DIRECT MANPOWER ALLOCATION REPORT - ALPINE TOWER

60 Date:-
Friday, July 07, 2017

ELECTRICAL
Sl.No ELECTRICAL Level Location Supervisor Electrician Helper Welder OTHER Sub-Total Remarks
Tower-1 Core Wall Core Back Box Installations 1 1 2
24th Flr All Appartments - Rope Pulling 1 1 2
3
1 25th Flr All Appartments - Rope Pulling 1 1 2
M/s Prabhat Power
33th Flr Lift Lobby & Staircase Conduiting 1 1 2

TOWER-2 10th Flr Lobby to All Apartments -Main Rope P/g 1 1 2


4th Flr Repairing Work 1 1 2
1
2 18th Flr Choke up - All Appartments 1 1 2
M/s Asean Power
21st Flr Chasing & Conduiting - All Appartments 1 1 2
16th to 17th Flr All appartments - House Keepings 1 1 2
TOTAL ELECTRICAL MANPOWER 22
PLUMBING
Sl.No Plumbing Level Location Supervisor Plumber Helper Welder Fitter OTHER Sub-Total Remarks
Tower-1 16th Flr Toiltes all Appts 1 1 2
13th Flr Toiltes all Appts 1 2 3
1 1
M/S Sterling & Wilson 17th & 18th Flr Toiltes all Appts 1 1 2
1th to 13th Flr Pumbing Shafts 3 & 7 2 2 4

TOWER-2 9th Flr Toiltes all Appts 1 1 2


11th Flr Toiltes all Appts 1 1 2
12th Flr Toilets all Appts 1 1 1 2
2
M/S Sterling & Wilson 16th Flr Toilets all Appts 1 1 2
13th Flr kitchen 1 1 2

TOTAL PLUMBING MANPOWER 21


FIRE FIGHTING
Sl.No Fire Fighting Level Location Supervisor Fitter Welder Helper Sub-Total Remarks
TOWER-1 P4 All Appartments 1 0 1 2
1 1
M/S Sterling & Wilson Fire Shaft All Appartments 2 1 3 6
TOWER-2 12 th Flr All Appartments 1 2 3
2 1
M/S Sterling & Wilson 13th Flr All Appartments 1 1 2 4

Total Fire Fighting Manpower 17


DIRECT MANPOWER ALLOCATION REPORT - ALPINE TOWER

Total Manpower: 19 Date:- Saturday, June 24, 2017

ELECTRICAL
Sl.No ELECTRICAL Level Location Supervisor Foreman Electrician Semi Electrician Helper Welder OTHER Sub-Total Remarks

18th Flr 2 2
1 M/s Asian Power
19th flr 2 2

20th Flr 2 2

3rd Flr 1 1

2 M/s Prabhat Powetech 16th Flr 7 2 12


3
21st Flr 0
35th Flr- Slab 0
0

TOTAL ELECTRICAL MANPOWER 19


PLUMBING
Sl.No Plumbing Level Location Supervisor Foreman Plumber Semi Plumber Helper Welder Fitter OTHER Sub-Total Remarks
0
0
0
0
0
0
0
0
0

TOTAL PLUMBING ELECTRICAL MANPOWER 0


FIRE FIGHTING
Sl.No Fire Fighting Level Location Supervisor Foreman Fitter Semi Fitter Welder Helper Sub-Total Remarks
0
0
0
0
Total Fire Fighting Manpower 0
DIRECT MANPOWER ALLOCATION REPORT - ALPINE TOWER

Total Manpower: 14 Date:- Sunday, June 25, 2017

ELECTRICAL
Sl.No ELECTRICAL Level Location Supervisor Foreman Electrician Semi Electrician Helper Welder OTHER Sub-Total Remarks

6th Flr 2 2
1 M/s Asian Power
4th Flr 2 2

20th Flr 2 2

21st Flr 1 1

2 M/s Prabhat Powetech 16th Flr 2 2


17th Flr 1 1
1
21st Flr 2 2
Store 2 2

TOTAL ELECTRICAL MANPOWER 14


PLUMBING
Sl.No Plumbing Level Location Supervisor Foreman Plumber Semi Plumber Helper Welder Fitter OTHER Sub-Total Remarks
0
0
0
0
0
0
0
0
0

TOTAL PLUMBING ELECTRICAL MANPOWER 0


FIRE FIGHTING
Sl.No Fire Fighting Level Location Supervisor Foreman Fitter Semi Fitter Welder Helper Sub-Total Remarks
0
0
0
0
Total Fire Fighting Manpower 0
DIRECT MANPOWER ALLOCATION REPORT - ALPINE TOWER

Total Manpower: 18 Date:- Monday, June 26, 2017

ELECTRICAL
Sl.No ELECTRICAL Level Location Supervisor Foreman Electrician Semi Electrician Helper Welder OTHER Sub-Total Remarks

20th Flr 2 1 3
1 M/s Asian Power
20th Flr 2 1 3
1
21st Flr 1 1 2

2 M/s Prabhat Powetech 16th Flr 1 1 2


2
23rd Flr 2 1 3
6th -8th Flr 1 1 2
19th Flr 2 1 3

TOTAL ELECTRICAL MANPOWER 18


PLUMBING
Sl.No Plumbing Level Location Supervisor Foreman Plumber Semi Plumber Helper Welder Fitter OTHER Sub-Total Remarks
0
0
0
0
0
0
0
0
0

TOTAL PLUMBING ELECTRICAL MANPOWER 0


FIRE FIGHTING
Sl.No Fire Fighting Level Location Supervisor Foreman Fitter Semi Fitter Welder Helper Sub-Total Remarks
0
0
0
0
Total Fire Fighting Manpower 0
DIRECT MANPOWER ALLOCATION REPORT - ALPINE TOWER

Total Manpower: 19 Date:- Saturday, June 24, 2017

ELECTRICAL
Sl.No ELECTRICAL Level Location Supervisor Foreman Electrician Semi Electrician Helper Welder OTHER Sub-Total Remarks

20th Flr 1 1 2
1 M/s Asian Power
18th Flr 1 1 2

16th Flr 1 1 1 2

21st Flr 1 1 2

13th Flr 1 1 2

2 M/s Prabhat Powetech 11th Flr 1 1


19th Flr 1 1
10th-13th Flr 1 1 2
1
37th Core Slab 1 1
16th -17th Flr 1 1 2
16th Flr 1 1 2

TOTAL ELECTRICAL MANPOWER 19


PLUMBING
Sl.No Plumbing Level Location Supervisor Foreman Plumber Semi Plumber Helper Welder Fitter OTHER Sub-Total Remarks
0
0
0
0
0
0
0
0
0

TOTAL PLUMBING ELECTRICAL MANPOWER 0


FIRE FIGHTING
Sl.No Fire Fighting Level Location Supervisor Foreman Fitter Semi Fitter Welder Helper Sub-Total Remarks
0
0
0
0
Total Fire Fighting Manpower 0
DIRECT MANPOWER ALLOCATION REPORT - ALPINE TOWER

Total Manpower: 71 Date:- Wednesday, June 28, 2017

ELECTRICAL
Sl.No ELECTRICAL Level Location Supervisor Foreman Electrician Semi Electrician Helper Welder OTHER Sub-Total Remarks

35th Flr - Slab 2 2


1 M/s Asian Power
17th Flr - Finishes 2 2

20th Flr - Finishes 1 2 2

21st Flr - Finishes 4 4

22nd Flr - Finishes 2 2

2 M/s Prabhat Powetech 35th Flr - Slab 3 3


16th Flr - Finishes 3 2 5
11th Flr - Finishes 1 1
2
0
0
0

TOTAL ELECTRICAL MANPOWER 21


PLUMBING
Sl.No Plumbing Level Location Supervisor Foreman Plumber Semi Plumber Helper Welder Fitter OTHER Sub-Total Remarks
Tower-1 11th floor 2 2 4
APT-3 PL SHAFT 1 2 4
1
8TH FLOOR 1 1 2
13TH FLOOR 1 2 3
APT-4 PL SHAFT 1 2 3
P4-SLEEVE CUTING 1 1
0
TOWER-2 0
9TH FLOOT 1 2 3
10th FLOOT 1 2 3
11th FLOOT 1 2 3
12th FLOOT 1 2 3
0
0
0
0

TOTAL PLUMBING ELECTRICAL MANPOWER 29


FIRE FIGHTING
Sl.No Fire Fighting Level Location Supervisor Foreman Fitter Semi Fitter Welder Helper Sub-Total Remarks

TOWER-1 2ND FLOOR 1 1 1 3


1
13TH FLOOR 1 1 2 4
FIRE SHAFT 1 3 4
TOWER-2 11TH FLOOR 2 1 2 5
1
PIPE 2 3 5
SHIFTING
0
0
0
0
0
Total Fire Fighting Manpower 21
DIRECT MANPOWER ALLOCATION REPORT - ALPINE TOWER

Total Manpower: 69 Date:- Wednesday, June 28, 2017

ELECTRICAL
Sl.No ELECTRICAL Level Location Supervisor Foreman Electrician Semi Electrician Helper Welder OTHER Sub-Total Remarks

20th Flr 1 1 2
1 M/s Asian Power
18th Flr 1 1 2
Tower-2
16th Flr 1 2 2 4

19th Flr 1 1 2

Tower-1 ( Choke Up) 1 1 2

2 M/s Prabhat Powetech 16th Flr 3 1 4

Tower -1 17th - 22th Flr 1 1 2


35 th Flr Slab 3 2 2
2
32 Flr Lobby 1 1 5

TOTAL ELECTRICAL MANPOWER 25


PLUMBING
Sl.No Plumbing Level Location Supervisor Foreman Plumber Semi Plumber Helper Welder Fitter OTHER Sub-Total Remarks
Tower-1 11th floor 1 1 2
APT-3 PL SHAFT 1 1 3
9TH FLOOR 1 0 1
10th FLOOR 1 1 1 2
13TH FLOOR 1 1 2
12th FLOOR 1 1 2
36th FLOOR 1 1 2
0
TOWER-2 9TH FLOOR 1 1 3
10th FLOOR 2 2 4
1
12th FLOOR 2 2 4
13th FLOOR 1 1 2
0
0
0
0

TOTAL PLUMBING ELECTRICAL MANPOWER 27


FIRE FIGHTING
Sl.No Fire Fighting Level Location Supervisor Foreman Fitter Semi Fitter Welder Helper Sub-Total Remarks

TOWER-1 16TH FLOOR 1 1 2 4


1
13TH FLOOR 1 2 2 5

TOWER-2 11TH FLOOR 2 2 2 6


1
PIPE 1 1 2
SHIFTING
0
0
0
0
0
Total Fire Fighting Manpower 17
DIRECT MANPOWER ALLOCATION REPORT - ALPINE TOWER

Total Manpower: 65 Date:- Friday, June 30, 2017

ELECTRICAL
Sl.No ELECTRICAL Level Location Supervisor Foreman Electrician Semi Electrician Helper Welder OTHER Sub-Total Remarks

16th Flr 1 1 2
1 M/s Asian Power
17th Flr 2 2 4
Tower-2
18th Flr 1 1 1 2

20 th Flr 1 1 2

2 M/s Prabhat Powetech 16th Flr 3 3

Tower -1 17th - 19th Flr 1 1 2


35 th Flr Slab 3 2 5
2
4TH Flr - Flooring 1 1

TOTAL ELECTRICAL MANPOWER 21


PLUMBING
Sl.No Plumbing Level Location Supervisor Foreman Plumber Semi Plumber Helper Welder Fitter OTHER Sub-Total Remarks
Tower-1 11th floor 1 1 2
APT-3 PL SHAFT 1 1 3
9TH FLOOR 1 0 1
10th FLOOR 1 1 1 2
13TH FLOOR 1 1 2
12th FLOOR 1 1 2
36th FLOOR 1 1 2
0
TOWER-2 9TH FLOOR 1 1 3
10th FLOOR 2 2 4
1
12th FLOOR 2 2 4
13th FLOOR 1 1 2
0
0
0
0

TOTAL PLUMBING ELECTRICAL MANPOWER 27


FIRE FIGHTING
Sl.No Fire Fighting Level Location Supervisor Foreman Fitter Semi Fitter Welder Helper Sub-Total Remarks

TOWER-1 16TH FLOOR 1 1 2 4


1
13TH FLOOR 1 2 2 5

TOWER-2 11TH FLOOR 2 2 2 6


1
PIPE 1 1 2
SHIFTING
0
0
0
0
0
Total Fire Fighting Manpower 17
DIRECT MANPOWER ALLOCATION REPORT - ALPINE TOWER

Total Manpower: 63 Date:- Saturday, July 01, 2017

ELECTRICAL
Sl.No ELECTRICAL Level Location Supervisor Foreman Electrician Semi Electrician Helper Welder OTHER Sub-Total Remarks

17th Flr (DB Fix) 1 1 2


1 M/s Asian Power
17th Flr 2 2

17 th Flr (Rope) 1 1 1 2

19th -21th flr 1 1 2

2 M/s Prabhat Powetech 16th Flr 3 3


16th - 22th Flr 1 1 2
35 th Flr Slab 3 2 5
3
13th Flr - VDP's 1 1

TOTAL ELECTRICAL MANPOWER 19


PLUMBING
Sl.No Plumbing Level Location Supervisor Foreman Plumber Semi Plumber Helper Welder Fitter OTHER Sub-Total Remarks
Tower-1 12&13th floor 2 2 4
APT-4 PL SHAFT 1 1 3
1
8TH&9TH FLOOR 1 1 2
12TH FLOOR 1 1 2
36TH FLOOR SLEEVE 1 1 2
0
TOWER-2 0
9th FLOOR 1 1 2
10th FLOOR 1 1 2 4
10th FLOOR 1 1 2
12&13TH FLOOR 3 3 6
0
0
0

TOTAL PLUMBING ELECTRICAL MANPOWER 27


FIRE FIGHTING
Sl.No Fire Fighting Level Location Supervisor Foreman Fitter Semi Fitter Welder Helper Sub-Total Remarks

TOWER-1 13TH FLOOR 1 2 2 3 7

16TH FLOOR 1 1 2

TOWER-2 11TH FLOOR 0 1 1 2


1
12TH FLOOR 1 1 2 4

13TH FLOOR 1 1 2
0
0
0
0
Total Fire Fighting Manpower 17
DIRECT MANPOWER ALLOCATION REPORT - ALPINE TOWER

Total Manpower: 18 Date:- Monday, July 03, 2017

ELECTRICAL
Sl.No ELECTRICAL Level Location Supervisor Foreman Electrician Semi Electrician Helper Welder OTHER Sub-Total Remarks

16th Flr Choke Up 1 1 2


1 M/s Asian Power
16th Flr Rope Pulling 2 2

6th to 20th Flr 1 1 1

2 M/s Prabhat Powetech 16th Flr 3 3


16th - 22th Flr 1 1 2
35 th Flr Slab 2 2 4
2
10th to 12th Flr Finishing 1 1
23rd Flr Wall 2 1 3

TOTAL ELECTRICAL MANPOWER 18


PLUMBING
Sl.No Plumbing Level Location Supervisor Foreman Plumber Semi Plumber Helper Welder Fitter OTHER Sub-Total Remarks
Tower-1 12&13th floor 0
APT-4 PL SHAFT 0
8TH&9TH FLOOR 0
12TH FLOOR 0
36TH FLOOR SLEEVE 0
0
TOWER-2 0
9th FLOOR 0
10th FLOOR 0
10th FLOOR 0
12&13TH FLOOR 0
0
0
0

TOTAL PLUMBING ELECTRICAL MANPOWER 0


FIRE FIGHTING
Sl.No Fire Fighting Level Location Supervisor Foreman Fitter Semi Fitter Welder Helper Sub-Total Remarks
13TH
TOWER-1 FLOOR 0

16TH
FLOOR 0

11TH
TOWER-2 FLOOR 0

12TH
FLOOR 0

13TH
0
FLOOR
0
0
0
0
Total Fire Fighting Manpower 0
DIRECT MANPOWER ALLOCATION REPORT - ALPINE TOWER

61 Date:-
Thursday, July 06, 2017

ELECTRICAL
Sl.No ELECTRICAL Level Location Supervisor Electrician Helper Welder OTHER Sub-Total
Tower-1 6th,7th,12th,16th Flr Appt-1,Appt-1,Toilets, Appt-1&2 2 2 4
24th Flr All Appartments 3 1 4
3
1 25th Flr All Appartments 1 1 2
M/s Prabhat Power
1-20th Flr House Keeping 1 1

TOWER-2 9th Flr Lobby to All Apartments -Main Rope P/g 1 1 2


3st Flr Kitchens Reworks - All Appartments 1 1 2
1
2 17th Flr Choke up - All Appartments 1 1 2
M/s Asean Power
19th Flr Chasing & Conduiting - All Appartments 2 1 3

TOTAL ELECTRICAL MANPOWER 24


PLUMBING
Sl.No Plumbing Level Location Supervisor Plumber Helper Welder Fitter OTHER Sub-Total
Tower-1 16th Flr Toiltes all Appts 1 1 2
12th Flr Toiltes all Appts 1 2 3
1 1
M/S Sterling & Wilson 10th Flr Toiltes all Appts 1 0 1
5th to 6th Flr Pumbing Shafts 5 & 6 2 2 4

TOWER-2 9th Flr Toiltes all Appts 1 1 2


11th & 12 th Flr Toiltes all Appts 1 1 2
1
2 8th to 13th Flr Toilets all Appts 1 2 3
M/S Sterling & Wilson
0

TOTAL PLUMBING ELECTRICAL MANPOWER 19


FIRE FIGHTING
Sl.No Fire Fighting Level Location Supervisor Fitter Welder Helper Sub-Total
TOWER-1 16th Flr All Appartments 1 1 1 3
1 1
M/S Sterling & Wilson Fire Shaft All Appartments 2 1 4 7
TOWER-2 12 th Flr All Appartments 1 1 2
2 1
M/S Sterling & Wilson 13th Flr All Appartments 1 1 2 4

Total Fire Fighting Manpower 18


Remarks

Remarks

Remarks
DIRECT MANPOWER ALLOCATION REPORT - ALPINE TOWER

61 Date:-
Friday, July 07, 2017

ELECTRICAL
Sl.No ELECTRICAL Level Location Supervisor Electrician Helper Welder OTHER Sub-Total
Tower-1 16th,17th Flr All Appartments - Choke Up Clearance 2 2 4
24th Flr All Appartments 1 1 2
3
1 25th Flr All Appartments 1 1 2
M/s Prabhat Power
36 th Flr All Appartments - RCC Box Fixing 1 1

TOWER-2 9th Flr Lobby to All Apartments -Main Rope P/g 1 1 2


37th Flr Lobby Conduiting 1 1 2
1
2 17th Flr Choke up - All Appartments 1 1 2
M/s Asean Power
21st Flr Chasing & Conduiting - All Appartments 1 1 2
16th to 20th Flr All appartments - House Keepings 1 1 2
TOTAL ELECTRICAL MANPOWER 23
PLUMBING
Sl.No Plumbing Level Location Supervisor Plumber Helper Welder Fitter OTHER Sub-Total
Tower-1 16th Flr Toiltes all Appts 1 1 2
13th Flr Toiltes all Appts 1 2 3
1 1
M/S Sterling & Wilson 17th & 18th Flr Toiltes all Appts 1 1 2
1th to 13th Flr Pumbing Shafts 3 & 7 2 2 4

TOWER-2 9th Flr Toiltes all Appts 1 1 2


11th Flr Toiltes all Appts 1 1 2
12th Flr Toilets all Appts 1 1 1 2
2
M/S Sterling & Wilson 16th Flr Toilets all Appts 1 1 2
13th Flr kitchen 1 1 2

TOTAL PLUMBING MANPOWER 21


FIRE FIGHTING
Sl.No Fire Fighting Level Location Supervisor Fitter Welder Helper Sub-Total
TOWER-1 P4 All Appartments 1 0 1 2
1 1
M/S Sterling & Wilson Fire Shaft All Appartments 2 1 3 6
TOWER-2 12 th Flr All Appartments 1 2 3
2 1
M/S Sterling & Wilson 13th Flr All Appartments 1 1 2 4

Total Fire Fighting Manpower 17


Remarks

Remarks

Remarks
DIRECT MANPOWER ALLOCATION REPORT - ALPINE TOWER

60 Date:-
Friday, July 07, 2017

ELECTRICAL
Sl.No ELECTRICAL Level Location Supervisor Electrician Helper Welder OTHER Sub-Total Remarks
Tower-1 Core Wall Core Back Box Installations 1 1 2
24th Flr All Appartments - Rope Pulling 1 1 2
3
1 25th Flr All Appartments - Rope Pulling 1 1 2
M/s Prabhat Power
33th Flr Lift Lobby & Staircase Conduiting 1 1 2

TOWER-2 10th Flr Lobby to All Apartments -Main Rope P/g 1 1 2


4th Flr Repairing Work 1 1 2
1
2 18th Flr Choke up - All Appartments 1 1 2
M/s Asean Power
21st Flr Chasing & Conduiting - All Appartments 1 1 2
16th to 17th Flr All appartments - House Keepings 1 1 2
TOTAL ELECTRICAL MANPOWER 22
PLUMBING
Sl.No Plumbing Level Location Supervisor Plumber Helper Welder Fitter OTHER Sub-Total Remarks
Tower-1 16th Flr Toiltes all Appts 1 1 2
13th Flr Toiltes all Appts 1 2 3
1 1
M/S Sterling & Wilson 17th & 18th Flr Toiltes all Appts 1 1 2
1th to 13th Flr Pumbing Shafts 3 & 7 2 2 4

TOWER-2 9th Flr Toiltes all Appts 1 1 2


11th Flr Toiltes all Appts 1 1 2
12th Flr Toilets all Appts 1 1 1 2
2
M/S Sterling & Wilson 16th Flr Toilets all Appts 1 1 2
13th Flr kitchen 1 1 2

TOTAL PLUMBING MANPOWER 21


FIRE FIGHTING
Sl.No Fire Fighting Level Location Supervisor Fitter Welder Helper Sub-Total Remarks
TOWER-1 P4 All Appartments 1 0 1 2
1 1
M/S Sterling & Wilson Fire Shaft All Appartments 2 1 3 6
TOWER-2 12 th Flr All Appartments 1 2 3
2 1
M/S Sterling & Wilson 13th Flr All Appartments 1 1 2 4

Total Fire Fighting Manpower 17


DIRECT MANPOWER ALLOCATION REPORT - ALPINE TOWER

72 Date:- Thursday, July 13, 2017

ELECTRICAL
Sl.No ELECTRICAL Level Location Supervisor Electrician Helper Welder OTHER Sub-Total Remarks
Tower-1 36th Flr Slab Conduiting Works 3 2 5
R2 Flr Box Fixing & Wall Conduiting 1 1 2 5 Nos are subjected
3 to safety induction
1 18th Flr DB Installation 1 1 2
M/s Prabhat Power
29th Flr Rope Pulling 1 1 2

TOWER-2 19th Flr Conduiting 2 1 3


20th Flr Repairing Work 1 1 2
21th Flr Conduiting Work 1 1 2
2 22th Flr Box Painting 1 1 1
M/s Asean Power
7th & 8th Flr Repairing Work - 1 1 2
R1 th Flr Box Fixing 1 1 2
23th Flr Drop Opening & Point Fixing 1 1
TOTAL ELECTRICAL MANPOWER 28
PLUMBING
Sl.No Plumbing Level Location Supervisor Plumber Helper Welder Fitter OTHER Sub-Total Remarks
Tower-1 16th Flr Toiltes all Appts 1 1 2
12th Flr Toiltes all Appts 1 1 2
1 17th & 18th Flr Toiltes all Appts 1 2 2 4
M/S Sterling & Wilson
37th Flr Slab 1 1 2
1th to 13th Flr Pumbing Shafts 3 & 7 2 2 4

TOWER-2 0
1st to 13th Flr Plumbing Shaft 5 & 8 1 1 2
12th Flr Toilets all Appts 1 1 1 2
2
M/S Sterling & Wilson 16th Flr Toilets all Appts 1 1 2
13th Flr kitchen 1 1 2
19th & 20th Flr Toilets all Appts 2 3 5
TOTAL PLUMBING MANPOWER 27
FIRE FIGHTING
Sl.No Fire Fighting Level Location Supervisor Fitter Welder Helper Sub-Total Remarks
TOWER-1
1 1
M/S Sterling & Wilson 8th, 9th & 10th Flr Lobby Area 2 1 5 8
TOWER-2 Fire Shaft All Appartments 1 1 3 5
2 1
M/S Sterling & Wilson 13th Flr All Appartments 1 1 2

Total Fire Fighting Manpower 17