Loads:
-Bottom slab
Sf(kN/m) = dc. t . b
= 24 0.4 1
= 9.600
where by
dc- density of concrete
t - slab thicknes
b - width of the slab
-Earth's pressure;
-Vertical earth pressure, Pv;
Pv(kN/m2) = ds . h
= 18 2.7
= 48.600
where by
ds - dry density of the soil
h - height of the buried chamber.
Coefficient of active earth's pressure, Ka =1/3 For the angle of internal friction=300.
Ph(kN/m) = Ka. Pv
= 0.33 5
= 1.650
-Traffic load;
Due to passage of traffic on the top slab the load acting is taken as = 10kN/m
Job Number Sheet
Job Title
DESING OF INTAKES WORKS CHAMBER
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com UNITED REPUBLIC OF TANZANIA
Calcs by Checked by Date
E-Mail : mail@prokon.com BONIPHACE M. ALFRED C. 15/11/2013
Mmax
K= . . .
b d d Fcu
34810000
=
1000 204 204 35
= 0.0239
where by
b- width of the slab
d- effective depthy of the slab
fcu- characteristics strength of the concrete
lever arm, z;
1
K 2
z(mm) = d . 0.5 + 0.25 -
0.9
1
0.0239 2
= 204 0.5 + 0.25 -
0.9
= 198.431
Mmax
As(mm2/m) =
0.87 . f y. z
34810000
=
0.87 460 193.800
= 448.821
100 . As
p(%) =
AC
100 565
=
250000
= 0.2260
where by
Ac- is the gross area of concrete.
lever arm, z;
1
K 2
z(mm) = d . 0.5 + 0.25 -
0.9
1
0.0038 2
= 354 0.5 + 0.25 -
0.9
= 352.499
Mmax
As(mm2/m) =
0.87 . f y. z
16720000
=
0.87 460 336.300
= 124.232
-Provide T10 @300mm c/c (As=262mm2/m).
100 . As
p(%) =
AC
100 262
=
400000
= 0.0655
-Wall design:
where by
b- width of the slab
d- effective depthy of the slab
fcu- characteristics strength of the concrete
Job Number Sheet
Job Title
DESING OF INTAKES WORKS CHAMBER
Software Consultants (Pty) Ltd Client
Internet: http://www.prokon.com UNITED REPUBLIC OF TANZANIA
E-Mail : mail@prokon.com Calcs by Checked by Date
BONIPHACE M. ALFRED C. 15/11/2013
lever arm, z;
1
K 2
z(mm) = d . 0.5 + 0.25 -
0.9
1
0.0239 2
= 204 0.5 + 0.25 -
0.9
= 198.431
Mmax
As(mm2/m) =
0.87 . f y. z
34810000
=
0.87 460 193.800
= 448.821
-Provide T12 @200mm c/c (As=565mm2/m).
100 . As
p(%) =
AC
100 565
=
250000
= 0.2260