You are on page 1of 1

M.S.

NORD PEGASUS
OAK-CT-03 Procedures for Emergency Drills

FLOOD CONTROL STATION

SIGNAL All hands to flood control station! Seawater is leaking at! (at least twice)
TRANSCEIVER WORKING CHANNEL CH-1
TEAM RANK NAME DUTY CARRYINGGOODS
Commanding Master Yun, Yeong An In command of all operations.
team Deck Cadet Lisnang Jaya S Assist Master. Keep records. Transceiver
AB/Seaman Yusup Irmawan Helmsman
Yakup Tappi
AB/Seaman Send and receive signals. Act as lookout and messenger.
Kandari
On-scene C/Officer Pramono Heru In charge of on-scene flood control team. Transceiver, Torch lamp
flood control Boatswain Amir Zakaria Assist Chief Officer. Work on flood control. Axe, Torch lamp
team AB/Seaman Samsuri Work on flood control. Act as messenger. Saw, Handy hammer
O/Seaman Supriyadi Work on flood control. Water proofing materials & tools, Heaving line
O/Seaman Johanes Febri -Ditto- Water proofing materials & tools
Oiler Suprapto -Ditto- Water proofing materials & tools
O/Seaman Syaiful Hisyam -Ditto- Lights, Waste
Compartment 2/Officer Ken Yamauchi In charge of compartment flood control team. Transceiver, Torch lamp
Flood control
O/Seaman Bandung Andi Closure of water tight door & parts by 2nd Officers order. Handy hammer, iron pipe to lighten hinges
Team
Engine team C/Engineer Yoo, Jae Peal In charge of engine team.
1/Engineer Victor Emanuel Operation of engine team. Transceiver
2/Engineer Sinto Simon Operation of pump. Other auxiliary machineries and power source. Transceiver
3/Engineer Dicky Indra Communication with bridge. Keep records. Transceiver
Wiper Prasetiyo Assist 2nd Engineer.
Engine Cadet Steven Cung Assist Chief Engineer
Radio and Agung Mika
3/officer In charge of communications. Keep records. Handing of clerical matters with outsiders. Torch lamp
Medical team Albana
Cook Heri Nursidik Securing Provision. Medical Treatment.
Mess Boy Amsori -Ditto-
Notice

(1) When crew members are ordered to assemble at stations for flood control, they will quickly report to their own station ready to perform their duties.

(2) The person in charge of each team will report the present situation of his team to the Master as necessary.

(3) The on-scene flood control team may absorb the compartment flood control team or a part of the engine team under team under its command depending on the situation.

(4) In the case of flood in the engine room, all oilers will be stationed in the engine room for flood control, and other members of the on-scene flood control team and the compartment flood control team will operate with them.

(5) When the operation to control flooding proves to be unsuccessful and it is necessary for the entire crew to abandon ship, they will quickly shift to abandon ship station on hearing the order Assemble at abandon ship stations!
passed by word of mouth or by the loudspeaker system and the signal of seven short followed by a long blast on the whistle or the general alarm bell.

Lianyungang,16th Nov 2012

Capt. Yun,Yeong An

Revision 1 / 2006 Oct. 31 APPENDIX-C / Page 3

You might also like