MANPOWER ALLOCATION ( SHINBO )

Date: 4-Jul-16
Forman
BLDG Floor Work Description
Incharge
Foreman Elect. Sub Total
2F Removal of Services in Unassigned area Darwin 1 2 3

EPS rooms SNAG clearance 0 2 2


Tower Nestor
PMR Gypsum wall opening for ICT trunking System. 1 1 2

1F Replacment of busted Lamps Mone 1 3 4

PMR Sub Total 3 8 11

3F Mech. Area HMC SNAG Rectification Toto 1 2 3

Podium Labelling of Lighting Control Panels Artimeo 1 2 3

3M/1F
Replacment of busted LS9 Light in Lightwell & Abdul Awol 1 2 3
WH Removal of Services in Pharmacy Area

2F
Conduiting and wiring for Leak Detection Rayyan 2 2 4
system. (MCD-1486)

GF/1F
Recitifcation for Snag for CT, Radiology and Abu Bakar 1 3 4
Memography rooms.
WH Sub Total 6 11 17

9F Recitifcation for Snag List. Vinc 1 2 3

AH
Tower Gypsum wall opening for ICT trunking System. Shaheen 1 1 2

AH Sub Total 2 3 5

Conduiting and wiring for Leak Detection


Tri Boundary Hasheem 1 2 3
LL system. (MCD-1486)

LL Sub Total 1 2 3
Laying & Termination for Building Main
Conopy Rakib 1 2 3
External Entrance Signage Power.
LL Sub Total 1 2 3

13 26 39
Total