B K TAN CONSULTANTS

Project : PROPOSED NEIGHBOURHOOD RENEWAL PROGRAMME (NRP) Job No. Sheet No: 1
BATCH 10 FOR BLOCKS 140 TO 149 AT BUKIT BATOK WEST AVENUE 6/ BUKIT
BATOK STREET 11 FOR JURONG-CLEMENTI TOWN COUNCIL Designed by: SON Date: 8/9/2017
Subject : ECM Design Calculation for A1 BFA Ramp Checked by : BKT Date: 8/9/2017
Reference Output
Calculation of Soil Loss

Catchment area = 30.6 m2


Modified USLE equation

T = R x K x LS x C x P
Where , T = Sediment yield per storm event (tonnes)
R = Y2 ( V x Qp )0.56
Y2 = 89.6 for SI Units & 95.0 for English Units
3 ( Code of Practice On
V = Volume of runoff ( cm )
(m3/s) Surface Water
Qp = Peak Flow
K = Soil Erodibility Factor Drainage)
LS = Topographic Factor
C = Cover Factor
P = Management Practice Factor
2 2
here , A = 30.6 m (1 acre = 4046.856 m )
= 0.008 acre
K = 0.1
Where , l = Slope Length
S = Slope in %
m S
0.2 < 1%
0.3 1%<S<3%
0.4 3%<S<5%
0.5 5%<S<12%
0.6 >12%
l = 2030 mm = 2.03 m
S = 46% = 0.46
m = 0.6
m S
LS= (l/22.13) x(0.065+0.046S+0.0065S )
0.4 0.04
= (22.0/22.13) x(0.065+0.046x0.04+0.0065x0.04 )
= 0.022
C = 1
P = 1
Volume of runoff
V = C x I x Duration x A
C = 0.8
I = 80 mm/hr = 0.08 m/hr

Duration = 60 min = 1 hr = 3600 sec


2
A = 30.6 m
V = 0.8 x 0.08 x 1 x 30.6
3
= 1.958 m
Peak Flow
Qp = V / Duration
= 1.958 / 3600
3
= 0.0005 m /sec

R = Y2 ( V x Qp )
0.56

= 89.6 x ( 1.9584 x 0.0005 ) 0.56


= 1.940
T = R x K x LS x C x P

= 1.940 x 0.1 x 0.0216 x 1 x 1


= 0.004 tonnes
Total Suspended Solid
TSS = T
V
9
= 0.004 x 10 mg = 2142.7 mg/l > 50 mg/l

1.958 x 103 litre


B K TAN CONSULTANTS
Project : PROPOSED NEIGHBOURHOOD RENEWAL PROGRAMME (NRP) Job No. Sheet No: 2
BATCH 10 FOR BLOCKS 140 TO 149 AT BUKIT BATOK WEST AVENUE 6/
BUKIT BATOK STREET 11 FOR JURONG-CLEMENTI TOWN COUNCIL
Designed by: SON Date: 8/9/2017
Subject : ECM Design Calculation for A1 BFA Ramp Checked by: BKT Date: 8/9/2017
Reference Output
After reduced Total Suspended Solid = 0.25 x 2142.7

= 535.67 mg/l ( CP = 0.25 )

Computation of Peak Runoff


2
Catchment area = 30.6 m
Rational Formula
( Code of Practice On
Qr = 1 x C x I x A
Surface Water
360 Drainage)
3
Where , Qr = peak runoff at the point of design (m /s)
C = runoff coefficient
I = average rainfall intensity (mm/hr)
A = catchment area (hectares)

here , C = 0.8 ( Residential / Industrial areas densely built up)


I = 80 mm/hr
A = 30.6 m2 = 0.0031 hectares

Qr = 1 x C x I x A
360

= 1 x 0.8 x 80 x 0.00306
360

= 5E-04 m3/s

Computation of Discharge Capacity

Manning's Formula
( Code of Practice On
2/3 1/2
Qc = 1 x A x R x S Surface Water
n Drainage)
1/2
= k x S
3
Where , Qc = discharge capacity of drain (m /s)
n = roughness coefficient
2
A = flow area (m )
P = wetted perimeter (m)
R = A/P =hydraulic radius (m)
S = bed gradient

2/3
k = 1 x (A/P) x A
n

n = 0.015 (Concrete)
k = 0.365
A = 0.032
P = 0.461
S = 0.01 1:100

Qc = k x S1/2

= 0.365 x 0.01^(1/2)
3
= 0.037 m /s

Qr = 5E-04 m3/s < Qc =


3
0.037 m /s Ok
B K TAN CONSULTANTS
Project : PROPOSED NEIGHBOURHOOD RENEWAL PROGRAMME (NRP) Job No. Sheet No: 3
BATCH 10 FOR BLOCKS 140 TO 149 AT BUKIT BATOK WEST AVENUE 6/ BUKIT
BATOK STREET 11 FOR JURONG-CLEMENTI TOWN COUNCIL
Designed by: SON Date: 8/9/2017
Subject : ECM Design Calculation for A1 BFA Ramp Checked by: BKT Date: 8/9/2017
Reference Output

Storage

Storage for 1 in 5 years storm.

2
Rainfall shall be considered as 80mm for every m .

2
Site area = 30.6 m

C = 0.8

Storage requirement = 30.6 x 80 x 0.8


1000

3
= 1.958 m

Storage provide at site no. of Holding Tank

= 1x1.5x1.5x1.5

= 3.375 m3 > 1.958 m3 OK

Calculation of Treatment System

According to site area,

For 5000m2 site area, the require: minimum capacity is 40m3/hr

For 30.6 m2 site area, the treatment capacity

= 30.6 x 40
5000

3
= 0.245 m /hr
3
Use Flexi-M10, the treatment capacity = = 5 m /hr