You are on page 1of 6

Client : LAING O' ROURKE Date : NOV-06

Project : OXFORD UNIV. BIOCHEM PHASE-1 Calc'd by : V V


Estimate no : Checked by : SM
Contract no : 12320
Sheet no : C06/132/ 1-RevA

Connection - C06/132 ( Refer dwg no. 15458/001/S/03,@ grids 3/D)

LOADS: Vertical shear Tie force Propping force


UC 356x406x287 Fv := 325kN Ftie := 325kN P := 8375kN

UC 356x406x287 Fc := 8375kN
UC 356X406X287
2588.02kN

837
5kN
18
UC
356 7965.09kN
X40
6X2
87

SECTION-CC
A
B
C C D
STUB UC 356X406X287

50 80 80 80 80 80 80 195 195 80 80 80 80 80 80 50

50 120 120 120 170 120 120 120 120 120 120 120 120 120 120 120 120 120 120
40 THK PLATE

150
11 TYP
200

150
UC 356X406X287 D
A A
40 NOS.,M30 BOLTS GRADE 8.8 30 THK STIFFENER STRIP BEAM TOP & BOTTOM
B ( CAPTIVE NUTS TACK WELDED INNER OF FLANGES FOR BOLT ACCESS
(SNIPE 35x35)(TYP)
PLATE)
17mm PREP.,PPBW M30 BOLTS GRADE 8.8
(TYP) 50 THK CHEEK PLATE ( CAPTIVE NUTS TACK WELDED
INNER OF PLATE & FLANGE)
13mm PREP.,PPBW
75
= =

180
110
75

11 TYP
32 NOS.,M30 BOLTS GRADE 8.8 SECTION -BB
SECTION -DD
(1.5XDIA THREADED BOLTS)
250x25 THK END PLATE
50 THK END PLATE
BOLTS @ 150x/CRS

50 THK STIFFENER
15

UC 356X406X287 (TYP)
100
100
100

UC 305x305x198

NOTES: M24 BOLTS ON SLOTTED HOLES


SLOTS ON END PLATE(56 O/ALL)
PACKS 15(NOM)-30(MAX)
All welds are 8mmCFW SECTION -AA

All mail steels & fittings are Grade S355

All faces of connection are to be prepared for full contact bearing in accordance with Cl.7.2.3of
BS 5950 part 2

Variation no: Rev/date Description


- A/NOV-06 UPDATED TO SUIT INTERNAL REVIEW
Client : LAING O' ROURKE Date : NOV-06
Project : OXFORD UNIV. BIOCHEM PHASE-1 Calc'd by : V V
Estimate no : Checked by : SM
Contract no : 12320
Sheet no : C06/132/ 2-RevA

Sectional Properties
Column UC 305x305x198
Dc := 339.9mm Wc := 314.5mm Tc := 31.4mm tc := 19.1mm rc := 15.2mm dc := 246.7mm

Supporting Beam UC 356x406x287


2
Db := 393.6mm Wb := 399mm Tb := 36.5mm tb := 22.6mm rb := 15.2mm db := 290.2mm Ab := 36600mm

Propping Beam UC 356x406x287


2
Db1 := 393.6mmWb1 := 399mm Tb1 := 36.5mm tb1 := 22.6mm rb1 := 15.2mm db1 := 290.2mm Ab1 := 36600mm

Material Properties
N N
Design strength of S275 material py275 := 275 Bearing strength of material pbs := 460
upto & including 16mm thk 2 2
mm mm
Design strength of S355 material
N N
beyond 40mm thk and upto and py335 := 335 Design tensile strength for S275 pu275 := 328
including 63mm thk 2 2
mm mm

Design strength of S355 material N N


py345 := 345 Design tensile strength for S355 pu355 := 392
beyond 16mm thk and upto and 2 2
including 40mm thk mm mm

N
Design strength of weld pw := 220
2
mm
Check for Bolt

Dia of bolt d := 24mm Total no of bolts n := 6

Diameter of hole Dh := 26mm Shear capacity of bolt Ps1 := 132kN

No of bolt rows nr := 3 Tension capacity of bolt Pnom := 158kN

No of bolt columns nc := 2

tpa := 30mm
Thickness of packs

9d
Reduced shear capacity Ps := Ps1
8d + 3t Ps = 101.11 kN
pa

Fv
Vertical shear per bolt Fs := Fs = 54.17 kN
n

Fs(54.17 kN) < Ps(101.11 kN) : Therefore O.K.

Variation no: Rev/date Description


- A/NOV-06 UPDATED TO SUIT INTERNAL REVIEW
Client : LAING O' ROURKE Date : NOV-06
Project : OXFORD UNIV. BIOCHEM PHASE-1 Calc'd by : V V
Estimate no : Checked by : SM
Contract no : 12320
Sheet no : C06/132/ 3-RevA

Tie force
Ftie
Tension per bolt Ft := Ft = 54.17 kN
n

Ft(54.17 kN) < Pnom(158 kN) : Therefore O.K.

Check for weld between beam web and end plate


Ft kN
Tension per mm on weld FT := FT = 0.542
100mm mm

Fv kN
Vertical shear per mm FL := FL = 0.560
2 db mm

2
FT kN
Resultant force per mm R1 := + FL
2
R1 = 0.708
1.25 mm

R1
Size of fillet weld required s req := s req = 4.6 mm
0.7 pw

Adopt 8mm CFW

Check for end plate(tie force)


Ft tb
Moment due to bolt force M := 90mm 0.8 8mm M = 1.958 kN m
2 2

Dispersion length Ld := 80mm

M 4
Thickness of plate required treqd := treqd = 15.8 mm
pu355 Ld

Adopt 25mm thk end plate

Check for column flange(Tie force))


Ft tc
Moment due to bolt force M := 75mm rc M = 1.361 kN m
(Conservatively) 2 2

M 4
Thickness of flange required treqd := treqd = 13.18 mm < Tc = 31.4 mm
pu355 Ld

Therefore ok

Variation no: Rev/date Description


- A/NOV-06 UPDATED TO SUIT INTERNAL REVIEW
Client : LAING O' ROURKE Date : NOV-06
Project : OXFORD UNIV. BIOCHEM PHASE-1 Calc'd by : V V
Estimate no : Checked by : SM
Contract no : 12320
Sheet no : C06/132/ 4-RevA

Compression capacity of column web

ts := 50mm

15ts
Thickness of Stiffener plate

Wc tc
A2 := 4 35mm ts + 1878.6mm t c
2
Total area with stiffeners A2 = 58421.26 mm
2 2

1878.6
Bearing capacity of column web Pbw := A2 py335 Pbw = 19571.1 kN

15ts
P(8375 kN) < Pbw(19571.12 kN) : Therefore O.K.

Compression capacity of reduced beam section

( ) ( )
Reduced beam area 2
Ar1 := Ab 2 24.5 mm Tb 2 24.5 mm Tb Ar1 = 33023 mm

Compression capacity of beam Pt := Ar1 py345 Pt = 11392.94 kN

Pt (11392.94 kN) > P (8375 kN): Therefore O.K.

Checks for propping beam

Check for Bolt b/w propping beam & stub

Dia of bolt d := 30mm Total no of bolts n := 32

Diameter of hole Dh := 33mm Shear capacity of bolt Ps := 265kN

Component of incoming beam Fc1 := Fc cos ( 18deg) Fc1 = 7965.1 kN

Fc1
Vertical shear per bolt Fs := Fs = 248.91 kN
n

Fs(248.91 kN) < Ps(265 kN) : Therefore O.K.

Bearing capacity of stub web

Thickness of end plate tp := 50mm

Stiff bearing width (


b1 := tb1 + 2 tp + 5 Tb1 + rb1 ) b1 = 381.1 mm

Bearing capacity of stub web Pbs := b1 py335 tb1 Pbs = 2885.31 kN < Fc sin ( 18 deg) = 2588.02 kN

Adopt 30 thk stiffener Therefore fails

Variation no: Rev/date Description


- A/NOV-06 UPDATED TO SUIT INTERNAL REVIEW
Client : LAING O' ROURKE Date : NOV-06
Project : OXFORD UNIV. BIOCHEM PHASE-1 Calc'd by : V V
Estimate no : Checked by : SM
Contract no : 12320
Sheet no : C06/132/ 5-RevA

Stiff bearing width ( )


b2 := 30mm + 1.6 ( 8mm) + 2 Tb1 + 5 tp b2 = 365.8 mm

Stiff bearing width (


b1 := b2 + 2 tp + 5 Tb1 + rb1 ) b1 = 724.3 mm

Bearing capacity of stub web Pbs := 2b1 py335 tb1 Pbs = 10967.35 kN < Fc = 8375 kN
Therefore OK
Compression capacity of propping beam

Stiff bearing width b1 := tb + 1.6rb + 2 Tb + 5 tp b1 = 369.92 mm

Effective area ( )
Aeff := Db1 b1 Wb1 Aeff = 9448.32 mm
2

Fc2 := ( Ab1 Aeff) py335


Compression capacity of propping beam Fc2 = 9095.81 kN > Fc = 8375 kN

Therefore ok
All other checks are ok ,by inspection

Check for weld between propping beam flange and end plate

Fc1

2 kN
Vertical shear per mm(conservatively) FL := FL = 3.084
Wb1 mm
sin( 18deg)

FL
Size of PPBW required (
s := max 2 36.5 + 3 mm , ) + 3mm s = 16.74 mm
0.67py335
Adopt 17mm prep.PPBW

Check for bearing capacity of stub web @ column location

Stiff bearing width (


b1 := Dc + 2.5 ( 50mm) + 2.5 Tb1 + rb1 ) b1 = 594.15 mm

Fc sin ( 18deg) N N
Fch := Fch = 192.74 < py335 = 335
b1 tb 2 2
mm mm

Therefore ok

Variation no: Rev/date Description


- A/NOV-06 UPDATED TO SUIT INTERNAL REVIEW
Client : LAING O' ROURKE Date : NOV-06
Project : OXFORD UNIV. BIOCHEM PHASE-1 Calc'd by : V V
Estimate no : Checked by : SM
Contract no : 12320
Sheet no : C06/132/ 6-RevA

Case -1

Lv := 530mm 530
Lv = 530 mm
Shear length

260
Tensile length Lt := 260mm Lt = 260 mm

Block Shear capacity


( )
Pr := 0.6 py335 tb 2Lv + 3 Lt 1 Dh Pr = 7908.67 kN

Pr (7908.7 kN) > Fc1/2 (3982.5 kN): Therefore O.K.

All other checks are ok ,by inspection

Variation no: Rev/date Description


- A/NOV-06 UPDATED TO SUIT INTERNAL REVIEW

You might also like