INTRO

May 2017
Year 3/ 2nd Semester
Dr. Ir. Chew Kew Hong

Petroleum
Internal
Engineering Department Production Engineering II 1
Dr. Ir. Chew Kew Hong
1 (kewhong.chew@utp.edu.my)
Tel: 05-368 7048, Office: L-1-22

Mrs Putri Nurizatulshira


2 (nurizatulshira.b@utp.edu.my)
Tel: 05-368 7376, Office: J-2-5

Petroleum
Internal
Engineering Department Production Engineering II 2
Petroleum
Internal
Engineering Department Production Engineering II 3
4
Petroleum
Internal
Engineering Department Production Engineering II
Explain various types of PO 2
CLO 1
offshore structures

Describe different types of PO 2


CLO 2
oil & gas processing methods

Describe water handling


CLO 3 PO 1
techniques

Determine the process


CLO 4 PO 3
equipment sizing

Petroleum
Internal
Engineering Department Production Engineering II 5
1: Introduction
2: Field Development Concept
3: Oil & Gas Field Operations
4: Oil & Gas Production

Week 1 to Week 7
17-May to 30 Jun 2017
Petroleum
Internal
Engineering Department Production Engineering II 6
5: Separation Process
6: Transportation & Storage
7: Water Handling

Week 8 to Week 13
31 Oct to 9 Dec 2016
Petroleum
Internal
Engineering Department Production Engineering II 7
Assessment %

Quizzes 5

Assignments 25

Test 1 10

Test 2 10

Exam 50

Total 100

Petroleum
Internal
Engineering Department Production Engineering II 8
Topic Week Quizses Assignment Test

Introduction 1

Field Development Concept 2-3 Assignment 1

Oil & Gas Field Operations 4-5 Assignment 2

Oil & Gas Processing 6-7 Assignment 3 Test 1

Separation Processes 8-9

Transportation & Storage 10-11 Assignment 4

Water Handling 12-13 Assignment 5 Test 2

Study Week 14

Exam 15-16

Petroleum
Internal
Engineering Department Production Engineering II 9
U

Petroleum
Internal
Engineering Department Production Engineering II 10
Assignment Week Assignment

Assignment 1 3 Individual & Group

Assignment 2 5 Individual & Group

Assignment 3 7 Individual & Group

Assignment 4 9 Individual & Group

Assignment 5 13 Individual & Group

Petroleum
Internal
Engineering Department Production Engineering II 11
Main References
1. Stewart, Maurice (2014), Surface Production Operations. Gulf Professional
Publishing
2. Stewart, Maurice (2014), Design of Gas-Handling Systems and Facilities, Gulf
Professional Publishing
3. Manning F. S. and Thompson R.E. (1991), Oilfield Processing, Vol 1: Natural Gas,
PennWell Corporation
4. Manning F. S. and Thompson R.E. (1995), Oilfield Processing, Vol 2: Crude Oil,
PennWell Corporation

Optional References
1. Kenedy, John L (1993), Oil and Gas Pipeline Fundamentals, 2nd Edition, PennWell
Publishing
2. Szilas, A.P. (1995), Production and Transport of Oil and Gas, 2nd Edition, Elsevier
Science B. V.
3. Larry W. Lake, (2007) Facilities & Construction Engineering
Petroleum
Internal
Engineering Department Production Engineering II 12
Attendance
& Punctuality

Examples/ Extra
help (Team Spirit) Timeliness

e-Learning Plagiarism

Read WIDE Honesty &


& WILD commitment

Petroleum
Internal
Engineering Department Production Engineering II 13
All on the
same time-table
until
further notice

Petroleum
Internal
Engineering Department Production Engineering II 14
All on the same time-table
until further notice

Petroleum
Internal
Engineering Department Production Engineering II 15
Wednesday Friday*

Lectures 10am-12pm 8 10 am

D5 D2

Group A Group B Group C

Tuesday Thursday Friday

12 -2 pm 12 -2 pm 8 - 10 am
Tutorials
13-01-06 13-01-05 13-01-07

* If there is a lecture on Friday, then there is no tutorial for the week, refer to notice on U-Learning

Petroleum
Internal
Engineering Department Production Engineering II 16
A

>100 C

Petroleum
Internal
Engineering Department Production Engineering II 17
Petroleum
Internal
Engineering Department Production Engineering II 18
www4.ncsu.edu/unity/lockers/users/f/felder/public/ILSdir/styles.htm

Petroleum
Internal
Engineering Department Production Engineering II 19
Petroleum
Internal
Engineering Department Production Engineering II 20
Petroleum
Internal
Engineering Department Production Engineering II 21
The 10 Skills Employers Most Want In 2015 Graduates

1. Ability to work in a TEAM structure


2. Ability to make decisions and solve problems
3. Ability to communicate verbally with people inside and outside
an organization
4. Ability to plan, organize and prioritize work
5. Ability to obtain and process information
6. Ability to analyze quantitative data
7. Technical knowledge related to the job
8. Proficiency with computer software programs
9. Ability to create and/or edit written reports
10. Ability to sell and influence others
Petroleum
Internal
Engineering Department Production Engineering II
Top Qualities to Look for in Applicants (ENGINEERING)

1. Reliable technical skills and competence

2. Ability to demonstrate and apply technical knowledge

3. Strong communication skills

4. Ability to blend and work well with a TEAM

Petroleum