Primavera

Submitted by
{ V.Poorna Chandra Rao
Roll No : AH16123
Introduction
Primavera
Primavera is an enterprise project portfolio management software. It
includes project management, product management, collaboration
and control capabilities, and integrates with other enterprise
software such as Oracle and SAPs ERP systems. Primavera was
launched in 1983 by Primavera Systems Inc., which was acquired by
Oracle Corporation in 2008.

Enterprise Project Structure (EPS)


The enterprise project structure (EPS) represents the hierarchical
structure of all projects in the database. The EPS can be subdivided
into as many levels or nodes as needed to represent work at your
organization. Nodes at the highest, or root, level might represent
divisions within your company, project phases, site locations, or
other major groupings that meet the needs of your organization;
Introduction

Project planning
Project planning is part of project management, which relates to the use
of schedules such as Gantt charts to plan and subsequently report
progress within the project environment.

Resource levelling
A technique in which start and finish dates are adjusted based on
resource constraints with the goal of balancing demand for resources
with the available supply.
ADVANTAGES
We can set the multiple baseline to track the project
We can track the project actual cost, and planed cost.

We can track the earned value, planed value, actual cost of


project.
We can track schedule variance and schedule index

We can track Cost variance and Cost index

S.V= EV-PV IF <0 then behind the C.V= EV-PV IF <0 then over budget
schedule >0 then under budget
>0 then ahead of schedule =0 then on budget
=0 then on schedule
C.I = EV/PV if <1 then over budget
S.I = EV/PV if <1 then behind the >1 then under budget
schedule =1 then on budget
>1 then ahead of schedule
= 1 then on schedule
Benefits Of Baseline

A project baseline is essentially the baseline that is set for all


users who will access that particular project.

The project baseline is used for comparing to a projects dates,


cost and resourcing data.

It can also be used for earned value calculations.


Difference Between MSP and
Primavera
Basis MSProject Primavera

Multiple user acces Does not allow multiple Allow


users to work on a single
project at the same time.
Baseline 11 baselines can be created Unlimited baselines
for a project
Issues & Risks Issues or Risks cannot be Can record Issues and
tracked risks against a project,
wbs element or activity.
Web support Not available Plans, Document and
other information can be
converted to HRML
directly from the
software.
Custom Fields Formulas for custom fields Formulas cannot be set
possible and add additonal to custom fields,
values to it,