On 13th August, i was assigned at Environmental Impact Assessment (EIA) unit for a week. I
started my attachment at the unit by reporting at head of EIA unit, Madam Komalathevi. She briefly
explained to me about preliminary EIA, EIA report and post-EIA. During the first meeting, i was
given EIA writing guideline and Term of Reference (TOR) for dredging and reclaimation of land for
new jetty in Tanjung Langsat to study.

On second meeting with Madam Komala, she asked me to explain about what she had gave
me on previous meeting. Later on, she gave me full EIA report prepared by Kualiti Ceria Sdn Bhd on
the same project to study and prepare a summary regarding water quality, air quality, sedimentation
and waste management on that report as well as comparison between full EIA and TOR on that
project. I was given two days for preparation.

On last meeting with Madam Komala, i presented my summary on that EIA report as well as
suggestion whether the project can be approved by DOE and proceed or the otherwise.
Summary of Water Quality for EIA

Sumber Impak dan Aktiviti Kesan Alam Sekitar dan Cadangan Tebatan Impak Sampingan dan
Projek Kesan Sampingan Keperluan Pemantauan
-Sistem sanitasi dibina
ditapak di mana rawatan
-Penyelenggaraan tidak najis atau kumbahan
wajar terhadap berlaku di lokasi yang
kemudahan sanitasi sama menjana seperti
terutama pada pekerja dengan menggunakan
dan pejabat tapak boleh tangka septic
memberi kesan yang
berpotensi kerana -Pastikan untuk
bakteria pemindahan, membuat pembetungan Memerlukan pemantauan
Kemudahan sanitasi virus dan parasit yang mampan dengan yang ketat dan pengurusan
terdapat dalam najis mengambil kira oleh pengurus tapak atau
manusia keseluruhan dari pegawai tapak
pengalaman pengguna,
-Ia boleh mencemarkan najis dan pengumpulan
sumber air, tanah, dan sisa kaedah,
makanan dan memberi pengangkutan atau
kesan buruk terhadap pengangkut sisa,
kesihatan manusia rawatan dan
menggunakan semula
atau pelupusan

-Menyediakan dan
mewujudkan system loji
rawatan kumbahan
(STP) untuk merawat
kumbahan dan harus
mematuhi Standard A
berdasarkan Kualiti
Alam Sekeliling
Sembarangan lambakan (Kumbahan) Peraturan
Penghasilan sisa sisa kumbahan dan air 2009 Penyenggaraan system STP
kumbahan dan sullage basuhan akan adalah dengan kecekapan
menyebabkan -Penyelenggaraan STP dan pemprosesan yang
kemerosotan dan kesan yang betul perlu untuk tinggi
mungkin terhadap mengelakkan sebarang
kehidupan biologi kegagalan dan kesan
sampingan terhadap
alam sekitar

-Kumbahan dan air


basuhan perlu
dikeringkan dan
dilupuskan di tapak
buangan yang diluluskan
Garis data program pemantauan
12 lokasi telah dipilih untuk sampel air sungai
8 stesen di utara dan 4 stesen di selatan tapak cadangan projek
Keputusan daripada analisis kualiti air dibandingkan dengan Piawaian Kualiti Air
Kebangsaan (NWQS) bagi Malaysia dan Indeks Kualiti Air JAS.
Berdasarkan perbandingan dengan piawaian WQI, kualiti air di kebanyakan titik
persampelan diklasifikasikan sebagai bersih (Kelas I/II), sedikit tercemar (Kelas II/III) dan
tercemar (Kelas III)

Anggaran penduduk

45000 PE di Zon Selatan-Timur


65000 PE di Zon Barat

Pengurusan air buangan dan sisa kumbahan

Terdapat 2 loji rawatan kumbahan (STP) telah dicadangkan untuk projek ini
STP dengan keluasan rizab sebanyak 5.25 ekar telah diperuntukkan untuk menampung
45000 PE manakala kawasan seluas 6.61 ekar untuk menampung 65000 PE
Reka bentuk STP perlu mendapatkan kelulusan daripada Indah Water Konsortium Sdn
Bhd (IWK) dan harus direka mengikut garis panduan Pihak Berkuasa Tempatan
Ini adalah untuk memastikan semua pelepasan kumbahan yang mengalir ke arah Loji
Rawatan Pembetungan mengikut prosedur Standard A

Utiliti dan infrastruktur (bekalan air)

Air yang diperlukan untuk pembangunan disalurkan daripada air terawatt Syarikat Air Johor
Berhad (SAJ)
Ia adalah dasar SAJ untuk menyediakan bekalan air yang dirawat sepenuhnya yang
mencukupi kepada perkembangan-perkembangan dalam kawasan bekalannya
Air akan disalurkan daripada saluran paip retikulasi air SAJ yang sedia ada hendaklah
dipasang di kawasan rizab jalan daripada punca utama yang terdekat

Utiliti dan infrastruktur (peruntukan saliran)


Air larian dari tapak projek mengalir ke dalam besen pemendapan dan limpahan akan
disalurkan ke dalam Sungai Pontian Besar di mana apa-apa pelepasan effluent dari tapak
projek akan mematuhi Standard B Akta Kualiti Alam Sekeliling (Effluen Industri) 2009
Sumber-sumber lain effluent dari loji rawatan kumbahan (STP) di mana pelepasan harus
memenuhi Standard B, Peraturan-Peraturan Kualiti Alam Sekeliling (Kumbahan) 2009

Persekitaran sedia ada (hidrologi)


Projek yang dicadangkan adalah sebahagian daripada kawasan Kulai Estate dan terletak
berhampiran dengan Kg. Sri Paya, di dalam Daerah Kulai
Terdapat satu sungai utama yang mengalir ke kawasan projek iaitu Sungai Pontian Besar
Menurut Jabatan Pengairan dan Saliran (JPS), tiada data banjir telah direkodkan di
kawasan tapak projek cadangan

Persekitaran manusia (bekalan air)


SAJ Holdings Sdn Bhd kini membekalkan air bersih ke seluruh kawasan di dalam Daerah
Johor Bahru secara amnya dan kawasan Kulai secara khususnya
Bekalan air akan meningkat untuk memenuhi permintaan masa depan

Persekitaran manusia (pembentungan)


Sistem rawatan kumbahan adalah di bawah pengurusan IWK
Setiap organisasi perindustrian individu dijangka akan merawat sisa kumbahan dan
effluent perindustrian mereka sendiri dengan betul mengikut piawaian yang diperlukan
dan peraturan sebelum dilepaskan ke dalam sistem perparitan di sekitarnya

Peringkat pembinaan
Langkah-langkah yang akan dilaksanakan di tapak projek mengurangkan kesan buruk dan kesan
hakisan dan pemendapan termasuk penggunaan:

Perancangan dan fasa


Kawalan hakisan
Kawalan mendapan
Kawalan air larian permukaan

Methodology of water sampling


PARAMETER METHODOLOGY
Biological Oxygen Demand (BOD) - Used 1000ml plastic bottle
- Preserved water samples at
temperature, <4C
Chemical Oxygen Demand (COD) and - Used 100ml plastic bottle
Ammoniacal Nitrogen (AN) - Preserved water samples with sulphuric
acid (H2SO4)
Oil & Grease (O&G) - Used 500ml plastic bottle
- Preserved water samples with
hydrochloric acid (HCL)
E-Coli - Used 250ml sterilized glass bottle
- Preserved water samples with sodium
thiosulphate
Total Suspended Solid (TSS) - Used 1000ml plastic bottle
Heavy Metals - Used 1000ml plastic bottle

Temperature, pH and Dissolved Oxygen (DO) were measured in situ by using DO meter while other
parameters were sent to accredited laboratory, Chemical Laboratory (Malaysia) Sdn Bhd, Skim
Akreditasi Makmal Malaysia (SAMM No.180) for analysis.

Water Quality Index (WQI)

River Sampling Point WQI Class Status


SDK-UPS 75 II Slightly polluted
SDK-MID 76 II Slightly polluted
SDK-DNS1 65 III Slightly polluted
SDK-DNS2 84 II Clean
W1 83 II Clean
Sungai Pontian W2 80 II Slightly polluted
Besar W3 55 III Polluted
W4 95 I Clean
W5 88 II Clean
W6 96 I Clean
W7 92 I Clean
W8 93 I Clean

Description of proposed monitoring program


Location of water stations
Parameters
Points
Frequency of monitoring

Water quality Potential Impacts


Site clearing and earthwork
Silt and sediment
Disposal of biomass
Sanitation facilities for site office and base camp
Improper storage and handling of oil and petroleum products and agricultural chemicals

Mitigating measure for water quality preservation


Installation of an online water quality monitoring station
Frequent ambient water quality monitoring during the initial start-up phase of the project
site
Monthly sampling exercise for subsequent years
The project proponent must coordinate with the water service provider