0 Materials/ Equipment
Materials
Distilled Water
Stopwatch
Equipment
6
7
4
8
5
.
3 Packed Column 8. Load Tank
.
4 Receiver Tank 9. Heater
.
5 Air Blower
.
3.0 Methodology
3.1 Safety Precautions
1. All operating procedures and instructions must be read carefully before operating
any unit.
2. Do not touch the blower while it is running to avoid injuries.
3. Do not turn on the power if the unit is damaged or partially wet.
4. Do not come into contact with the hot component of the unit.
5. Keep hands dry while using glass apparatus to pour water into the make-up tank
and be extra cautious to ensure no water is spilled onto the electrical parts.
3.2 Standard Operating Procedures
make-up tank is replaced onto the load tank and the nuts are lightly tightened.
approximately 40 C.
6. The pump is switched on and set the water flowrate to 2.0 LPM. A steady state
operation is obtained where the water is distributed and flowing uniformly through
the packing.
7. The unit is run for about 20 minutes, for the float valve to correctly adjust the level
1. Heater is switched off and water is allowed to circulate through the cooling tower
recorded.
3. The stopwatch is started to determine the make-up water supply in an interval of
10 minutes.
4. In this 10-minute interval, a few sets of measurements such as temperatures,
differential pressure, air flow rate and heater power is recorded. Then, the mean
5.0 Conclusions
5.1 Conclusion
5.2 Recommendations
At the end of the cooling tower lab experience, several recommendations are generated
1. Routinely check and replace the rubber pipes to ensure there is minimal-to-no water
actual humidity of air in the lab, instead of assuming the humidity from the manual.
3. Use auxiliary heaters to increase the temperature difference between the return water
from the water heater and the cold supply water, as this will increase the enthalpy