You are on page 1of 6

FILE NAME: APSD

SHUTDOWNS APPROVED DURING THE MONTH OF


Time of Shutdown Load Shedding
Duration
Date Description of System Element
From (Hrs)
To (Hrs) MW LUs
(Hrs)
2/1/2016

2/2/2016 220/132kV Sub Station Girinagar 8:00 20:00 12:00 18.00 2.16

2/3/2016 - - - - - -
2/4/2016 - - - - - -
2/5/2016 - - - - - -

16/20MVA Transformer at
2/6/2016 8:00 20:00 12:00 18.00 2.16
220/132kV Sub Station Girinagar

2/7/2016
66kV Andhra-Nogli Feeder 10:00 17:00 7:00 23.00 1.61
2/8/2016 33/132kV Sub Station Malana,
Dhunkra adjacent to MPCL, Jari 12:30 15:30 3:00 - -
Kullu
2/9/2016
66kV Ghanvi to 66kV Sub Station
10:00 17:00 7:00 8.40 0.53
2/10/2016 Nathpa Line
132kV Larji-Bajoura Line 10:00 17:00 7:00 - -
2/11/2016 132kV Kangoo Bajoura Line 10:00 17:00 7:00 - -

2/12/2016 66/11kV Sub Station Davni 9:00 15:00 6:00 21.00 1.25
132kV Kunihar-Barotiwala
11:00 13:00 2:00 - -
Circuit No.II
2/13/2016
66kV Ghanvi Nathpa Line 10:00 17:00 7:00 8.04 0.53

220/132/33/11kV Sub Station


2/14/2016 10:00 17:00 7:00 - -
Jassure

2/15/2016 66kV Nogli-Andhra Feeder 10:00 17:00 7:00 20.00 1.40


2/16/2016
220/132/33kV Sub Station
2/17/2016 11:00 16:00 5:00 - -
Kangoo

Unit No.III at Andhra Power


2/18/2016 18.02.16 08.04.16 - -
House
220/132/33/11kV Sub Station
2/19/2016 10:00 17:00 7:00 - -
Jassure
2/20/2016
95(9.00 to
132/33/11Kv Sub Station Kala 12.00) & 55 2.85
9:00 14:00 5:00
Amb (12.00 to &1.10
2/21/2016 14.00)

220/132/33kV Sub Station


9:00 17:00 8:00 250.00 11.93
Girinagar

132/33kV Transformer Bank


2/22/2016 No.I&II at 132/66/33kV Sub 10:00 17:00 7:00 36.00 2.52
Station Jutogh

Area being fed through


2/23/2016 2x3MW Binwa Power House 23.02.15 25.02.15 33kV Sub Station
Baijnath

2/24/2016
2/25/2016

132/66kV Sub-Station Solan &


2/26/2016 132kV S/C T/L Giri-Solan Circuit- 10:00 17:00 7:00 47.00 3.28
I

2/27/2016 132/33kV, 25/31.5MVA Power 22:00 0:00 2:00 14.00 1.17


Transformer No.I
2/28/2016 0:00 22:00 22:00 14.00 3.08

132kV D/C transmission line


28.02.16 9:00 15:00 6:00 - -
Dehra to Hamirpur

132/66/11kV Sub Station


2/29/2016 9:00 17:00 8:00 68.00 5.40
Barotiwala
Total 545.44 37.02
NTH OF FEBRUARY 2016
Generation Loss Date of Last
Purpose of Shutdown Shutdown
MW LUs taken

Replacement of 16/20MVA,132/33kV Not


power Transformer No-2 with 25/31.3MVA, Mentioned
- -
132/33kV Power transformer at 220/132kV (Not
Sub-Station Girinagar Availed)

- - - -
- - - -
- - - -

Replacement of 16/20MVA,132/33kV
power Transformer No-2 with 25/31.3MVA, Not
- -
132/33kV Power transformer at 220/132kV mentioned.
Sub-Station Girinagar

Carrying out repair & maintenance works of


1.50 0.11 20.12.15
the line

2.00 0.06 Periodical Testing by P&T Team 20.01.16

Laying out ICx400Sq.mm cable between


4.80 0.30 Not Availed
Structure No.213 to 214.
- - Carrying out urgent maintenance work 13.10.15
Repair of middle wire between T.No.58 &
- - 13.10.15
59.
General maintenance of substation Not
- -
equipments & 66kV Bus Bar mentioned
Repair of 132kV Y-Phase CT (Change of
- - 30.12.15
gasket to stop oil leakage).
Laying out ICx400Sq.mm cable between Not
4.08 0.30
Structure No.213 to 214. mentioned

Erection, testing & commissioning of HV


- - and LV bushings of 220/132kV, 40/50MVA, 19.12.15
1-Phase transformer of 150MVA Bank.

Carrying out repair & maintenance works of


1.50 0.11
the line
Routine periodical testing of 220kV &
- - 132kV Power Transformer Bank by P&T
Division, Sundernagar.
Annual Maintenance Not
- -
mentioned
Connecting jumper to 220kV side, testing &
- - 19.12.15
commissioning of transformer

Shifting of load from transformer No-I to II


and transformer No-II to Transformer No-III
- - 04.11.15
due to replacement of faulty transformer No-
I
Replacement of electromechanical relays
- - with numeric O/C +E/F & f+df/dt relays of 30.11.15
132kV Kala Amb feeder.

Replacement of capacitor bank C.Ts and


- - 30.09.15
general mtc. of switchyard

Installation of cast steel gate valve 300mm


nominal bore in Hopper Valve No.1,
12.02.11 to
0.64 measurement of silt in fore-bay and other
17.02.11
works can be carried out during the period
of shutdown.

For general mtc. of 132/66kV Sub-station


Soaln i/c 132/66kV yard, Testing of
meterning equipment by M&T team,
General mtc/change of oil of BOCB of 66kV
- - Parwanoo feeder, Replacement of Applied For
flashed/damaged disc insulator, arcing
horns, jumpers, vibration damper etc. &
Cutting & looping of tree branches
underneath the line.
- - Replacement of faulty 132/33, 25/31.5MVA 21.02.16
Transformer No.1 with 16/20MVA,
Applied For
- - 132/33kV Transformer.
For cutting and lopping of tree branches
3/15 Applied
- - towards upstream ROW of 132kV D/C
for
transmission line Dehra to Hamirpur
General maintenance of s/stn. & periodical
- - 02.05.15
testing of transformers
13.88 1.52