You are on page 1of 24

S.

No Enterprise Product(Services) Stands for

Primary Rate Interface


1 PRI

2 BRI Basic Rate Interface

3 Centrex

4 POT Plain Old Telephony

5 SIP Session Initiation Protocol

6 IP-Centrex Internet Protocol-Centrex

7 DLC Domestic Leased Circuit

8 NPLC National Pvt. Leased Circuit


8 NPLC National Pvt. Leased Circuit

9 MPLS-LL MPLS-Leased Line

10 L2MC Layer 2 Multi Cast

11 DSLAM Digital Subscriber Line Access Multiplexer

12 ILL Internet Leased line


13 B-RAS Broadband Remote Access Server
14 NLD National Long Distance
Description Equipment Vendor

2Mbps TDMA circuit between C-5 & customer premises EPABX


ZTE,Ericssion and Lucent

132kbps TDMA circuit between MSAN & CP VC equipment.

64kbps circuits between MSAN & normal telephone device. UTSTARCOM and Huawei MSAN

64kbps circuits between MSAN & normal telephone device.

2Mbps onwards Ethernet circuit between NGN C-5 & customer ZTE and Huawei
premises IP-EPABX through SBC.

100kbps onwards Ethernet circuit between NGN C-5 & customer ZTE and Huawei
premises soft phone though SBC.

2Mbps onwards P2P circuit within one telecom circle boundary ECI, ALU, Tejas

2mbps onwards P2P circuit spanning minimum 2 telecom circles & ECI, ALU, Tejas
NLD path
2mbps onwards P2P circuit spanning minimum 2 telecom circles & ECI, ALU, Tejas
NLD path

64kbps onwards LL on MPLS platform with Ethernet hands-of Huawei

Ethernet Leased Line with multiple drops for broadcast ECI, ALU
applications.

Connects multiple customer digital subscriber line (DSL) interfaces ECI, Zyxel and UTSTAR
to a high-speed BH.

Internet leased line for enterprise customers


A broadband remote access server routes traffic to and from
broadband remote access devices such as digital subscriber line Huawei, Juniper
access multiplexers (DSLAM) on an Internet service provider's (ISP)
network.
NLD voice ZTE and Ericssion
KPI Measurement requirement Present Performance-Measurement Reports

1.PRI ASR ,PRI congestion,PRI Utilization greater than 100% and PRI ASR <
Available
25%

BRI,Centrex and POTs services given through DLC equipment.


1. DLC trunk ASR Available
2. DLC trunk congetion
3. V5.2 Link interface utilization between DLC to C5 switch .

SIP- PRIs : Voice- ZTE/Huawei : Voice SIP- PRIs :


1.ASR 1.ASR
2. Congestion 2.Congestion
Data KPI- Data-
1.Registration KPIs
Huawei: SIP PRIs 1.Registration KPIs 2.Session
2.Session KPIs KPIs
3.Traffic Module KPIs 3.Traffic Module KPIs 4.Device KPIs
4.Device KPIs 5.IP QOS KPI
5.IP QOS KPI

Circle wise monthly availability measured by


ES, SES and UAS of Transmission link SOC based on complaints
Circle wise monthly availability measured by
ES, SES and UAS of Transmission link SOC based on complaints

BH KPI-
1.Utilization BH KPI- All Being Measured.
2. Packet Loss Managed customers intergrated in UBIQUBE,
3. Jitter SOC monitoring those circuits performnace.
4. Latency

Circle wise monthly availability measured by


Avaliability of Transmission link SOC based on complaints

1) Uplink SNR
2) Downlink SNR
3) Uplink Signal Attenuation
4) Downlink Signal Attenuation DSLAM backhaul Utilization (server has gone
5) Latency down due to Faulty HW,) Capax required for
6) Packet loss Server
7) Payload
8 Throughput
9) DSLAM Backhaul Utilization

1) ILL Gateway Utilization.


2) Packet Loss 1 to 4 KPI are being measured & Managed.
3) Availability For 5th KPI-
4) Latency (server has gone down due to Faulty HW,)
Capax required for Server.
5) Bandwidth Utilization for the ILL customers.
1) B-RAS Availability (NE 40) - TTL.
2) Eth Trunks Availability.
3) CPU, Memory usage of the hardware(SFU 11,SRU 9,SRU 10,LPU 1,LPU
3,LPU 6,LPU 8) installed in B-RAS.
4) Number of BRAS links > 80% utilized (Eth Trunk 50,60 & 100)
5) BRAS links > 80% utilized (Eth Trunk 50,60 & 100) (50,60 and 100 are Eth
trunk interface no for identifications)
6) % of Access Rejects( < 80%)
7) % of Accounting Response(100 %)
8) Max concurrent users against licensed capacity. Available
9) Availability of AAA system.
10) CPU and Memory Usage of AAA system.
11) B-RAS Availability(E-320) - TTML.
12) Eth Links Utilization (E-320)
13) CPU usage of B-RAS(E-320)
14) Max concurrent users against licensed capacity(E-320)
15) B-RAS Availability(ME-60) - TTML.
16) Eth Links Utilization (ME-60)
17) CPU usage of B-RAS(ME-60)
18) Max concurrent users against licensed capacity(ME-60)
1.NLD ASR.
2.NLD Congestion.
3. No of POIs utilization > 80%. Available
4.VTCM Utilization < 80%
5.NO of modules - CAPS utilization > 60CPS
Requirement for Missing KPI Measurement

ZTE KPIs - Northbound interface require.


Huawei KPIs - CR raised ,development &
UAT completed.Reports not published due to commerical closure.
1) NMS and CPE has to upgraded with TR-069 Protocol .
OR
Need IT Access Approval for ECI tool connectivity to EOPS server. This is in WIP, KPI 1 to 7 will
avaliable for ECI DSLAM.
2) For Zyxel DSLAM, EMS has to be upgraded to support SNMP protocol.
3. UTISTAR Support not avalible with us.
4) The DSLAM Backhaul utilization reports are not being received due to server Hardware issue at
Turbhe. Capex approval expected for hardware replacement and NMS software installation.
Available other Reports Remarks

Majority PRIs connected to ZTE C5 switch

ZTE reports available locally ,unable to connect to server due to CR raised for Huawei SIP performance reports.Develpoment
non availability of Northbound interface feature. completed due to commericals reports not released by TCS team.

CR raised for Huawei SIP performance - IP Centrex


reports.Develpoment completed due to commericals reports not
released by TCS team.

There is no automated tool for taking circuit wise PM Tx Eqpt. Each


circuit PM to be taken Manually from NMS
There is no automated tool for taking circuit wise PM Tx Eqpt. Each
circuit PM to be taken Manually from NMS

There is no automated tool for taking circuit wise PM Tx Eqpt. Each


circuit PM to be taken Manually from NMS

NIL

1) ILL Gateway Utilization report.


2) Packet Loss report
3) Availability report.
4) Latency report.
Action point

,E/// reports need to check


authentication , (its < 100 PRI in .///
system), zero PRI deleted from SW.

Need to check Kaizen for report


process & Also check with OSS for
report generation.
Need to get CAPEX approval

Need to get CAPEX approval

You might also like