Establishment of CDM DNA under Ministry of Nature, Environment and Tourism 2004.11.14
2 5.3-CDM DNA will gather the evaluation of PINs from Appraisal committee members -Ministry of Nature, Voluntary
within 5 working days after sending it to their review. Environment and Tourism basis
Project Idea
5.4 –CDM DNA will respond to project developers within 10 working days by issuing -Ministry of mineral Endorsement/
Note/ PIN
objection
3 endorsement letter or objecting the PINs if it doesn’t meet the sustainable resources and energy
development criteria. -Ministry of Finance 10 working days
4 6.3 –CDM DNA will designate a technical committee to review and comment on PDD
- Ministry of Food, Obligatory
Agriculture and Soft Project
after 3 working days since it is submitted.
Approval/ Objection design
Industries document/
5 6.5 –CDM DNA will put PDDs for public consultation on it’s website for 2 weeks after
- Íèéñëýëèéí çàñàã 30 working days PDD
it’s submitted .
äàðãûí òàìãûí ãàçàð
6.8 -ÒÁÁ-òýé õîëáîîòîé ñàíàëàà èëýðõèéëýõýýð õºíäëºíãèéí ýòãýýä 3-ààñ äîîøã¿é -Mongolian National
6 õîíîãèéí ºìíº óðüä÷èëàí òîâ÷îîíä ìýäýãäñýí áîë хурлын хэлэлц¿¿лэгт тºсºлд chamber of Commerce
оролцогчдыг áàéëöóóëàí оролцуулж болно.
and Industry
6.10 -Õîðîîíû ãèø¿¿í á¿ðèéí òóõàéí òºñºëä ºãñºí ¿íýëãýýíèé íèéëáýð ä¿í ñºðºã áóþó -Mongolian association of
7 òàòãàëçñàí ýñâýë 0-ýýñ äýýø ýåðýã áóþó äýìæñýí áàéæ áîëîõ áºãººä òóñ á¿ð íýã Energy
ñàíàëä òîîöîãäîíî. Õорооны гиш¿¿äèéí ýíãèéí îëîíõûí ñàíàëààð òóõàéí òºñºëä
- National University of
òàòãàëçñàí ýñâýë áàòëàìæ áè÷èã îëãîõûã äýìæñýí øèéäâýðèéã ãàðãàíà. Ñàíàë
òýíöñýí òîõèîëäîëä òîâ÷îîíû ñàíàëûã õàðãàëçàí ¿çíý. Mongolia
- University of Science
8 6.11 -Хорооны даргûí гарын ¿сэг зурж áàòàëãààæóóëñàí ¿íýëãýýíèé øèéäâýðò and Technology
¿íäýñëýí òовчооны дарга òóõàéí тºсºлд оролцогчдод татгалзсан эсвэл
áàòëàìæèëñàí àëáàí áè÷èã олгоно.
9 6.12- ЦХМ-ын тºслийн баримт бичгийн багцыг х¿лээж авснаас хойш àæëûí 30
õîíîãò áàãòààí áàòëàìæ áè÷èã îëãîõ ýñýõ òàëààðõ àëáàí ¸ñíû øèéäâýð ãàðãàíà. Validation by
10 7.1 -Сонирхлын зºрчилòýé ãýæ тухайн õîðîîíû гиш¿¿н ¿çâýë àëèâàà тºслийг DOE
¿нэлэхээс татгалзаíà. Ýíý òóõàéãàà хорооíä болон товчоонд мэдэгдэх ¿¿рэгтэй.
12 Хэрэв дээрх øàëãóóð ¿ç¿¿ëýëò тус б¿рä ºãñºí îíîîíóóäûí íèéëáýð 0 болон ò¿¿íýýñ
Implementat Verification/
дээш байвал òóõàéí тºслèéã óëñ îðíû òогтвортой хºгжлийн шалгуурт нийцэж Registration CER issuance
ion DOE
байна гэж ¿знэ.
Sustainable development criteria for CDM
projects evaluation in Mongolia
3 Energy efficiency rehabilitation for G.Myagmar 100.0 –110.0 thousand tonCO2 80.0 million US$ PDD stage
pre-cast panel buildings in myagmar_arch@yahoo.com eq
Ulaanbaatar city
Reconstruction boilers in Power T.Ganbold 32,0 – 33,0 thousand ton CO2- 15.0 million US$ PIN
Plants of Darkhan and Erdenet tel:99163103, 341371 Ext: 225, eq
4 fax:343479
ganucs@fea.energy.mn
5 Salkhit wind park (50 MW) N.Ganhyag 180.0 – 190.0 thousand ton 85.0 million US$ Validation stage
gankhuyagd@newcom.mn CO2- eq
6 Replacement of coal and wood Ts.Puntsag 15.445 thousand ton CO2-eq PIN
fired heating by renewable info@steppesolar.com
heating system tel:317177/331356
Community based heating supply T.Ganbold 17,0-23,0 thousand tonCO2- eq 2,0 million US$ PDD stage (financed by ADB
in rural remote areas of Mongolia G.Purevdorj carbon fund)
7 Tel:99163103, 341371 Ext: 225,
Fax:343479
ganucs@fea.energy.mn,
prurevdorj@mobinet.mn
Program of Energy Efficiency, T.Ganbold 30,0 thousand tonCO2- eq 9.0 million US$ PIN
Power Plant Darkhan tel:99163103, 341371 Ext: 225,
8 fax:343479
ganucs@fea.energy.mn
9 Energy conservation with Tsoodol- general manager 30,0 thousand ton CO2- eq 0.6 - 0.8 million US$ PIN
utilisation of active mineral Tel: +976-99096149
additives (pozzolans) in Cement khutul_cement@rail.com
production
Energy conservation with Sh.Munhjargal-general manager 30,0 thousand ton CO2- eq 6.5 million US$ PIN
introduction of variable speed Tel: +976-91111558
10 drive pumps for heating engineer@dhc.mn
distribution in Ulaanbaatar
CDM projects reported to the CDM DNA (continued)
11 Waste gas to green energy B.Jigjidsuren 28,5 thousand 5,43 million PDD stage
Tel: 70110181 ton CO2 US$
info@newenergy.mn maqsood@newenergy.mn
zagdochir@newenergy.mn
12 Geothermal heating supply in ger Г.Мягмар, Deputy Director, 3 æèë= 99,6 ìÿí 175,0 million PIN
district Утас: 327252 Факс:322904 òí CO2- US$
E-mail: myagmar_arch@yahoo.com дүйцүүлэн
13 Maikhan Hydro Power Plant (12 Б. Давгадорж 47.3 ìÿí òí CO2- 9.8 million US$. PDD stage
MW ) Óòàñ:354257, 350268 дүйцүүлэн
usnyerchim@mongol.net, bdagvadorj@yahoo.com
14 Geothermal Project in Khangai Т. Ганболд, ЦХМ-ын зөвлөх, 50.0 ìÿí òí CO2 14.0 million US$ PIN
region of Mongolia Г. Пүрэвдорж
Утас:99163103, 341371 Ext: 225, Факс:343479
ganucs@fea.energy.mn, prurevdorj@mobinet.mn
15 Reduction of CO2 while introducing Äýä захирал Б. Цэрэннадмид 30,0 thousand 3.2 - 3.5 million PIN
the Ladle Refining furnace in утас: 1372-24203 tonCO2- US$
Darkhan metallurgical plant of факс: 1372-23946 дүйцүүлэн
Mongolia info@dmplant.mn HTTP:/www.dmplant.mn/
16 250 MW Khanbogd High power ÿéöýòãýõ захирал С. Мөнхжаргал 1.412 ìÿí òí CO2- 438 сая US$ PDD stage
wind farm óòàñ:70110546 дүйцүүлэн
qleantech@yahoo.com , www.qleantech.net
17 Biogas plant in Mongolia Äэд захирал Н. Ганбаатар 2.312 ìÿí òí 980.0 million PIN
óòàñ: 976-329192 факс:311612 CO2- дүйцүүлэн US$
гар утас: 976-99116315
info@monbiogas.com,
batsaikhan_baldandorj@yahoo.com www.ntic.mn
18 Shainshand wind farm Р. Давааням 174.0 ìÿí òí CO2- 75.0 million US$ PIN
Óòàñ:11-327626 дүйцүүлэн
sainshandwp@yahoo.com , www.monwea.mn
19 Thaishir hydro power plant ЦХМ-ын зөвлөх Т. Ганболд 29.640 ton CO2- НҮБ-ын уур амьсгалын өөрчлөлтийн
утас:99163103, 341371 Ext: 225, факс:343479 eq суурь конвенцийн газарт
ganucs@fea.energy.mn бүртгэгдсэн.48 ßÁÁ –ã 2010 îíû 1-ð
ñàðä àâñàí.
20 Durgun Hydro power plant ЦХМ-ын зөвлөх Т. Ганболд, 30.4 thousand НҮБ-ын уур амьсгалын өөрчлөлтийн
утас:99163103, 341371 Ext: 225, факс:343479 tonCO2- суурь конвенцийн газарт бүртгэгдсэн.
ganucs@fea.energy.mn дүйцүүлэн Õÿíàëò øèíæèëãýý õèéñýí òàéëàí
áýëòãýãäýæ áàéãàà.
21 Retrofit program for decentralised Dipl. Ing. Walter Paulsen: Andreas Glas M.A. 12 ìÿí òí CO2- НҮБ-ын уур амьсгалын өөрчлөлтийн
heating stations in Ulaanbaatar Tel.: +49 97 99 01-25 Tel.: +49 97 99 01-28 дүйцүүлэн суурь конвенцийн газарт бүртгэгдсэн.
Fax: +49 97 99 01-50 Îðîëöîã÷ òàëóóäûí çºð÷èëäººíººñ ¿¿äýí
õýðýãæèõã¿é áàéãàà.
CDM National bureau (DNA) Ministry of Nature, Environment
and Tourism
№ Projects Ангилал
1 Renewable Energy - Solar, wind, hydro and geothermal power stations
- Biomass, biogas
- Energy efficiency in electricity and heat stations
Energy efficiency - energy efficiency in supply and demand side
2 - Retrofit for small HOBs
- Improving coal quality
Electricity and heat - Energy efficiency rehabilitation for Pre-cast Panel buildings
3 supply efficiency in - Energy efficiency in lightning (PV lamp )
construction
- Energy conservation and emisision reductions from poor households
5 Waste -Composting
management -Utilization of landfill gas
6 Fuel switch - Gas
- Afforestation and Reforestation
7 Other - Land use management
- Coal mine methane utilization
- Improving the stoves of ger district and quality of coal
Address: Ministry of Nature, Environment and Toursim, CDM National Bureau (DNA)