Professional Documents
Culture Documents
ZANEROBE ING.
Tender Submission
1.0 Introduction
...1
2.0 Design Package
Review
.......1
2.1 Design
Understanding.....................................................................................
...........1
2.2 Client Brief
Compliance
1/2
2.3 Concerns and
Solutions
.2
3.0 Criteria.
..2
3.1
Experience
......2/3
3.2
Competency
..3
3.3
Timeliness
..3/4
3.4
Professionalism
4
3.5
Understanding
.4
4.0 Appendix
A1
5
5.0 Appendix
B1
6
1.0 Introduction
This document, on the behalf of Zanerobe ING. is comprised of the necessary
requirements for the tender of the construction of the mars rover designed
by Speed of Thought. It has been assembled to address Speed of Toughts
tender evaluation criteria to ensure the requirements are all reached and to
a standard that presents Zanerobe ING. as a more desired company to
contract the design rather than other contractors.
The client brief also specifies that the cargo within the rover must be easily
assessed from one metre away without accessing the rover. The design
satisfies this criteria as the cargo hold is derived from a transparent 1.25L
bottle which will allow clear view of the cargo from the required distance with
ease.
The client brief also requires the total cost of the prototype to fall within $30.
The design presented does so therefore satisfies this field of the client brief.
There should be no manual control of the vehicle either after it has been
released on the slope until in hit the ground. The design by Speed of Thought
includes no such features or intent to control the vehicle manually therefore
not breaching the client brief. One set of wheels must be in contact with the
ground after landing. The design proves to ensure this by using wheels of a
higher height than that of the wooden body. This will allow it to land upside
down and still have the wheels in contact with the ground.
2.3 Concerns and Solutions
Zanerobe ING. the concern arising that if the cart does happen to flip upside
down or have a hard shaky impact, the 600ml bottle may fall out from the
1.25L bottle cargo holder. A solution to this problem may be attaching two
Velcro loops pieces on two side at the ending of the bottle. A longer strip of
Velcro hooks may be then connected to each piece allowing the open end of
the 1.25L bottle to be enclosed. This will still however follow the client brief
as it states complex assembly such as screwing may not be allowed in the
loading of the cargo.
3.0 Criteria
The criteria set by Speed of Thought will be displayed in italics below, and
Zanerobe ING.s response will be set in normal text.
3.1 Experience
Power Tools
3.2 Competancy
Woodworking
Marks in this category will be assigned according to the quality of the
woodwork for which evidence is provided in the Experience category.
Difficulty of the woodworking sample will be considered. Past Projects
Evidence should be provided of at least one past design project completed
for home use, or for school. This evidence can also be considered for the
other categories of Woodworking Competency Woodworking Experience,
and Power tools Experience. This evidence will be assessed for complexity,
quality and skill.
As can be seen through the marks achieved for high school word work
classes, our company shows a high level of competency in woodworking and
sue of power tools. Techniques such as carve grinding and power drilling
have been practiced and applied. Use of saws and other power tools along
with the proper safety gear is well practiced for our team allowing us to
easily carry out the task of construction the mars rover design put forward by
Speed of Thought. Previous projects can be seen in Appendix A1. These all
show the necessary skill requirements required to construct the mars rover
prototype therefore Zanerobe ING. will be surely competent in the
construction of this rover to its desired standards.
3.3 Timeliness
Punctual to meetings Must provide evidence that the candidate is punctual
to meetings i.e. been on time, provide written minutes from past experience
as an evidence Timely email response Candidate should check their email on
regular basis and able to reply clearly and detailed within 24 hours
Zanerobe ING. have communication skills at the level expected by Speed of
Thoughts tender evaluation criteria. Emails are replied to within 24 hours
and other online means of communication means we are able to keep the
team updated throughout the project ensuring everyone is up to date with
the progress.
3.4 Professionalism
Must keep their knowledge up to date. Candidate should have excellent
communication skills i.e. able to explain available options, state total cost,
do what he say and say what he can do.
Our teams excellent online communication skills and quick replies allows us
to all stay up to date on the progress of the project. Our knowledge and skills
allow us to put forwards solutions and options to any problems that arise and
communicate them across to all members ensuring any changes are 100%
confirmed with all members.
3.5 Understanding
Come up with new ideas (rough prototype) to ensure that the candidate in
able to understand. Candidate should clearly define criteria for success of
the project and develop plans according to it so that envisioned project is
delivered with fewest number of flaws.
Zanerobe ING defines the success of the project not only in assembling the
rover to the specifications of the designers, but to also outline any problems
and put forwards solutions to ensure the designed rover completes its exact
intent. Our teams knowledge in design and construction will prove to solve
any problems that may arise and put forward any suggestions to the
designers. The rover will be built precisely to the specifications to ensure the
designers satisfaction however any suggestions in bettering the rover will be
brought forward to the designers to ensure the rover works the best it can.
4.0 Appendix A1
5.0 Appendix B1
High school marks for wood work class for
contractor, Vikush Hirani received from
Swan Valley Anglican Community School