You are on page 1of 52

14-jun-2017 Pagina: 1 de 36

XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.1 Anlisis No.: 10
Anlisis: CIME:0010 M2 657.78
LIMPIA, TRAZO Y NIVELACION DEL TERRENO (AREA DE EDIFICIOS).
MATERIALES
CALCALHIDRA TON $2,575.00 0.000200 $0.52 6.91%

DUELADUELA DE PINO DE 3a DE 3/4"x3.5"x8.25'' PZA $26.74 0.020000 7.05%


$0.53

MAHILOHILO CAAMO PZA $15.33 0.001000 $0.02 0.27%

3.VARILLA DE 3/8" 9.5 MM KG $14.42 0.020000 $0.29 3.86%

SUBTOTAL: MATERIALES $1.36 18.09%


MANO DE OBRA
1A1PCUADRILLA No 5 (1 ALBAIL+1 PEON) JOR $1,029.27 / 200.000000 68.48%

$5.15
SUBTOTAL: MANO DE OBRA $5.15 68.48%
EQUIPO Y HERRAMIENTA
%MO1HERRAMIENTA MENOR % $5.15 0.030000 1.99%
$0.15

SUBTOTAL: EQUIPO Y HERRAMIENTA $0.15 1.99%


BASICOS
100.CONCRETO DE F'c=100 KG/CM2. HECHO EN M3 $1,726.46 0.000500 11.44%

$0.86
OBRA, T.M.A=19 MM, RESISTENCIA
NORMAL
SUBTOTAL: BASICOS $0.86 11.44%
Costo Directo: $7.52
INDIRECTOS 10.358% $0.78
SUBTOTAL $8.30
FINANCIAMIENTO 2.2356% $0.19
SUBTOTAL $8.49
UTILIDAD 12.9032% $1.10
PRECIO UNITARIO $9.59
(* NUEVE PESOS 59/100 M.N. *)

ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA


14-jun-2017 Pagina: 2 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.1 Anlisis No.: 20
Anlisis: CIM:0021 M3 205.55
EXCAVACION A MANO EN TERRENO TIPO "C", CUALQUIER PROFUNDIDAD, INCLUYE: AFINE TALUDES, FONDO DE EXCAVACION,
ACARREOS DENTRO DE LA OBRA HASTA PRIMERA ESTACION ( 20.00 M ), MANO DE OBRA, HERRAMIENTA Y EQUIPO.
MANO DE OBRA

1PCUADRILLA No 1 (1 PEON) JOR $347.04 / 1.330000 $260.93 97.09%

SUBTOTAL: MANO DE OBRA $260.93 97.09%


EQUIPO Y HERRAMIENTA
%MO1HERRAMIENTA MENOR % $260.93 0.030000 2.91%

$7.83
SUBTOTAL: EQUIPO Y HERRAMIENTA $7.83 2.91%
Costo Directo: $268.76
INDIRECTOS 10.358% $27.84
SUBTOTAL $296.60
FINANCIAMIENTO 2.2356% $6.63
SUBTOTAL $303.23
UTILIDAD 12.9032% $39.13
PRECIO UNITARIO $342.36
(* TRESCIENTOS CUARENTA Y DOS PESOS 36/100 M.N. *)

ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA


14-jun-2017 Pagina: 3 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.1 Anlisis No.: 30
Anlisis: CIME:0035 M2 48.22
PLANTILLA DE CONCRETO HECHO EN OBRA F'C=100 KG/CM2 DE 5 CMS. DE ESPESOR., INCLUYE: ELABORACION DEL CONCRETO,
ACARREO A 2 ESTACIONES DE 20 MTS., HERRAMIENTA, LIMPIEZA Y MANO DE OBRA.
MANO DE OBRA
1A1PCUADRILLA No 5 (1 ALBAIL+1 PEON) JOR $1,029.27 0.050000 36.48%
$51.46

SUBTOTAL: MANO DE OBRA $51.46 36.48%


EQUIPO Y HERRAMIENTA
%MO1HERRAMIENTA MENOR % $51.46 0.030000 $1.54 1.09%

SUBTOTAL: EQUIPO Y HERRAMIENTA $1.54 1.09%


BASICOS
100.CONCRETO DE F'c=100 KG/CM2. HECHO EN M3 $1,726.46 0.051000 $88.05 62.42%

OBRA, T.M.A=19 MM, RESISTENCIA


NORMAL
SUBTOTAL: BASICOS $88.05 62.42%
Costo Directo: $141.05
INDIRECTOS 10.358% $14.61
SUBTOTAL $155.66
FINANCIAMIENTO 2.2356% $3.48
SUBTOTAL $159.14
UTILIDAD 12.9032% $20.53
PRECIO UNITARIO $179.67
(* CIENTO SETENTA Y NUEVE PESOS 67/100 M.N. *)

ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA


14-jun-2017 Pagina: 4 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.1 Anlisis No.: 40
Anlisis: CIME:0050 M3 43.7
RELLENO Y COMPACT. D/MAT/P/EXCAV.C/PISON Y AGUA, EN CAPAS DE 20CM. INCLLUYE: ACARREO A UNA ESTACION DE 20 MTS,
TRASPALEO, INCORPORACION DE AGUA, HERRAMIENTA Y MANO DE OBRA
MATERIALES
AGUAAGUA ( MANEJO) M3 $123.60 0.100000 7.96%

$12.36
SUBTOTAL: MATERIALES $12.36 7.96%
MANO DE OBRA
1ACUADRILLA No 3 (1 AYUDANTE GENERAL) JOR $416.45 / 3.000000 $138.82 89.37%

SUBTOTAL: MANO DE OBRA $138.82 89.37%


EQUIPO Y HERRAMIENTA
%MO1HERRAMIENTA MENOR % $138.82 0.030000 2.68%

$4.16
SUBTOTAL: EQUIPO Y HERRAMIENTA $4.16 2.68%
Costo Directo: $155.34
INDIRECTOS 10.358% $16.09
SUBTOTAL $171.43
FINANCIAMIENTO 2.2356% $3.83
SUBTOTAL $175.26
UTILIDAD 12.9032% $22.61
PRECIO UNITARIO $197.87
(* CIENTO NOVENTA Y SIETE PESOS 87/100 M.N. *)

ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA


14-jun-2017 Pagina: 5 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.1 Anlisis No.: 50
Anlisis: CIME:0070 M2 195.09
CIMBRA PARA CIMENTACION CON MADERA DE PINO DE 3a.,ACABADO COMUN, INCLUYE CIMBRADO Y DESCIMBRADO.
MATERIALES
DUELADUELA DE PINO DE 3a DE 3/4"x3.5"x8.25'' PZA $26.74 1.000000 $26.74 16.20%

BARROTEBARROTE DE PINO DE 3a DE 1.5"x3.5"x8.25'' PZA $38.76 0.200000 4.70%

$7.75
POLINPOLIN DE PINO DE 3a DE 3.5"x3."x8.25'' PZA $64.16 0.100000 3.89%

$6.42
1.ALAMBRE RECOCIDO KG $22.66 0.200000 $4.53 2.74%

DIESELDIESEL LTO $14.43 0.300000 2.62%

$4.33
CLAVOSCLAVOS DE 2 A 4 " KG $24.72 0.200000 2.99%

$4.94
SUBTOTAL: MATERIALES $54.71 33.14%
MANO DE OBRA
1C1ACUADRILLA No 7 (1 CARP. O.N. + JOR $964.27 / 9.000000 $107.14 64.91%

AYUDANTE)
SUBTOTAL: MANO DE OBRA $107.14 64.91%
EQUIPO Y HERRAMIENTA
%MO1HERRAMIENTA MENOR % $107.14 0.030000 $3.21 1.94%

SUBTOTAL: EQUIPO Y HERRAMIENTA $3.21 1.94%


Costo Directo: $165.06
INDIRECTOS 10.358% $17.10
SUBTOTAL $182.16
FINANCIAMIENTO 2.2356% $4.07
SUBTOTAL $186.23
UTILIDAD 12.9032% $24.03
PRECIO UNITARIO $210.26
(* DOSCIENTOS DIEZ PESOS 26/100 M.N. *)

ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA


14-jun-2017 Pagina: 6 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.1 Anlisis No.: 60
Anlisis: CIME:0080 M3 25.54
CONCRETO F'C=250 KG/CM2 EN CIMENTACION, T.M.A 3/4", HECHO EN OBRA, INCLUYE: COLADO, VIBRADO Y CURADO. ACARREOS A 2
ESTACIONES DE 20 MTS. HERRAMIENTA Y MANO DE OBRA.
MANO DE OBRA
1A5PCUADRILLA No 22 (1 ALBAIL + 5 PEONES) JOR $2,292.31 / 5.000000 $458.46 16.62%

SUBTOTAL: MANO DE OBRA $458.46 16.62%


EQUIPO Y HERRAMIENTA
$30.99
EQVIBVIBRADOR PARA CONCRETO HOR $61.98 0.500000 1.12%

%MO1HERRAMIENTA MENOR % $458.46 0.030000 0.50%


$13.75

SUBTOTAL: EQUIPO Y HERRAMIENTA $44.74 1.62%


BASICOS
250.CONCRETO DE F'c=250 KG/CM2, HECHO EN M3 $2,210.84 1.020000 $2,255.06 81.76%

OBRA, T.M.A.= 19 MM, RESISTENCIA


NORMAL
SUBTOTAL: BASICOS $2,255.06 81.76%
Costo Directo: $2,758.26
INDIRECTOS 10.358% $285.70
SUBTOTAL $3,043.96
FINANCIAMIENTO 2.2356% $68.05
SUBTOTAL $3,112.01
UTILIDAD 12.9032% $401.55
PRECIO UNITARIO $3,513.56
(* TRES MIL QUINIENTOS TRECE PESOS 56/100 M.N. *)

ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA


14-jun-2017 Pagina: 7 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.1 Anlisis No.: 70
Anlisis: CIME: 0120 KG 934.06
ACERO REFUERZO CIMENT. DIAMETRO #3 F'Y=4200KG/CM2 INCL. SUMINIST.HABILIT.ARMADO, TRASLAPES,SILLETAS,GANCHOS Y
DESPER.
MATERIALES
1.ALAMBRE RECOCIDO KG $22.66 0.500000 36.33%
$11.33

$15.43
3.VARILLA DE 3/8" 9.5 MM KG $14.42 1.070000 49.47%
SUBTOTAL: MATERIALES $26.76 85.80%
MANO DE OBRA
1F1ACUADRILLA No 6 (1 FIERRERO + 1 JOR $816.78 / 190.000000 $4.30 13.79%

AYUDANTE)
SUBTOTAL: MANO DE OBRA $4.30 13.79%
EQUIPO Y HERRAMIENTA
%MO1HERRAMIENTA MENOR % $4.30 0.030000 $0.13 0.42%

SUBTOTAL: EQUIPO Y HERRAMIENTA $0.13 0.42%


Costo Directo: $31.19
INDIRECTOS 10.358% $3.23
SUBTOTAL $34.42
FINANCIAMIENTO 2.2356% $0.77
SUBTOTAL $35.19
UTILIDAD 12.9032% $4.54
PRECIO UNITARIO $39.73
(* TREINTA Y NUEVE PESOS 73/100 M.N. *)

ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA


14-jun-2017 Pagina: 8 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.1 Anlisis No.: 80
Anlisis: CIME: 0121 KG 248.49
ACERO REFUERZO CIMENT. DIAMETRO #4 F'Y=4200KG/CM2 INCL. SUMINIST.HABILIT.ARMADO, TRASLAPES,SILLETAS,GANCHOS Y
DESPER.
MATERIALES
1.ALAMBRE RECOCIDO KG $22.66 0.400000 31.62%
$9.06

$15.43
4.VARILLA DE 1/2" 12.7 MM KG $14.42 1.070000 53.86%
SUBTOTAL: MATERIALES $24.49 85.48%
MANO DE OBRA
1F1ACUADRILLA No 6 (1 FIERRERO + 1 JOR $816.78 / 202.000000 $4.04 14.10%

AYUDANTE)
SUBTOTAL: MANO DE OBRA $4.04 14.10%
EQUIPO Y HERRAMIENTA
%MO1HERRAMIENTA MENOR % $4.04 0.030000 $0.12 0.42%

SUBTOTAL: EQUIPO Y HERRAMIENTA $0.12 0.42%


Costo Directo: $28.65
INDIRECTOS 10.358% $2.97
SUBTOTAL $31.62
FINANCIAMIENTO 2.2356% $0.71
SUBTOTAL $32.33
UTILIDAD 12.9032% $4.17
PRECIO UNITARIO $36.50
(* TREINTA Y SEIS PESOS 50/100 M.N. *)

ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA


14-jun-2017 Pagina: 9 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.1 Anlisis No.: 90
Anlisis: CIME: 0122 KG 628.87
ACERO REFUERZO CIMENT. DIAMETRO #5 F'Y=4200KG/CM2 INCL. SUMINIST.HABILIT.ARMADO, TRASLAPES,SILLETAS,GANCHOS Y
DESPER.
MATERIALES
1.ALAMBRE RECOCIDO KG $22.66 0.350000 28.77%
$7.93

$15.43
5.VARILLA DE 5/8" 15.9 MM KG $14.42 1.070000 55.99%
SUBTOTAL: MATERIALES $23.36 84.76%
MANO DE OBRA
1F1ACUADRILLA No 6 (1 FIERRERO + 1 JOR $816.78 / 200.000000 $4.08 14.80%

AYUDANTE)
SUBTOTAL: MANO DE OBRA $4.08 14.80%
EQUIPO Y HERRAMIENTA
%MO1HERRAMIENTA MENOR % $4.08 0.030000 $0.12 0.44%

SUBTOTAL: EQUIPO Y HERRAMIENTA $0.12 0.44%


Costo Directo: $27.56
INDIRECTOS 10.358% $2.85
SUBTOTAL $30.41
FINANCIAMIENTO 2.2356% $0.68
SUBTOTAL $31.09
UTILIDAD 12.9032% $4.01
PRECIO UNITARIO $35.10
(* TREINTA Y CINCO PESOS 10/100 M.N. *)

ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA


14-jun-2017 Pagina: 10 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.1 Anlisis No.: 100
Anlisis: CIME: 0125 KG 74.4
SUMINISTRO Y COLOCACION DE ANCLAS DE REDONDO LISO DE 5/8" CON UN DESARROLLO DE 1 M CON ROSCA EN UN EXTREMO,
INCLUYE TUERCAS Y RONDANAS, TRAZO, MATERIALES, CORTES, FIJACION, MANO DE OBRA, EQUIPO Y HERRAMIENTA.
MATERIALES
7018SOLDADURA ELECTRODO 7018 KG $34.53 0.050000 4.45%
$1.73

ANCLA8ANCLA DE 5/8" DE DIAM. DE 100 CM. KG $18.27 1.070000 50.23%


$19.55

C/TUERCA
SUBTOTAL: MATERIALES $21.28 54.68%
MANO DE OBRA
1S2ECUADRILLA No 18 (1 SOLDADOR+2 AY.ESP.) JOR $1,676.16 / 100.000000 $16.76 43.06%

SUBTOTAL: MANO DE OBRA $16.76 43.06%


EQUIPO Y HERRAMIENTA
EQPLANPLANTA DE SOLDAR MILLER HOR $7.50 0.050000 $0.38 0.98%

%MO1HERRAMIENTA MENOR % $16.76 0.030000 $0.50 1.28%

SUBTOTAL: EQUIPO Y HERRAMIENTA $0.88 2.26%


Costo Directo: $38.92
INDIRECTOS 10.358% $4.03
SUBTOTAL $42.95
FINANCIAMIENTO 2.2356% $0.96
SUBTOTAL $43.91
UTILIDAD 12.9032% $5.67
PRECIO UNITARIO $49.58
(* CUARENTA Y NUEVE PESOS 58/100 M.N. *)

ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA


14-jun-2017 Pagina: 11 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.2 Anlisis No.: 10
Anlisis: ESTR:0210 PZA 10
COLUMNA A BASE DE PERFIL TUBULAR CIRCULAR HUECO OC DE 10" CED. 40 DE 6 M DE ALTURA, CON UNA PLACA DE ACERO DE
45x45CM SOLDADA EN SUS EXTREMOS Y CARTABONES DE REFUERZO EN LA PLACA INFERIOR, INCLUYE: SOLDADURA,
PRIMER,MATERIAL, MANO DE OBRA, EQUIPO Y HERRAMIENTA.
MATERIALES
PTH-OC-204PERFIL TUBULAR REDONDO HUECO DE 10" PZA $11,837.46 1.020000 86.99%
$12,074.21

CED. 40
CO08PRIMARIO ANTICORROSIVO No.2, 89-97 LT $53.28 0.500000 0.19%

$26.64
BLANCO, 98 GRIS CLARO, 96 ROJO OXIDO
SUBTOTAL: MATERIALES $12,100.85 87.18%
MANO DE OBRA
1F1ACUADRILLA No 6 (1 FIERRERO + 1 JOR $816.78 / 0.850000 $960.92 6.92%

AYUDANTE)
SUBTOTAL: MANO DE OBRA $960.92 6.92%
EQUIPO Y HERRAMIENTA
%MO1HERRAMIENTA MENOR % $960.92 0.030000 $28.83 0.21%

%MO2ANDAMIOS % $960.92 0.030000 0.21%

$28.83
SUBTOTAL: EQUIPO Y HERRAMIENTA $57.66 0.42%
BASICOS
ESTCARTCartabn para estructura a base de placa de KG $58.28 1.000000 $58.28 0.42%

acero A-36, soldada a columnas y/o postes con


soldadura de electrodo 7018, incluye:
materiales, cortes, soldadura, mano de obra,
equipo y herramienta.
ESA64040Placa base de 3/4" de 45x45 cm. con 4 anclas PZA $701.77 1.000000 $701.77 5.06%

de redondo de 1" con un desarrollo de 90 cm


con rosca en un extremo, incluye: tuercas y
rondanas, trazo, materiales, cortes, soldadura,
fijacin, mano de obra, equipo y herramienta.
SUBTOTAL: BASICOS $760.05 5.48%
Costo Directo: $13,879.48
INDIRECTOS 10.358% $1,437.64
SUBTOTAL $15,317.12
FINANCIAMIENTO 2.2356% $342.43
SUBTOTAL $15,659.55
UTILIDAD 12.9032% $2,020.58
PRECIO UNITARIO $17,680.13
(* DIECISIETE MIL SEISCIENTOS OCHENTA PESOS 13/100 M.N. *)

ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA


14-jun-2017 Pagina: 12 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.2 Anlisis No.: 20
Anlisis: HERR:0010 M2 487.21
SUMINISTRO, NIVELACION Y MONTAJE DE CUBIERTA EN ARCO , A BASE DE LAMINA PINTRO ALUM CAL. 26, , INCLUYE: FLETES AL
SITIO,GRUA PARA MONTAJE, MANIOBRAS, ELEVACION, ACARREOS A UNA ESTACION DE 20 MTS., SOLDADURA E-6013 Y E-7018, CORTES,
FIJACION, SELLADO DE ORIFICIOS CON SILICON, HERRAMIENTA, MANO DE OBRA Y LIMPIEZA GENERAL.
MATERIALES
CO08PRIMARIO ANTICORROSIVO No.2, 89-97 LT $53.28 0.604000 $32.18 5.82%

BLANCO, 98 GRIS CLARO, 96 ROJO OXIDO


7018SOLDADURA ELECTRODO 7018 KG $34.53 0.075000 $2.59 0.47%

FB23PERFIL PTR DE 1 1/2" DE 1/8" KG $19.10 1.000000 3.45%

$19.10
SUBTOTAL: MATERIALES $53.87 9.74%
MANO DE OBRA
1F1ACUADRILLA No 6 (1 FIERRERO + 1 JOR $816.78 / 4.000000 $204.20 36.91%

AYUDANTE)
SUBTOTAL: MANO DE OBRA $204.20 36.91%
EQUIPO Y HERRAMIENTA
%MO1HERRAMIENTA MENOR % $204.20 0.030000 $6.13 1.11%

%MO2ANDAMIOS % $204.20 0.030000 $6.13 1.11%

EQPLANPLANTA DE SOLDAR MILLER HOR $7.50 0.500000 $3.75 0.68%

EQGRUAGRUA DE PATIO DE 20. TON HOR $836.64 / 200.000000 $4.18 0.76%

SUBTOTAL: EQUIPO Y HERRAMIENTA $20.19 3.66%


BASICOS
LAR10126Lmina pintro R-101, cal. 26, en cubierta M2 $269.55 1.020000 49.70%

$274.94
metlica, incluye: materiales, acarreos,
elevacin, fijacion, mano de obra, equipo y
herramienta.
SUBTOTAL: BASICOS $274.94 49.70%
Costo Directo: $553.20
INDIRECTOS 10.358% $57.30
SUBTOTAL $610.50
FINANCIAMIENTO 2.2356% $13.65
SUBTOTAL $624.15
UTILIDAD 12.9032% $80.54
PRECIO UNITARIO $704.69
(* SETECIENTOS CUATRO PESOS 69/100 M.N. *)

ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA


14-jun-2017 Pagina: 13 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.2 Anlisis No.: 30
Anlisis: HERR:0110 ML 53.16
CANALON DE LAMINA GALVANIZADA CAL 26 DE 8" x 4" DE DESARROLLO, APOYADO EN PTR Y LARGUERO, INCLUYE: MATERIALES DE
FIJACION, FLETES, ACARREOS, MANIOBRAS, DESPERDICIOS, ELEVACIONES, ANDAMIOS, MANO DE OBRA, HERRAMIENTA Y EQUIPO.
MATERIALES
7018SOLDADURA ELECTRODO 7018 KG $34.53 0.150000 $5.18 0.80%

CO08PRIMARIO ANTICORROSIVO No.2, 89-97 LT $53.28 0.100000 0.82%

$5.33
BLANCO, 98 GRIS CLARO, 96 ROJO OXIDO
THINNERTHINNER STANDARD LT $46.35 0.500000 3.58%

$23.18
FB001ANGULO DE FIER.1/8" x 3/4" TON $14,640.42 0.005000 11.31%
$73.20

$270.98
FB120LAMINA GALV. ESTRUCT. CAL.24 DE 16'' PZA $821.14 0.330000 41.85%
SUBTOTAL: MATERIALES $377.87 58.36%
MANO DE OBRA
1S2ECUADRILLA No 18 (1 SOLDADOR+2 AY.ESP.) JOR $1,676.16 / 7.000000 $239.45 36.98%

SUBTOTAL: MANO DE OBRA $239.45 36.98%


EQUIPO Y HERRAMIENTA
EQECORTEEQUIPO DE CORTE OXI-ACETILENO HOR $866.72 0.010000 1.34%
$8.67

EQPLANPLANTA DE SOLDAR MILLER HOR $7.50 0.100000 $0.75 0.12%

%MO1HERRAMIENTA MENOR % $239.45 0.040000 1.48%


$9.58

DOBLEZDOBLEZ DE LAMINA PZA $5.57 2.000000 1.72%


$11.14

SUBTOTAL: EQUIPO Y HERRAMIENTA $30.14 4.66%


Costo Directo: $647.46
INDIRECTOS 10.358% $67.06
SUBTOTAL $714.52
FINANCIAMIENTO 2.2356% $15.97
SUBTOTAL $730.49
UTILIDAD 12.9032% $94.26
PRECIO UNITARIO $824.75
(* OCHOCIENTOS VEINTICUATRO PESOS 75/100 M.N. *)

ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA


14-jun-2017 Pagina: 14 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.2 Anlisis No.: 40
Anlisis: ESTR:0215 PZA 1
CUBIERTA PARA GRADAS DE 15x2.05 M A BASE DE ESTRUCTURA METALICA CON TUBO CED. 40 DE 1 1/2" Y 2" Y POSTES DE 3" AHOGADA
EN MURO DE RESPALDO EN GRADAS, INCLUYE: TECHO DE POLICARBONATO UNIDO MEDIANTE PIJAS CON ARANDELAS Y GOMAS,
MATERIALES, ACARREOS, CORTES, TRAZO, HABILITADO, SOLDADURA, APLICACIN DE PRIMER ANTICORROSIVO, MONTAJE, MANO DE
OBRA, EQUIPO Y HERRAMIENTA.
MATERIALES
PLCRBNTPOLICARBONATO PARA TECHO M2 $228.08 31.030000 $7,077.32 16.87%

D-0107PIJA CABEZA PLANA 10x1 1/2" CTO. $27.24 0.400000 $10.90 0.03%

7018SOLDADURA ELECTRODO 7018 KG $34.53 0.057000 0.00%

$1.97
SUBTOTAL: MATERIALES $7,090.19 16.90%
MANO DE OBRA
1H1ACUADRILLA No 9 (1 HERRERO + AYUDANTE) JOR $994.33 / 0.270000 8.78%
$3,682.70

SUBTOTAL: MANO DE OBRA $3,682.70 8.78%


EQUIPO Y HERRAMIENTA
EQPLANPLANTA DE SOLDAR MILLER HOR $7.50 0.500000 $3.75 0.01%

SUBTOTAL: EQUIPO Y HERRAMIENTA $3.75 0.01%


BASICOS
TUA4075Tubo de acero soldable C-40 sin costura de 75 ML $650.39 16.750000 $10,894.03 25.96%

mm. de dimetro, incluye: materiales, acarreos,


cortes, soldadura, mano de obra, pruebas,
equipo y herramienta.
TUA4050Tubo de acero soldable C-40 sin costura de 50 ML $359.95 9.850000 $3,545.51 8.45%

mm. de dimetro, incluye: materiales, acarreos,


cortes, soldadura, mano de obra, pruebas,
equipo y herramienta.
TUA4038Tubo de acero soldable C-40 sin costura de 38 ML $286.19 58.500000 39.90%

$16,742.12
mm. de dimetro, incluye: materiales, acarreos,
cortes, soldadura, mano de obra, pruebas,
equipo y herramienta.
SUBTOTAL: BASICOS $31,181.66 74.31%
Costo Directo: $41,958.30
INDIRECTOS 10.358% $4,346.04
SUBTOTAL $46,304.34
FINANCIAMIENTO 2.2356% $1,035.18
SUBTOTAL $47,339.52
UTILIDAD 12.9032% $6,108.31
PRECIO UNITARIO $53,447.83
(* CINCUENTA Y TRES MIL CUATROCIENTOS CUARENTA Y SIETE
PESOS 83/100 M.N. *)
ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA
14-jun-2017 Pagina: 15 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.2 Anlisis No.: 50
Anlisis: ESTR:0220 KG 1,641.43
ESTRUCTURA METALICA EN ARCO A BASE DE TUBO DE FIERRO ESTRUCTURAL CED. 40 DE 2 1/2" EN CUERDA INFERIOR, SUPERIOR,
MONTANTES Y DIAGONALES SOLDADA EN SUS EXTREMOS A UNA PLACA DE 40X40 CMS. DE 1/2", INCLUYE: MATERIALES, ACARREOS,
CORTES, TRAZO, HABILITADO, SOLDADURA, APLICACIN DE PRIMER ANTICORROSIVO, TAPONES A BASE DE SOLERA DE 1/8",
MONTAJE, MANO DE OBRA, EQUIPO Y HERRAMIENTA.
MATERIALES
FB099PLACA A-36 DE 3 Y 4 DE 3/16" A 1/2" TON $14,640.42 0.000190 $2.78 3.49%

CO08PRIMARIO ANTICORROSIVO No.2, 89-97 LT $53.28 0.067000 4.48%

$3.57
BLANCO, 98 GRIS CLARO, 96 ROJO OXIDO
7018SOLDADURA ELECTRODO 7018 KG $34.53 0.070000 3.04%

$2.42
N105 TUBO NEG SOLD C-40 S/C 64MM KG $26.66 1.050000 $27.99 35.15%

SUBTOTAL: MATERIALES $36.76 46.16%


MANO DE OBRA
1H1ACUADRILLA No 9 (1 HERRERO + AYUDANTE) JOR $994.33 / 220.000000 5.68%

$4.52
1S1ECUADRILLA No 17 (1 SOLDADOR+1 AY.ESP.) JOR $1,114.23 / 45.000000 $24.76 31.09%

SUBTOTAL: MANO DE OBRA $29.28 36.77%


EQUIPO Y HERRAMIENTA
EQPLANPLANTA DE SOLDAR MILLER HOR $7.50 0.500000 $3.75 4.71%

%MO1HERRAMIENTA MENOR % $29.28 0.030000 $0.88 1.11%

%MO2ANDAMIOS % $29.28 0.030000 $0.88 1.11%

EQPLANPLANTA DE SOLDAR MILLER HOR $7.50 0.500000 4.71%


$3.75

EQECORTEEQUIPO DE CORTE OXI-ACETILENO HOR $866.72 0.005000 5.44%


$4.33

SUBTOTAL: EQUIPO Y HERRAMIENTA $13.59 17.08%


Costo Directo: $79.63
INDIRECTOS 10.358% $8.25
SUBTOTAL $87.88
FINANCIAMIENTO 2.2356% $1.96
SUBTOTAL $89.84
UTILIDAD 12.9032% $11.59
PRECIO UNITARIO $101.43
(* CIENTO UN PESOS 43/100 M.N. *)
ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA
14-jun-2017 Pagina: 16 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.2 Anlisis No.: 60
Anlisis: ESTR:0225 KG 2,204.27
ESTRUCTURA METALICA LATERAL A BASE DE PTR DE 2 1/2" CAL. 11 EN CUERDA INFERIOR, SUPERIOR Y DIAGONALES INCLUYE:
MATERIALES, ACARREOS, CORTES, TRAZO, HABILITADO, SOLDADURA, APLICACIN DE PRIMER ANTICORROSIVO, TAPONES A BASE DE
SOLERA DE 1/8", MONTAJE, MANO DE OBRA, EQUIPO Y HERRAMIENTA.
MATERIALES
PTR5003PTR DE 2" x 1/8" KG $25.34 1.070000 $27.11 37.11%

CO08PRIMARIO ANTICORROSIVO No.2, 89-97 LT $53.28 0.075000 $4.00 5.48%

BLANCO, 98 GRIS CLARO, 96 ROJO OXIDO


7018SOLDADURA ELECTRODO 7018 KG $34.53 0.068000 3.22%

$2.35
SUBTOTAL: MATERIALES $33.46 45.81%
MANO DE OBRA

1H1ACUADRILLA No 9 (1 HERRERO + AYUDANTE) JOR $994.33 / 200.000000 $4.97 6.80%

1S1ECUADRILLA No 17 (1 SOLDADOR+1 AY.ESP.) JOR $1,114.23 / 45.000000 33.89%

$24.76
SUBTOTAL: MANO DE OBRA $29.73 40.69%
EQUIPO Y HERRAMIENTA
EQPLANPLANTA DE SOLDAR MILLER HOR $7.50 0.500000 5.13%

$3.75
%MO1HERRAMIENTA MENOR % $29.73 0.030000 $0.89 1.22%

%MO2ANDAMIOS % $29.73 0.030000 $0.89 1.22%

EQECORTEEQUIPO DE CORTE OXI-ACETILENO HOR $866.72 0.005000 5.93%

$4.33
SUBTOTAL: EQUIPO Y HERRAMIENTA $9.86 13.50%
Costo Directo: $73.05
INDIRECTOS 10.358% $7.57
SUBTOTAL $80.62
FINANCIAMIENTO 2.2356% $1.80
SUBTOTAL $82.42
UTILIDAD 12.9032% $10.63
PRECIO UNITARIO $93.05
(* NOVENTA Y TRES PESOS 05/100 M.N. *)

ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA


14-jun-2017 Pagina: 17 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.2 Anlisis No.: 70
Anlisis: ESTR:0230 KG 2,392.32
SUMINISTRO Y COLOCACION DE LARGUEROS A BASE DE CANAL MONTEN DE 6" x 2" CAL. 12, UNIDO A LA CUERDA SUPERIOR DE LAS
ARMADURAS EN ARCO MEDIANTE SOLDADURA, INCLUYE: MATERIALES, ACARREOS, CORTES, TRAZO, HABILITADO, SOLDADURA,
APLICACIN DE PRIMER ANTICORROSIVO, MONTAJE, MANO DE OBRA, EQUIPO Y HERRAMIENTA.
MATERIALES
7018SOLDADURA ELECTRODO 7018 KG $34.53 0.030000 $1.04 3.03%

CO08PRIMARIO ANTICORROSIVO No.2, 89-97 LT $53.28 0.025000 3.88%

$1.33
BLANCO, 98 GRIS CLARO, 96 ROJO OXIDO
$0.70

THINNERTHINNER STANDARD LT $46.35 0.015000 2.04%


FB089MONTEN PINTADO TON $20,452.03 0.001050 $21.47 62.59%

SUBTOTAL: MATERIALES $24.54 71.54%


MANO DE OBRA
1S2ECUADRILLA No 18 (1 SOLDADOR+2 AY.ESP.) JOR $1,676.16 / 180.000000 27.14%

$9.31
SUBTOTAL: MANO DE OBRA $9.31 27.14%
EQUIPO Y HERRAMIENTA
EQPLANPLANTA DE SOLDAR MILLER HOR $7.50 0.010000 $0.08 0.23%

%MO1HERRAMIENTA MENOR % $9.31 0.040000 $0.37 1.08%

SUBTOTAL: EQUIPO Y HERRAMIENTA $0.45 1.31%


Costo Directo: $34.30
INDIRECTOS 10.358% $3.55
SUBTOTAL $37.85
FINANCIAMIENTO 2.2356% $0.85
SUBTOTAL $38.70
UTILIDAD 12.9032% $4.99
PRECIO UNITARIO $43.69
(* CUARENTA Y TRES PESOS 69/100 M.N. *)

ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA


14-jun-2017 Pagina: 18 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.3 Anlisis No.: 10
Anlisis: SALGGC08 SAL 10
SALIDA ELCTRICA APARENTE PARA CONTACTO DUPLEX POLARIZADO CON CONEXION A TIERRA, Y PROTECCION CONTRA FALLA A
TIERRA. CON PLACA Y TAPA CON INSTALACION AL INTEMPERIE.
MATERIALES
TT3342TUBO PVC PESADO 13MM PZA. $12.61 1.400000 $17.65 3.09%

TT3343TUBO PVC PESADO 19MM PZA. $16.05 0.700000 1.97%

$11.24
TT3880CAJA CUAD PVC 13MM C/TAPA PZA. $16.89 1.000000 2.96%
$16.89

TT3881CAJA CUAD PVC 19MM C/TAPA PZA. $21.47 1.000000 $21.47 3.76%

TT3883CHALUPA UNIVERS PVC DURALON PZA. $8.80 1.000000 $8.80 1.54%

TT3408CONEC PVC PESADO 13MM PZA. $3.94 2.000000 $7.88 1.38%

TT3409CONEC PVC PESADO 19MM PZA. $5.40 2.000000 1.89%


$10.80

TT3604CODO PVC PESADO 13MM PZA. $4.58 1.000000 0.80%


$4.58

DC2024CABLE THW 12 NEG MTS. $5.54 13.200000 $73.13 12.82%


DC2030CABLE THW 10 NEG MTS. $8.43 4.800000 7.09%

$40.46
AA1281SOCKET BAQ SENC CAFE PZA. $3.69 1.000000 0.65%
$3.69

RD0629INT SENC LUXORY PZA. $24.93 1.000000 $24.93 4.37%

RA1196PLA BAQ LUXORY MARF 1U PZA $21.05 1.000000 $21.05 3.69%

PIJAPIJA PZA $0.61 6.000000 $3.66 0.64%


TAQUETETAQUETE PZA $0.48 6.000000 0.50%

$2.88
SUBTOTAL: MATERIALES $269.11 47.15%
MANO DE OBRA
1E1ECUADRILLA No 19 (1 ELECTRIC.+AY.ESP) JOR $1,024.04 / 3.600000 49.85%
$284.46

SUBTOTAL: MANO DE OBRA $284.46 49.85%


EQUIPO Y HERRAMIENTA
%MO1HERRAMIENTA MENOR % $284.46 0.030000 1.49%
$8.53

%MO2ANDAMIOS % $284.46 0.030000 $8.53 1.49%

SUBTOTAL: EQUIPO Y HERRAMIENTA $17.06 2.98%


Costo Directo: $570.63
INDIRECTOS 10.358% $59.11
SUBTOTAL $629.74
FINANCIAMIENTO 2.2356% $14.08
SUBTOTAL $643.82
UTILIDAD 12.9032% $83.07
PRECIO UNITARIO $726.89
(* SETECIENTOS VEINTISEIS PESOS 89/100 M.N. *)
ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA
14-jun-2017 Pagina: 19 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.3 Anlisis No.: 20
Anlisis: TGALP13 ML 130
TUBO CONDUIT APARENTE DE 21 MM. DE DIMETRO, INCLUYE: MATERIALES, ACARREOS, CORTES, DESPERDICIOS, INSTALACIN,
MANO DE OBRA, PRUEBAS, EQUIPO Y HERRAMIENTA.
MATERIALES
TT3343TUBO PVC PESADO 19MM PZA. $16.05 0.350000 $5.62 24.17%

$1.64

360-211-17-34BOTE PEGAMENTO SILER 480 grs PESADO PZA $109.08 0.015000 7.05%
SUBTOTAL: MATERIALES $7.26 31.22%
MANO DE OBRA
1E1ECUADRILLA No 19 (1 ELECTRIC.+AY.ESP) JOR $1,024.04 / 66.000000 66.75%
$15.52

SUBTOTAL: MANO DE OBRA $15.52 66.75%


EQUIPO Y HERRAMIENTA
%MO1HERRAMIENTA MENOR % $15.52 0.030000 $0.47 2.02%

SUBTOTAL: EQUIPO Y HERRAMIENTA $0.47 2.02%


Costo Directo: $23.25
INDIRECTOS 10.358% $2.41
SUBTOTAL $25.66
FINANCIAMIENTO 2.2356% $0.57
SUBTOTAL $26.23
UTILIDAD 12.9032% $3.38
PRECIO UNITARIO $29.61
(* VEINTINUEVE PESOS 61/100 M.N. *)

ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA


14-jun-2017 Pagina: 20 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.3 Anlisis No.: 30
Anlisis: CPVCP51 ML 15
TUBO CONDUIT APARENTE DE 35 MM. DE DIMETRO, INCLUYE: MATERIALES, ACARREOS, CORTES, DESPERDICIOS, INSTALACIN,
MANO DE OBRA, PRUEBAS, EQUIPO Y HERRAMIENTA.
MATERIALES
TT3346TUBO PVC PESADO 38MM PZA. $38.71 0.350000 $13.55 34.93%

$3.27

360-211-17-34BOTE PEGAMENTO SILER 480 grs PESADO PZA $109.08 0.030000 8.43%
SUBTOTAL: MATERIALES $16.82 43.36%
MANO DE OBRA
1E1ECUADRILLA No 19 (1 ELECTRIC.+AY.ESP) JOR $1,024.04 / 48.000000 54.99%
$21.33

SUBTOTAL: MANO DE OBRA $21.33 54.99%


EQUIPO Y HERRAMIENTA
%MO1HERRAMIENTA MENOR % $21.33 0.030000 $0.64 1.65%

SUBTOTAL: EQUIPO Y HERRAMIENTA $0.64 1.65%


Costo Directo: $38.79
INDIRECTOS 10.358% $4.02
SUBTOTAL $42.81
FINANCIAMIENTO 2.2356% $0.96
SUBTOTAL $43.77
UTILIDAD 12.9032% $5.65
PRECIO UNITARIO $49.42
(* CUARENTA Y NUEVE PESOS 42/100 M.N. *)

ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA


14-jun-2017 Pagina: 21 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.3 Anlisis No.: 40
Anlisis: THWC10 ML 320
SUMINISTRO E INSTALACIN DE CABLE AWG CAL. 10, DE LA MARCA CONDUMEX, INCLUYE: MATERIALES, ACARREOS, INSTALACIN,
PUNTAS, PRUEBAS, MANO DE OBRA, EQUIPO Y HERRAMIENTA.
MATERIALES
DC2030CABLE THW 10 NEG MTS. $8.43 1.070000 59.15%

$9.02
DS1493CINTA PLAST 19MM X 18M NEG PZA. $9.06 0.010000 $0.09 0.59%

SUBTOTAL: MATERIALES $9.11 59.74%


MANO DE OBRA
1E1ECUADRILLA No 19 (1 ELECTRIC.+AY.ESP) JOR $1,024.04 / 180.000000 37.31%
$5.69

SUBTOTAL: MANO DE OBRA $5.69 37.31%


EQUIPO Y HERRAMIENTA
%MO1HERRAMIENTA MENOR % $5.69 0.030000 1.11%
$0.17

%MO2ANDAMIOS % $5.69 0.050000 1.84%


$0.28

SUBTOTAL: EQUIPO Y HERRAMIENTA $0.45 2.95%


Costo Directo: $15.25
INDIRECTOS 10.358% $1.58
SUBTOTAL $16.83
FINANCIAMIENTO 2.2356% $0.38
SUBTOTAL $17.21
UTILIDAD 12.9032% $2.22
PRECIO UNITARIO $19.43
(* DIECINUEVE PESOS 43/100 M.N. *)

ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA


14-jun-2017 Pagina: 22 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.3 Anlisis No.: 50
Anlisis: THWC12 ML 160
SUMINISTRO E INSTALACIN DE CABLE AWG CAL. 12, DE LA MARCA CONDUMEX, INCLUYE: MATERIALES, ACARREOS, INSTALACIN,
PUNTAS, PRUEBAS, MANO DE OBRA, EQUIPO Y HERRAMIENTA.
MATERIALES
DC2030CABLE THW 10 NEG MTS. $8.43 1.070000 59.15%

$9.02
DS1493CINTA PLAST 19MM X 18M NEG PZA. $9.06 0.010000 $0.09 0.59%

SUBTOTAL: MATERIALES $9.11 59.74%


MANO DE OBRA
1E1ECUADRILLA No 19 (1 ELECTRIC.+AY.ESP) JOR $1,024.04 / 180.000000 37.31%
$5.69

SUBTOTAL: MANO DE OBRA $5.69 37.31%


EQUIPO Y HERRAMIENTA
%MO1HERRAMIENTA MENOR % $5.69 0.030000 1.11%
$0.17

%MO2ANDAMIOS % $5.69 0.050000 1.84%


$0.28

SUBTOTAL: EQUIPO Y HERRAMIENTA $0.45 2.95%


Costo Directo: $15.25
INDIRECTOS 10.358% $1.58
SUBTOTAL $16.83
FINANCIAMIENTO 2.2356% $0.38
SUBTOTAL $17.21
UTILIDAD 12.9032% $2.22
PRECIO UNITARIO $19.43
(* DIECINUEVE PESOS 43/100 M.N. *)

ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA


14-jun-2017 Pagina: 23 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.3 Anlisis No.: 60
Anlisis: INTS3200 PZA 1
TABLERO DE DISTRIBUCION. EN CAJA 1, INCLUYE: CONEXION, PRUEBAS, MANO DE OBRA, EQUIPO Y HERRAMIENTA.
MATERIALES
CI6745INTERIOR NQOD442L225CU PZA. $4,395.25 1.000000 $4,395.25 17.12%

CI6788CAJA MH50M PZA. $399.31 1.000000 1.56%

$399.31
CI6790FTE MHC50 SOB PZA. $1,926.00 1.000000 7.50%

$1,926.00
CI6733KIT INT PRINCIPAL NQODKA PZA. $1,969.83 1.000000 $1,969.83 7.67%

CC6167INT TERMAG KAL 3P 200A PZA. $11,440.07 1.000000 44.57%

$11,440.07
CC6078INT TERMAG QOB 1P 20A PZA. $141.84 16.000000 8.84%

$2,269.44
SUBTOTAL: MATERIALES $22,399.90 87.26%
MANO DE OBRA
1T1ECUADRILLA No 21 (1 TECNICO+ 1 AY.ESP.) JOR $1,234.46 / 0.388943 $3,173.88 12.36%

SUBTOTAL: MANO DE OBRA $3,173.88 12.36%


EQUIPO Y HERRAMIENTA
%MO1HERRAMIENTA MENOR % $3,173.88 0.030000 $95.22 0.37%

SUBTOTAL: EQUIPO Y HERRAMIENTA $95.22 0.37%


Costo Directo: $25,669.00
INDIRECTOS 10.358% $2,658.80
SUBTOTAL $28,327.80
FINANCIAMIENTO 2.2356% $633.30
SUBTOTAL $28,961.10
UTILIDAD 12.9032% $3,736.91
PRECIO UNITARIO $32,698.01
(* TREINTA Y DOS MIL SEISCIENTOS NOVENTA Y OCHO PESOS
01/100 M.N. *)

ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA


14-jun-2017 Pagina: 24 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.3 Anlisis No.: 70
Anlisis: PRIMAPII PZA 10
LUMINARIA AUTOBALATRADA TIPO CAMPANA, DE 250 W., 220 V; CON LAMPARA DE ADITIVOS METALICOS. H= 7.5 M; MARCA "LJ
ILUMINACION"; MODELO CAMPANA CAT- CIP-250-AM-220-LP-L, CON ACCESORIO LENTE PLANO PROTECTOR CON SINCHO DE
PROTECCION, INCLUYE: MANO DE OBRA, EQUIPO Y HERRAMIENTA.
MATERIALES
LP739-ICCAMPANA LED 150 WATTS COMPACTA A PZA $3,720.50 1.000000 93.20%

$3,720.50
127/220 VOLTS MARCA TECNOLED
SUBTOTAL: MATERIALES $3,720.50 93.20%
MANO DE OBRA
1E1ECUADRILLA No 19 (1 ELECTRIC.+AY.ESP) JOR $1,024.04 / 4.000000 $256.01 6.41%

SUBTOTAL: MANO DE OBRA $256.01 6.41%


EQUIPO Y HERRAMIENTA
%MO1HERRAMIENTA MENOR % $256.01 0.030000 0.19%
$7.68

%MO2ANDAMIOS % $256.01 0.030000 $7.68 0.19%

SUBTOTAL: EQUIPO Y HERRAMIENTA $15.36 0.38%


Costo Directo: $3,991.87
INDIRECTOS 10.358% $413.48
SUBTOTAL $4,405.35
FINANCIAMIENTO 2.2356% $98.49
SUBTOTAL $4,503.84
UTILIDAD 12.9032% $581.14
PRECIO UNITARIO $5,084.98
(* CINCO MIL OCHENTA Y CUATRO PESOS 98/100 M.N. *)

ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA


14-jun-2017 Pagina: 25 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.4 Anlisis No.: 10
Anlisis: TUS150 ML 13
TUBO DE PVC SANITARIO, DE 102 MM. DE DIMETRO, INCLUYE: MATERIALES, ACARREOS, CORTES, DESPERDICIOS, MANO DE OBRA,
PRUEBAS, EQUIPO Y HERRAMIENTA.
MATERIALES
041-001-15-TUBO PVC E/L 150mm x 1 mto SANIT DU TRM $479.83 0.175000 54.42%

$83.97
96T
SUBTOTAL: MATERIALES $83.97 54.42%
MANO DE OBRA
1P1ECUADRILLA No 20 (1 PLOMERO+ 1 AY.ESP.) JOR $1,024.04 / 15.000000 44.25%

$68.27
SUBTOTAL: MANO DE OBRA $68.27 44.25%
EQUIPO Y HERRAMIENTA
%MO1HERRAMIENTA MENOR % $68.27 0.030000 1.33%

$2.05
SUBTOTAL: EQUIPO Y HERRAMIENTA $2.05 1.33%
Costo Directo: $154.29
INDIRECTOS 10.358% $15.98
SUBTOTAL $170.27
FINANCIAMIENTO 2.2356% $3.81
SUBTOTAL $174.08
UTILIDAD 12.9032% $22.46
PRECIO UNITARIO $196.54
(* CIENTO NOVENTA Y SEIS PESOS 54/100 M.N. *)

ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA


14-jun-2017 Pagina: 26 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.4 Anlisis No.: 20
Anlisis: CS90150 PZA 8
CODO DE PVC SANITARIO DE 45X102 MM., INCLUYE: MATERIALES, ACARREOS, CORTES, DESPERDICIOS, INSTALACIN, MANO DE
OBRA, PRUEBAS, EQUIPO Y HERRAMIENTA.
MATERIALES
042-001-A-1-CODO PVC DUR 45GX 150 mm. SANIT PZA $121.90 1.000000 $121.90 63.32%

4596
360-211-17-40LIMPIADOR SILER 500 ml PZA $36.48 0.060000 $2.19 1.14%

360-211-17-34BOTE PEGAMENTO SILER 480 grs PESADO PZA $109.08 0.090000 5.10%

$9.82
SUBTOTAL: MATERIALES $133.91 69.56%
MANO DE OBRA
1P1ECUADRILLA No 20 (1 PLOMERO+ 1 AY.ESP.) JOR $1,024.04 / 18.000000 29.55%

$56.89
SUBTOTAL: MANO DE OBRA $56.89 29.55%
EQUIPO Y HERRAMIENTA
%MO1HERRAMIENTA MENOR % $56.89 0.030000 $1.71 0.89%

SUBTOTAL: EQUIPO Y HERRAMIENTA $1.71 0.89%


Costo Directo: $192.51
INDIRECTOS 10.358% $19.94
SUBTOTAL $212.45
FINANCIAMIENTO 2.2356% $4.75
SUBTOTAL $217.20
UTILIDAD 12.9032% $28.03
PRECIO UNITARIO $245.23
(* DOSCIENTOS CUARENTA Y CINCO PESOS 23/100 M.N. *)

ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA


14-jun-2017 Pagina: 27 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.4 Anlisis No.: 30
Anlisis: CS45150 PZA 2
CODO DE PVC SANITARIO DE 90X102 MM., INCLUYE: MATERIALES, ACARREOS, CORTES, DESPERDICIOS, INSTALACIN, MANO DE
OBRA, PRUEBAS, EQUIPO Y HERRAMIENTA.
MATERIALES
360-211-17-40LIMPIADOR SILER 500 ml PZA $36.48 0.060500 $2.21 1.95%

360-211-17-34BOTE PEGAMENTO SILER 480 grs PESADO PZA $109.08 0.090000 $9.82 8.67%

$42.58
042-001-E-1-CODO PVC SANIT 87.5X160 DUR. CEMENT PZA $42.58 1.000000 37.61%

9096
SUBTOTAL: MATERIALES $54.61 48.23%
MANO DE OBRA
1P1ECUADRILLA No 20 (1 PLOMERO+ 1 AY.ESP.) JOR $1,024.04 / 18.000000 50.25%
$56.89

SUBTOTAL: MANO DE OBRA $56.89 50.25%


EQUIPO Y HERRAMIENTA
%MO1HERRAMIENTA MENOR % $56.89 0.030000 $1.71 1.51%

SUBTOTAL: EQUIPO Y HERRAMIENTA $1.71 1.51%


Costo Directo: $113.21
INDIRECTOS 10.358% $11.73
SUBTOTAL $124.94
FINANCIAMIENTO 2.2356% $2.79
SUBTOTAL $127.73
UTILIDAD 12.9032% $16.48
PRECIO UNITARIO $144.21
(* CIENTO CUARENTA Y CUATRO PESOS 21/100 M.N. *)

ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA


14-jun-2017 Pagina: 28 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.4 Anlisis No.: 40
Anlisis: RS6610 PZA 2
REGISTRO DE 0.60X0.60X1.00 M. DE MUROS DE TABIQUE ROJO RECOCIDO, ASENTADO CON MEZCLA CEMENTO ARENA 1:5, CON
APLANADO PULIDO EN EL INTERIOR, CON TAPA DE 8 CM. DE ESPESOR DE CONCRETO DE F'C=150 KG/CM2, CON MARCO Y
CONTRAMARCO A BASE DE ANGULO DE FIERRO DE 3"X3"X1/4, ANCLADA A CADENA PERIMETRAL DE 15X15 CM. ARMADA CON 4
VARILLAS DE 3/8" Y ESTRIBOS DEL NO.2 A CADA 20 CM., PISO DE 10 CM. DE ESPESOR DE CONCRETO DE F'C=150 KG/CM2, INCLUYE:
MATERIALES, ACARREOS, EXCAVACIN, MANO DE OBRA, EQUIPO Y HERRAMIENTA.
MATERIALES
TABIQUETABIQUE ROJO RECOCIDO MIL $4,455.78 0.110000 15.77%
$490.14

FB009ANGULO DE FIER. (3/16" Y 1/4") x 3" TON $14,640.42 0.038000 $556.34 17.90%

7018SOLDADURA ELECTRODO 7018 KG $34.53 0.500000 0.56%

$17.27
3.VARILLA DE 3/8" 9.5 MM KG $14.42 7.000000 $100.94 3.25%

2.ALAMBRON KG $20.60 1.700000 $35.02 1.13%

DUELADUELA DE PINO DE 3a DE 3/4"x3.5"x8.25'' PZA $26.74 1.000000 $26.74 0.86%

CLAVOSCLAVOS DE 2 A 4 " KG $24.72 0.400000 $9.89 0.32%


1.ALAMBRE RECOCIDO KG $22.66 0.500000 0.36%

$11.33
SUBTOTAL: MATERIALES $1,247.67 40.15%
MANO DE OBRA
1A1PCUADRILLA No 5 (1 ALBAIL+1 PEON) JOR $1,029.27 / 1.000000 $1,029.27 33.12%

1S1ECUADRILLA No 17 (1 SOLDADOR+1 AY.ESP.) JOR $1,114.23 / 6.000000 5.98%


$185.71

SUBTOTAL: MANO DE OBRA $1,214.98 39.10%


EQUIPO Y HERRAMIENTA
%MO1HERRAMIENTA MENOR % $1,214.98 0.030000 $36.45 1.17%

SUBTOTAL: EQUIPO Y HERRAMIENTA $36.45 1.17%


BASICOS
1:5MORTERO CEMENTO ARENA 1:5 M3 $1,893.52 0.170000 10.36%
$321.90

150.CONCRETO DE F'c=150 KG/CM2, HECHO EN M3 $1,911.95 0.150000 9.23%


$286.79

OBRA, T.M.A.= 19 MM, RESISTENCIA


NORMAL
SUBTOTAL: BASICOS $608.69 19.59%
Costo Directo: $3,107.79
INDIRECTOS 10.358% $321.90
SUBTOTAL $3,429.69
FINANCIAMIENTO 2.2356% $76.67
SUBTOTAL $3,506.36
UTILIDAD 12.9032% $452.43
PRECIO UNITARIO $3,958.79
(* TRES MIL NOVECIENTOS CINCUENTA Y OCHO PESOS 79/100 M.N.
*)
ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA
14-jun-2017 Pagina: 29 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.5 Anlisis No.: 10
Anlisis: CIME0016 M2 30.83
DEMOLICIN DE PISO DE CONCRETO ARMADO DE 10 CM, DE ESPESOR CON ROMPEDORA ELECTRICA, INCLUYE: EQUIPO DE CORTE,
ROMPEDORA,RETIRO DE ESCOMBRO A TIRO AUTORIZADO, MANO DE OBRA, EQUIPO Y HERRAMIENTA.
MANO DE OBRA
1OMCUADRILLA No 25 (1 OPERADOR DE JOR $376.74 / 11.000000 $34.25 41.34%

MAQ.M.)
SUBTOTAL: MANO DE OBRA $34.25 41.34%
EQUIPO Y HERRAMIENTA
EQROMPEEROMPEDORA ELECTRICA S/OPERADOR HOR $90.68 / 3.000000 36.49%
$30.23

EQECORTEEQUIPO DE CORTE OXI-ACETILENO HOR $866.72 / 50.000000 $17.33 20.92%

%MO1HERRAMIENTA MENOR % $34.25 0.030000 $1.03 1.24%

SUBTOTAL: EQUIPO Y HERRAMIENTA $48.59 58.65%


Costo Directo: $82.84
INDIRECTOS 10.358% $8.58
SUBTOTAL $91.42
FINANCIAMIENTO 2.2356% $2.04
SUBTOTAL $93.46
UTILIDAD 12.9032% $12.06
PRECIO UNITARIO $105.52
(* CIENTO CINCO PESOS 52/100 M.N. *)

ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA


14-jun-2017 Pagina: 30 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.5 Anlisis No.: 20
Anlisis: CIME0028 PZA 1
DEMOLICION DE REGISTRO ELECTRICO PARA SU POSTERIOR REUBICACION, INCLUYE: RETIRO DE ESCOMBRO A TIRO AUTORIZADO,
MANO DE OBRA, EQUIPO Y HERRAMIENTA
MANO DE OBRA
1OMCUADRILLA No 25 (1 OPERADOR DE JOR $376.74 / 2.000000 $188.37 72.84%

MAQ.M.)
SUBTOTAL: MANO DE OBRA $188.37 72.84%
EQUIPO Y HERRAMIENTA
EQROMPEEROMPEDORA ELECTRICA S/OPERADOR HOR $90.68 / 2.000000 17.53%
$45.34

EQECORTEEQUIPO DE CORTE OXI-ACETILENO HOR $866.72 / 45.000000 $19.26 7.45%

%MO1HERRAMIENTA MENOR % $188.37 0.030000 $5.65 2.18%

SUBTOTAL: EQUIPO Y HERRAMIENTA $70.25 27.16%


Costo Directo: $258.62
INDIRECTOS 10.358% $26.79
SUBTOTAL $285.41
FINANCIAMIENTO 2.2356% $6.38
SUBTOTAL $291.79
UTILIDAD 12.9032% $37.65
PRECIO UNITARIO $329.44
(* TRESCIENTOS VEINTINUEVE PESOS 44/100 M.N. *)

ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA


14-jun-2017 Pagina: 31 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.5 Anlisis No.: 30
Anlisis: CIME: 0145 ML 44.4
CADENA DE 15x30 CM DE CONCRETO HECHO EN OBRA F'C=200 KG/CM2, ACABADO COMUN, CON ARMEX 15x30, INCLUYE: MATERIALES,
ACARREOS, CORTES, DESPERDICIOS, TRASLAPES, AMARRES, CIMBRADO, COLADO, DESCIMBRADO, MANO DE OBRA, EQUIPO Y
HERRAMIENTA.
MATERIALES
DUELADUELA DE PINO DE 3a DE 3/4"x3.5"x8.25'' PZA $26.74 1.000000 $26.74 5.71%

POLINPOLIN DE PINO DE 3a DE 3.5"x3."x8.25'' PZA $64.16 0.200000 2.74%

$12.83
CLAVOSCLAVOS DE 2 A 4 " KG $24.72 0.125000 0.66%

$3.09
1.ALAMBRE RECOCIDO KG $22.66 0.200000 $4.53 0.97%

DIESELDIESEL LTO $14.43 0.200000 $2.89 0.62%

$23.69
2.ALAMBRON KG $20.60 1.150000 5.06%

ARMEX15304ARMEX 15-30-4 M $30.90 1.050000 6.92%

$32.45
SUBTOTAL: MATERIALES $106.22 22.68%
MANO DE OBRA
1A1PCUADRILLA No 5 (1 ALBAIL+1 PEON) JOR $1,029.27 / 4.000000 54.91%

$257.32
SUBTOTAL: MANO DE OBRA $257.32 54.91%
EQUIPO Y HERRAMIENTA
%MO1HERRAMIENTA MENOR % $257.32 0.030000 $7.72 1.65%

SUBTOTAL: EQUIPO Y HERRAMIENTA $7.72 1.65%


BASICOS
200.CONCRETO DE F'c=200 KG/CM2, HECHO EN M3 $2,060.78 0.047250 20.78%

$97.37
OBRA, T.M.A.= 19 MM, RESISTENCIA
NORMAL
SUBTOTAL: BASICOS $97.37 20.78%
Costo Directo: $468.63
INDIRECTOS 10.358% $48.54
SUBTOTAL $517.17
FINANCIAMIENTO 2.2356% $11.56
SUBTOTAL $528.73
UTILIDAD 12.9032% $68.22
PRECIO UNITARIO $596.95
(* QUINIENTOS NOVENTA Y SEIS PESOS 95/100 M.N. *)

ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA


14-jun-2017 Pagina: 32 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.5 Anlisis No.: 40
Anlisis: CIME: 0140 M2 211.07
SUMINISTRO Y COLOCACION DE MALLA ELECTROSOLDAD DE 2.5 M X 6 M ( 15 M2) INCLUYE SUMINIST.HABILIT.ARMADO,
TRASLAPES,SILLETAS,GANCHOS Y DESPER.
MATERIALES
661010MALLA ELECTROSOLDADADA 6x6/10-10 M2 $32.45 1.100000 79.88%
$35.70

$0.57
1.ALAMBRE RECOCIDO KG $22.66 0.025000 1.28%
SUBTOTAL: MATERIALES $36.27 81.16%
MANO DE OBRA
1F1ACUADRILLA No 6 (1 FIERRERO + 1 JOR $816.78 / 100.000000 $8.17 18.28%

AYUDANTE)
SUBTOTAL: MANO DE OBRA $8.17 18.28%
EQUIPO Y HERRAMIENTA
%MO1HERRAMIENTA MENOR % $8.17 0.030000 $0.25 0.56%

SUBTOTAL: EQUIPO Y HERRAMIENTA $0.25 0.56%


Costo Directo: $44.69
INDIRECTOS 10.358% $4.63
SUBTOTAL $49.32
FINANCIAMIENTO 2.2356% $1.10
SUBTOTAL $50.42
UTILIDAD 12.9032% $6.51
PRECIO UNITARIO $56.93
(* CINCUENTA Y SEIS PESOS 93/100 M.N. *)

ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA


14-jun-2017 Pagina: 33 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.5 Anlisis No.: 50
Anlisis: CIME:0075 M2 211.07
PISO DE CONCRETO HIDRAULICO DE ACABADO FINO DE 12 CM. DE ESPESOR DE RESISTENCIA F'C= 250 KG/CM2, INCL. ELABORACION
DE CONCRETO CON REVOLVEDORA, VACIADO, VIBRADO, CURADO, CIMBRADO, Y DESCIMBRADO, ACARREO DEL MATERIAL, CON
CARRETILLA Y BOTES, MATERIALES, EQUIPO, HERRAMIENTA Y MANO DE OBRA.
MATERIALES
DUELADUELA DE PINO DE 3a DE 3/4"x3.5"x8.25'' PZA $26.74 0.180000 $4.81 1.27%

AGUAAGUA ( MANEJO) M3 $123.60 0.010000 0.33%


$1.24

1.ALAMBRE RECOCIDO KG $22.66 0.330000 1.97%

$7.48

3.VARILLA DE 3/8" 9.5 MM KG $14.42 0.006600 $0.10 0.03%


SUBTOTAL: MATERIALES $13.63 3.60%
MANO DE OBRA
1A5PCUADRILLA No 22 (1 ALBAIL + 5 PEONES) JOR $2,292.31 / 27.000000 22.36%

$84.90
SUBTOTAL: MANO DE OBRA $84.90 22.36%
EQUIPO Y HERRAMIENTA
%MO1HERRAMIENTA MENOR % $84.90 0.030000 0.67%

$2.55
SUBTOTAL: EQUIPO Y HERRAMIENTA $2.55 0.67%
BASICOS
250.CONCRETO DE F'c=250 KG/CM2, HECHO EN M3 $2,210.84 0.126000 73.38%
$278.57

OBRA, T.M.A.= 19 MM, RESISTENCIA


NORMAL
SUBTOTAL: BASICOS $278.57 73.38%
Costo Directo: $379.65
INDIRECTOS 10.358% $39.32
SUBTOTAL $418.97
FINANCIAMIENTO 2.2356% $9.37
SUBTOTAL $428.34
UTILIDAD 12.9032% $55.27
PRECIO UNITARIO $483.61
(* CUATROCIENTOS OCHENTA Y TRES PESOS 61/100 M.N. *)

ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA


14-jun-2017 Pagina: 34 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.5 Anlisis No.: 60
Anlisis: CIME:0036 M2 11.94
PINTURA ACRILICA EN SUPERFICIE, INCLUYENDO UNA MANO DE SELLADOR ACRILICO COMEX O SIMILAR, DOS MANOS DE PINTURA
ACRILICA ULTRAPISOS O SIMILAR. ACARREO MATERIAL PRIMERA ESTACION = 20.00 MTS.
MATERIALES
PIN-535PINTURA ACRILICA ESPECIAL LT $77.25 0.176400 $13.63 26.97%

THINNERTHINNER STANDARD LT $46.35 0.090000 8.25%

$4.17

DUELADUELA DE PINO DE 3a DE 3/4"x3.5"x8.25'' PZA $26.74 0.150000 $4.01 7.93%


AGUAAGUA ( MANEJO) M3 $123.60 0.010000 $1.24 2.45%

SUBTOTAL: MATERIALES $23.05 45.60%


MANO DE OBRA
1P1ACUADRILLA No 8 (1 PINTOR + AYUDANTE) JOR $800.83 / 30.000000 52.81%
$26.69

SUBTOTAL: MANO DE OBRA $26.69 52.81%


EQUIPO Y HERRAMIENTA
%MO1HERRAMIENTA MENOR % $26.69 0.030000 1.58%

$0.80
SUBTOTAL: EQUIPO Y HERRAMIENTA $0.80 1.58%
Costo Directo: $50.54
INDIRECTOS 10.358% $5.23
SUBTOTAL $55.77
FINANCIAMIENTO 2.2356% $1.25
SUBTOTAL $57.02
UTILIDAD 12.9032% $7.36
PRECIO UNITARIO $64.38
(* SESENTA Y CUATRO PESOS 38/100 M.N. *)

ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA


14-jun-2017 Pagina: 35 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.5 Anlisis No.: 70
Anlisis: CIME:0076 JGO 2
SUMINISTRO Y COLOCACION DE CANASTA DE BASQUETBALL Y PORTERIAS, INCLUYE MATERIALES DE FIJACION,TRANSPORTE, Y
POSTURA
MATERIALES
JGO-TAB-CANASTA DE BASQUETBALL CON JGO $22,486.95 1.000000 $22,486.95 99.60%

BSCKTPORTERIAS Y TABLERO DE MICA, ALTURA


AJUSTABLE.
SUBTOTAL: MATERIALES $22,486.95 99.60%
MANO DE OBRA
1PCUADRILLA No 1 (1 PEON) JOR $347.04 / 4.000000 $86.76 0.38%

SUBTOTAL: MANO DE OBRA $86.76 0.38%


EQUIPO Y HERRAMIENTA
%MO1HERRAMIENTA MENOR % $86.76 0.030000 $2.60 0.01%

SUBTOTAL: EQUIPO Y HERRAMIENTA $2.60 0.01%


Costo Directo: $22,576.31
INDIRECTOS 10.358% $2,338.45
SUBTOTAL $24,914.76
FINANCIAMIENTO 2.2356% $556.99
SUBTOTAL $25,471.75
UTILIDAD 12.9032% $3,286.67
PRECIO UNITARIO $28,758.42
(* VEINTIOCHO MIL SETECIENTOS CINCUENTA Y OCHO PESOS
42/100 M.N. *)

ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA


14-jun-2017 Pagina: 36 de 36
XIMEDA S.A. DE C.V.

Dependencia: H. AYUNTAMIENTO MUNICIPAL CONSTITUCIONAL


SANTA CRUZ XOXOCOTLAN

No. DE INVITACIN: MSCX/INV/FORTALECE/0701-N/2017 Fecha: 2017/06/14 Duracin: 60 das naturales


Obra: CONSTRUCCION DE TECHADO EN LA ESCUELA PRIMARIA SOR JUANA INES DE LA CRUZ CLAVE: 20DPR3454E

Lugar: COLONIA LAS CULTURAS SANTA CRUZ XOXOCOTLAN OAXACA Inicio Obra: 26-jun-2017
Fin Obra: 24-ago-2017
ANLISIS, CLCULO E INTEGRACIN DE LOS PRECIOS UNITARIOS (ANEXO 10)

Cdigo Concepto Unidad Costo Cantidad Importe %


Partida: 1.5 Anlisis No.: 80
Anlisis: CIME: 0141 M2 657.78
LIMPIEZA GENERAL PARA ENTREGA DE OBRA, INCL. DETERGENTE, AGUA NECESARIA, HERRAMIENTA, ACARREOS A 20 M. DE DISTANCIA
DE MATERIAL DE PRODUCTO DE LIMPIEZA EN BOTE ALCOHOLERO, EQUIPO Y MANO DE OBRA.
MATERIALES
%MO3MATERIALES MENORES % $17.35 0.100000 8.87%

$1.74
SUBTOTAL: MATERIALES $1.74 8.87%
MANO DE OBRA
1ACUADRILLA No 3 (1 AYUDANTE GENERAL) JOR $416.45 / 24.000000 $17.35 88.48%

SUBTOTAL: MANO DE OBRA $17.35 88.48%


EQUIPO Y HERRAMIENTA
%MO1HERRAMIENTA MENOR % $17.35 0.030000 2.65%

$0.52
SUBTOTAL: EQUIPO Y HERRAMIENTA $0.52 2.65%
Costo Directo: $19.61
INDIRECTOS 10.358% $2.03
SUBTOTAL $21.64
FINANCIAMIENTO 2.2356% $0.48
SUBTOTAL $22.12
UTILIDAD 12.9032% $2.85
PRECIO UNITARIO $24.97
(* VEINTICUATRO PESOS 97/100 M.N. *)

ADMINISTRADOR UNICO LIC. CIRO EDUARDO CASTILLEJOS SIBAJA