5 DAY OPERATIONAL FORECAST WELL : HOKCHI - 6

sbado 26 ago domingo 27 ago lunes 28 ago martes 29 ago mircoles 30 ago jueves 31 ago
00:00 Drill 3m of new formation formation, circulate
00:00
priorFlow
to LOT
check - POOH Lay down BHA 00:00 Run 3 - make up test and run MDT 00:00 Run - 5 GR-CBL/VDL - 9 5/8" 13.3/8 00:00
csg Run 7" liner in DP 00:00 RIH 9 5/8" Packer to place packer at +/- 2450 m
01:00 01:00 01:00 01:00 01:00 Tag TD, pick up and circulate 01:00
02:00 Perform FIT/LOT 02:00 02:00 02:00 02:00 02:00
03:00 03:00 03:00 03:00 RD wire line 03:00 R/U Cementing equipment. Test lines03:00
04:00 Drill 8 1/2" hole as per program to 3375m 04:00 04:00 04:00 Make up rack back cement head and04:00 liner hanger
Set liner hanger., release r/tool and shear
04:00ball seat
05:00 05:00 05:00 05:00 05:00 Circ and condition mud prior to cement 05:00 Carry out positive casing liner test 300/1600 psi
06:00 06:00 06:00 06:00 Rig up handling equipment 06:00 06:00 Set packer at 2800m, p/test annular
07:00 07:00 07:00 07:00 07:00 Circ and Cement 7" liner in place. Set07:00liner top
Putpacker
packer in circ postion, Tool box talk Displace column of diesel,
08:00 08:00 Toolbox talk - Rig up wireline 08:00 08:00 Run 7" liner with reamer shoe, rigid centralizers
08:00 08:00
09:00 09:00 Run 1 - Res-sonic-caliper Gamma 09:00 09:00 09:00 09:00 Pressure test lines , Displace string to diesel to 2200 psi draw down
10:00 10:00 10:00 10:00 10:00 10:00
11:00 11:00 11:00 11:00 11:00 Release and pickup 15 m circ out cement 11:00 Perform draw down test to 7" liner lap for 6 hours
12:00 12:00 12:00 12:00 12:00 12:00
13:00 13:00 13:00 13:00 R/D handling equipment, R/U DP handling
13:00 equipment
POOH and lay out liner running tool, 13:00
lay out cmt. head
14:00 14:00 14:00 14:00 P/Up hanger 14:00 14:00
15:00 15:00 15:00 15:00 15:00 15:00 Reveres string to mud, unset packer
16:00 circulate hole clean 16:00 Run 2 - Density nuetron Spectral 16:00 16:00 Run 7" liner in DP 16:00 16:00
17:00 17:00 17:00 Run - 5 GR-CBL/VDL - 9 5/8" 13.3/8 17:00
csg 17:00 17:00 Flow Check POOH. L/D packer
18:00 Pump out to shoe 18:00 18:00 18:00 18:00 18:00
19:00 19:00 19:00 19:00 19:00 M/U 9-5/8" and 13 3/8" Blackhawk packer 19:00 assy and surface head
20:00 Flow check - POOH Lay down BHA 20:00 20:00 20:00 20:00 20:00
21:00 21:00 21:00 21:00 21:00 21:00
22:00 22:00 22:00 22:00 22:00 RIH 9 5/8" Packer to place packer at 22:00+/- 2450 m
23:00 23:00 23:00 23:00 23:00 23:00
Equipment From Rig Equipment From Rig Equipment From Rig Equipment From Rig Equipment From Rig Equipment From Rig

Equipment To Rig Equipment To Rig Equipment To Rig Equipment To Rig Equipment To Rig Equipment To Rig
SH-0020
DIVE EQUIPMENT?? BLACK HAWK TOOLS 9 5/8 & 13 3/8 Propesa Tool Box
Tubbing 2 7/8,3 1/2 & 4" DST SH-0021
WELL BORE TOOLS-CHEMS-SCRAPPERS

(To Rig) FLIGHT (From Rig) (To Rig) FLIGHT (From Rig) (To Rig) FLIGHT (From Rig) (To Rig) FLIGHT (From Rig) (To Rig) FLIGHT (From Rig) (To Rig) FLIGHT (From Rig)
2 Liner Hanger 3 SLB Cmnt 1 FMC
4 Matyep 1 Black Hawk Tec 1 Hok WSE 1 2 Propesa
2 Tamsa

8 0 0 0 4 0 1 1 0 0 3 0

Max. Pers. 120 Yesterday's POB 113 Max forecast POB next 5 days 125
POB 121 POB 121 POB 125 POB 125 POB 125 POB 128
Vessels Vessels Vessels Vessels Vessels Vessels

sbado 26 ago domingo 27 ago lunes 28 ago martes 29 ago mircoles 30 ago jueves 31 ago

170826Hokchi 6 Lookahead_ 5 Day Forecast


26/08/2017 - 06:46 a. m.
10 DAY OPERATIONAL FORECAST WELL : HOKCHI - 6
sbado 26 ago domingo 27 ago lunes 28 ago martes 29 ago mircoles 30 ago
00:00 Drill 3m of new formation formation, 00:00
circulate
Flow
prior
check
to LOT
- POOH Lay down BHA 00:00 Run 3 - make up test and run MDT 00:00 Run - 5 GR-CBL/VDL - 9 5/8" 13.3/800:00
csg Run 7" liner in DP
01:00 01:00 01:00 01:00 01:00 Tag TD, pick up and circulate
02:00 Perform FIT/LOT 02:00 02:00 02:00 02:00
03:00 03:00 03:00 03:00 RD wire line 03:00 R/U Cementing equipment. Test lines
04:00 Drill 8 1/2" hole as per program to 3375m
04:00 04:00 04:00 Make up rack back cement head and04:00 liner hanger
Set liner hanger., release r/tool and shear ball seat
05:00 05:00 05:00 05:00 05:00 Circ and condition mud prior to cement
06:00 06:00 06:00 06:00 Rig up handling equipment 06:00
07:00 07:00 07:00 07:00 07:00 Circ and Cement 7" liner in place. Set liner top packer
08:00 08:00 Toolbox talk - Rig up wireline 08:00 08:00 Run 7" liner with reamer shoe, rigid centralizers
08:00
09:00 09:00 Run 1 - Res-sonic-caliper Gamma 09:00 09:00 09:00
10:00 10:00 10:00 10:00 10:00
11:00 11:00 11:00 11:00 11:00 Release and pickup 15 m circ out cement
12:00 12:00 12:00 12:00 12:00
13:00 13:00 13:00 13:00 R/D handling equipment, R/U DP handling
13:00 equipment
POOH and lay out liner running tool, lay out cmt. head
14:00 14:00 14:00 14:00 P/Up hanger 14:00
15:00 15:00 15:00 15:00 15:00
16:00 circulate hole clean 16:00 Run 2 - Density nuetron Spectral 16:00 16:00 Run 7" liner in DP 16:00
17:00 17:00 17:00 Run - 5 GR-CBL/VDL - 9 5/8" 13.3/817:00
csg 17:00
18:00 Pump out to shoe 18:00 18:00 18:00 18:00
19:00 19:00 19:00 19:00 19:00 M/U 9-5/8" and 13 3/8" Blackhawk packer assy and surface h
20:00 Flow check - POOH Lay down BHA 20:00 20:00 20:00 20:00
21:00 21:00 21:00 21:00 21:00
22:00 22:00 22:00 22:00 22:00 RIH 9 5/8" Packer to place packer at +/- 2450 m
23:00 23:00 23:00 23:00 23:00

jueves 31 ago viernes 01 sep sbado 02 sep domingo 03 sep lunes 04 sep
00:00 RIH 9 5/8" Packer to place packer at00:00
+/- 2450M/Um 13-3/8" Blackhawk packer with 00:00
DP tail Change BOP UPR with VAR 3 1/2" x00:00
5 1/2"RIH
andwith
Full combined
BOP Test 7", 9 5/8" and 1300:00
3/8" scrappers
Flow Check POOH ,
01:00 01:00 01:00 01:00 01:00
02:00 02:00 RIH with 5-1/2" DP to +/- 1100 m 02:00 02:00 02:00
03:00 03:00 03:00 03:00 03:00
04:00 04:00 04:00 04:00 04:00 P/Test well to 5500psi over sea water
05:00 Carry out positive casing liner test 300/1600
05:00 psi 05:00 05:00 05:00 RU wire line
06:00 Set packer at 2800m, p/test annular06:00 Set packer and test annulus 06:00 06:00 06:00
07:00 Put packer in circ postion, Tool box talk
07:00Displace
Displace
column
column
of diesel,
of diesel 07:00 07:00 07:00 Run USIT/VDL/GR-Nuetron for 7" liner
08:00 08:00 Perform draw down test to 9-5/8" liner08:00
lap for 2 hours 08:00 Tool Box talks Displace well to sea water,
08:00 Flush surface systems
09:00 Pressure test lines , Displace string 09:00
to diesel to 2200 psi draw down 09:00 09:00 09:00
10:00 10:00 10:00 10:00 10:00
11:00 Perform draw down test to 7" liner lap11:00
for 6 hours 11:00 11:00 11:00
12:00 12:00 Displace column to mud, unset packer 12:00 12:00 12:00
13:00 13:00 13:00 13:00 13:00 Run Gyro lof for hole well
14:00 14:00 POOH. L/D packer 14:00 14:00 14:00
15:00 Reveres string to mud, unset packer15:00 15:00 15:00 15:00
16:00 16:00 16:00 16:00 16:00
17:00 Flow Check POOH. L/D packer 17:00 17:00 17:00 17:00
18:00 18:00 Change BOP UPR with VAR 3 1/2" x18:00 5 1/2" and
RIH Full
withBOP
combined
Test 7", 9 5/8" and 1318:00
3/8" scrappers
Flow Check POOH , 18:00
19:00 19:00 19:00 19:00 19:00
20:00 20:00 20:00 20:00 20:00
21:00 21:00 21:00 21:00 21:00
22:00 22:00 22:00 22:00 22:00 R/D Wireline
23:00 23:00 23:00 23:00 23:00 Reuniones de seguridad (distribuidas a lo largo de la operaci