Fire & Gas Detection System

1 Physical check of F&G Control Panel wiring (Random)

2 Ensure no Manual Override in the FSD Logic

3 Cause & Effect to be checked as per Cause & Effect Matrix

4 Physical check & Operational check of FM200 Fire suppression system instruments for P-I Platfo
Physical check & Operational check of CO2 Fire suppression system instruments for P-I Platform
5
Generator A & B, P-1C Platform - Switch Gear Room, P-1C Platform - UPS & Battery Room, P-1C

6 Physical check & Operational check of Wet Chemical system instruments for P-I Platform - Acco

7 Physical check & Operational check of Deluge Systems

8 Physical check & Operational check to be carried for the below F&G instruments

Location P-I
Sl.No Item Description Accomodation Main Cellar
HeliDeck
Modules Deck Deck
1 Methyane Gas Detector 0 4 7 20

2 Hydrogen Gas Detector 0 0 0 0

3 Flame Detector 0 0 7 6

4 Heat Detector (Rate of Rise) 0 2 7 24

5 Smoke Detector (Optical) 0 24 0 3

6 Manual Alarm Call Point 0 3 7 9

7 Abort Switch 0 0 0 1

Emergency Shut Down Push


8 0 0 4 6
Button

9 Vibrating Bell C/W Strobe 0 2 0 0

FM200 Manual Release Push


10 0 0 0 2
Button
CO2 Manual Release Push
11 0 0 0 0
Button

12 Water Release Push Button 0 0 0 0

13 Site Siren 1 0 0 5
14 Public Address Siren 0 0 1 0

15 Flashing Beacon (Red) 1 0 0 3

16 Flashing Beacon (Blue) 1 0 0 3

17 Horn C/W Strobe 0 0 0 0

18 CO2 Status Light 0 0 0 0

19 Deluge Valve 0 0 7 3

No Drawings available to define the actual tags


Information based on the given Emergency Response Plan 2016
e & Gas Detection System

m instruments for P-I Platform Switch Gear Room


instruments for P-I Platform - Vent Boom, P-1C Platform - Turbine A & B, P-1C Platform - Power
UPS & Battery Room, P-1C Platform - HVAC Machinery Room

ents for P-I Platform - Accomodation module Kitchen

instruments

Location P-1C
Main Cellar Checks Remarks
Deck Deck
6 30 Physical check & Operational

0 1 Physical check & Operational

10 8 Physical check & Operational

0 5 Physical check & Operational

0 12 Physical check & Operational

3 1 Physical check & Operational

0 2 Physical check & Operational

0 0 Physical check & Operational

0 1 Physical check & Operational

0 0 Physical check & Operational

1 5 Physical check & Operational

2 0 Physical check & Operational

0 3 Physical check & Operational


0 0 Physical check & Operational

0 3 Physical check & Operational

0 3 Physical check & Operational

0 3 Physical check & Operational

2 5 Physical check & Operational

0 3 Physical check & Operational


Electrical

1 Lighting Panel

2 Light Fixtures Details

Power Generator Gas Engine V-


3
801A/B

4 Motor Check

Physical checks for below panels


Supply Unit B 110 V (E-831A/B)
110 V AC Inverter (E-834)
380/110 VAC Bypass Transformer (E-837)
24V Supply unit for NAV AIDS (E-841)
NAV AIDS Distribution Panel (E-843A/B/C)
Supply Unit A 24 V ESD/F&G (E-851A/B)
24V DC Panel (E-853)
110 V DC No Break System (V-830A/B)
Rectifier for Nav-Aid Supply (V-840A/B)
110V AC No Break system Emergency Switch Board
Emergency Distribution for Lube oil pump (E-891A/B)
Normal Lighting Distribution Panel (E-861)
Emergency Lighting Distribution Panel (E-862)
5
110 V DC Emergency Distribution Panel (E-833)
5

110 VDC/220 VAC convertor for DCS


Temperature and Pressure control panel (E-807)
Temperature and Pressure control panel (E-857)
24 V DC No Break System (V-850A/B)
General
Chlorination Package panel
Escape capsules Electrical panel & motors
ESD, F&G, DCS panels
Flare ignition package panels
Glycol Reboiler local control panel
Oily water separator - filter control panel
Electricals of all UCP's & Pump LCP's

Single line diagram & Electrical equipment list not available to define the actual quanti
Electrical
1. Physical check & Operational
2. Verify the grounding connections & internal wirings (Random Basis)
No supportive documents found to define the actual quantity and tags
1. Physical overall check on generator
2. Inspect Engine/generator mounted control junction boxes and power junction box for loose or
contaminated connections
3. Verify the grounding connections to the junction boxes and the generator/engine body
4. Proper operation and function of (trip circuit breaker, shut the engine down, alarm activation and
lamp warning) according to the control/protection circuit of the generator.
5. Automatic changeover & Synchronising between 2 generators
6. Trip relay settings to be checked as per relay coordination sheet
Item Tag
P-1C Platform
1. Physical check & Operational P-801A/B
2. Verify the grounding connection P-811A/B
3. Check Insulation Resistance Test or Verify P-806A/B
the previous/latest PM records
P-804
P-I Platform

P-104A/B
P-110A/B
P-126/P-127
Motors Related to Compressor trains, HVAC systems to be checked
below panels
-831A/B)
34)
ansformer (E-837)
V AIDS (E-841)
Panel (E-843A/B/C)
D/F&G (E-851A/B)

stem (V-830A/B)
pply (V-840A/B)
em Emergency Switch Board
n for Lube oil pump (E-891A/B)
ution Panel (E-861)
stribution Panel (E-862)
Distribution Panel (E-833)
vertor for DCS
ure control panel (E-807)
ure control panel (E-857)
em (V-850A/B)

anel
ical panel & motors

panels
ontrol panel
filter control panel
& Pump LCP's

Electrical equipment list not available to define the actual quantity and tags
Remarks
gs (Random Basis)
l quantity and tags

on boxes and power junction box for loose or

boxes and the generator/engine body


ker, shut the engine down, alarm activation and
ircuit of the generator.
2 generators
rdination sheet
Item Description
P-1C Platform
Condensate Transfer Pump
Corrosion Inhibitor Inj. Pump
KO Drum Pump
Drain Caission Pump
P-I Platform
Methanol Injection Pump
Corrosion Inhibitor Inj. Pump
Glycol Reconcentrator Pump
s to be checked

These tags derived from DNV-


GL Report : 10071-003-April &
May 2015 E&I Rev.0
antity and tags
Sl.No Item Description Item Tag No.

1 Navigation Aid Control Panel

2 Obstruction Lights Emergency Panel

3 Helideck Status Light Control Panel

4 Obstruction Lights

5 Visibility Meter

6 Photocell (if available)

7 Omni Directional Fog Horn

8 Navigation Light White

No Drawings available to define the actual quantity and tags


Checks

1. Physical check & Operational

2. Verify the grounding connections &


internal wirings (Random Basis)

1. Physical check & Operational

2. Verify the grounding connections &


internal wirings (Random Basis)

1. Physical check & Operational

2. Verify the grounding connections &


internal wirings (Random Basis)

Physical check & Operational

Physical check & Operational

Physical check & Operational

Physical check & Operational

Physical check & Operational


Remarks
Sl.No Item Description Item Tag No.

1 Telecom & PABX System Control Box

2 Marine VHF system

3 Aeronautical VHF system

4 Radar Beacon

5 Microwave Radio

6 CCTV System

7 P.A. System

8 PABX System
Communication Equipments physical check in Escape Capsules - 03 nos (P-I Main Deck, P-I Cel
9
of 01 no SART, 01 no EPIRB, 01 no VHF Radio, 01 no Usage Instructions

No Drawings available to define the actual quantity and tags


Checks Remarks

Physical check & Operational

Physical check & Operational

Physical check & Operational

Physical check & Operational

Physical check & Operational

Physical check & Operational

Physical check & Operational

Physical check & Operational


cape Capsules - 03 nos (P-I Main Deck, P-I Cellar Deck, P-1C Cellar Deck). Each consists
no Usage Instructions

ty and tags
Instrumentation
1 All Instruments related to Well Head Control Panel to be physically verified

2 All Instruments related to Gas compressor package to be physically verified

3 All instruments to be checked related to ESD, FSD, USD, LSD & Shut down valves, Blow dow

4 Instruments physical check & previous Calibration records check for the below mentioned E

5 Ensure no Manual Override in the ESD/LSD/PSD Logic

6 Cause & Effect Logic to be checked as per Cause & Effect Matrix

Sl.No Unit/Package Item Tag No


Instruments of P-1C Platform
1 PSV 61504
Compressed Air System
2 PSLL 61511

3 PSV 32260

4 PSLL 32258

5 PSHH 32259

6 XV 32023

7 PT 32060

8 PCV 32060

9 PSV 32160

10 PSLL 32158

11 PSHH 32159

12 LT 32052

13 Condensate Treatment LCV 32052

14 BDV 32052

15 PSHH 32053

16 PT 32052

17 PCV 32052

18 LSLL 32053

19 LSHH 32054

20 LT 32056
21 LCV 32056

22 XV 32024

23 PSV 32001A/B

24 LSLL 59011

25 PSV 59101

26 PSV 59102

27 Corrosion Inhibitor PSV 59103

28 PSV 59201

29 PSV 59202

30 PSV 59203

31 XV 63206

32 Diesel System LSHH 63209

33 LSLL 63208

34 Drain Caission LSHL 53170

35 XV 32500

36 LT 34292
Vent KO Drum
37 LSLL 34295

38 LSHH 34294

Instruments of P1 Platform

39 PSV 110A/B
Chemical Injection System
40 PSV 104A/B

41 PSV 101A/B/C

42 Desanders PSV 101D/E/F

43 PSV 101G/H/I

44 LT 106

45 LCV 106

46 PSV 106

47 SDV 106

48 PSV 101T

Glycol Dehydration & Fuel Gas


49 Glycol Dehydration & Fuel Gas BDV 1

50 BDV 2

51 LT 101T1

52 LCV 101T1

53 LCV 101T2

54 LT 101T2

55 PSV 120

56 LLT 120A

57 LCV 120A

58 LLT 120B

59 LCV 120B

60 PSV 121

61 Glycol Reconcentrator PSV 126

62 PSV 127

63 PS 125A

64 SDV 125A

65 TT 125

66 TCV 125

67 LADL 120

68 PSV 103A1/A2

69 PADH 103A

70 LADH 103A

71 LADL 103A
72 LTI 103A
73 LC1V 103A
74 LT 103A
75 LCV 103A
76 PSV 103B1/B2
77 PADH 103B
78 LADH 103B
79 Production Separator D103A/B/C LADL 103B
Production Separator D103A/B/C
80 LTI 103B
81 LC1V 103B
82 LT 103B
83 LCV 103B
84 PSV 103C1/C2
85 PADH 103C
86 LADH 103C
87 LADL 103C
88 LTI 103C
89 LC1V 103C
90 LT 103C
91 LCV 103C
92 LTI 105
93 LCIV 105
94 PT 105A
95 Condensate Coalescer D105 PCV 105A
96 LT 105
97 LCV 105
98 PSV 105
99 SDV 101
100 LS 150
101 PADL 101
102 PADH 101
Sump Leg
103 PALL 113
104 PAHH 114
105 PSV 101
106 PSV 111
107 LT 135
108 Vent Scrubber D135 LCV 135
109 LADH 135
First stage compressor & 2nd Stage
110 No drawings found to provide the tag list
compressor
First stage scrubber & 2nd stage scrubber,
111 No drawings found to provide the tag list
Fuel gas scrubber
112 Cause & Effect chart not found in the provided list
113 These tags collected from the available P&ID's
Instrumentation
o be physically verified

to be physically verified

USD, LSD & Shut down valves, Blow down valves, Control valves, PSV's

ecords check for the below mentioned ESD related instruments as a minimum

ic

Effect Matrix

Checks Remarks
Instruments of P-1C Platform
1. Physical Check & Operational
Check 2. Previous
Calibration Records Verification
Instruments of P1 Platform
wings found to provide the tag list

wings found to provide the tag list


Open Points found from latest DNV-GL Report : 10071-003-April & May 2015 E&I Rev.0

3
Open Points found from latest DNV-GL Report : 10071-003-April & May 2015 E&I Rev.0
Electrical P1 Platform

Reviewing motor test record book and meggering test for all platform motors as per
system 54 list, found motors with tag no DG-RM (Diesel Radiator Motor) and E-CM-A
(Escape Capsule Motor) indicates low winding resistance reading (CAT B)

Instruments P1 Platform
ESD sea pipe line to P2. The displayed action of PSLL 113 and PSHH 114 on DCS graphics
needs to be verified. (CAT C)
Instrument junction boxes on the main deck, tag nos to be installed (CAT C)
Electrical P1-C Platform
110V AC Inverter Panel (E-834), cooling fan found noisy (CAT C)
New installed temperature and pressure control panel (E-807) Internal wiring needs fixing
and arranging (CAT C)
New installed temperature and pressure control panel (E-857) cable ID to be installed (CAT
C)