COMPUTOS METRICOS

CALIDAD, PROPUESTA T
MODALIDAD:
PROYECTO: CONSTRUCCIN SALN MULTIFUNCIONAL THONTORQA COSTO
UBICACIN: COMUNIDAD THONTORQA FECHA: OCTUBRE, 2012
DISTRITO: 8

N Alto Ancho Largo Long. Sup.


N DESCRIPCION DE ACTIVIDAD Unid.
Veces (m) (m) (m) (ml) (m2)

1 INSTALACION DE FAENAS GLB


1
1
2 REPLANTEO ESTRUCTURAS Y EDIFICACIONES M2
Superficie Saln 1 318.55
318.55
3 EXCAVACION TERRENO COMN C/MAQUINARIA M3
PROGRESIVAS
0+008 0.00 0.24
0+009 1.00 1.19
0+010 1.00 2.56
0+011 1.00 5.11
0+012 1.00 21.07
0+013 1.00 31.37
0+014 1.00 32.14
0+015 1.00 33.03
0+016 1.00 34.07
0+017 1.00 35.60
0+018 1.00 37.63
0+019 1.00 37.25
0+020 1.00 36.91
0+021 1.00 36.67
0+022 1.00 36.58
0+023 1.00 36.65
0+024 1.00 36.82
0+025 1.00 36.86
0+026 1.00 37.08
0+027 1.00 37.49
0+028 1.00 37.82
0+029 1.00 37.47
0+030 1.00 35.99
0+031 1.00 33.74
0+032 1.00 30.67
0+033 1.00 28.12
0+034 1.00 36.26

4 EXCAVACION MANUAL TERRENO SEMI DURO M3
Zapatas 14 1.5 0.80 0.80
Eje A y C (1;6) 2 0.50 0.30 20.15
Excavacin cimientos
Eje 1 y 6 (A;C) 2 0.50 0.30 7.15
Eje z (escenario) 1 0.50 0.30 7.49
Excavacin machones de columnas de ladrillo 6 0.50 0.30 0.30
descuento excavacin de zapatas -14 0.50 0.30 0.80

5 CARGA Y TRANSPORTE MATERIAL EXCAVADO M3
Volumen total de excavacin terreno comn c/maquinaria
Volumen total de excavacin manual terreno semi duro
N Alto Ancho Largo Long. Sup.
N DESCRIPCION DE ACTIVIDAD Unid.
Veces (m) (m) (m) (ml) (m2)


30 % de esponjamiento 30%
TOTAL
6 ZAPATAS DE H A + FIERRO TIPO "A" M3
Zapatas tipo 14 0.35 0.75 0.75

7 COLUMNAS DE H A TIPO "A" M3


fachadas laterales 2 5.70 0.25 0.25
fachada frontal y posterior 12 4.45 0.25 0.25

8 CIMIENTOS DE H C 50% P.D. TIPO "B" M3
Eje A -C (1;5) 2 0.50 0.30 15.85
Eje 1(A;C) 1 0.50 0.30 7.15
Eje A-C (5,6) 2 0.50 0.30 3.85
Eje z (escenario) 1 0.50 0.30 7.32
Para columnas de ladrillo 6 0.50 0.30 0.30
Descuento de volumen columnas -14 0.50 0.15 0.30

9 COLUMNAS LADRILLO 18H (25X25 CM) ML
fachada frontal 6 2.61 15.66
15.66
10 SOBRECIMIENTOS H C TIPO "A" 50 % P.D. M3
Eje 1 (A;C) 2 0.50 0.12 20.15
Eje 6 (A;C) 2 0.80 0.12 20.15
Eje A y C (1;5) 2 0.50 0.12 7.15
Eje A y C (5;6) 2 0.80 0.12 7.15
Eje z (escenario) 1 0.80 0.20 7.49
Para columnas de ladrillo 6 0.50 0.30 0.30
Descuento de volumen columnas -14 0.50 0.15 0.30
Descuento puerta principal -1 0.50 0.12 1.80
Descuento puerta secundaria -1 0.50 0.12 0.80

11 IMPERMEABILIZACION DE SOBRECIMIENTOS M2
Eje 1 (A;C) 2 0.12 20.15 4.84
Eje 6 (A;C) 2 0.12 20.15 4.84
Eje A y C (1;5) 2 0.12 7.15 1.72
Eje A y C (5;6) 2 0.12 7.15 1.72
Eje z (escenario) 1 0.20 7.49 1.50
Descuento de volumen columnas -14 0.15 0.30 -0.63
Descuento puerta principal -1 0.12 1.80 -0.22
Descuento puerta secundaria -1 0.12 0.80 -0.10
13.66
12 MURO LADRILLO 18 H E=12 CM (VISTO) M2
Eje 1-6 (A;C) 2 3.10 7.15 44.33
Eje A-C (1;6) 2 2.85 20.15 114.86
Parapeto 2 0.30 7.76 4.66
Mojinetes 4 1.21 3.19 7.72
N Alto Ancho Largo Long. Sup.
N DESCRIPCION DE ACTIVIDAD Unid.
Veces (m) (m) (m) (ml) (m2)

Descuento puerta principal -1 3.20 1.80 -5.76


Descuento puerta secundaria -1 3.20 0.80 -2.56
Descuento ventanas fachada frontal y posterior -7 2.73 1.20 -22.93
Descuento ventanas fachada larteral -2 3.10 1.50 -9.30
-2 0.54 1.50 -0.81
Descuento escenario -1 0.30 15.00 -2.25
127.95
13 VIGA CADENA DE HA TIPO "A" M3
Eje 1-6 (A;B) Y (B;C) 4 0.30 0.20 3.88
Eje A-C (1;6) 2 0.35 0.20 20.15

14 BOTAGUAS DE LADRILLO GAMB E=12 CM VISTO ML
ventanas fachada lateral (V4 y V5) 2 1.50 3.00
ventanas fachada frontal (V1,V2,V3) y posterior (V6,V7,V8,V9) 7 1.20 8.40
11.40
15 CUBIERTA TEJA COLONIAL CERMICA M2
saln multifuncional + pasillo con cubierta 1 10.21 20.90 213.39
213.39
16 CUMBRERA TEJA COLONIAL CERMICA ML
1 20.90 20.90
20.90

17 CIELO RASO CON VIGA VISTA + MADERAMEN M2


salon 1 7.20 20.00 144.00
pasillo 1 1.84 20.00 36.80
aleros 1 0.45 20.00 9.00
2 0.25 10.04 5.02
194.82
18 REVOQUE YESO INTERIOR M2
Eje 1-6 (A;C) 2 3.71 7.00 51.94
Eje A-C (1;6) 2 3.71 20.00 148.40
Mojinetes 2 0.57 9.92 5.65
Descuento puerta principal -1 3.20 1.80 -5.76
Descuento puerta secundaria -1 3.20 0.80 -2.56
Descuento ventanas fachada frontal y posterior -7 2.73 1.20 -22.93
Descuento ventanas fachada larteral -2 3.10 1.50 -9.30
-2 0.54 1.50 -0.81
Descuento sector escenario frontal -1 0.60 7.00 -4.20
Descuento sector escenario laterales -2 0.60 3.00 -3.60
156.83
19 REVOQUE CEMENTO EXTERIOR M2
Eje 1-6 (A;C) 2 3.66 7.30 53.44
Eje A-C (1;6) 2 3.66 20.30 148.60
Mojinetes 2 1.32 7.29 9.62
Descuento puerta principal -1 3.20 1.80 -5.76
Descuento puerta secundaria -1 3.20 0.80 -2.56
Descuento ladrillo visto sector puerta secundaria -1 2.85 2.50 -7.13
Descuento ventanas y ladrillo visto fachada frontal y posterior -8 2.85 3.00 -68.40
Descuento ventanas y ladrillo visto fachada larteral -4 3.25 2.98 -38.74
-4 0.85 2.98 -5.07
Jambas de ventanas 14 2.73 0.10 3.82
N Alto Ancho Largo Long. Sup.
N DESCRIPCION DE ACTIVIDAD Unid.
Veces (m) (m) (m) (ml) (m2)

7 0.10 1.20 0.84


Jambas puerta principal 2 3.20 0.10 0.64
1 0.10 1.80 0.18
Jambas puerta secundaria 2 3.20 0.10 0.64
1 0.10 0.80 0.08
90.21
20 EMPEDRADO + CONTRAPISO HS E=10 CM M2
Saln Multifuncional + pasillo + acera laterales y posterior 1 9.13 20.90 190.82
decuento columnas de pasillo 6 0.30 0.30 0.54
descuento muros Eje 1-6 (A;C) 2 0.12 20.15 4.84
descuento muros Eje A-C (1;6) 2 0.12 7.15 1.72
197.91
21 PISO DE CERMICA NACIONAL M2
Saln Multifuncional 1 7.00 20.00 140.00
rea frontal de escenario 1 0.60 7.00 4.20
144.20
22 ZCALO DE CERMICA NACIONAL ML
Saln Multifuncional 2 20.00 40.00
2 7.00 14.00
Sector gradas escenario huella 3 0.30 0.90
Sector gradas escenario contra huella 4 0.25 1.00
55.90
23 CANALETA Y BAJANTE DE CALAMINA PLANA GAL. N 28 ML
Canaleta de calamina 1 20.90 20.90
Bajante 2 2.90 5.80
26.70
24 TABLERO PARA MEDIDOR PZA
1
1.00
25 TABLERO DE DISTRIBUCIN ELECTRICO PZA
1
1.00

26 ILUMINACION FLUORESCENTE (2X40 W) PTO


saln multifuncional 12
pasillo 3
15.00
27 INSTALACION ELECTRICA TOMACORRIENTE PTO
3
3.00
28 PUERTA DE MADERA ROBLE TIPO TABLERO + QUIN M2
Puerta Principal 1 3.20 1.80 5.76
Puerta secundaria 1 3.20 0.80 2.56
8.32
29 VENTANA MADERA CEDRO M2
ventanas fachada frontal y posterior 7 2.73 1.20 22.93
ventanas fachada larteral 2 3.10 1.50 9.30
2 0.54 1.50 0.81
33.04
30 PROV. Y COLOC. VIDRIO DOBLE (3 MM.) M2
N Alto Ancho Largo Long. Sup.
N DESCRIPCION DE ACTIVIDAD Unid.
Veces (m) (m) (m) (ml) (m2)

ventanas fachada frontal y posterior 7 2.73 1.20 22.93


ventanas fachada larteral 2 3.10 1.50 9.30
2 0.54 1.50 0.81
33.04
31 PINTURA LATEX INTERIOR M2
Eje 1-6 (A;C) 2 3.71 7.00 51.94
Eje A-C (1;6) 2 3.71 20.00 148.40
Mojinetes 2 0.57 9.92 5.65
Descuento puerta principal -1 3.20 1.80 -5.76
Descuento puerta secundaria -1 3.20 0.80 -2.56
Descuento ventanas fachada frontal y posterior -7 2.73 1.20 -22.93
Descuento ventanas fachada larteral -2 3.10 1.50 -9.30
-2 0.54 1.50 -0.81
Descuento sector escenario frontal -1 0.60 7.00 -4.20
Descuento sector escenario laterales -2 0.60 3.00 -3.60
156.83
32 PINTURA LATEX EXTERIOR M2
Eje 1-6 (A;C) 2 3.66 7.30 53.44
Eje A-C (1;6) 2 3.66 20.30 148.60
Mojinetes 2 1.32 7.29 9.62
Descuento puerta principal -1 3.20 1.80 -5.76
Descuento puerta secundaria -1 3.20 0.80 -2.56
Descuento ladrillo visto sector puerta secundaria -1 2.85 2.50 -7.13
Descuento ventanas y ladrillo visto fachada frontal y posterior -8 2.85 3.00 -68.40
Descuento ventanas y ladrillo visto fachada larteral -4 3.25 2.98 -38.74
-4 0.85 2.98 -5.07
Jambas de ventanas 14 2.73 0.10 3.82
7 0.10 1.20 0.84
Jambas puerta principal 2 3.20 0.10 0.64
1 0.10 1.80 0.18
Jambas puerta secundaria 2 3.20 0.10 0.64
1 0.10 0.80 0.08
90.21
33 PINTURA MUROS DE LADRILLO VISTO EXTERIOR M2
ladrillo visto sector puerta secundaria 1 2.85 2.50 7.13
ladrillo visto fachada frontal y posterior 8 2.85 3.00 68.40
ladrillo visto fachada larteral 4 3.25 2.98 38.74
4 0.85 2.98 10.13
Descuento ventanas fachada frontal y posterior -7 2.73 1.20 -22.93
Descuento ventanas fachada larteral -2 3.10 1.50 -9.30
-2 0.54 1.50 -1.62
90.55

34 BARNIZADO EN CARPINTERIA DE MADERA M2


puerta principal 1 3.20 1.80 5.76
puerta secundaria 1 3.20 0.80 2.56
ventanas fachada frontal y posterior 7 2.73 1.20 22.93
ventanas fachada larteral 2 3.10 1.50 9.30
2 0.54 1.50 0.81
N Alto Ancho Largo Long. Sup.
N DESCRIPCION DE ACTIVIDAD Unid.
Veces (m) (m) (m) (ml) (m2)

vigas vista 21 7.91 0.35 29.07


70.43
35 PROV. Y COL. REJAS METLICA M2
ventanas fachada frontal y posterior 7 2.73 1.20 22.93
ventanas fachada larteral 2 3.10 1.50 9.30
2 0.54 1.50 0.81
33.04
36 PLACA DE ENTREGA DE OBRAS PZA
1
1.00
37 LIMPIEZA GENERAL GLB
1
1.00
COMPUTOS METRICOS
CALIDAD, PROPUESTA TCNICA Y
COSTO

Vol.
Total
(m3)

1.00

318.55

788.14

0.00
0.72
1.88
3.84
13.09
26.22
31.76
32.59
33.55
34.84
36.62
37.44
37.08
36.79
36.63
36.62
36.74
36.84
36.97
37.29
37.66
37.65
36.73
34.87
32.21
29.40
32.19
788.14
21.34
13.44
6.05
2.15
1.12
0.27
-1.68
21.34
1052.33
788.14
21.34
Vol.
Total
(m3)

809.48
242.85
1052.33
2.76
2.76
2.76

4.05
0.71
3.34
4.05
8.04
4.76
1.07
1.16
1.10
0.27
-0.32
8.04
15.66

9.52
2.42
3.87
0.86
1.37
1.20
0.27
-0.32
-0.11
-0.05
9.52
13.66

127.95
Vol.
Total
(m3)

3.75
0.93
2.82
3.75
11.40

213.39

20.90

194.82

156.83

90.21
Vol.
Total
(m3)

197.91

144.20

55.90

26.70

1.00

1.00

15.00

3.00

8.32

33.04

33.04
Vol.
Total
(m3)

156.83

90.21

90.55

70.43
Vol.
Total
(m3)

33.04

1.00

1.00
PRESUPUESTO GENERAL

PROYECTO: CONSTRUCCIN SALN MULTIFUNCIONAL THONTORQA PLAZO

UBICACIN: COMUNIDAD THONTORQA PROPONENTE

DISTRITO: 8 120 DAS

PRECIO COSTO
ITEM DESCRIPCION UNID CANTIDAD
UNITARIO TOTAL
1 INSTALACION DE FAENAS GLB 1.00 0.00
2 REPLANTEO ESTRUCTURAS Y EDIFICACIONES M2 318.55 0.00
3 EXCAVACION TERRENO COMN C/MAQUINARIA M3 788.14 0.00
4 EXCAVACION MANUAL TERRENO SEMI DURO M3 21.34 0.00
5 CARGA Y TRANSPORTE MATERIAL EXCAVADO M3 1052.33 0.00
6 ZAPATAS DE H A + FIERRO TIPO "A" M3 2.76 0.00
7 COLUMNAS DE H A TIPO "A" M3 4.05 0.00
8 CIMIENTOS DE H C 50% P.D. TIPO "B" M3 8.06 0.00
9 COLUMNAS LADRILLO 18H (25X25 CM) ML 15.66 0.00
10 SOBRECIMIENTOS H C TIPO "A" 50 % P.D. M3 9.52 0.00
11 IMPERMEABILIZACION DE SOBRECIMIENTOS M2 13.66 0.00
12 MURO LADRILLO 18 H E=12 CM (VISTO) M2 127.95 0.00
13 VIGA CADENA DE HA TIPO "A" M3 3.75 0.00
14 BOTAGUAS DE LADRILLO GAMB E=12 CM VISTO ML 11.40 0.00
15 CUBIERTA TEJA COLONIAL CERMICA M2 213.39 0.00
16 CUMBRERA TEJA COLONIAL CERMICA ML 20.90 0.00
17 CIELO RASO CON VIGA VISTA + MADERAMEN M2 194.82 0.00
18 REVOQUE YESO INTERIOR M2 156.83 0.00
19 REVOQUE CEMENTO EXTERIOR M2 90.21 0.00
20 EMPEDRADO + CONTRAPISO HS E=10 CM M2 197.91 0.00
21 PISO DE CERMICA NACIONAL M2 144.20 0.00
22 ZCALO DE CERMICA NACIONAL ML 55.90 0.00
23 CANALETA Y BAJANTE DE CALAMINA PLANA GAL. N 28 ML 26.70 0.00
24 TABLERO PARA MEDIDOR PZA 1.00 0.00
25 TABLERO DE DISTRIBUCIN ELECTRICO PZA 1.00 0.00
26 ILUMINACION FLUORESCENTE (2X40 W) PTO 15.00 0.00
27 INSTALACION ELECTRICA TOMACORRIENTE PTO 3.00 0.00
28 PUERTA DE MADERA ROBLE TIPO TABLERO + QUIN M2 8.32 0.00
29 VENTANA MADERA CEDRO M2 33.04 0.00
30 PROV. Y COLOC. VIDRIO DOBLE (3 MM.) M2 33.04 0.00
31 PINTURA LATEX INTERIOR M2 156.83 0.00
32 PINTURA LATEX EXTERIOR M2 90.21 0.00
33 PINTURA MUROS DE LADRILLO VISTO EXTERIOR M2 90.55 0.00
34 BARNIZADO EN CARPINTERIA DE MADERA M2 70.43 0.00
35 PROV. Y COL. REJAS METLICA M2 33.04 0.00
36 PLACA DE ENTREGA DE OBRAS PZA 1.00 0.00
37 LIMPIEZA GENERAL GLB 1.00 0.00
COSTO PARCIAL DEL PROYECTO (Bs.) 0.00

Nota La comunidad se encargar de retirar:


- cubierta de calamina ms el maderamen de la construccin existente
- Puerta, ventana + vidrios
- Quitar el medidor de luz + el cableado y todo lo que la comunidad vea por conveniente
almacer Esto se realizar con
anticipacion a que la empresa adjudicada inicie la ejecucin de la obra
PRESUPUESTO GENERAL

PROYECTO: CONSTRUCCIN SALN MULTIFUNCIONAL THONTORQA PLAZO

UBICACIN: COMUNIDAD THONTORQA PROPONENTE

DISTRITO: 8 120 DAS

PRECIO COSTO
ITEM DESCRIPCION UNID CANTIDAD
UNITARIO TOTAL
Arq. Janeth S. Faln Robledo
PROFESIONAL DE PROYECTOS D-8
CUADRO DE COTIZACION

PROYECTO: CONSTRUCCIN SALN MULTIFUNCIONAL THONTORQA DISTRITO :


UBICACION: COMUNIDAD THONTORQA FECHA:

DATOS DEL PROPONENTE PLAZO

Nombre y Apellidos: PROPONENTE

C.I.: NIT.: Fono: 120 DAS

ITEM DESCRIPCION UNID CANTIDAD PRECIO


UNITARIO
1 INSTALACION DE FAENAS GLB 1.00
2 REPLANTEO ESTRUCTURAS Y EDIFICACIONES M2 318.55
3 EXCAVACION TERRENO COMN C/MAQUINARIA M3 788.14
4 EXCAVACION MANUAL TERRENO SEMI DURO M3 21.34
5 CARGA Y TRANSPORTE MATERIAL EXCAVADO M3 1052.33
6 ZAPATAS DE H A + FIERRO TIPO "A" M3 2.76
7 COLUMNAS DE H A TIPO "A" M3 4.05
8 CIMIENTOS DE H C 50% P.D. TIPO "B" M3 8.06
9 COLUMNAS LADRILLO 18H (25X25 CM) ML 15.66
10 SOBRECIMIENTOS H C TIPO "A" 50 % P.D. M3 9.52
11 IMPERMEABILIZACION DE SOBRECIMIENTOS M2 13.66
12 MURO LADRILLO 18 H E=12 CM (VISTO) M2 127.95
13 VIGA CADENA DE HA TIPO "A" M3 3.75
14 BOTAGUAS DE LADRILLO GAMB E=12 CM VISTO ML 11.40
15 CUBIERTA TEJA COLONIAL CERMICA M2 213.39
16 CUMBRERA TEJA COLONIAL CERMICA ML 20.90
17 CIELO RASO CON VIGA VISTA + MADERAMEN M2 194.82
18 REVOQUE YESO INTERIOR M2 156.83
19 REVOQUE CEMENTO EXTERIOR M2 90.21
20 EMPEDRADO + CONTRAPISO HS E=10 CM M2 197.91
21 PISO DE CERMICA NACIONAL M2 144.20
22 ZCALO DE CERMICA NACIONAL ML 55.90
23 CANALETA Y BAJANTE DE CALAMINA PLANA GAL. N 28 ML 26.70
24 TABLERO PARA MEDIDOR PZA 1.00
25 TABLERO DE DISTRIBUCIN ELECTRICO PZA 1.00
26 ILUMINACION FLUORESCENTE (2X40 W) PTO 15.00
27 INSTALACION ELECTRICA TOMACORRIENTE PTO 3.00
28 PUERTA DE MADERA ROBLE TIPO TABLERO + QUIN M2 8.32
29 VENTANA MADERA CEDRO M2 33.04
30 PROV. Y COLOC. VIDRIO DOBLE (3 MM.) M2 33.04
31 PINTURA LATEX INTERIOR M2 156.83
32 PINTURA LATEX EXTERIOR M2 90.21
33 PINTURA MUROS DE LADRILLO VISTO EXTERIOR M2 90.55
34 BARNIZADO EN CARPINTERIA DE MADERA M2 70.43
35 PROV. Y COL. REJAS METLICA M2 33.04
36 PLACA DE ENTREGA DE OBRAS PZA 1.00
37 LIMPIEZA GENERAL GLB 1.00
COSTO PARCIAL DEL PROYECTO

La comunidad se encargar de retirar:


- cubierta de calamina ms el maderamen de la construccin existente
- Puerta, ventana + vidrios
- Quitar el medidor de luz + el cableado y todo lo que la comunidad vea por conveniente almacer
CUADRO DE COTIZACION

PROYECTO: CONSTRUCCIN SALN MULTIFUNCIONAL THONTORQA DISTRITO :


UBICACION: COMUNIDAD THONTORQA FECHA:

DATOS DEL PROPONENTE PLAZO

Nombre y Apellidos: PROPONENTE

C.I.: NIT.: Fono: 120 DAS

ITEM DESCRIPCION UNID CANTIDAD PRECIO


La comunidad se encargar de retirar: UNITARIO
- cubierta de calamina ms el maderamen de la construccin existente
- Puerta, ventana + vidrios
- Quitar el medidor de luz + el cableado y todo lo que la comunidad vea por conveniente almacer
Esto se realizar con anticipacion a que
la empresa adjudicada inicie la ejecucin de la obra

____________________
FIRMA PROPONENTE
8
OCTUBRE, 2012

PLAZO

PROPONENTE

120 DAS

COSTO
TOTAL

por conveniente almacer


8
OCTUBRE, 2012

PLAZO

PROPONENTE

120 DAS

COSTO
TOTAL
HONORABLE ALCALDIA DE SUCRE

DEPARTAMENTO DE ESTUDIOS Y PROYECTOS

CUADRO DE COTIZACION

DATOS DEL PROPONENTE


Nombre y Apellidos
NIT.
C.I.
Telfono

___________________
FIRMA PROPONENTE
PLAZO

PROPONENTE
INSTALACION DE FAENAS 5h
REPLANTEO ESTRUCTURAS Y EDIFICACIONES 6h
EXCAVACION TERRENO COMN C/MAQUINARIA 1d
EXCAVACION MANUAL TERRENO SEMI DURO 2d
CARGA Y TRANSPORTE MATERIAL EXCAVADO 2d
ZAPATAS DE H A + FIERRO TIPO "A" 2d
COLUMNAS DE H A TIPO "A" 2d
CIMIENTOS DE H C 50% P.D. TIPO "B" 2d
COLUMNA LADRILLO 18 H (25 X 25CM) 1d
SOBRECIMIENTOS H C TIPO "A" 50 % P.D. 6h
IMPERMEABILIZACION DE SOBRECIMIENTOS 1h
MURO LADRILLO 18H E=12 CM (VISTO) 15d
VIGA CADENA DE HA TIPO "A" 1d
BOTAGUAS DE LADRILLO GAMB E=12 CM VISTO 6h
CUBIERTA TEJA COLONIAL CERMICA 36d
CUMBRERA TEJA COLONIAL CERMICA 6h
CIELO RASO CON VIGA VISTA 19d
REVOQUE YESO INTERIOR 9d
REVOQUE CEMENTO EXTERIOR 6d
EMPEDRADO + CONTRAPISO HS E=10 CM 10d
PISO DE CERAMICA NACIONAL 12d
ZOCALO DE CERAMICA NACIONAL 1d
CANALETA Y BAJANTE DE CALAMINA GAL. N26 2d
TABLERO PARA MEDIDOR 0h
TABLERO DE DISTRIBUCION ELECTRICO 1h
ILUMINACION FLUORESCENTE (2X40 W) 2d
INSTALACION ELECTRICA TOMACORRIENTE 3h
PUERTA DE MADERA ROBLE TIPO TABLERO+QUI 2d
VENTANA MADERA CEDRO 3d
PROV. Y COLOC. VIDRIO DOBLE (3 MM.) 3h
PINTURA LATEX INTERIORES 2d
PINTURA LATEX EXTERIORES 2d
PINTURA MUROS DE LADRILLO VISTO 2d
BARNIZADO EN CARPINTERIA DE MADERA 1d
PROV. Y COL. REJAS METALICAS 2d
LIMPIEZA GENERAL 3h