AZOTEA NPT (9.

25)

TRAMO (A1- C)

Peso propio 300 Kg/m

Acabados 100 Kg/m

D = 400 Kg/m

L = 100 Kg/m

WL= 100 X 0.4 0= 40 Kg/m

WD= 400x 0.4=160 Kg/m

3 3.75 m 4

TRAMO (B B 1)

Peso propio =300 Kg/m

Acabados = 100 Kg/m

D =400 Kg/m

L = 100 Kg/m

WL= 100X 0.4 = 40Kg/m

WD= 400X 0.4 = 160Kg/m

3.75 m
0.78 m 2 3

TRAMO (B1 C)

CM

Peso propio =300 Kg/m

Acabados = 100 Kg/m

400 Kg/m

P.P Base del tanque = 200 Kg/ m X 0.3m = 720Kg/ m

V.
Sobre caras = 100 Kg/m (para todo el tramo)

P H2O Peso de agua = 100 Kg X 0.4/ 1.5 m = (Una porcin)

= 178 Kg / m (Una porcin)

Debido al tanque 218

W= 100X0.4/1.5= 178Kg/m

WL= 100X0.4 = 40Kg/m

WL= 720Kg/mX 0.4m = 288Kg/m

WD=400 X 0.4= 160Kg/ m

1.0.78 m 1.50

2 243 2

VIGA EJES

Peso TRAMO AB

Carsa permanente

Peso propio = 0.25X 0.4X2400 = 240Kg/m

Peso propio de aliserado = 300 (0.30 + 1.47) = 531Kg/m

Acabados = 100 (1.47 + 0.3) 177 m

WD= 948

Sobre carsa =100 (1.47+0.3) = 177 = L

Tabique (1) 7424 X 2. 45 = 673,7

2.7

Tabique (2) = 669,3

TRAMO BC

Peso propio de la visa = 0.24 X 2 X 2400 = 240Kg /m

Peso de losa = 300 X 1.50 = 420

Acabados = 100 X 1.5 = 150

840

Sobre carsa = 100 (1,47 + 0.3) = 177 L

Tabique = 741 X 2 = 504.1

2.94
WL =177

WD1= 948 WD2= 1623.7 1617.3 1381

840

0.66 0.63 1m

4.83 3.58

A B C