ACKNOWLEDGEMENT

First and foremost, I would like to record my gratefulness to God for His Kindness and

Mercifulness for giving me the opportunity, strength and strong spirit in completing this Industria l

Training and related report in the way it should be and protect me from any problem througho ut

this duration. Since I have the opportunity for doing the industrial training in this company,

Aqvaspace Sdn. Bhd. for almost 4 month, the training have been something valuable for me.

Firstly I would like to express my gratitude to Aqvaspace Sdn. Bhd. for allowing me to do

my Industrial Training in their company. Besides that, I would like to extend my appreciation

and gratitude to my supervisor, Mr. Narensh Nair A/L Narandran Nair and Mr. Kumarasen

A/L Ganayser for helping me a lot during my Industrial Training. Not forgotten, to Aqvaspace

Sdn. Bhd Director Mr. Karthigayen A/L Veerasamy and Senior Modeller Dr. Muthulaksmi A/P

Alagan who help me a lot while doing the work by teaching me new things. Without the support

and advice, I might not have been able to give full commitment along this training period. Special

thanks also to my University Supervisor Dr.Nantini Sridewi A/P Appan for guidance, criticis m

and advice for me during this training period. Besides that, I really appreciate the co-operation

that are given by UPNM management whose encouragement and support from the initial to the

final level enable me to complete this industrial training.

Last but not least, I would like to thank to my parents, siblings, friends and also other

organization that involved directly or indirectly for their guidance and suggestions. All ideas and

encouragement are much appreciated.

iii
TABLE OF CONTENT

CONTENT PAGE

STUDENT DECLARATION i

CONFORMATION OF SUPERVISOR ii

ACKNOWLEDGEMENT iii

TABLE OF CONTENT iv-vi

LIST OF FIGURE vii-viii

LIST OF TABLES ix

LIST OF APPENDIX ix

CHAPTER I:INTRODUCTION OF INDUSTRIAL TRAINING

1.1 INTRODUCTION 1-2

1.2 OBJECTIVE OF INDUSTRIAL TRAINING 3

1.3 OBJECTIVE OFINDUSTRIAL TRAINING REPORT 4

1.4 IMPORTANCE OF INDUSTRIAL TRAINING 5

iv
CHAPTER 2 ORGANIZATION INFORMATION

2.1 COMPANY PROFILE 6

2.2 ORGANIZATION BACKGROUND 7

2.3 COMPANY LOCATION 8

2.4 ORGANIZATION CHART 9

2.5 COMPANY VISION 10

2.6 COMPANY COOPERATE LOGO 10

2.7 ORGANIZATION ACTIVITY 11-17

2.8 NUMERICAL MODELLING, SOFTWARE AND INSTRUMENT 18

CHAPTER 3 SUMMARY OF INDUSTRIAL TRAINING

ACTIVITY

3.1 INTRODUCTION 19

3.2 SCOPE OF WORK 20

3.3 DESCRIPTION OF THE STUDY AREA 21-22

3.4 SURVEY EQUIPMENT 23-24

3.5 HYDROGRAPHIC SURVEY 25-28

3.6 LAND SURVEY 29-33

3.7 ESTABLISHMENT OF TIDAL OBSERVATION STATION 34-35

3.8 MARINE DATA COLLECTION 36-44

3.9 RESULTS AND FINDINGS 45-51

3.10 SOFTWARE 52-54

v
CHAPTER 4 CONCLUSION & SUGGESTION

4.1 CONCLUSION 55

4.2 RECOMMENDATIONS 56

BIBLIOGRAPHY 57

APPENDICES 58-60

vi
LIST OF FIGURES

TITLE PAGE

Figure 2.1: Aqvaspace Sdn. Bhd location 8

Figure 2.2: Company Logo 10

Figure 3.1: View of Tanjung Balau 21

Figure 3.2: View of Desaru beach 22


22
Figure 3.3:View of Tanjung Balau Resort

Figure 3.4: Concept of DGPS Navigation 26

Figure 3.5: Concept of Single Beam Bathymetry 27


28
Figure 3.6: Preparation of Bathymetry
32
Figure 3.7: Typical Schematic Sketch of survey location
33
Figure 3.8: Process of Topography

Figure 3.9: Principle of Tide Gauge Deployment 34

Figure 3.10: Location of ADCP Deployment 38


39
Figure 3.11: Preparation of ADCP Deployment
40
Figure 3.12: Deployment of ADCP

Figure 3.13: Retrieval of ADCP 41

Figure 3.13: Working Principle of Grab Sampler 42


43
Figure 3.14: Location of Grab Sample Collection

Figure 3.15: Collection of Grab Samples 44

vii
Figure 3.16: Result of Topography 45

Figure 3.17: ADCP Result (Water Level) at Desaru,Johor 46

Figure 3.18: ADCP Result (Current speed) at Desaru,Johor 46

Figure 3.19:ADCP Result (Current Direction) at Desaru,Johor 47

Figure 3.20: Bathymetry Result at Desaru,Johor 48

Figure 3.21:3D Bathymetry Result at Desaru,Johor 48

Figure 3.22: Grain size distribution 49

Figure 3.23: Sediment Composition 49

Figure 3.24: Google Earth software 52

Figure 3.25: Global Mapper software 54

viii
LIST OF TABLES

Table 2.1:Organization chart of company 9

Table 3.1: Geographical location of ADCP Deployment 38

Table 3.2: Geographical location of Grab Sample Collection 43

Table 3.3: Summary of Sediment Characteristics 50

LIST OF APPENDICES

1. Picture of river cross-section using RTK method 9

2. Picture of river cross-section using RTK method 58

3. Picture of Tide Gauge establishment preparation 59

4. Picture of Tide Gauge establishment preparation 59

5. Picture of ADCP Retrieval with the aid of diver 60

6. Picture of measuring downstream using RTK Method 60