EARTHWORK CALCULATION WORKSHEET

Upstream 0 EL. = 0.00


PROJECT NAME: STRUCTURE ID #: 0 0

COUNTY: PREPARED BY: 0


0
PROJECT ID#: DATE: 0

Top Width (ft): Embankment Elevation Embankment Subcut Bottom Width (ft)

Front Slope ( :1): Settlement (%): Side Slope (:1)

Back Slope ( :1):

DESIGN DATA EMBANKMENT SUBCUT CORE

CORE DIST AVG END TOTAL AVG END TOTAL BTM. AVG END
EXISTING FILL END AREA CU. YARDS SUBCUT END AREA CU. YDS. END AREA CU. YDS. TOTAL CUBIC
STA. TRENCH B/W AREA CUBIC AREA (SQ. CUBIC CORE AREA
GROUND ELEV. HEIGHT (SQ.FT.) PER FT. GRADE ELEV. (SQ.FT) PER FOOT (SQ.FT) PER FOOT YARDS
DEPTH STA. (SQ.FT.) YARDS FT) YARDS ELEV. (SQ.FT.)

0.00 0.00 0.00 0.00 0.00 0.00


0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.00

EMBANKMENT TOTAL (C.Y. ) 0.00 SUBCUT TOTAL (C.Y. ) 0.00 CORE TOTAL (C.Y. ) 0.00
TOTAL YDS OF COMPACTED FILL 0.00
CLICK PROFILE TAB TO SEE A GRAPHIC
REPRESENTATION OF EMBANKMENT
Prepared by Minnesota Board of Water & Soil Resources SURFACE AREA OF EMBANKMENT (ACRES) 0.00
06/17/02 Version 5.0
12.00

10.00

8.00
ELEVATION (FT.)

6.00

4.00

2.00

0.00
0 2 4 6 8 10 12

STATION (FT.)
EMBANKMENT SUBCUT EXISTING GROUND CORE
Instructions/tips for using BSWR Earthwork-Standard v.5
Spreadsheet

The spreadsheet is Protected, meaning that only certain cells can be edited. O
with a white background may be edited or have info. entered into them.
Cells with a red triangle in the upper right corner have Tool Tips associated w
them. Just place the pointer in one of these cells and a box will appear with inf
about what that cell does or what values should be entered into it.
The 1st station entered should be the beginning station of the planned embankm
example: Your profile runs from 0+00 to 9+30. Your embankment starts at 0+1
station entered must be 10. If your embankment starts at 0+00, then the 1
entered must be 0, etc
The elevation of the 1st station entered must be equal to the value entered in the
Embankment Elevation field.
In order for the subcut quantity to calculate correctly, the 2nd station entered sh
within 1 or 2 feet of the 1st station and the 2nd exiting ground elevation should b
tenths less than the 1st existing ground elevation. Conversely, the 2
should be within 1 or 2 feet of the last station and the 2nd to last existing ground
elevation should a few tenths less than the last existing ground elevation.
Example: the 1st value is station 0 with an existing ground elevation of 100 ft. T
value should be station 1 with an existing ground elevation of 99.9. The same
applies to the end of the series. If the last value is station 50 with an existing g
elevation of 100 ft., than the second to last value should be station
ground elevation of 99.9 ft. This will force the spreadsheet to calculate the beg
and ending points of the subcut in the correct spots.
Clicking the Profile tab at the bottom of the spreadsheet gives the user a graph
information entered. This page has been sized to print out so that the graph can
trimmed and be manually placed on the BWSR standard design sheets. This el
the need to hand draw the profile and should save people not using the standard
on CAD a lot of time.
If anyone has problems using the spreadsheet or has any questions, please feel
contact: