 mt. height


= 5.000 x 1.80 x 2 x 1
= 18.00 cu.mt. ..(F1)

\Quantity of concrete for 5.0 mt. to 10.0 mt. height


= 1.125 x 1.80 x 2 x 1
= 4.05 cu.mt. ..(F2)

(D) For U type Return Left and Right


Side Walls
Length = 3 mt
Height = 99.425 - 93.55 = 5.875 mt
Thickness = (0.3+0.9) /2 = 0.60 mt

\Quantity of concrete for 0.0 mt. to 5.0 mt. height


= 5.000 x 3.00 x 0.60 x 2 x 2
= 36.00 cu.mt. ..(F1)

\Quantity of concrete for 5.0 mt. to 10.0 mt. height


= 0.875 x 3.00 x 0.60 x 2 x 2
= 6.30 cu.mt. ..(F2)
Total qnty for abutments and return walls and U Type rturns

\Quantity of concrete for 0.0 mt. to 5.0 mt. height

= 65.60 + 36.00 + 36.00


= 137.60 cu.mt.
Say 138 cu.mt. ..(F / F1)

\Quantity of concrete for 5.0 mt. to 10 mt. height

= 8.10 + 6.30
= 14.40 cu.mt.
Say 15 cu.mt. ..(F / F2)
(23) Providing and casting in situ design mix concrete using slag cement M.30 mix for RCC
work in pier cap,abutment cap,dirt wall including M.35 bed blocks or pedestals of
required size below bearings as per detailed drawing, shuttering, scaffolding
wherever necessary,laying,vibrating curing and finishing etc.complete.

(A) Quantity of concrete for abutment A/L and A/R

(ii) Volume of abut cap


Abut cap size = 1.25 x 8.4 x 0.6

Qty of abut cap cap = 2 x 6.3


= 12.60 cu.mt.

(iii) For dirt wall

height of wall = 99.425 - 98.70 - 0.375 = 0.35 mt


Length of wall = 8.40
Width of wall = 0.39

Qty of dirt wall = 2 x 1 x 0.35 x 8.40 x 0.390


= 2.29 cu.mt.

Total Qty. of concrete for abutment = 12.60 + 2.29


= 14.89 Cu. Mt.

Say 15.00 Cu.mt. ..(F)

(A) Quantity of concrete for pier

(ii) Volume of pier cap


pier cap size = 1.4 x 9 x 0.30 +
( 8.7 + 9 ) /2 x 0.30 x (1.4+1.1)/2

Qty of pier cap = 1 x( 3.78 + 3.3188 )


for one pier
= 7.10 cu.mt.
Total Qty. of concrete for pier

Say 8.00 Cu.mt. ..(V)

(24) Providing and placing in position TMT bar reinforcement of grade Fe - 415 D including
cutting,bending,hooking,tying etc.complete as per detailed drawing & specification
for the following( Fusion Bonded Epoxy Coating)

(a) For abutment A/L and A/R Steel @ 150 Kg / cu.mt. of concrete
\Qty. of steel = ( 65.60 ) x 150
1000
= 9.84 T .....(F1)

(B) For abutment Cap and Dirt wall Steel @ 85 Kg / cu.mt. of concrete
\Qty. of steel = ( 12.60 + 2.29 ) x 85
1000
= 1.27 T .....(F2)
(C) For Return wall and U return Steel @ 105 Kg / cu.mt. of concrete

\Qty. of steel = ( 44.10 + 42.3 ) x 105 )


1000
= 9.07 T .....(F3)

Total F1toF3= 9.84 + 1.27 + 9.07 = 20.18

Say 20.00 T .....(F)

(D) For pier

(i) For pier Steel @ 120 Kg / cu.mt. of concrete


\Qty. of steel = ( 1363.4 )x 120
1000
= 163.61 T .....(V1)

(ii) For pier cap Steel @ 85 Kg / cu.mt. of concrete


\Qty. of steel = 7.10 x 85
1000
= 0.60 T .....(V2)

Total V1 + V2 = 163.61 + 0.60 = 164.21 T

Say 164.30 T .....(V)

(25) Providing & fixing in positiontar paper bearings as per detailed design and drawings
and specifications etc. complete

- lump -

(26) Providing weep holes in abutments,returns using 10 cm dia. A.C. pipe & C.I. grouting
including cutting, fixing the pipe in required slope position as directed etc. complete

Area of filter = 157.00 m2


157.00
No. of weepholes = = 109.03
1.44
Say 110.00 Nos. ..(F)
( D ) SUPERSTRUCTURE

Item No.

(27) Providing and casting in situ controlled cement using slag cement M 30 for
R.C.C. work in superstructure including centering shuttering scaffolding,
ramming,vibrating curing and finishing complete.

(A)12 mt Solid slab type of superstructure.


quantity of concrete per span = 95.50 Cmt. (Ref. G.O.G Std)

quantity of concrete for 40 nos. of span

= 40 x 95.50
= 3820 Cmt.
Say 3820.00 cu.mt.

(28) Providing and fixing in position steel bar reinforcement of steel grade
FE-415 D (TMT) including cutting ,bending, hooking, tying, welding etc,

complete as per detailed drawing and specification( Fusion Bonded Epoxy Coating)
(A) 12 mt solid slab slab type of superstructure.

R.C. Solid slab and foot path


Qty. of steel = 85.000 Kg/ Cmt

\ Total qty. for 40 span


= 85.000 x 3820

= 324700 Kgs

Say 324.70 T

(29) Providing and laying of a stripseal expansion joint catering to maximum


horizontal movement up to 70 mm complete as per drawing and
standard specifications to be installed by the manufacturer\ suppliers or
their authorised reoresentative ensuring complience to the manufacture's
instruction for installation.
Qty = 8.4 x 3
= 25.20 Rmt.

Say 25.20 Rmt.


( E ) FIXED ITEMS

Item No.

(30) Providing and casting in situ. Design mix concrete using slag cement M30 for
average 75 mm thick RCC wearing coat laid as directed includind temping,
vibrating,finishing, curing and filling in joints with bitumen etc. complete.

40 spans of 12.00 mt. c/c each

Clear road width= 12.00 mt.

Qty =( 40 x 12.00 ) x 12.00 x 0.075

= 480.00 x 12.00 x 0.075


= 432.00 cu.mt.

Say 432.00 cu.mt.

(31) Providing and casting in situ controlled cement concrete using slag cement
M30 for kerb / kerb blocks including formwork curing,finishing etc. complete.

Section of kerb on return portion

Qty for 12 mt span = 3.04 Cmt (Ref. G.O.G Std)

Length = 2 x [2x(3.0+2+0.39)] = 21.56 mt


\ Total Qty. of kerb for bridge

Qty. = ( 62 / 12 ) x 3.04 = 5.46 cu.mt.


= 5.46 cu.mt.

Say 5.46 cu.mt.

(32) Providing parapet of ordinary cement concrete M-200 as per detailed drawings with
necessary reainforcement including, shuttering, laying vibrating and finishing to line and
level complete.(ii) Cast in situ.

At Ch:134/825 to 135/675
2 x 850 = 1700 Rmt

Total = 1700 Rmt

(33) Providing galvanised 100mm dia water spouts including necessary iron
gratings as per drawings including fixing etc. complete.

40 nos. / span @ 12 mt. C/C

\ Total for 2 span


= 40 x 2
= 80 Nos.
Say 80 Nos.
(34) Providing and fixing marble slab including engraving letters, number
painting etc. complete.

Size = 75 x 60 x 4
cm cm cm

Total = 2 Nos.

(35) Providing and casting in situ design mix concrete using slag cement M30 for
RCC approach slab including form work, curing, finishing etc. complete.

Qty = 8.40 x 3.50 x 0.35 x 2


= 20.58 cu.mt.

Say 21.00 cu.mt.

(36) Providing and fixing in position TMT reinforcement bars of grade Fe - 415 D
including cutting, bending, hooking, tying etc. complete as per detailed
drawings.( Fusion Bonded Epoxy Coating)

(1) For R.C.C. wearing coat

steel @ 60 Kg / cu.mt.

\ Qty of steel= 432.00 x 60


1000

= 25.92 T
Say 25.92 T

(2) For R.C.C. kerb

steel @ 100 Kg / cu.mt.

\ Qty of steel= 5.46 x 100


1000

= 0.55 T

Say 0.55 T

(3) For R.C.C. approach slab

steel @ 75 Kg / cu.mt.

\ Qty of steel= 21.00 x 75


1000

= 1.58 T

Say 1.60 T

\ Total = 25.92 + 0.55 + 1.60 = 28.07 T


Construction of Ghaduli - Santalpur Road in Kutch & Patan District Section :-
Kunariya - Tagdibet - Dholavira Road Ch :115/950 to 147/048. Ta :
Bhuj, Dist : Bhuj-Kachchh
RATE ANALYSIS

R.A NO 36 Item no 12

Providing and filling in foundation with nominal mix concrete M.15mix and providing
necessary vertical pin headers including formwork,laying,vibrating, ramming, finishing if
necessary and curing etc.complete as per specifications.

Basic Rate of M 10 (Item no 12A / p 352) 2089.98 CUM

Difference of cement bag 6.6 - 4.4 2.20 bag

Basic cost of Slag cement bag 315.00 per bag

Total Rs 2089.98 + 315.00 * 2.20 2782.98


say Rs 2782.98 /cum

R.A NO 37 Item no 13

Providing and filling in foundation concrete mix M.30 and providing necessary vertical pin
headers including formwork,laying,vibrating, ramming, finishing if necessary and curing
etc.complete as per specifications.

Basic Rate of M 10 (Item no 12A / p 352) 2089.98 CUM

Difference of cement bag 9.5 - 4.4 5.10 bag

Basic cost of slag cement bag 315.00 per bag

Total Rs 2089.98 + 315.00 * 5.10 3696.48


say Rs 3696.48 /cum

R.A NO 38 Item no 14

Providing and placing in position deformed bar reinforcements of grade Fe 500 D (TMT) for
following items including cutting, bending, hooking, tying, etc. complete

Basic Rate of Item No.27107,Pg.382 43992 Ton

Basic Rate for FE 415 steel Bars per Ton 36000

Basic Rate for TMT Bars ( FE-500 D ) per Ton 36750

Diffrence 36750 - 36000 = 750


Total Rs 43992.00 + 0.00 43992.0
Epoxy Coating = 11113.0
say Rs 55105.0 /ton
R.A NO 39 Item no 17

Providing & laying design mix concrete M35 for R.C.C.bored piles of 1.20 mt. in diameter
including ramming vibrating, curing and finishing etc. complete.

Basic Rate of M 25 (Item no 27041 / p 359)


4055.82 CUM

Difference of cement bag 11 - 9.9 1.10 bag

Basic cost of slag cement bag 315.00 per bag

Total Rs 4055.82 + 315.00 * 1.10 4402.32


say Rs 4402.00 /cum

R.A NO 40 Item no 18

Providing and fixing in position steel bar reinforcement of grade Fe - 500 D (TMT) for R.C.C.
bored piles as per detailed drawings including cutting,bending,hooking tying welding and
including forming the cage and lowering it in position etc. complete.

Basic Rate of Item No.43,Pg.124 43992 Ton

Basic Rate for Fe 415 steel Bars per Ton 36000

Basic Rate for TMT Bars ( FE-500 D ) per Ton 36750

Diffrence 36750 - 36000 = 750

Total Rs 43992.00 + 0.00 43992.0


Epoxy Coating = 11113.0
say Rs 55105.0 /ton

R.A NO 41 Item no 20

Providing & casting in situ design mix concrete M30 for R.C.C. pile cap including, necessary
formwork, vibrating, curing etc. complete.

Basic Rate of M 20 (Item no 45 / p 360)


3748.38 CUM

Difference of cement bag 9.5 - 8 1.50 bag

Basic cost of slag cement bag 315.00 per bag

Total Rs 3748.38 + 315.00 * 1.50 4220.88


say Rs 4220.88 /cum
R.A NO 42 Item no 21

Providing and fixing in position steel bar reinforcement of grade Fe - 500 D (TMT) for R.C.C.
pile cap per detailed drawings including cutting,bending,hooking, tying welding etc.
complete.

Basic Rate of Item No.27107,Pg.382 45008 Ton

Basic Rate for Fe 415 steel Bars per Ton 36000

Basic Rate for TMT Bars ( FE-500 D ) per Ton 36750

Diffrence 36750 - 36000 = 750

Total Rs 45008.49 + 0.00 45008.5


Epoxy Coating = 11113.0
say Rs 56121.5 /ton

R.A NO 43 Item no 22

Providing and casting in situ design mix concrete M.30 mix for RCC work in pier,abutment and
returns as per detailed drawing, shuttering, scaffolding wherever necessary,laying,vibrating
curing and finishing etc.complete. (A) ( For 0.00 to 5.00 Mt. depth)

Basic Rate of M 20 (Item No.64AA,Pg.365) 3451.30 CUM

Difference of cement bag 9.50 - 8.00 1.50 bag

Basic cost of slag cement bag 315.00 per bag

Total Rs 3451.30 + 315.00 * 1.50 3923.80


say Rs 3923 /cum

Providing and casting in situ design mix concrete M.30 mix for RCC work in pier,abutment and
returns as per detailed drawing, shuttering, scaffolding wherever necessary,laying,vibrating
curing and finishing etc.complete. (B) (For 5.00 to 10.00 Mt. depth)

Basic Rate of M 20 (Item No.64 (BA),Pg.365) 3669.40 CUM

Difference of cement bag 9.50 - 8.00 1.50 bag

Basic cost of slag cement bag 315.00 per bag

Total Rs 3669.40 + 315.00 * 1.50 4141.90


say Rs 4141 /cum

Providing and casting in situ design mix concrete M.30 mix for RCC work in pier,abutment and
returns as per detailed drawing, shuttering, scaffolding wherever necessary,laying,vibrating
curing and finishing etc.complete. (C) (For 10.00 to 15.00 Mt. depth)
Basic Rate of M 20 (Item No.64 (CA),Pg.365) 4213.03 CUM

Difference of cement bag 9.50 - 8.00 1.50 bag

Basic cost of slag cement bag 315.00 per bag

Total Rs 4213.03 + 315.00 * 1.50 4685.53


say Rs 4685 /cum

R.A NO 44 Item no 23

Providing and casting in situ design mix concrete M.30 mix for RCC work in pier cap,abutment
cap,dirt wall including M.35 bed blocks or pedestals of required size below bearings as per
detailed drawing, shuttering, scaffolding wherever necessary,laying,vibrating curing and
finishing etc.complete.

Basic Rate of M 25 (Item No.66 (BA),Pg.365) 3503.13 CUM

Difference of cement bag 9.50 - 9.00 0.50 bag

Basic cost of slag cement bag 315.00 per bag

Total Rs 3503.13 + 315.00 * 0.50 3660.63


say Rs 3660 /cum

R.A NO 45 Item no 24

Providing and placing in position steel bar reinforcement of grade Fe - 500 D(TMT) for
following items including cutting,bending,hooking,tying etc. complete as per detailed
drawings and specifications for the following.

Basic Rate of Item No.27109,Pg.383 45008 Ton

Basic Rate for Fe415 steel Bars per Ton 36000

Basic Rate for TMT Bars ( FE-500 D ) per Ton 36750

Diffrence 36750 - 36000 = 750

Total Rs 45008.49 + 0.00 45008.5


Epoxy Coating = 11113.0
say Rs 56121.5 /ton
R.A NO 46 Item no 27

Providing and casting in situ design mix concrete M.30 mix for RCC work in Super structure
including centering, shuttering, scaffolding, ramming, vibrating curing and finishing
etc.complete. (A) RCC SOLID SLAB.

Basic Rate of M 20 (Item No.74 (BA),Pg.369) 3602.88 CUM

Difference of cement bag 9.50 - 9.00 0.50 bag

Basic cost of Slag cement bag 315.00 per bag

Total Rs 3602.88 + 315.00 * 0.50 3760.38


say Rs 3760 /cum

R.A NO 47 Item no 28

Providing and fixing in position steel bar reinforcement of steel grade FE-500 D (TMT)
including cutting ,bending, hooking, tying, welding etc, complete as per detailed drawing and
specification

Basic Rate of Item No.79(A)Pg.131 43744 Ton

Basic Rate for Fe415 steel Bars per Ton 48000

Basic Rate for TMT Bars ( FE-500 D ) per Ton 53000

Diffrence 53000 - 48000 = 5000

Total Rs 43744.32 + 5000.00 48744.3


Epoxy Coating = 11113.0
say Rs 59857.3 /ton

R.A NO 48 Item no 30

Providing and Casting in situ design mix concrete of M30 for average 75 mm thick wearing
coat laid as directed including temping, vibrating, finishing, curing and fillings in joints with
bitumen complete .

Basic Rate of M 20 (Item No.27091BA),Pg.377) 3682.71 CUM

Difference of cement bag 9.50 - 8.00 1.50 bag

Basic cost of slag cement bag 315.00 per bag

Total Rs 3682.71 + 315.00 * 1.50 4155.21


say Rs 4155 /cum
R.A NO 49 Item no 31

Providing and casting in situ design mix concrete M30 for RCC kerb including formwork
curing, finishing etc. complete.

Basic Rate of M 20 (Item no 93 (BA) / p 378) 3385.49 CUM

Difference of cement bag 9.5 - 8 1.50 bag

Basic cost of slag cement bag 315.00 per bag

Total Rs 3385.49 + 315.00 * 1.50 3857.99


say Rs 3857.00 /cum

R.A NO 50 Item no 35

Providing and casting in situ design mix concrete M30 for RCC approach slab including form
work, curing, finishing etc. complete.

Basic Rate of M 20 (Item No.103 BA ,Pg.382) 3562.10 CUM

Difference of cement bag 9.50 - 8.00 1.50 bag

Basic cost of slag cement bag 315.00 per bag

Total Rs 3562.10 + 315.00 * 1.50 4034.60


say Rs 4035 /cum
R.A NO 51 Item no 36

Providing and placing in position steel bar reinforcement of grade Fe - 500 D(TMT) for
following items including cutting,bending,hooking,tying etc. complete as per detailed
drawings and specifications for the following.

Basic Rate of Item No.105,Pg.137 44410 Ton

Basic Rate for Fe415 steel Bars per Ton 48000

Basic Rate for TMT Bars ( FE-500 D ) per Ton 53000

Diffrence 53000 - 48000 = 5000


Total Rs 44409.83 + 5000.00 49409.8
Epoxy Coating = 11113.0
say Rs 60522.8 /ton
99.225
7.225 97.925
4.125 1.05

92
0.34
Construction of Ghaduli - Santalpur Road in Kutch & Patan
District Section :- Kunariya - Tagdibet - Dholavira Road
Ch :115/950 to 147/048. Ta : Bhuj, Dist : Bhuj-
Construction Division:- Vadodara R & B division,Vadodara
Kachchh
Circle:- Vadodara Panchayat R&B circle.

Cost Estimate:- For Bridge

Sub Estimate:-1 : Bridge Portion

:: RECAPITULATION SHEET ::

Section Amount in (Rs.)


Section A : GENERAL ITEMS 264637.00
Section B : FOUNDATION 114403449.00
Section C : SUBSTRUCTURE 16576668.00
Section D : SUPERSTRUCTURE 34221336.00

Section E : FIXED ITEMS 4944135.00

Total (Rs.) = 170410225.00


Add 1 % for Quality Control (Rs.) = 1704102.00
Total (Rs.) = 172114327.00
or Work Charge Establishment (Rs.) = 3442287.00
Total (Rs.) = 175556614.00
Say Rs. = 175557000.00

Deputy Executive Engineer Executive Engineer


R&B Panchayat Division R&B Panchayat Sub Division
Vadodara
Construction of Ghaduli - Santalpur Road in Kutch & Patan District Section :-
Kunariya - Tagdibet - Dholavira Road Ch :115/950 to 147/048. Ta : Bhuj,
Dist : Bhuj-Kachchh
Construction Division:- Vadodara R & B division,Vadodara

Circle:- Vadodara Panchayat R&B circle.

Cost Estimate:- For Bridge & Approaches

RECAPITULATION SHEET

Estimate Amount in (Rs.)

Sub Estimate-1 Bridge Portion 175557000

Sub Estimate-2 Approach Portion 1608089


Total Cost
Rs. = 177165088.93
Say Rs. 177166000.00

Deputy Executive Engineer Executive Engineer


R&B Panchayat Division R&B Panchayat Sub Division
Vadodara
2480311
Construction of Ghaduli - Santalpur Road in Kutch & Patan District Section :-
Kunariya - Tagdibet - Dholavira Road Ch :115/950 to 147/048. Ta : Bhuj,
Dist : Bhuj-Kachchh
TalukAnkleshwar
Dist :Bharuch

SALIENT FEATURES

1.0. Location of Bridge Constructing a Submersible bridge on River


Amaravati near Village Avadar Pardimokha
Road,Tal. Ankaleshwar Dist: Bharuch

2.0. Type of Proposed Bridge.

i) Square / Skew Square

ii) Length & type of Bridge 72.00mt,Bridge having 6 span of


submersible Bridge

iii) Type of Superstructure .... R.C.C. Solid Slab Type of Super St

iv) Type of substructure R.C.C. wall type pier, RCC Abutme

v) Type of Foundation Pile FOUNDATION

3A. Existing Bridge on U/S :

i) Distance -------

ii) Waterway -------

iii) Type of foundation -------

iv) Catchments Area -------

v) Design OR observed Discharge -------

3B. Existing Bridge on U/S :

i) Distance -------

ii) Waterway -------

iii) Type of foundation -------


iv) Catchments Area -------

v) Design OR observed Discharge -------

4 Any irrigation scheme


completed / under
construction or existing on
4A. U/S ofscheme
If the D/S is on U/s.

1) Dist. from bridge.

2) C.A. at Dam site .....

3) way/ waster weir

4) Maximum routed discharge

4.B. If the scheme is on D/s. ......

i) Distance from bridge.

ii) under submergence ......

iii) F.R.L. of the Dam. ......

Hydraulics & features of proposed


5.0. bridge

i) Catchments Area 85 SQ KM

ii) Indlis' discharge 1090.1 CUMECS

iii) Max. obstructed discharge 240.6 CUMECS

v) Max. observed reported/H.F.L. 104 R.L. mt

vii) Afflux 0.39 mt

viii) A.H.F.L. 104.20 R.L. Mts.

ix) Vertical clearance 0.05 mt

x) Max. obstructed velocity 4.57 mt/sec.


xi) Obstruction
(Percentage) 22.07 %

xii) Depth of superstructure 0.95 mt

xiii) Road level 105.75 R.L. mts.

6.0. Design parameters adopted


in the bridge

i) Discharge 1090.1000 CUMECS

ii) H.F.L. 104.00 R.L. mts

iii) Silt Factor (ksf) 1.50

7.0. Foundations :

i) Average Bed Level in channel 99.2 R.L.

ii) Depth of normal scour 'd'.. 11.99 m below HFL

iii) Max. scourprotection


(As scour level @ pier
is (2d)
provided,scour depth is 80.01
considered ground level)

iv) Max. scour level @ abutment Abtutment 88.76


abutment (1.27 d)

v) Design foundation
grip
Scour Consideration with minimum Abt 72.09
33% grip Pier 83.74

vi) Availability of hard strata ---------

vii) the bridge Pile

viii) Type Strata at foudation level Heavy boulder

8.0. Approaches :

i) High level / submersible... submersible


ii) Length of approaches 50 mt left side and 450 mt rt side

a) Left Bank...
b) Right Bank..

iii) In case of Submersible appro

(a) Formation Level of Approache --------- R.L. mt

(b) Length of Submergence. ---------

Left Bank ---------

Right Bank ---------

(c) Depth of submergence. 1 mt


i) Maximum 1
ii) Minimum 0
iii) Average 0.5

d) Average height of spilling ban ---------

iv) In case of high level approah

(a) Max. height of bank


(b) Average height of bank

9.0. Cost of bridge proper.... Rs. 40843820.00

10.0. Cost per Rmt. of bridge Rs. 567275.28

### Any Special OR niteable featu ---------

Deputy Executive Engineer Executive Engineer


R&B Panchayat Division R&B Panchayat Sub Division
Ankaleshwar Bharuch
Name of Work:Constructing a Submersible bridge on River Amaravati near Village Avadar
Pardimokha Road, Tal. Ankaleshwar Dist: Bharuch

Construction Division:- Bharuch R & B division,Vadodara

Circle:- Vadodara Panchayat R&B circle.

Cost Estimate:- For Approach

Sub Estimate:-2 : Approach Portion(Both sides)

:: RECAPITULATION SHEET ::

Section Amount in (Rs.)

Section A:APPROACH 0.00


Total (Rs.) = 0.00
Add 1 % for Quality Control (Rs.) = 0.00
Total (Rs.) = 0
Add 5 % for Continuies (Rs.) = 0.00
Total (Rs.) = 0
Add 2 % for Work Charge Establishment (Rs.) = 0.00
Total (Rs.) = 0
ADD Survey and sub-soil inverstigation, hydrology and consultancy services= #VALUE!
Total (Rs.) = #VALUE!
Say Rs. = #VALUE!

Deputy Executive Engineer Executive Engineer


R&B Panchayat Division R&B Panchayat Sub Division
Ankaleshwar Bharuch
Construction of Ghaduli - Santalpur Road in Kutch & Patan District Section :-
Kunariya - Tagdibet - Dholavira Road Ch :115/950 to 147/048. Ta : Bhuj,
Dist : Bhuj-Kachchh
Construction Division:- Vadodara R & B division,Vadodara

Circle:- Vadodara Panchayat R&B circle.

Cost Estimate:- For Bridge & Approaches

RECAPITULATION SHEET

Estimate Amount in (Rs.)

Sub Estimate-1 Bridge Portion 172114327

Sub Estimate-2 Approach Portion #VALUE!


Total Cost
Rs. = #VALUE!
Say Rs. #VALUE!

Deputy Executive Engineer Executive Engineer


R&B Panchayat Division R&B Panchayat Sub Division
Ankaleshwar Bharuch