Professional Documents
Culture Documents
1
Sl.
No. Description No. Length Width Depth Qty Unit Rate Amount
2
Sl.
No. Description No. Length Width Depth Qty Unit Rate Amount
3
Sl.
No. Description No. Length Width Depth Qty Unit Rate Amount
Total 23422099.1
4
Name of work : Improvements to Road Najumalige Circle to Five Light Circle ( Selected Reaches) CH 0.00 Km to
0.300KM in Mysore City
Sl.
No. Description No. Length Width Depth Qty Unit Rate Amount
1 KSRRB 500-2. Cleaning the existing black topped surface with brooms,
soft brushes and finally dusting with old gunny bags and / or
compressed air to receive bituminous treatment including cost of all
materials, labour, HOM of machineries complete as per specifications.
MORTH / Chapter 5
Total 2500000.0
Zone 1 Muda
Mysore
6
Name of work : Improvements to Narayanashastri road From Chamaraja Double road to JLB road via Siddapa
Square( selected Reaches ) CH 0.00 M to 260.00M in Mysore City
Sl.
No. Description No. Length Width Depth Qty Unit Rate Amount
1 KSRRB 500-2. Cleaning the existing black topped surface with brooms,
soft brushes and finally dusting with old gunny bags and / or
compressed air to receive bituminous treatment including cost of all
materials, labour, HOM of machineries complete as per specifications.
MORTH / Chapter 5
Total 2500000.0
Zone 1 Muda
Mysore
8
Name of work : Improvements to Narayanashastri road From Chamaraja Double road to JLB road via Siddapa
Square( selected Reaches ) CH 270.00 M to 630.00 M in Mysore City
Sl.
No. Description No. Length Width Depth Qty Unit Rate Amount
1 KSRRB 500-2. Cleaning the existing black topped surface with brooms,
soft brushes and finally dusting with old gunny bags and / or
compressed air to receive bituminous treatment including cost of all
materials, labour, HOM of machineries complete as per specifications.
MORTH / Chapter 5
( PWD , Mysore circle SR 2013-14 Page no.175 Item no. 21.2 )
From CH 270.0M to 480.0 M 1 210.00 12.0 - 2520.00
From CH 480.0M to 630.0 M 1 150.00 15.0 -
2250.00
4770.00 Sqm 2.52 12037.00
2 KSRRB M500-10. Tack Coat:- Providing and applying tack coat with
bitumen emulsion using emulsion pressure distributor at the rate of
0.20 kg per sqm on the prepared bituminous/granular surface cleaned
with mechancial broom. complete as per specifications. MORTH
Specification No. 503 Using 80/100 Bitumin
Total 2500000.0
Zone 1 Muda
Mysore
10
Name of work : Improvements to Narayanashastri road From Chamaraja Double road to JLB road via Siddapa
Square( selected Reaches ) CH 640.0 M to 830.0 M and CH 1380.00M to 1505.00M in Mysore City
Sl.
No. Description No. Length Width Depth Qty Unit Rate Amount
1 KSRRB 500-2. Cleaning the existing black topped surface with brooms,
soft brushes and finally dusting with old gunny bags and / or
compressed air to receive bituminous treatment including cost of all
materials, labour, HOM of machineries complete as per specifications.
MORTH / Chapter 5
( PWD , Mysore circle SR 2013-14 Page no.175 Item no. 21.2 )
From CH 640.0M to 830.00 M 1 290.00 12.0 - 3480.00
From CH 1380.0M to 1505.00M 1 125.00 10.0 - 1250.00
4730.00 Sqm 2.52 11936.00
2 KSRRB M500-10. Tack Coat:- Providing and applying tack coat with
bitumen emulsion using emulsion pressure distributor at the rate of
0.20 kg per sqm on the prepared bituminous/granular surface cleaned
with mechancial broom. complete as per specifications. MORTH
Specification No. 503 Using 80/100 Bitumin
Total 2500000.0
Zone 1 Muda
Mysore
12
Name of work : Improvements to Narayanashastri road From Chamaraja Double road to JLB road via Siddapa
Square( selected Reaches ) CH 1510.0 M to 1985.00 M in Mysore City
Sl.
No. Description No. Length Width Depth Qty Unit Rate Amount
1 KSRRB 500-2. Cleaning the existing black topped surface with brooms,
soft brushes and finally dusting with old gunny bags and / or
compressed air to receive bituminous treatment including cost of all
materials, labour, HOM of machineries complete as per specifications.
MORTH / Chapter 5
Total 2500000.0
Zone 1 Muda
Mysore
14
Name of work : Filling of Potholes to road from Ramaswamya circle to Harding Circle in Mysore City
Sl.
No. Description No. Length Width Depth Qty Unit Rate Amount
Total 495000.0
16
Sl.
No. Description No. Length Width Depth Qty Unit Rate Amount
Total 398476.4
17
Detailed Estimate for Septik Tank @ Ramabai nagar (Balance Area Road No.2 to
15)
CAzd
2500000.00
g.
Sl. Measurment
No Particular's Units No Quantity Rate
Length Breadth Depth
1 KSRB 2-2.2 : Earthwork excavation for pipeline trenches (except building
works) including on bank upto a lead of30metres including danger lighting
and using sight rails and boning rods at every 100 metres wherever
necessary as directed in the following strata (2014-15 SR Page No.5, Item
No.1)
A For 0 to 2m depth
For Upto Bottom &
Bed Concrete Cum 1 25.00 6.10 2.00 305.00
For triangular
Cum 0.5 15.35 6.10 0.23 10.53
Portion below
Total 246.91
Cum
C For 4 to 6m depth
For triangular
Portion below Cum 0.5 15.35 6.10 0.88 40.97
Total
40.97
Cum
In all soil mixed with boulders of 30 cms.size upto and exclusive of
disintegrated rock. (2014-15 SR Page No.5, Item No.1.1)
In hard rock by Chistelling containing iron ore upto 20% by chistelling and
trmming to proper slope. (2014-15 SR Page No.7, Item No.1.5)
4 KSRB 4-4.2 : Extra for use of water proofing compound in Cement concrete
of mix 1:1.5:3,at one kg of compound per bag of cement.
(2014-15 SR Page No.15, Item No.4.25)
Page 20
Sl. Measurment
Particular's Units No Quantity Rate
No Length Breadth Depth
7 KSRB 4.9.2 : Providing TMT Steel reinforcement for R.C.C work including
straightening, cutting, bending, hooking, placing in position, lapping and /
or welding wherever required, tying with binding wire and anchoring to
the adjoining members wherever necessary complete as per design (laps,
hooks and wastage shall not be measured and paid) cost of materials,
labour, HOM of machinery complete as per specifications.
(2014-15 SR Page No.19, Item No.4.46)
10.50 76066.53
Basic Rate 73851.00 M.T
Add 3% A.W. 2215.53
Total Rs. 76066.53
9 Supplying and fixing medium duty SFRC frame and cover confirming to IS 12592
(Part -1) 1988 and IS (Part-2) 1991 with latest amendment, including cutting slabs 0
the required size for the opening and fixing the cover in CC 1:2:4 and CM 1:3
plastering 20mm thick to all exposed faces,curing for 10 Day's with all lead and
life etc,Complete (P-151,I-17 of KUWS & DB SR 2010-2011)
2.00
2.00 1054.00
10 Providing and fixing cast iron soil pipe for ventilating shaft 5 meters high with
specials and cowl and with suitable grips in CC 1:2:4 pillar using 10mm to 20mm
graded hard granite/trap/basalt or any other approved metal with 15cm thick
C.C around upto 1.22 meters above the G.L and with a foundation base of
90x90x90cm plastered with 12mm thick CM 1:3 to all exposed faces and linking
the shaft to the manhole by means of 15cms.diaS.W pipes and
specials,joinying,with tar dipped hemp 1:1/2 C.M caulking,curing with all lead &
lifts.for all materials earth work excavation and refilling in all strata, and disposal
of surplus earh as directed with a lead of not more than 30 meters etc., complete
(P-161.I-9.2 of KUWS & DB SR 2010-2011)
Page 22
ea Road No.2 to
2500000.00
Amount
21934.00
51397.00
Page 23
Amount
89265.00
59072.00
115599.00
992244.00
Page 24
Amount
31097.00
141808.00
52291.00
Page 25
Amount
798699.00
110400.00
2108.00
Page 26
Amount
32662.00
1424.00
2500000 2500000 0
most economical and
ear 2014-2015.
fficer
DA, Mysore
Page 27