Professional Documents
Culture Documents
SHAH ALAM
1
RUBRICS FOR DP2 2013
CHEMICAL DESIGN (ABSORBER, CENTRIGUGAL COMPRESSOR, CYCLONE, DECANTER, DISTILLATION COLUMN,
EXTRACTOR, GRANULATOR, HEAT EXCHANGER, REACTOR)
Topic Exceptional
Calculation method:
Calculations include: Column diameter, particle size - The calculations presented are detailed and easy to understand
distribution, diameter, overall efficiency, velocity, -The method of calculation has been clearly identified and performed
pressure drop, vessel area. appropriately
3 - The flowsheet are clear and understandable
- Equipment and streams are clearly and appropriately labelled
- The dimensions of the design is acceptable and logic to the industrial
application
2
RUBRICS FOR DP2 2013
3
RUBRICS FOR DP2 2013
MECHANICAL DESIGN (ABSORBER, CENTRIGUGAL COMPRESSOR, CYCLONE, DECANTER, DISTILLATION COLUMN,
EXTRACTOR, GRANULATOR, HEAT EXCHANGER, REACTOR)
Topic Exceptional
Feasibility of design (design specification, assumption - The calculations presented are detailed and easy to understand
of design) - The method of calculation has been clearly identified and performed
3
Calculation include but not limited to: Vessel appropriately
thickness, vessel support, flange design, design loads - Assumptions of design are stated clearly and appropriately
4
RUBRICS FOR DP2 2013
5
RUBRICS FOR DP2 2013
ECONOMIC ANALYSIS
Topic Exceptional
6
RUBRICS FOR DP2 2013
7
RUBRICS FOR DP2 2013
8 Verification by Capcost software Capcost is used extensively for overall verification of work done
8
RUBRICS FOR DP2 2013
PLANT SAFETY AND LAYOUT
Topic Exceptional
1. Objectives
2. SOP for critical equipment
Standard Operating Procedure And Start-up &
1 3. Checklist
Shut-down Procedure
4. Start-up and shut-down procedure (Detail discussion of four of the above
criteria, Plant related safety)
1. Objectives
2. Study Node (eg: cooling coil,stirrer for reactor)
3. Process parameter (eg: flow, temperature)
4. Guideword (eg: no, high, low)
5. Possible causes (eg: pipe blockage)
2 HAZOP
6. Consequences (eg: temperature increase)
7. Relevant recommended action (eg: install high temperature alarm)
8. P&ID after HAZOP
(Detail discussion of seven to eight of the above criteria, Plant related
safety)
9
RUBRICS FOR DP2 2013
1. Objectives
2. Acceptable area of plant layout
3. Plant area zoning
4. Possible facility
3 Plant Layout
5. Exit/entrance point
6. Evacuation and assembly point
(Detail discussion of five to six of the above criteria, Plant related safety)
1. Objectives
2. Hazard identification
3. Possible accident scenario
4 Emergency Response Plan
4. Emergency response procedure for possible accident scenario
5. Possible emergency devices
(Detail discussion of five of the above criteria, Plant related safety)
10
RUBRICS FOR DP2 2013
PROCESS INTEGRATION
Topic Exceptional
- Justify the DTmin selection based on type of industry (ie. Natural gas plant,
1 Determination of DTmin petrochemical etc)
- Reference of the selection is provided (ie journal, book etc)
11
RUBRICS FOR DP2 2013
- HEN design for above and below the pinch are available (except for the
case of threshold problem, either one will do)
- The design are correct and feasible (CP rules as guidance to get the
4 Heat Exchanger Network feasible match ONLY)
- The feasibility of the design are available via T-H diagram for all matches
(hot streams are hotter than cold streams when matching etc)
- The design are comply to the DTmin for the matches
12
RUBRICS FOR DP2 2013
PROCESS CONTROL
Topic Exceptional
1 Selection of Control Variable * -The correct control variables are selected for all control loop in the process
2 Selection of Manipulative Variable * -The correct manipulative variables are selected for all control loop in the
process.
3 Selection of Control Strategy * -The correct control strategies are used for all control loop in the process.
- The correct P&ID format is used providing a clear and concise illustration
of all equipments and instruments
4 P&ID Diagram -The P&ID is labelled completely and correctly
-The connection between all the variables are correct
13
RUBRICS FOR DP2 2013
ENVIRONMENT, WASTE PREVENTION AND TREATMENT
Topic Exceptional
Process synthesis and description of the waste -Student can describe the processes of preliminary treatment, primary
2
treatment facility treatment, and secondary treatment at wastewater treatment plant
-Student can describe the process and can list at least 5 to do the mass
3 Manual mass balance calculation balance calculation as well as explain probable causes for changes in these
variables
Preliminary equipment sizing and costing (not a -Student can describe the equipment ALL and can do the preliminary sizing
4
detailed design) and costing
14
RUBRICS FOR DP2 2013
THANK YOU
GOOD LUCK..!
15