Project Job Ref.

ATT Hoddesdon TCL 421 c02


Section Sheet no./rev.
Toureen Group
LTM 1055 Crane 1
25 Cecil Road
Harrow Calc. by Date Chk'd by Date App'd by Date

Middlesex HA3 5QY BM 9/21/2015 IF 9/21/2015


Project Job Ref.

ATT Hoddesdon TCL 421 c02


Section Sheet no./rev.
Toureen Group
LTM 1055 Crane 2
25 Cecil Road
Harrow Calc. by Date Chk'd by Date App'd by Date

Middlesex HA3 5QY BM 9/21/2015 IF 9/21/2015


, . ,



. .

/ .

. 60 . 83

. 240 . 10,2 40
Works Slew
Area Restriction
Line
Max radius
40 metres

4m Exclusion
Zone from
excavation MainContractor:

25CecilRoad
Wealdstone
Middlesex
HA35QY
Tel:02084247999
Fax:02084247998
Email:info@toureenmangan.co.uk
DATE: SCALE:
10/09/2015 NTS
DRAWINGNUMBER:
TC/HODD/CP001
DRAWINGTITLE:

60T Mobile Crane ProposedCranePlan


LT11
TEST REPORT: ESTIMATION OF CALIFORNIA BEARING RATIO
In-house Test Procedure STP S8 & Design Manual for Roads and Bridges
Vol. 7, Sect. 2 HD 25-94

REPORT NUMBER : FS15-239999-106223-8 CLIENT : S Walsh and Sons Ltd


CLIENT REF.: LT11 ADDRESS : East Hordon Hall Business Park,Tilbury Road,
Brentwood, Essex
DATE TESTED : 07/07/2015
TESTED BY : Peter Reed SITE : Ratty's Lane, Hoddesdon
LOCATION : ?LT11 MATERIAL : Clay with Crush

TEST RESULTS

LOAD APPLIED AVERAGE BEARING GAUGE READING GAUGE SETTLEMENT AVERAGE


TO PLATE PRESSURE 1 2 3 1 2 3 SETTLEMENT
kN kN/m mm mm mm

0.0 0.0 20.27 11.51 17.85 0.00 0.00 0.00 0


27.6 95.5 20.01 11.22 17.63 0.26 0.29 0.22 0.26
42.7 147.5 19.74 10.92 17.41 0.53 0.59 0.44 0.52
57.7 199.5 19.50 10.61 17.08 0.77 0.90 0.77 0.81
75.8 261.9 19.23 10.19 16.89 1.04 1.32 0.96 1.11
93.8 324.3 18.97 9.87 16.61 1.30 1.64 1.24 1.39
120.9 417.9 18.71 9.63 16.38 1.56 1.88 1.47 1.64

EQUIPMENT DETAILS

APPLIED LOAD vs SETTLEMENT RELATIONSHIP


Plate Diameter : 607 mm
450 Plate Area : 0.2894 m
400 Plate Correction : 0.84
BEARING PRESSURE (kN/m)

350
AVERAGE BEARING PRESSURE
300

250 Average Bearing Pressure (P) at 1.25mm penetration

200
P = 293 kN / m
150

100
ESTIMATED C.B.R VALUE
50

0 Estimated C.B.R at 1.25mm penetration


0.00 0.25 0.50 0.75 1.00 1.25 1.50 1.75

Estimated C.B.R.=91%
AVERAGE SETTLEMENT (mm)

Estimated C.B.R.=91%

REMARKS :
For and on behalf of CET
Jon Champion - National Operations Manager
John Newbery - Laboratory Manager
Matt Oliver- Site Manager
Adrian McGilvery - Senior Technician
Approved Signatory Nick Ring - Principal Technician
Report Format : STP S8 rev.1 08-Jul-15