ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : PEKERJAAN PERSIAPAN

Volume
No Uraian Harga Satuan (Rp) Jumlah Harga (Rp)
Unit Quantity
ANL.I MOBILISASI & DEMOBILISASI
1 Concrete Mixer 0.3 - 0.6 M3 Unit 1.0000 200,000.00 200,000.00
2 Truck Concrete Mixer Unit 1.0000 500,000.00 500,000.00
3 Generator Set Unit 1.0000 150,000.00 150,000.00
4 Mesin Las dan Mesin Potong Unit 1.0000 150,000.00 150,000.00
5 Concrete Vibrator Unit 1.0000 100,000.00 100,000.00
6 Hand Stampher Unit 1.0000 150,000.00 150,000.00
7 Water Pump Unit 1.0000 100,000.00 100,000.00
8 Menara Suar Unit 1.0000 40,000,000.00 40,000,000.00
JUMLAH 41,350,000.00
DEMOBILISASI 1,350,000.00
JUMLAH 42,700,000.00
ANL.II DIREKSI KEET / BARAK KERJA
1 Direksi Keet M2 36.0000 120,000.00 4,320,000.00
2 KM/ WC @ 1 unit 2 x 2 M Unit 4.0000 600,000.00 2,400,000.00
JUMLAH 6,720,000.00
ANL.II ADMINISTRASI PROYEK
1 Dokumentasi Lapangan Ls 1.0000 120,000.00 120,000.00
2 Laporan Harian dan Mingguan @ 3 ex Mgg 60.0000 50,000.00 3,000,000.00
3 Laporan Bulanan @ 3 ex Bln 4.0000 50,000.00 200,000.00
4 Shop Drawing Bk 5.0000 150,000.00 750,000.00
5 As Built Drawing ( ABD ) Ls 5.0000 150,000.00 750,000.00
JUMLAH 4,820,000.00

Jenis Pekerjaan : : Penggalian 1 m3 Tanah Biasa sedalam 2 m


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.1

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja L.01 OH 0.9000 75,000.00 67,500.00
2 Mandor L.04 OH 0.0250 120,000.00 3,000.00
Jumlah Tenaga Kerja 70,500.00
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 70,500.00
E Overhead & Profit 12% XD 8,460.00
F Harga Satuan Pekerjaan ( D + E ) 78,960.00
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pengurugan kembali 1 m3 galian tanah


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.9

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja Galian Tanah L.01 OH 0.5000 75,000.00 37,500.00
2 Mandor L.04 OH 0.0500 120,000.00 6,000.00
Jumlah Tenaga Kerja 43,500.00
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 43,500.00
E Overhead & Profit 12% XD 5,220.00
F Harga Satuan Pekerjaan ( D + E ) 48,720.00

Jenis Pekerjaan : Pengurugan 1 m3 dengan pasir urug


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.11

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja Galian Tanah L.01 OH 0.3000 75,000.00 22,500.00
2 Mandor L.04 OH 0.0100 120,000.00 1,200.00
Jumlah Tenaga Kerja 23,700.00
B. BAHAN
1 Pasir Urug M3 1.200 150,000.00 180,000.00
Jumlah Bahan 180,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 203,700.00
E Overhead & Profit 12% X D 24,444.00
F Harga Satuan Pekerjaan ( D + E ) 228,144.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pemasangan 1m3 pondasi batu belah campuran 1SP : 4PP
Satuan / Unit : M3
Analisa : AHSP PU A.3.2.1.2

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja L.01 OH 1.5000 75,000.00 112,500.00
2 Tukang L.02 OH 0.7500 100,000.00 75,000.00
3 Kepala Tukang L.03 OH 0.0750 120,000.00 9,000.00
4 Mandor L.04 OH 0.0750 120,000.00 9,000.00
Jumlah Tenaga Kerja 205,500.00
B. BAHAN
1 Batu Belah / Kali M3 1.200 170,000.00 204,000.00
2 Semen Portland Kg 163.000 1,450.00 236,350.00
3 Pasir Pasang M3 0.520 190,000.00 98,800.00
Jumlah Bahan 539,150.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 744,650.00
E Overhead & Profit 12% X D 89,358.00
F Harga Satuan Pekerjaan ( D + E ) 834,008.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pemasangan 1m3 batu kosong (Aanstamping)


Satuan / Unit : M3
Analisa : AHSP PU A.3.2.1.9

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja L.01 OH 0.7800 75,000.00 58,500.00
2 Tukang L.02 OH 0.3900 100,000.00 39,000.00
3 Kepala Tukang L.03 OH 0.0390 120,000.00 4,680.00
4 Mandor L.04 OH 0.0390 120,000.00 4,680.00
Jumlah Tenaga Kerja 106,860.00
B. BAHAN
1 Batu Belah/ Kali M3 1.2000 170,000.00 204,000.00
2 Pasir Urug M3 0.4320 150,000.00 64,800.00
Jumlah Bahan 268,800.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 375,660.00
E Overhead & Profit 12% X D 45,079.20
F Harga Satuan Pekerjaan ( D + E ) 420,739.20

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Beton Mutu F'c = 21,7 Mpa (K 250), Slump (12 2) cm, W/c = 0,56
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja L.01 OH 1.6500 75,000.00 123,750.00
2 Tukang L.02 OH 0.2750 100,000.00 27,500.00
3 Kepala Tukang L.03 OH 0.0280 120,000.00 3,360.00
4 Mandor L.04 OH 0.0830 120,000.00 9,960.00
Jumlah Tenaga Kerja 164,570.00
B. BAHAN
1 Semen Portland Kg 384.00 1,450.00 556,800.00
2 Pasir Beton Kg 692.00 135.71 93,914.29
3 Batu Pecah Kg 1,039.00 140.74 146,229.63
4 Air Liter 215.00 50.00 10,750.00
Jumlah Bahan 807,693.92
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 972,263.92
E Overhead & Profit 12% X D 116,671.67
F Harga Satuan Pekerjaan ( D + E ) 1,088,935.59

or; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg


Jenis Pekerjaan : Pembesian 1 Kg Dengan Besi Polos
Satuan / Unit : Kg
Analisa : AHSP PU A.4.1.1.17

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja L.01 OH 0.0700 75,000.00 5,250.00
2 Tukang L.02 OH 0.0700 100,000.00 7,000.00
3 Kepala Tukang L.03 OH 0.0070 120,000.00 840.00
4 Mandor L.04 OH 0.0400 120,000.00 4,800.00
Jumlah Tenaga Kerja 17,890.00
B. BAHAN
1 Besi Beton Polos Kg 10.500 14,250.00 149,625.00
2 Kawat Beton Kg 0.150 20,000.00 3,000.00
Jumlah Bahan 152,625.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 170,515.00
E Per Kg Pembesian = D / 10 17,051.50
F Overhead & Profit 12% X E 2,046.18
G Harga Satuan Pekerjaan ( E + F ) 19,097.68

Jenis Pekerjaan : Pemasangan 1m2 bekesting untuk pondasi


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.20

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.5200 75,000.00 39,000.00
2 Tukang OH 0.2600 100,000.00 26,000.00
3 Kepala Tukang OH 0.0260 120,000.00 3,120.00
4 Mandor OH 0.0260 120,000.00 3,120.00
Jumlah Tenaga Kerja 71,240.00
B. BAHAN
1 Kayu Kelas III M3 0.040 3,088,000.00 123,520.00
2 Paku 5 cm - 10 cm Kg 0.300 20,744.00 6,223.20
3 Minyak Bekisting Liter 0.100 10,600.00 1,060.00
Jumlah Bahan 130,803.20
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 202,043.20
E Overhead & Profit 12% X D 24,245.18
F Harga Satuan Pekerjaan ( D + E ) 226,288.38
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pemasangan 1m2 bekesting untuk sloof


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.21

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.5200 75,000.00 39,000.00
2 Tukang OH 0.2600 100,000.00 26,000.00
3 Kepala Tukang OH 0.0260 120,000.00 3,120.00
4 Mandor OH 0.0260 120,000.00 3,120.00
Jumlah Tenaga Kerja 71,240.00
B. BAHAN
1 Kayu Kelas III M3 0.045 3,088,000.00 138,960.00
2 Paku 5 cm - 10 cm Kg 0.300 20,744.00 6,223.20
3 Minyak Bekisting Liter 0.100 10,600.00 1,060.00
Jumlah Bahan 146,243.20
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 217,483.20
E Overhead & Profit 12% X D 26,097.98
F Harga Satuan Pekerjaan ( D + E ) 243,581.18

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pemasangan 1m2 bekesting untuk kolom


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.22

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6600 75,000.00 49,500.00
2 Tukang OH 0.3300 100,000.00 33,000.00
3 Kepala Tukang OH 0.0330 120,000.00 3,960.00
4 Mandor OH 0.0330 120,000.00 3,960.00
Jumlah Tenaga Kerja 90,420.00
B. BAHAN
1 Kayu Kelas III M3 0.045 3,088,000.00 138,960.00
2 Paku 5 cm - 10 cm Kg 0.300 20,744.00 6,223.20
3 Minyak Bekisting Liter 0.100 10,600.00 1,060.00
Jumlah Bahan 146,243.20
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 236,663.20
E Overhead & Profit 12% X D 28,399.58
F Harga Satuan Pekerjaan ( D + E ) 265,062.78
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Balok


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.23

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6600 75,000.00 49,500.00
2 Tukang OH 0.3300 100,000.00 33,000.00
3 Kepala Tukang OH 0.0330 120,000.00 3,960.00
4 Mandor OH 0.0330 120,000.00 3,960.00
Jumlah Tenaga Kerja 90,420.00
B. BAHAN
1 Kayu Kelas III M3 0.0400 3,088,000.00 123,520.00
2 Paku 5 cm - 10 cm Kg 0.4000 20,744.00 8,297.60
3 Minyak Bekisting Liter 0.2000 10,600.00 2,120.00
4 Balok Kayu Kelas II M3 0.0180 4,618,000.00 83,124.00
5 Plywood tebal 9 mm Lbr 0.3500 222,600.00 77,910.00
6 Kayu dolken dia. 8-10 cm, L = 4 M Batang 2.0000 21,800.00 43,600.00
Jumlah Bahan 338,571.60
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 428,991.60
F Overhead & Profit 12% X E 51,478.99
G Harga Satuan Pekerjaan ( D + E ) 480,470.59

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Plat Lantai


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.24

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6600 75,000.00 49,500.00
2 Tukang OH 0.3300 100,000.00 33,000.00
3 Kepala Tukang OH 0.0330 120,000.00 3,960.00
4 Mandor OH 0.0330 120,000.00 3,960.00
Jumlah Tenaga Kerja 90,420.00
B. BAHAN
1 Kayu Kelas III M3 0.0400 3,088,000.00 123,520.00
2 Paku 5 cm - 10 cm Kg 0.4000 20,744.00 8,297.60
3 Minyak Bekisting Liter 0.2000 10,600.00 2,120.00
4 Balok Kayu Kelas II M3 0.0150 4,618,000.00 69,270.00
5 Plywood tebal 9 mm Lbr 0.3500 222,600.00 77,910.00
6 Kayu dolken dia. 8-10 cm, L = 4 M Batang 6.0000 21,800.00 130,800.00
Jumlah Bahan 411,917.60
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 502,337.60
F Overhead & Profit 12% X E 60,280.51
G Harga Satuan Pekerjaan ( D + E ) 562,618.11
SUPLEMEN.1 : Pondasi Tapak 150 x 150 cm
No URAIAN ANALISA Satuan Koefisien Harga Satuan Jumlah Harga
1 Beton K.250 A. 4.1.1.8 M 1.0000 1,088,935.59 1,088,935.59
2 Pembesian A. 4.1.1.17 Kg 150.0000 19,097.68 2,864,652.00
3 Bekesting A. 4.1.1.20 M2 5.0000 226,288.38 1,131,441.92
Harga Satuan Pekerjaan 5,085,029.51

SUPLEMEN.2 : Beton Bertulang Sloof 40 x 40 cm


No URAIAN ANALISA Satuan Koefisien Harga Satuan Jumlah Harga
1 Beton K.250 A. 4.1.1.8 M 1.0000 1,088,935.59 1,088,935.59
2 Pembesian A. 4.1.1.17 Kg 135.0000 19,097.68 2,578,186.80
3 Bekesting A. 4.1.1.21 M2 5.0000 243,581.18 1,217,905.92
Harga Satuan Pekerjaan 4,885,028.31

SUPLEMEN.3 : Beton Bertulang Sloof 20 x 25 cm


No URAIAN ANALISA Satuan Koefisien Harga Satuan Jumlah Harga
1 Beton K.250 A. 4.1.1.8 M 1.0000 1,088,935.59 1,088,935.59
2 Pembesian A. 4.1.1.17 Kg 140.0000 19,097.68 2,673,675.20
3 Bekesting A. 4.1.1.21 M2 5.0000 243,581.18 1,217,905.92
Harga Satuan Pekerjaan 4,980,516.71

SUPLEMEN.4 : Beton Bertulang Kolom 20 x 20 cm


No URAIAN ANALISA Satuan Koefisien Harga Satuan Jumlah Harga
1 Beton K.250 A. 4.1.1.8 M 1.0000 1,088,935.59 1,088,935.59
2 Pembesian A. 4.1.1.17 Kg 130.0000 19,097.68 2,482,698.40
3 Bekesting A. 4.1.1.22 M2 6.0000 265,062.78 1,590,376.70
Harga Satuan Pekerjaan 5,162,010.69
SUPLEMEN.5 : Beton Bertulang Ring Balk 15 x 20 cm
No URAIAN ANALISA Satuan Koefisien Harga Satuan Jumlah Harga
1 Beton K.250 A. 4.1.1.8 M 1.0000 1,088,935.59 1,088,935.59
2 Pembesian A. 4.1.1.17 Kg 140.0000 19,097.68 2,673,675.20
3 Bekesting A. 4.1.1.23 M2 4.0000 480,470.59 1,921,882.37
Harga Satuan Pekerjaan 5,684,493.15

SUPLEMEN.6 : Beton Bertulang Plat Lantai 15 cm


No URAIAN ANALISA Satuan Koefisien Harga Satuan Jumlah Harga
1 Beton K.250 A. 4.1.1.8 M 1.0000 1,088,935.59 1,088,935.59
2 Pembesian A. 4.1.1.17 Kg 145.0000 19,097.68 2,769,163.60
3 Bekesting A. 4.1.1.24 M2 6.0000 562,618.11 3,375,708.67
Harga Satuan Pekerjaan 7,233,807.86

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pemasangan 1 m2 dinding bata merah (5 x11x 22) cm tebal 1/2 batu campuran 1SP : 2PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.7

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 75,000.00 22,500.00
2 Tukang OH 0.1000 100,000.00 10,000.00
3 Kepala Tukang OH 0.0100 120,000.00 1,200.00
4 Mandor OH 0.0150 120,000.00 1,800.00
Jumlah Tenaga Kerja 35,500.00
B. BAHAN
1 Batu Bata Bh 70.000 850.00 59,500.00
2 Semen Portland Kg 18.950 1,450.00 27,477.50
3 Pasir Pasang M3 0.038 190,000.00 7,220.00
Jumlah Bahan 94,197.50
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 129,697.50
E Overhead & Profit 12% XD 15,563.70
F Harga Satuan Pekerjaan ( D + E ) 145,261.20

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Plesteran 1 PC : 2 PP Tebal 15 mm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.2

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 75,000.00 22,500.00
2 Tukang OH 0.1500 100,000.00 15,000.00
3 Kepala Tukang OH 0.0150 120,000.00 1,800.00
4 Mandor OH 0.0150 120,000.00 1,800.00
Jumlah Tenaga Kerja 41,100.00
B. BAHAN
1 Semen Portland Kg 10.224 1,450.00 14,824.80
2 Pasir Pasang M3 0.020 190,000.00 3,800.00
Jumlah Bahan 18,624.80
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 59,724.80
E Overhead & Profit 12% XD 7,166.98
F Harga Satuan Pekerjaan ( D + E ) 66,891.78
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pengecatan Tembok Baru (1 x plamir, 1 x cat dasar, 2 x cat penutup)
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.10

No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja L.01 OH 0.0200 75,000.00 1,500.00
2 Tukang L.02 OH 0.0630 100,000.00 6,300.00
3 Kepala Tukang L.03 OH 0.0060 120,000.00 720.00
4 Mandor L.04 OH 0.0030 120,000.00 360.00
Jumlah Tenaga Kerja 8,880.00
B. BAHAN
1 Plamir Kg 0.1000 15,900.00 1,590.00
2 Cat dasar tembok Kg 0.1000 42,000.00 4,200.00
3 Cat tembok / penutup 2x Kg 0.2600 45,000.00 11,700.00
Jumlah Bahan 17,490.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 26,370.00
E Overhead & Profit 12% X D 3,164.40
F Harga Satuan Pekerjaan ( D + E ) 29,534.40

Banda Aceh, 10 April 2017


CV. EGROUP KARYA

M.HERKA
DIREKTUR
BILLOFQUANTITY

PEKERJAAN : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH


LOKASI : PROVINSI ACEH
TAHUN ANGGARAN : 2017

NO HARGA
URAIAN Analisa VOLUME SATUAN
. SATUAN (Rp)

I PEKERJAAN PERSIAPAN
1 Survei Awal dan Penentuan Posisi Taksir 1.00 Ls 7,000,000
2 Pembersihan Lokasi Taksir 225.00 M2 10,000
3 Biaya Mobilisasi dan demobilisasi ANL. I. 1.00 Paket 42,700,000
4 Pemasangan Bowplank Taksir 60.00 m' 15,000
5 Pengukuran Taksir 1.00 Paket 2,500,000
6 Bangunan Direksi Keet dan Barak Kerja ANL.II. 1.00 Paket 6,720,000
7 Air bersih Taksir 4.00 Bln 3,000,000
8 Obat- obatan/ P3K Taksir 4.00 Bln 1,500,000
9 Papan Nama Proyek Taksir 1.00 Paket 1,000,000
10 Dokumentasi/Administrasi/As Built Drawing ANL. III. 1.00 Paket 4,820,000
Jumlah I
II PEKERJAAN TANAH
1 Galian Tanah Pondasi A. 2.3.1.1 137.20 M3 78,960
2 Pasangan Batu Kosong (Aanstamping) A. 3.2.1.9 9.80 M3 420,739
3 Urugan Pasir Bawah Pondasi A. 2.3.1.11 9.80 M3 228,144
4 Timbunan Kembali Tanah Bekas Galian A. 2.3.1.9 117.85 M3 48,720
Jumlah II
III PEKERJAAN BETON BERTULANG
Beton Bertulang K250
1 Pondasi Tapak SUPLEMEN.1 19.35 M3 5,085,030
2 Sloof 40/40 SUPLEMEN.2 2.80 M3 4,885,028
3 Plat Lantai 15 cm SUPLEMEN.6 2.87 M3 7,233,808
Jumlah III
IV PEKERJAAN KONSTRUKSI MENARA
1 Pengadaan Pabrikasi Kerangka Menara Besi Baja Galvanis Taksir 8,250.00 Kg 45,000
2 Pengadaan Baut dan Ring Galvanis Taksir 1,600.00 Bh 10,000
3 Pemasangan/Perakitan Menara Suplemen A 1.00 Unit 55,700,000
4 Pembuatan Pintu Pengaman Lampu Suar Suplemen B 1.00 Unit 3,094,200
5 Cat Menara dengan Cat Marine Paint Putih 3x Suplemen C 1.00 Unit 16,588,000
6 Perancah dan Alat Bantu Taksir 1.00 Unit 10,000,000
Jumlah IV

V PEKERJAAN PENGADAAN PERALATAN SBN DAN LAIN-LAIN


1 Pengadaan/Pemasangan Sistem Lampu Suar Jarak Tampak 12 NM Taksir 1.00 Unit 90,000,000
2 Pengadaan dan Pemasangan Solar Cell 12V - 50W lengkap Instaasi Taksir 3.00 Unit 7,000,000
Dudukan dan Instalasi ke Lampu Suar
3 Pengadaan Battery Maintenance Free 12 - 105AH Taksir 3.00 Bh 5,000,000
4 Pembuatan Box Battery Suplemen D 1.00 Unit 1,175,700
5 Pengadaan dan Pemasangan Sistem Penangkal Petir Suplemen E 1.00 Unit 7,820,000
6 Pengadaan dan Pemasangan Radar Reflektor Suplemen F 1.00 Unit 7,480,000
Jumlah V

VI PEKERJAAN PEMAGARAN LOKASI MENARA DENGAN PAGAR BRC 10 X 10 M


1 PEKERJAAN TANAH
a Galian Tanah Pondasi A. 2.3.1.1 17.80 M3 78,960
b Timbunan Kembali Tanah Bekas Galian A. 2.3.1.9 11.87 M3 48,720
c Urugan Pasir Bawah Pondasi A. 2.3.1.11 3.01 M3 228,144
d Pasangan Pondasi Batu Gunung A. 3.2.1.2 13.40 M3 834,008
e Pasangan Batu Kosong (Aanstamping) A. 3.2.1.9 2.53 M3 420,739
2 PEKERJAAN BETON BERTULANG
a Kolom 20/20 SUPLEMEN.4 1.31 M3 5,162,011
b Sloof 20/20 SUPLEMEN.3 1.80 M3 4,980,517
c Ring Balk 5/20 SUPLEMEN.5 0.52 M3 5,684,493
3 PEKERJAAN PASANGAN
a Pasangan Bata 1:2 A. 4.4.1.7 20.00 M2 145,261
b Plesteran 1:2 A. 4.4.2.2 57.60 M2 66,892
4 Tiang Pagar BRC T = 1,7 m + Asesoris kualitas No.1 Taksir 30.00 Btg 600,000
5 Pagar BRC T = 1,2 m + Asesoris kualitas No.1 Taksir 15.00 Unit 1,300,000
6 Pengecatan Dinding/Tembok Pagar A. 4.7.1.10 57.60 M2 29,534
7 Pembuatan Pintu Pagar dari Besi Plat lengkap Kunci dan Gembok Taksir 1.00 Unit 8,000,000
8 Relief Kolom Taksir 16.00 Unit 175000
Jumlah VI
JUMLAH
HARGA (Rp)

7,000,000
2,250,000
42,700,000
900,000
2,500,000
6,720,000
12,000,000
6,000,000
1,000,000
4,820,000
85,890,000

10,833,312
4,123,244
2,235,811
5,741,652
22,934,019

98,395,321
13,678,079
20,761,029
###

371,250,000
16,000,000
55,700,000
3,094,200
16,588,000
10,000,000
###

90,000,000
21,000,000

15,000,000
1,175,700
7,820,000
7,480,000
###

1,405,488
578,306
686,713
11,175,707
1,064,470

6,762,234
8,964,930
2,955,936
2,905,224
3,852,966
18,000,000
19,500,000
1,701,181
8,000,000
2,800,000
90,353,157
MULAI MASA AKHIR
BULAN 1 ### 29 Friday, June 16, 2017
M1 ### 7 ###
M2 ### 7 Friday, June 02, 2017
M3 ### 6 Friday, June 09, 2017
M4 ### 6 Friday, June 16, 2017

BULAN 2 ### 29 Sunday, July 16, 2017


M5 ### 7 ###
M6 ### 7 Sunday, July 02, 2017
M7 ### 6 Sunday, July 09, 2017
M8 ### 6 Sunday, July 16, 2017

BULAN 3 ### 29 ###


M9 ### 7 Monday, July 24, 2017
M10 ### 7 ###
M11 ### 6 ###
M12 ### 6 ###

BULAN 4 ### 29 ###


M13 ### 7 ###
M14 ### 7 ###
M15 ### 6 ###
M16 ### 6 ###
MUTUAL CHECK (MC) - 0
KEGIATAN : PEMBANGUNAN SARANA PERHUBUNGAN LAUT
NAMA PAKET : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
NOMOR KONTRAK : 02/KPA.09/PEL/2017
TANGGAL KONTRAK : 18 Mei 2017
NILAI KONTRAK : Rp 1.041.830.000,00
SUMBER DANA : APBA
TAHUN ANGGARAN : 2017
LOKASI : PELABUHAN LABUHAN HAJI ACEH SELATAN

KONTRAK AWAL PEKERJAAN TAMBAH PEKERJAAN KURANG MC-0


NO. URAIAN SATUAN HARGA SATUAN
(Rp) JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
VOLUME (Rp) VOLUME (Rp) VOLUME (Rp) VOLUME (Rp)
I PEKERJAAN PERSIAPAN
1 Survei Awal dan Penentuan Posisi Ls 7,000,000 1.00 7,000,000 - - - 1.00 7,000,000.00
2 Pembersihan Lokasi M2 10,000 225.00 2,250,000 93.00 930,000.00 132.00 1,320,000.00
3 Biaya Mobilisasi dan demobilisasi Paket 42,700,000 1.00 42,700,000 - 0.75 32,025,000.00 0.25 10,675,000.00
4 Pemasangan Bowplank m' 15,000 60.00 900,000 2.00 30,000.00 58.00 870,000.00
5 Pengukuran Paket 2,500,000 1.00 2,500,000 - - - 1.00 2,500,000.00
6 Bangunan Direksi Keet dan Barak Kerja Paket 6,720,000 1.00 6,720,000 - - - 1.00 6,720,000.00
7 Air bersih Bln 3,000,000 4.00 12,000,000 - 3.50 10,500,000.00 0.50 1,500,000.00
8 Obat- obatan/ P3K Bln 1,500,000 4.00 6,000,000 - 3.50 5,250,000.00 0.50 750,000.00
9 Papan Nama Proyek Paket 1,000,000 1.00 1,000,000 - 1.00 1,000,000.00 - -
10 Dokumentasi/Administrasi/As Built Drawing Paket 4,820,000 1.00 4,820,000 - 0.95 4,579,000.00 0.05 241,000.00
Jumlah I 85,890,000 - 0.00 54,314,000.00 31,576,000
II PEKERJAAN TANAH
1 Galian Tanah Pondasi M3 78,960 137.20 10,833,312 22.91 1,809,136.26 114.29 9,024,175.74
2 Pasangan Batu Kosong (Aanstamping) M3 420,739 9.80 4,123,244 1.01 424,365.97 8.79 3,698,878.19
3 Urugan Pasir Bawah Pondasi M3 228,144 9.80 2,235,811 1.01 230,110.60 8.79 2,005,700.60
4 Timbunan Kembali Tanah Bekas Galian M3 48,720 117.85 5,741,652 37.34 1,819,439.63 80.51 3,922,212.37
Jumlah II 22,934,019 - 4,283,052 18,650,967
III PEKERJAAN BETON BERTULANG
Beton Bertulang K250
1 Pondasi Tapak M3 5,085,030 19.35 98,395,321 3.15 16,017,842.94 16.20 82,377,477.98
2 Sloof 40/40 M3 4,885,028 2.80 13,678,079 - - - 2.80 13,678,079.25
3 Plat Lantai 15 cm M3 7,233,808 2.87 20,761,029 0.71 5,118,597.23 3.58 25,879,625.78
Jumlah III 132,834,429 0.00 5,118,597.23 16,017,842.94 121,935,183
IV PEKERJAAN KONSTRUKSI MENARA - - -
1 Pengadaan Pabrikasi Kerangka Menara Besi Baja Galvanis Kg 45,000 8,250.00 371,250,000 686.89 30,910,170.18 8,936.89 402,160,170.18
2 Pengadaan Baut dan Ring Galvanis Bh 10,000 1,600.00 16,000,000 187.38 1,873,785.34 1,787.38 17,873,785.34
3 Pemasangan/Perakitan Menara Unit 55,700,000 1.00 55,700,000 - - - 1.00 55,700,000.00
4 Pembuatan Pintu Pengaman Lampu Suar Unit 3,094,200 1.00 3,094,200 - - - 1.00 3,094,200.00
5 Cat Menara dengan Cat Marine Paint Putih 3x Unit 16,588,000 1.00 16,588,000 - - - 1.00 16,588,000.00
6 Perancah dan Alat Bantu Unit 10,000,000 1.00 10,000,000 - - - 1.00 10,000,000.00
Jumlah IV 472,632,200 32,783,956 - 505,416,156
V PEKERJAAN PENGADAAN PERALATAN SBN DAN LAIN-LAIN
1 Pengadaan/Pemasangan Sistem Lampu Suar Jarak Tampak 12 NM Unit 90,000,000 1.00 90,000,000 - - - 1.00 90,000,000.00
2 Pengadaan dan Pemasangan Solar Cell 12V - 50W lengkap Instaasi Unit 7,000,000 3.00 21,000,000 - - - 3.00 21,000,000.00
Dudukan dan Instalasi ke Lampu Suar -
3 Pengadaan Battery Maintenance Free 12 - 105AH Bh 5,000,000 3.00 15,000,000 2.00 10,000,000.00 5.00 25,000,000.00
4 Pembuatan Box Battery Unit 1,175,700 1.00 1,175,700 - - - 1.00 1,175,700.00
5 Pengadaan dan Pemasangan Sistem Penangkal Petir Unit 7,820,000 1.00 7,820,000 - - - 1.00 7,820,000.00
6 Pengadaan dan Pemasangan Radar Reflektor Unit 7,480,000 1.00 7,480,000 - - - 1.00 7,480,000.00
Jumlah V 142,475,700 10,000,000.00 - 152,475,700
MUTUAL CHECK (MC) - 0
KEGIATAN : PEMBANGUNAN SARANA PERHUBUNGAN LAUT
NAMA PAKET : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
NOMOR KONTRAK : 02/KPA.09/PEL/2017
TANGGAL KONTRAK : 18 Mei 2017
NILAI KONTRAK : Rp 1.041.830.000,00
SUMBER DANA : APBA
TAHUN ANGGARAN : 2017
LOKASI : PELABUHAN LABUHAN HAJI ACEH SELATAN

KONTRAK AWAL PEKERJAAN TAMBAH PEKERJAAN KURANG MC-0


NO. URAIAN SATUAN HARGA SATUAN
(Rp) JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
VOLUME (Rp) VOLUME (Rp) VOLUME (Rp) VOLUME (Rp)
VI PEKERJAAN PEMAGARAN LOKASI MENARA DENGAN PAGAR BRC 10 X 10 M
1 PEKERJAAN TANAH
a Galian Tanah Pondasi M3 78,960 17.80 1,405,488 2.12 167,395.20 15.68 1,238,092.80
b Timbunan Kembali Tanah Bekas Galian M3 48,720 11.87 578,306 8.19 399,016.80 3.68 179,289.60
c Urugan Pasir Bawah Pondasi M3 228,144 3.01 686,713 1.57 358,186.08 1.44 328,527.36
d Pasangan Pondasi Batu Gunung M3 834,008 13.40 11,175,707 4.76 3,969,878.08 8.64 7,205,829.12
e Pasangan Batu Kosong (Aanstamping) M3 420,739 2.53 1,064,470 0.61 256,650.91 1.92 807,819.26
2 PEKERJAAN BETON BERTULANG
a Kolom 20/20 M3 5,162,011 1.31 6,762,234 0.35 1,806,703.74 0.96 4,955,530.26
b Sloof 20/20 M3 4,980,517 1.80 8,964,930 0.60 2,988,310.02 1.20 5,976,620.05
c Ring Balk 5/20 M3 5,684,493 0.52 2,955,936 0.22 1,250,588.49 0.30 1,705,347.95
3 PEKERJAAN PASANGAN - - -
a Pasangan Bata 1:2 M2 145,261 20.00 2,905,224 15.50 2,251,548.60 4.50 653,675.40
b Plesteran 1:2 M2 66,892 57.60 3,852,966 48.60 3,250,940.31 9.00 602,025.98
4 Tiang Pagar BRC T = 1,7 m + Asesoris kualitas No.1 Btg 600,000 30.00 18,000,000 8.00 4,800,000.00 22.00 13,200,000.00
5 Pagar BRC T = 1,2 m + Asesoris kualitas No.1 Unit 1,300,000 15.00 19,500,000 3.00 3,900,000.00 12.00 15,600,000.00
6 Pengecatan Dinding/Tembok Pagar M2 29,534 57.60 1,701,181 18.24 538,707.46 39.36 1,162,473.98
7 Pembuatan Pintu Pagar dari Besi Plat lengkap Kunci dan Gembok Unit 8,000,000 1.00 8,000,000 - - 1.00 8,000,000.00
8 Relief Kolom Unit 175000 16.00 2,800,000 4.00 700,000.00 12.00 2,100,000.00
Jumlah VI 90,353,157 - 26,637,925.70 63,715,232

Disetujui oleh : Diperiksa oleh : Diajukan Oleh :


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
BIDANG PELAYARAN CV. CIPTA MARGA UTAMA CV.E-GROUP KARYA
DINAS PERHUBUNGAN ACEH

AL MUNAWAR, A.Md SUFNI ACHMAD HANURA PERKASA


NIP: 19820417 201212 1 002 INSPECTOR SITE MANAGER
REKAPITULASI MUTUAL CHECK (MC) - 0

KEGIATAN : PEMBANGUNAN SARANA PERHUBUNGAN LAUT


NAMA PAKET : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
NOMOR KONTRAK : 02/KPA.09/PEL/2017
TANGGAL KONTRAK : 18 Mei 2017
NILAI KONTRAK : Rp 1.041.830.000,00
SUMBER DANA : APBA
TAHUN ANGGARAN : 2017
LOKASI : PELABUHAN LABUHAN HAJI ACEH SELATAN

JUMLAH HARGA (Rp)


NO. URAIAN
KONTRAK AWAL PEK. TAMBAH PEK. KURANG MC - 0

I. PEKERJAAN PERSIAPAN Rp 85,890,000.00 Rp - Rp 54,314,000.00 Rp 31,576,000.00


II. PEKERJAAN TANAH Rp 22,934,019.36 Rp - Rp 4,283,052.46 Rp 18,650,966.90
III. PEKERJAAN BETON BERTULANG Rp 132,834,428.73 Rp 5,118,597.23 Rp 16,017,842.94 Rp 121,935,183.02
IV. PEKERJAAN KONSTRUKSI MENARA Rp 472,632,200.00 Rp 32,783,955.52 Rp - Rp 505,416,155.52
V. PEKERJAAN PENGADAAN PERALATAN SBN DAN LAIN-LAIN Rp 142,475,700.00 Rp 10,000,000.00 Rp - Rp 152,475,700.00
VI. PEKERJAAN PEMAGARAN LOKASI MENARA DENGAN PAGAR BRC 10 X 10 M Rp 90,353,157.47 Rp - Rp 26,637,925.70 Rp 63,715,231.77

JUMLAH Rp 947,119,505.56 Rp 47,902,552.75 Rp 101,252,821.10 Rp 893,769,237.20


P P N 10 % Rp 94,711,950.56 Rp 4,790,255.27 Rp 10,125,282.11 Rp 89,376,923.72
JUMLAH TERMASUK PPN Rp 1,041,831,456.11 Rp 52,692,808.02 Rp 111,378,103.21 Rp 983,146,160.92
PEMBULATAN Rp 1,041,830,000.00 Rp 52,690,000.00 Rp 111,380,000.00 Rp 983,140,000.00

Disetujui oleh : Diperiksa oleh : Diajukan Oleh:


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
BIDANG PELAYARAN CV. CIPTA MARGA UTAMA CV.E-GROUP KARYA
DINAS PERHUBUNGAN ACEH

AL MUNAWAR, A.Md SUFNI ACHMAD HANURA PERKASA


NIP: 19820417 201212 1 002 INSPECTOR SITE MANAGER

Mengetahui/Menyetujui:
KUASA PENGGUNA ANGGARAN
BIDANG PELAYARAN
DINAS PERHUBUNGAN ACEH

T. FAISAL, ST, MT
NIP: 19750114 200312 1 003
REKAPITULASI VOLUME (MC-0)

KEGIATAN PEMBANGUNAN SARANA PERHUBUNGAN LAUT


NAMA PAKET PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
NOMOR KONTRAK 02/KPA.09/PEL/2017
TANGGAL KONTRAK 18 Mei 2017
NILAI KONTRAK Rp 1.041.830.000,00
SUMBER DANA APBA
TAHUN ANGGARAN 2017

NO. URAIAN VOLUME SAT KET

I PEKERJAAN PERSIAPAN
1 Survei Awal dan Penentuan Posisi 1.00 Ls
2 Pembersihan Lokasi 132.00 M2
3 Biaya Mobilisasi dan demobilisasi 0.25 Paket
4 Pemasangan Bowplank 58.00 m'
5 Pengukuran 1.00 Paket
6 Bangunan Direksi Keet dan Barak Kerja 1.00 Paket
7 Air bersih 0.50 Bln
8 Obat- obatan/ P3K 0.50 Bln
9 Papan Nama Proyek 0.00 Paket
10 Dokumentasi/Administrasi/As Built Drawing 0.05 Paket

II PEKERJAAN TANAH
1 Galian Tanah Pondasi 114.29 M3
2 Pasangan Batu Kosong (Aanstamping) 8.79 M3
3 Urugan Pasir Bawah Pondasi 8.79 M3
4 Timbunan Kembali Tanah Bekas Galian 80.51 M3

III PEKERJAAN BETON BERTULANG


0 Beton Bertulang K250
1 Pondasi Tapak 16.20 M3
2 Sloof 40/40 2.80 M3
3 Plat Lantai 15 cm 3.58 M3

IV PEKERJAAN KONSTRUKSI MENARA


1 Pengadaan Pabrikasi Kerangka Menara Besi Baja Galvanis 8936.89 Kg
2 Pengadaan Baut dan Ring Galvanis 1787.38 Bh
3 Pemasangan/Perakitan Menara 1.00 Unit
4 Pembuatan Pintu Pengaman Lampu Suar 1.00 Unit
5 Cat Menara dengan Cat Marine Paint Putih 3x 1.00 Unit
6 Perancah dan Alat Bantu 1.00 Unit

V PEKERJAAN PENGADAAN PERALATAN SBN DAN LAIN-LAIN


1 Pengadaan/Pemasangan Sistem Lampu Suar Jarak Tampak 12 NM 1.00 Unit
2 Pengadaan dan Pemasangan Solar Cell 12V - 50W lengkap Instaasi 3.00 Unit
Dudukan dan Instalasi ke Lampu Suar
3 Pengadaan Battery Maintenance Free 12 - 105AH 3.00 Bh
4 Pembuatan Box Battery 1.00 Unit
5 Pengadaan dan Pemasangan Sistem Penangkal Petir 1.00 Unit
6 Pengadaan dan Pemasangan Radar Reflektor 1.00 Unit

VI PEKERJAAN PEMAGARAN LOKASI MENARA DENGAN PAGAR BRC 10 X 10 M


1 PEKERJAAN TANAH
a Galian Tanah Pondasi 15.68 M3
b Timbunan Kembali Tanah Bekas Galian 3.68 M3
c Urugan Pasir Bawah Pondasi 1.44 M3
d Pasangan Pondasi Batu Gunung 8.64 M3
e Pasangan Batu Kosong (Aanstamping) 1.92 M3
REKAPITULASI VOLUME (MC-0)

KEGIATAN PEMBANGUNAN SARANA PERHUBUNGAN LAUT


NAMA PAKET PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
NOMOR KONTRAK 02/KPA.09/PEL/2017
TANGGAL KONTRAK 18 Mei 2017
NILAI KONTRAK Rp 1.041.830.000,00
SUMBER DANA APBA
TAHUN ANGGARAN 2017

NO. URAIAN VOLUME SAT KET


2 PEKERJAAN BETON BERTULANG
a Kolom 20/20 0.96 M3
b Sloof 20/20 1.20 M3
c Ring Balk 5/20 0.30 M3
3 PEKERJAAN PASANGAN
a Pasangan Bata 1:2 4.50 M2
b Plesteran 1:2 9.00 M2
4 Tiang Pagar BRC T = 1,7 m + Asesoris kualitas No.1 22.00 Btg
5 Pagar BRC T = 1,2 m + Asesoris kualitas No.1 12.00 Unit
6 Pengecatan Dinding/Tembok Pagar 39.36 M2
7 Pembuatan Pintu Pagar dari Besi Plat lengkap Kunci dan Gembok 1.00 Unit
8 Relief Kolom 12.00 Unit

Disetujui oleh : Diperiksa oleh : Diajukan Oleh:


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
BIDANG PELAYARAN CV. CIPTA MARGA UTAMA CV.E-GROUP KARYA
DINAS PERHUBUNGAN ACEH

AL MUNAWAR, A.Md SUFNI ACHMAD HANURA PERKASA


NIP: 19820417 201212 1 002 INSPECTOR SITE MANAGER
PERHITUNGAN KUANTITAS
KEGIATAN : PEMBANGUNAN SARANA PERHUBUNGAN LAUT
NAMA PAKET : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
NOMOR KONTRAK : 02/KPA.09/PEL/2017
TANGGAL KONTRAK : 18 Mei 2017
NILAI KONTRAK : Rp 1.041.830.000,00
SUMBER DANA : APBA
TAHUN ANGGARAN : 2017
LOKASI : PELABUHAN LABUHAN HAJI ACEH SELATAN

PANJANG LEBAR TINGGI UNIT VOL. SAT


NO PEKERJAAN KET.
(m) A B RATA2 A B RATA2

I PEKERJAAN PERSIAPAN
1 Survei Awal dan Penentuan Posisi 1.00 Ls

2 Pembersihan Lokasi 10.00 10.00 10.00 10.00 100.00 M2

3 Biaya Mobilisasi dan demobilisasi 1.00 Paket

4 Pemasangan Bowplank 10.00 10.00 10.00 10.00 40.00 m'

5 Pengukuran 1.00 Paket

6 Bangunan Direksi Keet dan Barak Kerja 1.00 Paket

7 Air bersih 4.00 Bln

8 Obat- obatan/ P3K 4.00 Bln

9 Papan Nama Proyek 1.00 Paket

10 Dokumentasi/Administrasi/As Built Drawing 1.00 Paket

II PEKERJAAN TANAH
1 Galian Tanah Pondasi 6.63 6.63 6.63 6.63 2.60 2.60 2.60 114.29 m3

2 Pasangan Batu Kosong (Aanstamping) 6.63 6.63 6.63 6.63 0.20 0.20 0.20 8.79 m3

3 Urugan Pasir Bawah Pondasi 6.63 6.63 6.63 6.63 0.20 0.20 0.20 8.79 m3

4 Timbunan Kembali Tanah Bekas Galian 80.51

III PEKERJAAN BETON BERTULANG


Beton Bertulang K250
1 Pondasi Tapak 2.25 2.25 2.25 2.25 0.60 0.60 0.60 4.00 12.15 m3
0.75 0.75 0.75 0.75 1.80 1.80 1.80 4.00 4.05 m3
16.20 m3

2 Sloof 40/40 4.375 0.40 0.40 0.40 0.40 0.40 0.40 4.00 2.80 m3

3 Plat Lantai 15 cm 4.375 4.375 4.375 4.38 0.15 0.15 0.15 1.00 2.87 m3

IV PEKERJAAN KONSTRUKSI MENARA


1 Pengadaan Pabrikasi Kerangka Menara Besi Baja Galvanis
P BJ
Section 1
L.100.100.10 10.00 15.10 151.00 BJ L.100.100.10 = 15.1
L.80.80.8 15.96 9.66 154.17 BJ L.80.80.8 = 9.66
11.20 9.66 108.19
L.70.70.7 10.00 7.38 73.80 BJ L.70.70.7 = 7.38
L.60.60.6 BJ L.60.60.6 = 5.42
L.50.50.5 82.40 BJ L.50.50.5 = 3.78

Section 2
L.100.100.10 10.00 15.10 151.00 BJ L.100.100.10 = 15.1
L.80.80.8 15.96 9.66 154.17 BJ L.80.80.8 = 9.66
11.20 9.66 108.19
L.70.70.7 10.00 7.38 73.80 BJ L.70.70.7 = 7.38
L.60.60.6 BJ L.60.60.6 = 5.42
L.50.50.5 82.40 BJ L.50.50.5 = 3.78

Section 3
L.100.100.10 10.00 15.10 151.00 BJ L.100.100.10 = 15.1
L.80.80.8 15.96 9.66 154.17 BJ L.80.80.8 = 9.66
11.20 9.66 108.19
L.70.70.7 10.00 7.38 73.80 BJ L.70.70.7 = 7.38
L.60.60.6 BJ L.60.60.6 = 5.42
L.50.50.5 82.40 BJ L.50.50.5 = 3.78

L.100.100.10 30.00 BJ L.100.100.10 = 1


L.80.80.8 BJ L.80.80.8 = 9.66
L.70.70.7 BJ L.70.70.7 = 7.38
L.60.60.6 BJ L.60.60.6 = 5.42
L.50.50.5 82.40 BJ L.50.50.5 = 3.78

2 Pengadaan Baut dan Ring Galvanis


3 Pemasangan/Perakitan Menara 1.00 Unit
4 Pembuatan Pintu Pengaman Lampu Suar 1.00 Unit
5 Cat Menara dengan Cat Marine Paint Putih 3x 1.00 Unit
6 Perancah dan Alat Bantu 1.00 Unit

V PEKERJAAN PENGADAAN PERALATAN SBN DAN LAIN-LAIN


1 Pengadaan/Pemasangan Sistem Lampu Suar Jarak Tampak 12 NM 1.00 Unit
2 Pengadaan dan Pemasangan Solar Cell 12V - 50W lengkap Instaasi 3.00 Unit
Dudukan dan Instalasi ke Lampu Suar
3 Pengadaan Battery Maintenance Free 12 - 105AH 3.00 Bh
4 Pembuatan Box Battery 1.00 Unit
5 Pengadaan dan Pemasangan Sistem Penangkal Petir 1.00 Unit
6 Pengadaan dan Pemasangan Radar Reflektor 1.00 Unit

VI PEKERJAAN PEMAGARAN LOKASI MENARA DENGAN PAGAR BRC 10 X 10 M


1 PEKERJAAN TANAH
a Galian Tanah Pondasi 32.00 0.68 0.60 0.64 0.70 0.70 0.70 1.00 14.34 m3

b Timbunan Kembali Tanah Bekas Galian 3.78 m3

c Urugan Pasir Bawah Pondasi 32.00 0.60 0.60 0.60 0.05 0.05 0.05 1.00 0.96 m3

d Pasangan Pondasi Batu Gunung 32.00 0.50 0.30 0.40 0.60 0.60 0.60 1.00 7.68 m3

e Pasangan Batu Kosong (Aanstamping) 32.00 0.60 0.60 0.60 0.10 0.10 0.10 1.00 1.92 m3

2 PEKERJAAN BETON BERTULANG


a Kolom 20/20 2.00 0.20 0.20 0.20 0.20 0.20 0.20 12.00 0.96 m3

b Sloof 20/20 30.00 0.20 0.20 0.20 0.20 0.20 0.20 1.00 1.20 m3

c Ring Balk 5/20 30.00 0.20 0.20 0.20 0.05 0.05 0.05 1.00 0.30 m3

3 PEKERJAAN PASANGAN
a Pasangan Bata 1:2 30.00 0.15 0.15 0.15 1.00 4.50 m2

b Plesteran 1:2 30.00 0.15 0.15 0.15 2.00 9.00 m2

4 Tiang Pagar BRC T = 1,7 m + Asesoris kualitas No.1 22.00 Btng

5 Pagar BRC T = 1,2 m + Asesoris kualitas No.1 12.00 Unit

6 Pengecatan Dinding/Tembok Pagar 30.00 0.40 0.40 0.40 2.00 24.00 m2


0.80 0.80 0.80 1.60 1.60 1.60 12.00 15.36 m2
39.36 m2

7 Pembuatan Pintu Pagar dari Besi Plat lengkap Kunci dan Gembok 1.00 Unit

8 Relief Kolom 12.00 Unit

Disetujui Oleh: Diperiksa oleh : Dibuat Oleh:


PEMBANTU PPTK KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
BIDANG PELAYARAN CV. CITRA MARGA UTAMA CV. BIMA MARGA
DINAS PERHUBUNGANACEH

ZULHILAL, ST SUKNI ACHMAD HANURA PERKASA


NIP: 19750110 200604 1 002 INSPECTOR SITE MANAGER
PERHITUNGAN KUANTITAS
KEGIATAN : PEMBANGUNAN SARANA PERHUBUNGAN LAUT BULAN I
NAMA PAKET : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
NOMOR KONTRAK : 02/KPA.09/PEL/2017
TANGGAL KONTRAK : 18 Mei 2017
NILAI KONTRAK : Rp 1.041.830.000,00
SUMBER DANA : APBA
TAHUN ANGGARAN : 2017
LOKASI : PELABUHAN LABUHAN HAJI ACEH SELATAN

PANJANG LEBAR TINGGI UNIT VOL. SAT


NO PEKERJAAN KET.
(m) A B RATA2 A B RATA2

I PEKERJAAN PERSIAPAN
1 Survei Awal dan Penentuan Posisi 1.00 Ls

2 Pembersihan Lokasi 11.00 12.00 12.00 12.00 132.00 M2

3 Biaya Mobilisasi dan demobilisasi 0.25 Paket Asumsi

4 Pemasangan Bowplank 10.00 10.00 10.00 10.00 40.00 m'


4.50 18.00 m'
58.00 m'

5 Pengukuran 1.00 Paket

6 Bangunan Direksi Keet dan Barak Kerja 1.00 Paket

7 Air bersih 0.50 Bln

8 Obat- obatan/ P3K 0.50 Bln

9 Papan Nama Proyek

10 Dokumentasi/Administrasi/As Built Drawing 0.05 Paket Asumsi

Disetujui Oleh: Diperiksa oleh : Dibuat Oleh:


PEMBANTU PPTK KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
BIDANG PELAYARAN CV. CIPTA MARGA UTAMA CV. E-GROUP KARYA
DINAS PERHUBUNGANACEH

ZULHILAL, ST SUFNI ACHMAD HANURA PERKASA


NIP: 19750110 200604 1 002 INSPECTOR SITE MANAGER
PERHITUNGAN KUANTITAS
KEGIATAN : PEMBANGUNAN SARANA PERHUBUNGAN LAUT
NAMA PAKET : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
NOMOR KONTRAK : 02/KPA.09/PEL/2017
TANGGAL KONTRAK : 18 Mei 2017
NILAI KONTRAK : Rp 1.041.830.000,00
SUMBER DANA : APBA
TAHUN ANGGARAN : 2017
LOKASI : PELABUHAN LABUHAN HAJI ACEH SELATAN

PANJANG LEBAR TINGGI UNIT VOL. SAT


NO PEKERJAAN KET.
(m) A B RATA2 A B RATA2
L 100.100.10

II PEKERJAAN TANAH
37
4 .5

Angkor baut pondasi

D Sloof 40x40
0.00

1 Galian Tanah Pondasi 6.63 6.63 6.63 6.63 2.60 2.60 2.60 114.29 m3
0,00

- 0.20 30
5
M uka tanah asli M uka tanah asli
10
61

24
4

2 Pasangan Batu Kosong (Aanstamping) 6.63 6.63 6.63 6.63 0.20 0.20 0.20 8.79 m3
C
Tanah Urug

- 1,80
Beton K 225
1:2:3
91
5
1

- 2,40

3 Urugan Pasir Bawah Pondasi 6.63 6.63 6.63 6.63 0.20 0.20 0.20 8.79 m3 - 2,60
- 2,80
25
5

36
5
Pondasi Tapak

Aanstamping

19
8
Pasir Urug

4 Timbunan Kembali Tanah Bekas Galian 80.51 m3

Disetujui Oleh: Diperiksa oleh : Dibuat Oleh:


PEMBANTU PPTK KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
BIDANG PELAYARAN CV. CIPTA MARGA UTAMA CV. E-GROUP KARYA
DINAS PERHUBUNGANACEH

ZULHILAL, ST SUFNI ACHMAD HANURA PERKASA


NIP: 19750110 200604 1 002 INSPECTOR SITE MANAGER
PERHITUNGAN KUANTITAS
KEGIATAN : PEMBANGUNAN SARANA PERHUBUNGAN LAUT
NAMA PAKET : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
NOMOR KONTRAK : 02/KPA.09/PEL/2017
TANGGAL KONTRAK : 18 Mei 2017
NILAI KONTRAK : Rp 1.041.830.000,00
SUMBER DANA : APBA
TAHUN ANGGARAN : 2017
LOKASI : PELABUHAN LABUHAN HAJI ACEH SELATAN

PANJANG LEBAR TINGGI UNIT VOL. SAT


NO PEKERJAAN KET.
(m) A B RATA2 A B RATA2
L 100.100.10

37
4 .5

Angkor baut pondasi

III PEKERJAAN BETON BERTULANG 0.00


D
0,00
Sloof 40x40

Beton Bertulang K250


- 0.20 0
3
5
Muka tanah asli Muka tanah asli
06
1 1

1 Pondasi Tapak 2.25 2.25 2.25 2.25 0.60 0.60 0.60 4.00 12.15 m3
0.75 0.75 0.75 0.75 1.80 1.80 1.80 4.00 4.05 m3
42
44

C
Tanah Urug

16.20 m3 - 1,80
Beton K 225
1:2:3
91
5
1

- 2,40
Pondasi Tapak
- 2,60 2
5

- 2,80 6
3
5
Aanstamping

89
9
1
Pasir Urug

43
7 .5

2 Sloof 40/40 4.375 0.40 0.40 0.40 0.40 0.40 0.40 4.00 2.80 m3
164
1

43
7 .5

Angkor baut pondasi


L 100.100.10
96
5 8 19
89

3 Plat Lantai 15 cm 4.775 4.775 4.775 4.78 0.15 0.15 0.15 1.00 3.42 m3
0.750 0.175 0.175 0.18 0.15 0.15 0.15 8.00 0.16 m3
3.58
19
89

59
68

Disetujui Oleh: Diperiksa oleh : Dibuat Oleh:


PEMBANTU PPTK KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
BIDANG PELAYARAN CV. CIPTA MARGA UTAMA CV. E-GROUP KARYA
DINAS PERHUBUNGANACEH

ZULHILAL, ST SUFNI ACHMAD HANURA PERKASA


NIP: 19750110 200604 1 002 INSPECTOR SITE MANAGER
PERHITUNGAN KUANTITAS
KEGIATAN : PEMBANGUNAN SARANA PERHUBUNGAN LAUT
NAMA PAKET : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
NOMOR KONTRAK : 02/KPA.09/PEL/2017
TANGGAL KONTRAK : 18 Mei 2017
NILAI KONTRAK : Rp 1.041.830.000,00
SUMBER DANA : APBA
TAHUN ANGGARAN : 2017
LOKASI : PELABUHAN LABUHAN HAJI ACEH SELATAN

DIMENSI UNIT VOL SAT


NO PEKERJAAN BERAT JENIS KET.
P L T

IV PEKERJAAN KONSTRUKSI MENARA


1 Pengadaan Pabrikasi Kerangka Menara Besi Baja Galvanis
A.Pondasi
Angker
Round Bar 28 mm - 1.2 m 1.20 4.83 16.00 92.74 Kg
PL 10x350x350 0.35 0.35 78.50 8.00 76.93 Kg
L 100x100x10 - 4.38 m 4.38 15.10 4.00 264.25 Kg
L 100x100x10 - 1 m 1.00 15.10 4.00 60.40 Kg
Sub Jumlah 494.32 Kg

Disetujui Oleh: Diperiksa oleh : Dibuat Oleh:


PEMBANTU PPTK KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
BIDANG PELAYARAN CV. CIPTA MARGA UTAMA CV. E-GROUP KARYA
DINAS PERHUBUNGANACEH

ZULHILAL, ST SUFNI ACHMAD HANURA PERKASA


NIP: 19750110 200604 1 002 INSPECTOR SITE MANAGER
PERHITUNGAN KUANTITAS

KEGIATAN : PEMBANGUNAN SARANA PERHUBUNGAN LAUT


NAMA PAKET : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
NOMOR KONTRAK : 02/KPA.09/PEL/2017
TANGGAL KONTRAK : 18 Mei 2017
NILAI KONTRAK : Rp 1.041.830.000,00
SUMBER DANA : APBA
TAHUN ANGGARAN : 2017
LOKASI : PELABUHAN LABUHAN HAJI ACEH SELATAN

DIMENSI UNIT VOL SAT


NO PEKERJAAN BERAT JENIS KET.
P L T

B. Segment 1
I. Column
L 100x100x10 - 6m 6.00 15.10 4.00 362.40 Kg BJ L.100.100.10 = 15.1
PL 20x350x350 0.35 0.35 157.14 4.00 77.00 Kg BJ L.80.80.8 = 9.66
PL 16x350x350 0.35 0.35 125.51 4.00 61.50 Kg BJ L.70.70.7 = 7.38
PL 16x350x350 0.35 0.35 125.51 4.00 61.50 Kg BJ L.60.60.6 = 5.42
PL 16x300x350 0.30 0.35 125.51 12.00 158.14 Kg BJ L.50.50.5 = 3.78

II. Bracing Vertical


L 70x70x7 - 5,57m 5.57 7.38 8.00 328.85 Kg
L 60x60x6 - 1,9 m 1.90 5.42 8.00 82.38 Kg D 12
D 20 L 80.80.8 D 20
Plat Baja 8 mm
L 80.80.8
D 12
D 20
D 16 + 5,00

L 60x60x6 - 2,2 m 2.20 5.42 8.00 95.39 Kg


D 12 D 12
D 16 D 16
D 20

1 4 4
4

III. Bracing Horizontal D 12 L 60.60.6 L 60.60.6 D 12

L 60x60x6 - 0,9 m 0.90 5.42 8.00 39.02 Kg


D 12 D 12

L 60x60x6 - 1,5 m 1.50 5.42 8.00 65.04 Kg


1 4 4
4

3 2
1 6

L 80x80x8 - 4 m 4.00 9.66 4.00 154.56 Kg D 12 L 60.60.6

D 12 D 12
L 60.60.6 D 12

L 80x80x8 - 3 m 3.00 9.66 4.00 115.92 Kg


9 7 3
4

IV. Plat Bracing D 20 D 20 0,00

PL 8x350x350 0.35 0.35 62.92 4.00 30.83 Kg 3 7 .


4 5

PL 8x300x350 0.30 0.35 62.92 4.00 26.43 Kg


Sub Jumlah 1,658.97 Kg

Disetujui Oleh: Diperiksa oleh : Dibuat Oleh:


PEMBANTU PPTK KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
BIDANG PELAYARAN CV. CIPTA MARGA UTAMA CV. E-GROUP KARYA
DINAS PERHUBUNGANACEH

ZULHILAL, ST SUFNI ACHMAD HANURA PERKASA


NIP: 19750110 200604 1 002 INSPECTOR SITE MANAGER
PERHITUNGAN KUANTITAS

KEGIATAN : PEMBANGUNAN SARANA PERHUBUNGAN LAUT


NAMA PAKET : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
NOMOR KONTRAK : 02/KPA.09/PEL/2017
TANGGAL KONTRAK : 18 Mei 2017
NILAI KONTRAK : Rp 1.041.830.000,00
SUMBER DANA : APBA
TAHUN ANGGARAN : 2017
LOKASI : PELABUHAN LABUHAN HAJI ACEH SELATAN

DIMENSI UNIT VOL SAT


NO PEKERJAAN BERAT JENIS KET.
P L T

C. Segment 2
I. Column
L 100x100x10 - 6m 6.00 15.10 4.00 362.40 Kg D 12
D 20 L 80.80.8 D 20 L 80.80.8 D 12
D 20
D 20 D 16 D 20 + 10,00

L 90x90x9 - 0,7m 0.70 12.20 4.00 34.16 Kg D 16


D 20
D 16

L 100.100.10
PL 10x350x250 0.35 0.25 78.50 8.00 54.95 Kg

L 100.100.10

L6

.6
60
0.

L7
.7
60
315

0.
70

0.

L6
.6

70
0.
L7

.7
L 60.60.6 L 60.60.6

II. Bracing Vertical D 12


D 12 D 12
D 12

L 100.100.10
L 100.100.10
L 70x70x7 - 3,4m 3.40 7.38 16.00 401.47 Kg

L7
.7
315

70

0.
L 60x60x6 - 1,8m 1.80 5.42 8.00 78.05 Kg

70
0.
L7

.7
L 60x60x6 - 1,6m 1.60 5.42 8.00 69.38 Kg D 12 D 12 D 12 D 12
326
1 2

L 100.100.10
L 100.100.10

L7

7
0.
0.

0.7
315

III. Bracing Horizontal

70

L7
.7
L 60.60.6 L 60.60.6
L 60x60x6 - 1.1m 1.10 5.42 8.00 47.68 Kg D 12
Sambungan A D 12 D 12
D 12
Sambungan A

L 100.100.10
L6
L 100.100.10
L 60x60x6 - 1m 1.00 5.42 8.00 43.34 Kg

.6

L7

7
60

0.
0.

60
0.
0.

0.7
70
L6

.6
L 80x80x8 - 3,7m 3.70 9.66 4.00 142.97 Kg
315

L7
.7
635
2

D 12 D 12
L 80.80.8 L 80.80.8
L 80x80x8 - 2,5m 2.50 9.66 4.00 96.60 Kg
D 20 D 20 D 20 + 5,00
D 12 D 16 D 12
D 16 D 16
D 20

IV. Plat Bracing


PL 8x350x350 0.35 0.35 62.92 4.00 30.83 Kg
PL 8x350x350 0.30 0.35 62.92 4.00 26.43 Kg
PL 10x350x300 0.35 0.30 78.50 8.00 65.94 Kg
Sub Jumlah 1,454.19 Kg

Disetujui Oleh: Diperiksa oleh : Diajukan Oleh :


PEMBANTU PPTK KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
BIDANG PELAYARAN CV. CIPTA MARGA UTAMA CV.E-GROUP KARYA
DINAS PERHUBUNGANACEH

ZULHILAL, ST SUFNI ACHMAD HANURA PERKASA


NIP: 19750110 200604 1 002 INSPECTOR SITE MANAGER
PERHITUNGAN KUANTITAS

KEGIATAN : PEMBANGUNAN SARANA PERHUBUNGAN LAUT


NAMA PAKET : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
NOMOR KONTRAK : 02/KPA.09/PEL/2017
TANGGAL KONTRAK : 18 Mei 2017
NILAI KONTRAK : Rp 1.041.830.000,00
SUMBER DANA : APBA
TAHUN ANGGARAN : 2017
LOKASI : PELABUHAN LABUHAN HAJI ACEH SELATAN

PANJANG UNIT VOL SAT


NO PEKERJAAN KET.
A B RATA2 RATA2

D. Segment 3 D 12
D 20
D 20
L 70.70.7 D 20
D 16
L 70.70.7
D 12
D 20
D 20 + 15,00

I. Column D 16
D 20
D 16

L 80x80x8 - 6m 6.00 9.66 4.00 231.84 Kg

L 80.80.8
L 80.80.8
1 5
3

L 90x90x9 - 0,7m 0.70 12.20 4.00 34.16 Kg L 50.50.5 L 50.50.5


D 12 D 12
PL 10x350x250 0.35 0.25 78.50 8.00 54.95 Kg D 12 D 12

1 5
3

II. Bracing Vertical


L 60x60x6 - 3m 3.00 5.42 16.00 260.16 Kg
3 2
1 6 2

D 12 D 12 D 12 D 12

Sambungan B Sambungan B

L 50x50x5 - 1,8m 1.80 3.75 8.00 54.00 Kg 1 5


3

L 50x50x5 - 1,7m 1.70 3.75 8.00 51.00 Kg L 50.50.5 D 12 D 12 L 50.50.5

L 100.100.10

L 100.100.10
D 12 D 12
2 7 0
5

III. Bracing Horizontal 1 5


3

L 60x60x6 - 1.1m 1.10 5.42 8.00 47.70 Kg D 12


D 20
D 20
L 80.80.8 D 20
D 16
L 80.80.8 D 12
D 20
D 20 + 10,00

L 60x60x6 - 0,8m 0.80 5.42 8.00 34.69 Kg D 16


D 20
D 16

L 70x70x7 - 3,2m 3.20 7.38 4.00 94.46 Kg


L 70x70x7 - 2,4m 2.40 7.38 4.00 70.85 Kg

IV. Plat Bracing


PL 8x350x250 0.35 0.25 62.92 4.00 22.02 Kg
PL 8x250x350 0.25 0.35 62.92 4.00 22.02 Kg
PL 10x350x250 0.35 0.25 78.50 8.00 54.95 Kg

Sub Jumlah 1,032.80 Kg

Disetujui Oleh: Diperiksa oleh : Diajukan Oleh :


PEMBANTU PPTK KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
BIDANG PELAYARAN CV. CIPTA MARGA UTAMA CV.E-GROUP KARYA
DINAS PERHUBUNGANACEH

ZULHILAL, ST SUFNI ACHMAD HANURA PERKASA


NIP: 19750110 200604 1 002 INSPECTOR SITE MANAGER
PERHITUNGAN KUANTITAS

KEGIATAN : PEMBANGUNAN SARANA PERHUBUNGAN LAUT


NAMA PAKET : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
NOMOR KONTRAK : 02/KPA.09/PEL/2017
TANGGAL KONTRAK : 18 Mei 2017
NILAI KONTRAK : Rp 1.041.830.000,00
SUMBER DANA : APBA
TAHUN ANGGARAN : 2017
LOKASI : PELABUHAN LABUHAN HAJI ACEH SELATAN

PANJANG UNIT VOL SAT


NO PEKERJAAN KET.
A B RATA2 RATA2

E. Segment 4 Lampu Suar

M eja Lampu

I. Column Solar Cell

L 70x70x7 - 2m 2.00 7.38 4.00 59.04 Kg


Penangkal Petir

L 80x80x8 - 0,6m 0.60 9.66 4.00 23.18 Kg


Box Baterai
+ 21,00
L 50.50.5

PL 8x350x250 0.35 0.25 62.92 8.00 44.04 Kg D 12


L 50.50.5
785
2

UNP 100
D 12 UNP 100 + 20,00
D 16 D 16

II. Bracing Vertical D 12 D 20


D 12
L 70.70.7
D 20
L 70.70.7
D 20
D 12

L 60x60x6 - 2,9m 2.90 5.42 16.00 251.49 Kg

L 70.70.7
L 70.70.7
315

L 50x50x5 - 1,5m 1.50 3.75 8.00 45.00 Kg L 50.50.5 L 50.50.5


D 12 D 12

L 50x50x5 - 1,4m 1.40 3.75 8.00 42.00 Kg D 12 D 12

Sambungan C Sambungan C 315

III. Bracing Horizontal 13


262

L 80.80.8
L 80.80.8
L 50x50x5 - 0,8m 0.80 3.75 8.00 24.00 Kg
L 50x50x5 - 0,9m 0.90 3.75 8.00 27.00 Kg
315

L 50.50.5 D 12 D 12 L 50.50.5
L 70x70x7 - 2,5m 2.50 7.38 4.00 73.80 Kg D 12 D 12

L 80.80.8
L 80.80.8
315

IV. Plat Bracing D 12


D 20 L 70.70.7 D 20 L 70.70.7
D 12
D 20
D 16 + 15,00

PL 8x350x350 0.35 0.35 62.92 4.00 30.83 Kg


D 20 D 20
D 16 D 16
D 20

PL 8x350x300 0.35 0.30 62.92 8.00 52.85 Kg


Sub Jumlah 673.24 Kg

Disetujui Oleh: Diperiksa oleh : Diajukan Oleh :


PEMBANTU PPTK KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
BIDANG PELAYARAN CV. CIPTA MARGA UTAMA CV.E-GROUP KARYA
DINAS PERHUBUNGANACEH

ZULHILAL, ST SUFNI ACHMAD HANURA PERKASA


NIP: 19750110 200604 1 002 INSPECTOR SITE MANAGER
PERHITUNGAN KUANTITAS

KEGIATAN : PEMBANGUNAN SARANA PERHUBUNGAN LAUT


NAMA PAKET : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
NOMOR KONTRAK : 02/KPA.09/PEL/2017
TANGGAL KONTRAK : 18 Mei 2017
NILAI KONTRAK : Rp 1.041.830.000,00
SUMBER DANA : APBA
TAHUN ANGGARAN : 2017
LOKASI : PELABUHAN LABUHAN HAJI ACEH SELATAN

PANJANG UNIT VOL SAT


NO PEKERJAAN KET.
A B RATA2 RATA2

V. Platform
1 UNP 100 - 4,3m 4.30 9.37 14.00 564.07 Kg
2 Plat Bordes 5x4,5x4,5 4.50 4.50 48.79 1.00 988.00 Kg
3 PL 6x100x50 0.25 0.20 47.11 45.00 106.00 Kg
4 L 50x50x5 - 4,3m 4.30 3.75 16.00 258.00 Kg
5 L 50x50x5 - 1,2m 1.20 3.75 16.00 72.00 Kg
6 L 50x50x5 - 1,4m 1.40 3.75 12.00 63.00 Kg
7 L 50x50x5 - 0,9m 0.90 3.75 12.00 40.50 Kg
8 L 50x50x5 - 1m 1.00 3.75 3.00 11.25 Kg
9 L 50x50x5 - 1,1m 1.10 3.75 2.00 8.25 Kg

F.Dudukan Lampu
PL 10x300x150 0.80 0.80 78.50 1.00 50.24 Kg

Sub Jumlah 2,161.31 Kg

Disetujui Oleh: Diperiksa oleh : Diajukan Oleh :


PEMBANTU PPTK KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
BIDANG PELAYARAN CV. CIPTA MARGA UTAMA CV.E-GROUP KARYA
DINAS PERHUBUNGANACEH

ZULHILAL, ST SUFNI ACHMAD HANURA PERKASA


NIP: 19750110 200604 1 002 INSPECTOR SITE MANAGER
PERHITUNGAN KUANTITAS

KEGIATAN : PEMBANGUNAN SARANA PERHUBUNGAN LAUT


NAMA PAKET : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
NOMOR KONTRAK : 02/KPA.09/PEL/2017
TANGGAL KONTRAK : 18 Mei 2017
NILAI KONTRAK : Rp 1.041.830.000,00
SUMBER DANA : APBA
TAHUN ANGGARAN : 2017
LOKASI : PELABUHAN LABUHAN HAJI ACEH SELATAN

PANJANG UNIT VOL SAT


NO PEKERJAAN KET.
A B RATA2 RATA2

G. Tangga 4 Unit
1 UNP 120 - 4m 4.00 13.40 4.00 214.40 Kg
2 UNP 120 - 1,1m 1.10 13.40 8.00 117.92 Kg
3 UNP 120 - 1,3m 1.30 13.40 4.00 69.68 Kg
4 UNP 80 - 6m 6.00 7.96 8.00 382.08 Kg
5 Round Bar 12mm 0.80 0.89 192.00 136.70 Kg
6 Plat 8x350x350 0.35 0.35 62.92 8.00 61.66 Kg
7 Pipa 1" - 6m 6.00 1.48 8.00 71.04 Kg
8 L 45x45x4 - 1m 1.00 2.72 40.00 108.80 Kg
9 L 40x40x4 - 1m 1.00 2.42 16.00 38.72 Kg
10 L 40x40x4 - 1,3m 1.30 2.42 8.00 25.17 Kg
11 L 40x40x4 - 1,3m 1.20 2.42 20.00 58.08 Kg
12 PL 6x150x150 0.15 0.15 47.11 8.00 8.48 Kg
13 Plat strip 40 - 1,4m 1.40 1.19 76.00 126.62 Kg
14 Round Bar 12mm - 1m 1.00 0.89 48.00 42.72 Kg
Sub Jumlah 1,462.07
Jumlah Total 8,936.89 Kg

Disetujui Oleh: Diperiksa oleh : Diajukan Oleh :


PEMBANTU PPTK KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
BIDANG PELAYARAN CV. CIPTA MARGA UTAMA CV.E-GROUP KARYA
DINAS PERHUBUNGANACEH

ZULHILAL, ST SUFNI ACHMAD HANURA PERKASA


NIP: 19750110 200604 1 002 INSPECTOR SITE MANAGER
PERHITUNGAN KUANTITAS

KEGIATAN : PEMBANGUNAN SARANA PERHUBUNGAN LAUT


NAMA PAKET : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
NOMOR KONTRAK : 02/KPA.09/PEL/2017
TANGGAL KONTRAK : 18 Mei 2017
NILAI KONTRAK : Rp 1.041.830.000,00
SUMBER DANA : APBA
TAHUN ANGGARAN : 2017
LOKASI : PELABUHAN LABUHAN HAJI ACEH SELATAN

PANJANG UNIT VOL SAT


NO PEKERJAAN KET.
A B RATA2 RATA2

2 Pengadaan Baut dan Ring Galvanis 20 % dari jumlah rangka baja galvanis 1,787.38 Kg

3 Pemasangan/Perakitan Menara 1.00 Unit

4 Pembuatan Pintu Pengaman Lampu Suar 1.00 Unit

5 Cat Menara dengan Cat Marine Paint Putih 3x 1.00 Unit

6 Perancah dan Alat Bantu 1.00 Unit

Disetujui Oleh: Diperiksa oleh : Diajukan Oleh :


PEMBANTU PPTK KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
BIDANG PELAYARAN CV. CIPTA MARGA UTAMA CV.E-GROUP KARYA
DINAS PERHUBUNGANACEH

ZULHILAL, ST SUFNI ACHMAD HANURA PERKASA


NIP: 19750110 200604 1 002 INSPECTOR SITE MANAGER
PERHITUNGAN KUANTITAS
KEGIATAN : PEMBANGUNAN SARANA PERHUBUNGAN LAUT
NAMA PAKET : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
NOMOR KONTRAK : 02/KPA.09/PEL/2017
TANGGAL KONTRAK : 18 Mei 2017
NILAI KONTRAK : Rp 1.041.830.000,00
SUMBER DANA : APBA
TAHUN ANGGARAN : 2017
LOKASI : PELABUHAN LABUHAN HAJI ACEH SELATAN

PANJANG LEBAR TINGGI UNIT VOL. SAT


NO PEKERJAAN KET.
(m) A B RATA2 A B RATA2

V PEKERJAAN PENGADAAN PERALATAN SBN DAN LAIN-LAIN


1 Pengadaan/Pemasangan Sistem Lampu Suar Jarak Tampak 12 NM 1.00 Unit

2 Pengadaan dan Pemasangan Solar Cell 12V - 50W lengkap Instaasi 3.00 Unit
Dudukan dan Instalasi ke Lampu Suar

3 Pengadaan Battery Maintenance Free 12 - 105AH 3.00 Bh

4 Pembuatan Box Battery 1.00 Unit

5 Pengadaan dan Pemasangan Sistem Penangkal Petir 1.00 Unit

6 Pengadaan dan Pemasangan Radar Reflektor 1.00 Unit

Disetujui Oleh: Diperiksa oleh : Dibuat Oleh:


PEMBANTU PPTK KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
BIDANG PELAYARAN CV. CIPTA MARGA UTAMA CV. E-GROUP KARYA
DINAS PERHUBUNGANACEH

ZULHILAL, ST SUFNI ACHMAD HANURA PERKASA


NIP: 19750110 200604 1 002 INSPECTOR SITE MANAGER
PERHITUNGAN KUANTITAS
KEGIATAN : PEMBANGUNAN SARANA PERHUBUNGAN LAUT
NAMA PAKET : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
NOMOR KONTRAK : 02/KPA.09/PEL/2017
TANGGAL KONTRAK : 18 Mei 2017
NILAI KONTRAK : Rp 1.041.830.000,00
SUMBER DANA : APBA
TAHUN ANGGARAN : 2017
LOKASI : PELABUHAN LABUHAN HAJI ACEH SELATAN

PANJANG LEBAR TINGGI UNIT VOL. SAT


NO PEKERJAAN KET.
(m) A B RATA2 A B RATA2
800

VI PEKERJAAN PEMAGARAN LOKASI MENARA DENGAN PAGAR BRC 10 X 10 M 300 250 250

1 PEKERJAAN TANAH
a Galian Tanah Pondasi 32.00 0.80 0.60 0.70 0.70 0.70 0.70 1.00 15.68 m3

b Timbunan Kembali Tanah Bekas Galian 3.68 m3

c Urugan Pasir Bawah Pondasi 32.00 0.60 0.60 0.60 0.10 0.05 0.08 1.00 1.44 m3

d Pasangan Pondasi Batu Gunung 32.00 0.50 0.40 0.45 0.60 0.60 0.60 1.00 8.64 m3 PIN TU PAGAR

300

e Pasangan Batu Kosong (Aanstamping) 32.00 0.60 0.60 0.60 0.10 0.10 0.10 1.00 1.92 m3 SITE PLAN REALISASI
SKALA 1:80

4
20
Pagar BRC 120cm

18 0
2 PEKERJAAN BETON BERTULANG Ringbalk 5/20
Pasangan Bata

a Kolom 20/20 2.00 0.20 0.20 0.20 0.20 0.20 0.20 12.00 0.96 m3 Sloof 20/20

5
Angker 10 - 100

35
b Sloof 20/20 30.00 0.20 0.20 0.20 0.20 0.20 0.20 1.00 1.20 m3

60
c Ring Balk 5/20 30.00 0.20 0.20 0.20 0.05 0.05 0.05 1.00 0.30 m3

10
50
60

POTONGAN A-A
SKALA 1:20

Disetujui Oleh: Diperiksa oleh : Dibuat Oleh:


PEMBANTU PPTK KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
BIDANG PELAYARAN CV. CIPTA MARGA UTAMA CV. E-GROUP KARYA
DINAS PERHUBUNGANACEH

ZULHILAL, ST SUFNI ACHMAD HANURA PERKASA


NIP: 19750110 200604 1 002 INSPECTOR SITE MANAGER
PERHITUNGAN KUANTITAS

KEGIATAN : PEMBANGUNAN SARANA PERHUBUNGAN LAUT


NAMA PAKET : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
NOMOR KONTRAK : 02/KPA.09/PEL/2017
TANGGAL KONTRAK : 18 Mei 2017
NILAI KONTRAK : Rp 1.041.830.000,00
SUMBER DANA : APBA
TAHUN ANGGARAN : 2017
LOKASI : PELABUHAN LABUHAN HAJI ACEH SELATAN

PANJANG LEBAR TINGGI UNIT VOL. SAT


NO PEKERJAAN KET.
(m) A B RATA2 A B RATA2

3 PEKERJAAN PASANGAN 800

a Pasangan Bata 1:2 30.00 0.15 0.15 0.15 1.00 4.50 m2 300 250 250

b Plesteran 1:2 30.00 0.15 0.15 0.15 2.00 9.00 m2

4 Tiang Pagar BRC T = 1,7 m + Asesoris kualitas No.1 22.00 Btng

PINTU PAGAR

300

5 Pagar BRC T = 1,2 m + Asesoris kualitas No.1 12.00 Unit


SITE PLAN REALISASI
SKALA 1:80

2
20

4
6 Pengecatan Dinding/Tembok Pagar 30.00 0.40 0.40 0.40 2.00 24.00 m2 Pagar BRC 120cm

0.80 0.80 0.80 1.60 1.60 1.60 12.00 15.36 m2


39.36 m2

18 0
Ringbalk 5/20
Pasangan Bata

Sloof 20/20

7 Pembuatan Pintu Pagar dari Besi Plat lengkap Kunci dan Gembok 1.00 Unit

5
Angker 10 - 100

35
60
8 Relief Kolom 12.00 Unit

10
50
60

POTONGAN A-A
SKALA 1:20

Disetujui Oleh: Diperiksa oleh : Dibuat Oleh:


PEMBANTU PPTK KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
BIDANG PELAYARAN CV. CIPTA MARGA UTAMA CV. E-GROUP KARYA
DINAS PERHUBUNGANACEH

ZULHILAL, ST SUFNI ACHMAD HANURA PERKASA


NIP: 19750110 200604 1 002 INSPECTOR SITE MANAGER
REKAPITULASI
BILL OF QUANTITY

PEKERJAAN : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH


LOKASI : PROVINSI ACEH
SUMBER DANA : 2017

JUMLAH HARGA
NO. URAIAN

I. PEKERJAAN PERSIAPAN Rp 85,890,000.00

II. PEKERJAAN TANAH Rp 22,934,019.36

III. PEKERJAAN BETON BERTULANG Rp 132,834,428.73

IV. PEKERJAAN KONSTRUKSI MENARA Rp 472,632,200.00

V. PEKERJAAN PENGADAAN PERALATAN SBN DAN LAIN-LAIN Rp 142,475,700.00

VI. PEKERJAAN PEMAGARAN LOKASI MENARA DENGAN PAGAR BRC 10 X 10 Rp 90,353,157.47

JUMLAH Rp 947,119,505.56
P P N 10 % Rp 94,711,950.56
JUMLAH TERMASUK PPN Rp 1,041,831,456.11
PEMBULATAN Rp 1,041,830,000.00
TERBILANG : Satu milyar empat puluh satu juta delapan ratus tiga puluh ribu rupiah

Banda Aceh, 10 April 2017


CV. EGROUP KARYA

M.HERKA
DIREKTUR
Suplemen A : 1 Unit Pemasangan/Perakitan Menara tinggi 20 Meter diperkirakan dapat diselesaikan dalam
jangka waktu 20 hari ( taksir )
15.0000 Orang Pekerja Rp. 75,000.00Rp.
1.0000 Orang Mandor Rp. 120,000.00Rp.
8.0000 Orang Tukang Rp. 100,000.00Rp.
2.0000 Orang Kepala Tukang Rp. 120,000.00Rp.
Rp.
Upah 20 Hari x Rp. 2,285,000.00 Rp.
- - Peralatan Rp. 10,000,000.00 Rp.
Jumlah Rp.

Suplemen B : 1 Unit Pembuatan dan Pemasangan Pintu Pengaman Lampu Suar / Menara Suar
60.0000 Kg Besi beton Rp. 14,250.00 Rp.
5.0000 Kg Kawat Las Rp. 28,000.00 Rp.
0.2500 Botol Aceteline Rp. 500,000.00 Rp.
0.5000 Botol Oxigen Rp. 583,000.00 Rp.
1.0000 Stel Engsel Cabut Rp. 26,500.00 Rp.
1.0000 Buah Gembok Rp. 21,200.00 Rp.
9.0000 Orang Pekerja Rp. 75,000.00 Rp.
1.0000 Orang Mandor Rp. 120,000.00 Rp.
2.0000 Orang Tukang Besi Rp. 100,000.00 Rp.
4.0000 Orang Tukang Las Rp. 100,000.00 Rp.
2.0000 Orang Kepala Tukang Rp. 120,000.00 Rp.
Jumlah Rp.
Suplemen C : 1 Meter Pengecatan Menara 3 x An. Taksir
3.0000 Kg Cat Marine Paint Rp. 127,200.00 Rp.
1.0000 Liter Thiner Rp. 31,800.00 Rp.
4.0000 Orang Pekerja Rp. 75,000.00 Rp.
0.0500 Orang Mandor Rp. 120,000.00 Rp.
0.5000 Orang Tukang Rp. 100,000.00 Rp.
0.5000 Orang Kepala Tukang Rp. 120,000.00 Rp.
Jumlah Rp.
Upah 20 Meter x Rp. 829,400.00 Rp.

Suplemen D : 1 Unit Pembuatan dan Pemasangan Box Batteray


25.0000 Kg Besi beton Rp. 14,250.00 Rp.
2.0000 Kg Kawat Las Rp. 28,000.00 Rp.
0.1000 Botol Aceteline Rp. 500,000.00 Rp.
0.2500 Botol Oxigen Rp. 583,000.00 Rp.
1.0000 Stel Engsel Cabut Rp. 26,500.00 Rp.
1.0000 Buah Gembok Rp. 21,200.00 Rp.
2.0000 Orang Pekerja Rp. 75,000.00 Rp.
0.5000 Orang Mandor Rp. 120,000.00 Rp.
0.5000 Orang Tukang Besi Rp. 100,000.00 Rp.
2.0000 Orang Tukang Las Rp. 100,000.00 Rp.
0.5000 Orang Kepala Tukang Rp. 120,000.00 Rp.
Jumlah Rp.

Suplemen E : 1 Unit Pengadaan/Pemasangan dan Pembumian Penangkal Petir diperkirakan dapat diselesaikan
dalam waktu 2 hari ( taksir )
6.0000 Orang Pekerja Rp. 75,000.00
Rp.
1.0000 Orang Mandor Rp. 120,000.00
Rp.
1.0000 Orang Tukang Rp. 100,000.00
Rp.
2.0000 Orang Kepala Tukang Rp. 120,000.00
Rp.
Rp.
Upah 2 Hari x Rp. 910,000.00 Rp.
Bahan dan Peralatan Rp. 6,000,000.00 Rp.
Jumlah Rp.

Supleme F : 1 Unit Pengadaan/Pemasangan Radar Replektor, dapat diselesaikan 2 hari


8.0000 Orang Pekerja Rp. 75,000.00 Rp.
1.0000 Orang Mandor Rp. 120,000.00 Rp.
4.0000 Orang Tukang Rp. 100,000.00 Rp.
1.0000 Orang Kepala Tukang Rp. 120,000.00 Rp.
Rp.
Upah 2 Hari x Rp. 1,240,000.00 Rp.
0.5000 Unit Bahan dan Peralatan Rp. 5,000,000.00 Rp.
Jumlah Rp.
akan dapat diselesaikan dalam

1,125,000.00
120,000.00
800,000.00
240,000.00
2,285,000.00
45,700,000.00
10,000,000.00
55,700,000.00

Suar / Menara Suar


855,000.00
140,000.00
125,000.00
291,500.00
26,500.00
21,200.00
675,000.00
120,000.00
200,000.00
400,000.00
240,000.00
3,094,200.00

381,600.00
31,800.00
300,000.00
6,000.00
50,000.00
60,000.00
829,400.00
16,588,000.00

356,250.00
56,000.00
50,000.00
145,750.00
26,500.00
21,200.00
150,000.00
60,000.00
50,000.00
200,000.00
60,000.00
1,175,700.00

etir diperkirakan dapat diselesaikan

450,000.00
120,000.00
100,000.00
240,000.00
910,000.00
1,820,000.00
6,000,000.00
7,820,000.00

600,000.00
120,000.00
400,000.00
120,000.00
1,240,000.00
2,480,000.00
5,000,000.00
7,480,000.00
Analisa Harga Satuan Bahan

Jenis : Semen PC
Harga : Rp 89,000.00
No URAIAN SATUAN VOL HARGA SATUAN JUMLAH
( Rp ) ( Rp )
BAHAN
- Semen P.C di Simeulue Zak 1.00 Rp 77,000.00 Rp 77,000.00
UPAH dan TRANSPORT
- upah muat dari truck ke boat Zak 1.00 Rp 2,500.00 Rp 2,500.00
- Pengangkutan dengan boat Zak 1.00 Rp 5,000.00 Rp 5,000.00
- upah bongkar dari boat ke dermaga Zak 1.00 Rp 2,500.00 Rp 2,500.00
- upah angkut ke lokasi Zak 1.00 Rp 2,000.00 Rp 2,000.00

Jumlah Rp 89,000.00

Jenis Batu Gunung


Harga : Rp 355,000.00
No URAIAN SATUAN VOL HARGA SATUAN JUMLAH
( Rp ) ( Rp )
BAHAN
- Batu Gunung di Simeulue m3 1.00 Rp 220,000.00 Rp 220,000.00
UPAH dan TRANSPORT
- upah muat dari truck ke boat m3 1.00 Rp 25,000.00 Rp 25,000.00
- Pengangkutan dengan boat m3 1.00 Rp 25,000.00 Rp 25,000.00
- upah bongkar dari boat ke dermaga m3 1.00 Rp 25,000.00 Rp 25,000.00
- upah angkut ke lokasi m3 1.00 Rp 60,000.00 Rp 60,000.00

Jumlah Rp 355,000.00

Jenis : Pasir Beton


Harga : Rp 999,500.00
No URAIAN SATUAN VOL HARGA SATUAN JUMLAH
( Rp ) ( Rp )
BAHAN
- Pasir beton di Simeulue m3 1.00 Rp 190,000.00 Rp 190,000.00
UPAH dan TRANSPORT
- biaya karung dan pengisian Karung 70.00 Rp 5,000.00 Rp 350,000.00
- upah muat dari truck ke boat Karung 70.00 Rp 2,500.00 Rp 175,000.00
- Pengangkutan dengan boat Karung 70.00 Rp 4,000.00 Rp 280,000.00
- upah bongkar dari boat ke dermaga m3 1.00 Rp 2,500.00 Rp 2,500.00
- upah angkut ke lokasi m3 1.00 Rp 2,000.00 Rp 2,000.00

Jumlah Rp 999,500.00
Ket :
- diangkut dalam karung
- 1 m3 = 70 karung

Jenis : Pasir Pasang


,Material
Harga : Rp 999,500.00
Satuan/m3

No URAIAN SATUAN VOL HARGA SATUAN JUMLAH


( Rp ) ( Rp )
BAHAN
- Pasir pasang di Simeulue m3 1.00 Rp 190,000.00 Rp 190,000.00
UPAH dan TRANSPORT
- biaya karung dan pengisian Karung 70.00 Rp 5,000.00 Rp 350,000.00
- upah muat dari truck ke boat Karung 70.00 Rp 2,500.00 Rp 175,000.00
- Pengangkutan dengan boat Karung 70.00 Rp 4,000.00 Rp 280,000.00
- upah bongkar dari boat ke dermaga m3 1.00 Rp 2,500.00 Rp 2,500.00
- upah angkut ke lokasi m3 1.00 Rp 2,000.00 Rp 2,000.00

Jumlah Rp 999,500.00

Ket :
- diangkut dalam karung
- 1 m3 = 70 karung

Jenis : Pasir Urug


Harga : Rp 959,500.00
Satuan/m3
No URAIAN SATUAN VOL HARGA SATUAN JUMLAH
( Rp ) ( Rp )
BAHAN
- Pasir urug di Simeulue m3 1.00 Rp 150,000.00 Rp 150,000.00
UPAH dan TRANSPORT
- biaya karung dan pengisian Karung 70.00 Rp 5,000.00 Rp 350,000.00
- upah muat dari truck ke boat Karung 70.00 Rp 2,500.00 Rp 175,000.00
- Pengangkutan dengan boat Karung 70.00 Rp 4,000.00 Rp 280,000.00
- upah bongkar dari boat ke dermaga m3 1.00 Rp 2,500.00 Rp 2,500.00
- upah angkut ke lokasi m3 1.00 Rp 2,000.00 Rp 2,000.00

Jumlah Rp 959,500.00

Ket :
- diangkut dalam karung
- 1 m3 = 70 karung
Jenis : Besi Beton Polos
Harga : Rp 27,500.00
Satuan/m3

No URAIAN SATUAN VOL HARGA SATUAN JUMLAH


( Rp ) ( Rp )
BAHAN
- Besi beton di Simeulue Kg 1.00 Rp 22,000.00 Rp 22,000.00
UPAH dan TRANSPORT
- upah muat dari truck ke boat Kg 1.00 Rp 1,000.00 Rp 1,000.00
- Pengangkutan dengan boat Kg 1.00 Rp 2,500.00 Rp 2,500.00
- upah bongkar dari boat ke dermaga Kg 1.00 Rp 1,000.00 Rp 1,000.00
- upah angkut ke lokasi Kg 1.00 Rp 1,000.00 Rp 1,000.00

Jumlah Rp 27,500.00

Jenis : Besi Beton Ulir


Harga : Rp 38,500.00
Satuan/m3

No URAIAN SATUAN VOL HARGA SATUAN JUMLAH


( Rp ) ( Rp )
BAHAN
- Besi beton di Simeulue Kg 1.00 Rp 33,000.00 Rp 33,000.00
UPAH dan TRANSPORT
- upah muat dari truck ke boat Kg 1.00 Rp 1,000.00 Rp 1,000.00
- Pengangkutan dengan boat Kg 1.00 Rp 2,500.00 Rp 2,500.00
- upah bongkar dari boat ke dermaga Kg 1.00 Rp 1,000.00 Rp 1,000.00
- upah angkut ke lokasi Kg 1.00 Rp 1,000.00 Rp 1,000.00

Jumlah Rp 38,500.00

Jenis : Batu Bata


Harga : Rp 1,250.00
Satuan/buah

No URAIAN SATUAN VOL HARGA SATUAN JUMLAH


( Rp ) ( Rp )
BAHAN
- Batu Bata di Simeulue Buah 1.00 Rp 700.00 Rp 700.00
UPAH dan TRANSPORT
- biaya karung dan pengisian Karung 0.05 Rp 5,000.00 Rp 250.00
- upah muat dari truck ke boat Buah 1.00 Rp 50.00 Rp 50.00
- Pengangkutan dengan boat Buah 1.00 Rp 100.00 Rp 100.00
- upah bongkar dari boat ke dermaga Buah 1.00 Rp 50.00 Rp 50.00
- upah angkut ke lokasi Buah 1.00 Rp 100.00 Rp 100.00

Jumlah Rp 1,250.00

Ket :
- diangkut dalam karung
- 1 Karung = 20 Buah Batu Bata
DAFTAR HARGA
TAHUN ANGGARAN 2017

HARGA
NO. URAIAN UPAH SATUAN SATUAN KETERANGAN
( Rp. )

1 Pekerja Hari 75,000.00


2 Tukang Batu/Besi Hari 100,000.00
3 . Kepala Tukang Batu/Besi Hari 120,000.00
4 Tukang Kayu/Cat Hari 100,000.00
5 Kepala Tukang Kayu/Cat Hari 120,000.00
6 . Mandor Hari 120,000.00
7 . Tukang Las Hari 100,000.00

HARGA
NO. U R A I A N SATUAN SATUAN KETERANGAN
( Rp. )

A. BAHAN
1 Aceteline Botol 500,000.00
2 Air Ltr 50.00
3. Batu Bata Buah 850.00
4. Batu Kali/Batu Belah (Sungai/Gunung) 15/20 cm M3 170,000.00
5 Batu Pecah 2/3 M3 190,000.00
6 Besi Beton Polos Kg 14,250.00
7 Besi Beton Ulir Kg 23,000.00
8 Cat Anti Fauling sekualitas Nippon Kg 127,200.00
9 Cat Dasar Kg 42,000.00
10 Cat Dinding Sekualitas Nippon Kg 45,000.00
11 Dolken Kayu 5 x 10 x 400 Cm Btg 21,800.00
12 Ensel Cabut Stel 26,500.00
13 Gembok Buah 21,200.00
14 Grandel Stel 39,220.00
15 Kayu Balok Klas II M3 4,618,000.00
16 Kayu Kasau 5/7 untuk Bouwplank Kayu Klas III M3 3,088,000.00
17 Kawat Beton Kg 20,000.00
18 Kawat Las Kg 28,000.00
19 Minyak Bekisting Liter 10,600.00
20 Oxigen Botol 583,000.00
21 Paku Kayu Kg 20,744.00
22 Papan Bekisting M3 5,088,000.00
23 Pasir Beton M3 190,000.00
24 Pasir Pasang M3 190,000.00
25 Pasir Urug M3 190,000.00
26 Plamir Kg 15,900.00
27 Semen Andalas @ 40 Kg zak 58,000.00
28 Semen Andalas @ 40 Kg Kg 1,450.00
29 Triplek 9 mm Lbr 222,600.00
30 Tanah Urug M3 81,620.00
31 Thiner / Minyak cat Ltr 31,800.00
HARGA
NO. U R A I A N SATUAN SATUAN KETERANGAN
( Rp. )

Banda Aceh, 10 April 2017


CV. EGROUP KARYA

M.HERKA
DIREKTUR
JADWAL PELAKSANAAN
PEKERJAAN : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
LOKASI : PROVINSI ACEH
TAHUN ANGGARAN : 2017

Bobot MASA PELAKSANAAN


JUMLAH
NO. URAIAN Rencana BULAN KE-1 BULAN KE-2 BULAN KE-3 BULAN KE-4 KET
HARGA (Rp)
(%) 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

I PEKERJAAN PERSIAPAN
1 Survei Awal dan Penentuan Posisi 7,000,000 0.74% 0.007
2 Pembersihan Lokasi 2,250,000 0.24% 0.002
3 Biaya Mobilisasi dan demobilisasi 42,700,000 4.51% 0.011 0.011 0.011 0.011
4 Pemasangan Bowplank 900,000 0.10% 0.001
5 Pengukuran 2,500,000 0.26% 0.003
6 Bangunan Direksi Keet dan Barak Kerja 6,720,000 0.71% 0.007
7 Air bersih 12,000,000 1.27% 0.003 0.003 0.003 0.003
8 Obat- obatan/ P3K 6,000,000 0.63% 0.002 0.002 0.002 0.002
9 Papan Nama Proyek 1,000,000 0.11% 0.001
10 Dokumentasi/Administrasi/As Built Drawing 4,820,000 0.51% 0.003 0.003

II PEKERJAAN TANAH
1 Galian Tanah Pondasi 10,833,312 1.14% 0.006 0.006
2 Pasangan Batu Kosong (Aanstamping) 4,123,244 0.44% 0.004
3 Urugan Pasir Bawah Pondasi 2,235,811 0.24% 0.002
4 Timbunan Kembali Tanah Bekas Galian 5,741,652 0.61% 0.006

III PEKERJAAN BETON BERTULANG


Beton Bertulang K250
1 Pondasi Tapak 98,395,321 10.39% 0.035 0.035 0.035
2 Sloof 40/40 13,678,079 1.44% 0.014
3 Plat Lantai 15 cm 20,761,029 2.19% 0.022

IV PEKERJAAN KONSTRUKSI MENARA


1 Pengadaan Pabrikasi Kerangka Menara Besi Baja Galvanis 371,250,000 39.20% 0.065 0.065 0.065 0.065 0.065 0.065
2 Pengadaan Baut dan Ring Galvanis 16,000,000 1.69% 0.003 0.003 0.003 0.003 0.003 0.003
3 Pemasangan/Perakitan Menara 55,700,000 5.88% 0.020 0.020 0.020
4 Pembuatan Pintu Pengaman Lampu Suar 3,094,200 0.33% 0.003
5 Cat Menara dengan Cat Marine Paint Putih 3x 16,588,000 1.75% 0.009 0.009
6 Perancah dan Alat Bantu 10,000,000 1.06% 0.004 0.004 0.004

V PEKERJAAN PENGADAAN PERALATAN SBN DAN LAIN-LAIN


1 Pengadaan/Pemasangan Sistem Lampu Suar Jarak Tampak 12 NM 90,000,000 9.50% 0.048 0.048
2 Pengadaan dan Pemasangan Solar Cell 12V - 50W lengkap Instaasi 21,000,000 2.22% 0.011 0.011
Bobot MASA PELAKSANAAN
JUMLAH
NO. URAIAN Rencana BULAN KE-1 BULAN KE-2 BULAN KE-3 BULAN KE-4 KET
HARGA (Rp)
(%) 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
Dudukan dan Instalasi ke Lampu Suar
3 Pengadaan Battery Maintenance Free 12 - 105AH 15,000,000 1.58% 0.008 0.008
4 Pembuatan Box Battery 1,175,700 0.12% 0.001
5 Pengadaan dan Pemasangan Sistem Penangkal Petir 7,820,000 0.83% 0.004 0.004
6 Pengadaan dan Pemasangan Radar Reflektor 7,480,000 0.79% 0.004 0.004

VI PEKERJAAN PEMAGARAN LOKASI MENARA DENGAN PAGAR BRC 10 X 10 M


1 PEKERJAAN TANAH
a Galian Tanah Pondasi 1,405,488 0.15% 0.001
b Timbunan Kembali Tanah Bekas Galian 578,306 0.06% 0.001
c Urugan Pasir Bawah Pondasi 686,713 0.07% 0.001
d Pasangan Pondasi Batu Gunung 11,175,707 1.18% 0.012
e Pasangan Batu Kosong (Aanstamping) 1,064,470 0.11% 0.001
2 PEKERJAAN BETON BERTULANG
a Kolom 20/20 6,762,234 0.71% 0.007
b Sloof 20/20 8,964,930 0.95% 0.009
c Ring Balk 5/20 2,955,936 0.31% 0.003
3 PEKERJAAN PASANGAN
a Pasangan Bata 1:2 2,905,224 0.31% 0.003
b Plesteran 1:2 3,852,966 0.41% 0.004
4 Tiang Pagar BRC T = 1,7 m + Asesoris kualitas No.1 18,000,000 1.90% 0.019
5 Pagar BRC T = 1,2 m + Asesoris kualitas No.1 19,500,000 2.06% 0.021
6 Pengecatan Dinding/Tembok Pagar 1,701,181 0.18% 0.002
7 Pembuatan Pintu Pagar dari Besi Plat lengkap Kunci dan Gembok 8,000,000 0.84% 0.008
8 Relief Kolom 2,800,000 0.30% 0.003
JUMLAH 947,119,506 100.00%
0.010 0.052 0.108 0.110 0.150 0.116 0.089 0.185 0.028 0.023 0.023 0.021 0.063 0.009 0.014 -

0.010 0.062 0.170 0.280 0.430 0.546 0.635 0.819 0.847 0.870 0.894 0.914 0.977 0.986 1.000 1.000

Banda Aceh, 10 April 2017


CV. EGROUP KARYA

M.HERKA
DIREKTUR
ANALISA TEKNIS

PEKERJAAN : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH


LOKASI : PROVINSI ACEH
TAHUN ANGGARAN : 2017

ANALISA TEKNIS
NO. URAIAN VOLUME SAT Bahan Tenaga Kerja Produktivitas Masa Pelaksanaan
Ket
Bahan Vol Sat Jenis Jumlah Koef. Prod. Hari mgg

I PEKERJAAN PERSIAPAN
1 Survei Awal dan Penentuan Posisi 1.00 Ls 1
2 Pembersihan Lokasi 225.00 M2 1
3 Biaya Mobilisasi dan demobilisasi 1.00 Paket 4
4 Pemasangan Bowplank 60.00 m' 1
5 Pengukuran 1.00 Paket 1
6 Bangunan Direksi Keet dan Barak Kerja 1.00 Paket 1
7 Air bersih 4.00 Bln 4
8 Obat- obatan/ P3K 4.00 Bln P3K 4
9 Papan Nama Proyek 1.00 Paket Papan Nama Proyek 1
10 Dokumentasi/Administrasi/As Built Drawing 1.00 Paket 2

II PEKERJAAN TANAH
1 Galian Tanah Pondasi 137.20 M3 Pekerja 10 0.9 11.11 12.35 2
Mandor 1 0.025

2 Pasangan Batu Kosong (Aanstamping) 9.80 M3 Batu Belah/ Kali 11.76 M3 Pekerja 1 0.78
Pasir Urug 4.2336 M3 Tukang 1 0.39 2.56 3.82 1
Kepala Tukang 1 0.039
Mandor 1 0.039

3 Urugan Pasir Bawah Pondasi 9.80 M3 Pasir Urug 11.76 M3 Pekerja Galian Tanah 1 0.3 3.33 2.94 1
Mandor 1 0.01

4 Timbunan Kembali Tanah Bekas Galian 117.85 M3 Pekerja Galian Tanah 10 0.5 20.00 5.89 1
Mandor 1 0.05

III PEKERJAAN BETON BERTULANG


Beton Bertulang K250
1 Pondasi Tapak 19.35 M3
- Beton K.250 19.35 M Semen Portland 7430.4 Kg Pekerja 1 1.650
Pasir Beton 13390.2 Kg Tukang 1 0.275 3.64 5.32 1
Batu Pecah 20104.65 Kg Kepala Tukang 1 0.028
Air 4160.25 Liter Mandor 1 0.083

- Pembesian 2,902.50 Kg Besi Beton Polos 30476.25 Kg Pekerja 5 0.070


Kawat Beton 435.375 Kg Tukang 12 0.070 171.43 16.93 3
Kepala Tukang 1 0.007
ANALISA TEKNIS
NO. URAIAN VOLUME SAT Bahan Tenaga Kerja Produktivitas Masa Pelaksanaan
Ket
Bahan Vol Sat Jenis Jumlah Koef. Prod. Hari mgg
Mandor 1 0.040

- Bekesting 96.75 M2 Kayu Kelas III 3.87 M3 Pekerja 4 0.520


Paku 5 cm - 10 cm 29.025 Kg Tukang 2 0.260 7.69 12.58 3
Minyak Bekisting 9.675 Liter Kepala Tukang 1 0.026
Mandor 1 0.026

2 Sloof 40/40 2.80 M3


Beton K.250 2.80 M Semen Portland 1075.2 Kg Pekerja 1 1.65
Pasir Beton 1937.6 Kg Tukang 1 0.275 3.64 0.77 1
Batu Pecah 2909.2 Kg Kepala Tukang 1 0.028
Air 602 Liter Mandor 1 0.083

Pembesian 378.00 Kg Besi Beton Polos 3969 Kg Pekerja 2 0.07


Kawat Beton 56.7 Kg Tukang 2 0.07 28.57 13.23 3
Kepala Tukang 1 0.007
Mandor 1 0.04

Bekesting 14.00 M2 Kayu Kelas III 0.630 M3 Pekerja 1 0.52


Paku 5 cm - 10 cm 4.200 Kg Tukang 1 0.26 3.85 3.64 1
Minyak Bekisting 1.400 Liter Kepala Tukang 1 0.026
- Mandor 1 0.026

3 Plat Lantai 15 cm 2.87 M3


Beton K.250 2.87 M Semen Portland 1102.08 Kg Pekerja 1 1.65
Pasir Beton 1986.04 Kg Tukang 1 0.275 3.64 0.79 1
Batu Pecah 2981.93 Kg Kepala Tukang 1 0.028
Air 617.05 Liter Mandor 1 0.083

Pembesian 416.15 Kg Besi Beton Polos 4369.575 Kg Pekerja 1 0.07


Kawat Beton 62.4225 Kg Tukang 1 0.07 14.29 29.13 5
Kepala Tukang 1 0.007
Mandor 1 0.04

Bekesting 17.22 M2 Kayu Kelas III 0.689 M3 Pekerja 1 0.66


Paku 5 cm - 10 cm 6.888 Kg Tukang 1 0.33 3.03 5.68 1
Minyak Bekisting 3.444 Liter Kepala Tukang 1 0.033
Balok Kayu Kelas II 0.258 M3 Mandor 1 0.033
Plywood tebal 9 mm 6.027 Lbr
Kayu dolken 103.320 Batang

IV PEKERJAAN KONSTRUKSI MENARA


1 Pengadaan Pabrikasi Kerangka Menara Besi Baja Galvanis 8,250.00 Kg Kerangka Menara Besi 5
8,250.00 Kg
Baja Galvanis

2 Pengadaan Baut dan Ring Galvanis 1,600.00 Bh 5


Baut dan Ring Galvanis 1,600.00 Bh
ANALISA TEKNIS
NO. URAIAN VOLUME SAT Bahan Tenaga Kerja Produktivitas Masa Pelaksanaan
Ket
Bahan Vol Sat Jenis Jumlah Koef. Prod. Hari mgg
ANALISA TEKNIS
NO. URAIAN VOLUME SAT Bahan Tenaga Kerja Produktivitas Masa Pelaksanaan
Ket
Bahan Vol Sat Jenis Jumlah Koef. Prod. Hari mgg
3 Pemasangan/Perakitan Menara 1.00 Unit Pekerja 15 20.00 3
Mandor 1
Tukang 8
Kepala Tukang 2

4 Pembuatan Pintu Pengaman Lampu Suar 1.00 Unit Besi beton 60.00 Kg Pekerja 9
Kawat Las 5.00 Kg Mandor 1 1
Aceteline 0.25 Botol Tukang Besi 2
Oxigen 0.50 Botol Tukang Las 4
Engsel Cabut 1.00 Stel Kepala Tukang 2
Gembok 1.00 Buah
Pekerja 9.00 Orang
Mandor 1.00 Orang

5 Cat Menara dengan Cat Marine Paint Putih 3x 1.00 Unit Cat Marine Paint 60 Kg Pekerja 8 2
Thiner 20 Liter Mandor 1
Tukang 1
Kepala Tukang 1

6 Perancah dan Alat Bantu 1.00 Unit Perancah 1 Set 1

V PEKERJAAN PENGADAAN PERALATAN SBN DAN LAIN-LAIN


1 Pengadaan/Pemasangan Sistem Lampu Suar Jarak Tampak 12 NM 1.00 Unit Lampu Suar 1 Unit 2
2 Pengadaan dan Pemasangan Solar Cell 12V - 50W lengkap Instaasi 3.00 Unit Solar Cell 12V - 50W 3 Unit 2
Dudukan dan Instalasi ke Lampu Suar
3 Pengadaan Battery Maintenance Free 12 - 105AH 3.00 Bh Battery Maintenance 3 Unit 2
4 Pembuatan Box Battery 1.00 Unit Box Battery 1 Unit 2
5 Pengadaan dan Pemasangan Sistem Penangkal Petir 1.00 Unit Penangkal Petir 1 Unit 2
6 Pengadaan dan Pemasangan Radar Reflektor 1.00 Unit Radar Reflektor 1 Unit 2

VI PEKERJAAN PEMAGARAN LOKASI MENARA DENGAN PAGAR BRC 10 X 10 M


1 PEKERJAAN TANAH
a Galian Tanah Pondasi 17.80 M3 Pekerja 3 0.900 3.33 5.34 1
Mandor 1 0.025

b Timbunan Kembali Tanah Bekas Galian 11.87 M3 Pekerja Galian Tanah 1 0.500 2.00 5.94 1
Mandor 1 0.050

c Urugan Pasir Bawah Pondasi 3.01 M3 Pasir Urug 1.200 M3 Pekerja Galian Tanah 1 0.30 3.33 0.90 1
Mandor 1 0.01

d Pasangan Pondasi Batu Gunung 13.40 M3 Batu Belah / Kali 16.080 M3 Pekerja 4 1.500
Semen Portland 2,184.200 Kg Tukang 2 0.750 2.67 5.03 1
Pasir Pasang 6.968 M3 Kepala Tukang 1 0.075
Mandor 1 0.075
ANALISA TEKNIS
NO. URAIAN VOLUME SAT Bahan Tenaga Kerja Produktivitas Masa Pelaksanaan
Ket
Bahan Vol Sat Jenis Jumlah Koef. Prod. Hari mgg
e Pasangan Batu Kosong (Aanstamping) 2.53 M3 Batu Belah/ Kali 3.036 M3 Pekerja 2 0.780
Pasir Urug 1.093 M3 Tukang 1 0.390 2.56 0.99 1
Kepala Tukang 1 0.039
Mandor 1 0.039

2 PEKERJAAN BETON BERTULANG


a Kolom 20/20 1.31 M3
- Beton K.250 1.31 M Semen Portland 503 Kg Pekerja 1.000 1.650
Pasir Beton 907 Kg Tukang 1.000 0.275 3.64 0.36 1
Batu Pecah 1,361 Kg Kepala Tukang 1.000 0.028
Air 282 Liter Mandor 1.000 0.083

- Pembesian 130.00 Kg Besi Beton Polos 1365 Kg Pekerja 2.000 0.07


Kawat Beton 19.5 Kg Tukang 2.000 0.07 28.57 4.55 1
Kepala Tukang 1.000 0.007
Mandor 1.000 0.04

- Bekesting 6.00 M2 Kayu Kelas III 0.045 M3 Pekerja 1.000 0.660


Paku 5 cm - 10 cm 0.3 Kg Tukang 1.000 0.330 3.03 1.98 1
Minyak Bekisting 0.1 Liter Kepala Tukang 1.000 0.033
Mandor 1.000 0.033
b Sloof 20/20 1.80 M3
- Beton K.250 1.80 M Semen Portland 691.2 Kg Pekerja 1.000 1.650
Pasir Beton 1245.6 Kg Tukang 1.000 0.275 3.64 0.50 1
Batu Pecah 1870.2 Kg Kepala Tukang 1.000 0.028
Air 387 Liter Mandor 1.000 0.083

- Pembesian 140.00 Kg Besi Beton Polos 1470 Kg Pekerja 2.000 0.07


Kawat Beton 21 Kg Tukang 2.000 0.07 28.57 4.90 1
Kepala Tukang 1.000 0.007
Mandor 1.000 0.04

- Bekesting 5.00 M2 Kayu Kelas III 0.225 M3 Pekerja 1.000 0.520


Paku 5 cm - 10 cm 1.500 Kg Tukang 1.000 0.260 3.85 1.30 1
Minyak Bekisting 0.500 Liter Kepala Tukang 1.000 0.026
Mandor 1.000 0.026

c Ring Balk 5/20 0.52 M3


- Beton K.250 0.52 M Semen Portland 199.68 Kg Pekerja 1.000 1.650
Pasir Beton 359.84 Kg Tukang 1.000 0.275 3.64 0.14 1
Batu Pecah 540.28 Kg Kepala Tukang 1.000 0.028
Air 111.8 Liter Mandor 1.000 0.083

- Pembesian 72.80 Kg Besi Beton Polos 764.4 Kg Pekerja 1.000 0.070


Kawat Beton 10.92 Kg Tukang 1.000 0.070 14.29 5.10 1
Kepala Tukang 1.000 0.007
Mandor 1.000 0.040
ANALISA TEKNIS
NO. URAIAN VOLUME SAT Bahan Tenaga Kerja Produktivitas Masa Pelaksanaan
Ket
Bahan Vol Sat Jenis Jumlah Koef. Prod. Hari mgg

- Bekesting 2.08 M2 Kayu Kelas III 0.083 M3 Pekerja 1.000 0.660


Paku 5 cm - 10 cm 0.832 Kg Tukang 1.000 0.330 3.03 0.69 1
Minyak Bekisting 0.416 Liter Kepala Tukang 1.000 0.033
Balok Kayu Kelas II 0.037 M3 Mandor 1.000 0.033
Plywood tebal 9 mm 0.728 Lbr
Kayu dolken dia. 8-10 cm, 4.160 Batang

3 PEKERJAAN PASANGAN
a Pasangan Bata 1:2 20.00 M2 Batu Bata 1400.000 Bh Pekerja 1.00 0.300
Semen Portland 379.000 Kg Tukang 1.00 0.100 10.00 2.00 1
Pasir Pasang 0.760 M3 Kepala Tukang 1.00 0.010
Mandor 1.00 0.015

b Plesteran 1:2 57.60 M2 Semen Portland 588.902 Kg Pekerja 1.00 0.300


Pasir Pasang 1.152 M3 Tukang 1.00 0.150 6.67 8.64 2
Kepala Tukang 1.00 0.015
Mandor 1.00 0.015

4 Tiang Pagar BRC T = 1,7 m + Asesoris kualitas No.1 30.00 Btg Tiang Pagar BRC 30.00 Btg Pekerja 1.00 1
Tukang 1.00
Mandor 1.00

5 Pagar BRC T = 1,2 m + Asesoris kualitas No.1 15.00 Unit Pagar BRC 15.00 Unit Pekerja 1.00 1
Tukang 1.00
Mandor 1.00

6 Pengecatan Dinding/Tembok Pagar 57.60 M2 Plamir 5.760 Kg Pekerja 1.00 0.020


Cat dasar tembok 5.760 Kg Tukang 1.00 0.063 15.87 3.63 1
Cat tembok / penutup 2x 14.976 Kg Kepala Tukang 1.00 0.006
Mandor 1.00 0.003

7 Pembuatan Pintu Pagar dari Besi Plat lengkap Kunci dan Gembok 1.00 Unit Pintu Pagar dari Besi Plat 1 Unit Pekerja 1.00 1
Tukang 1.00
Mandor 1.00

8 Relief Kolom 16.00 Unit Semen PC Kg Pekerja 1.00 1


Pasir Pasang M3 Tukang 1.00
Air ltr Mandor 1.00

Banda Aceh, 10 April 2017


CV. EGROUP KARYA

M.HERKA
ANALISA TEKNIS
NO. URAIAN VOLUME SAT Bahan Tenaga Kerja Produktivitas Masa Pelaksanaan
Ket
Bahan Vol Sat Jenis Jumlah Koef. Prod. Hari mgg
DIREKTUR
JADWAL PENGIRIMAN BARANG
PEKERJAAN : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
LOKASI : PROVINSI ACEH
TAHUN ANGGARAN : 2017

JADWAL PENGIRIMAN
NO. URAIAN BAHAN/BARANG VOLUME SAT BULAN KE-1 BULAN KE-2 BULAN KE-3 BULAN KE-4 KET
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

1 Kerangka Menara Besi Baja Galvanis 8,250.00 Kg


2 Baut dan Ring Galvanis 1,600.00 Bh Pengiriman diseseuaikan dengan kerangka menara
1 Lampu Suar Jarak Tampak 12 NM 1.00 Unit Pengiriman diseseuaikan dengan kerangka menara
2 Solar Cell 12V - 50W 3.00 Unit Pengiriman diseseuaikan dengan kerangka menara
3 Battery Maintenance Free 12 - 105AH 3.00 Bh Pengiriman diseseuaikan dengan kerangka menara
5 Penangkal Petir 1.00 Unit Pengiriman diseseuaikan dengan kerangka menara
6 Radar Reflektor 1.00 Unit Pengiriman diseseuaikan dengan kerangka menara

KET.
Pemesanan Banda Aceh, 10 April 2017
Pabrikasi/ proses orderan di workshop CV. EGROUP KARYA
Pengiriman ke lokasi
Pemasangan di lokasi

M.HERKA
DIREKTUR
SPESIFIKASI TEKNIS
PEKERJAAN : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
LOKASI : PROVINSI ACEH

NO. URAIAN BAHAN/BARANG VOLUME SAT MEREK SPESIFIKASI KET


1 Kerangka Menara Besi Baja Galvanis 8,250.00 Kg - Jenis besi : besi galvanize
2 Baut dan Ring Galvanis 1,600.00 Bh - Jenis besi : besi galvanize
Standar : SNI 07 1353 1989 ICS
3 Lampu Suar Jarak Tampak 12 NM 1.00 Unit SEALITE - Type : SL-C600 Spesifikasi lengkap lampu suar bisa dilihat
- Light Source : SL- 125-4 (144 LED latern as pad brosur lampu suar
- Bahan rangka lampu standartd)
: polyethylene
- Bahan body lampu : Polycarbonate
- baterai : 100 Ah
4 Solar Cell 12V - 50W 3.00 Unit Sundaya Max Power : 50 W
Power Voltage (Vmp) : 17.5V
Weight : 4,8Kg
Number cell : 36
5 Battery Maintenance Free 12 - 105AH 3.00 Bh Cycling capacity 20 hour rate
reserve capacity 175 minute
Height (w/terminal) 236 mm
Height (case only) 211 mm
Lenght 307 mm
width 169 mm
Weight 30.2 kg
6 Penangkal Petir 1.00 Unit Standar
7 Radar Reflektor 1.00 Unit Standar

Banda Aceh, 10 April 2017


CV. EGROUP KARYA

M.HERKA
DIREKTUR
PROGRES MINGGUAN
PERIODE TANGGAL : 18 MEI S/D 24 MEI 2017

KEGIATAN : PEMBANGUNAN SARANA PERHUBUNGAN LAUT


MINGGU I
NAMA PAKET : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
NOMOR KONTRAK : 02/KPA.09/PEL/2017
TANGGAL KONTRAK : 18 Mei 2017
NILAI KONTRAK : Rp 1.041.830.000,00
SUMBER DANA : APBA
TAHUN ANGGARAN : 2017
LOKASI : PELABUHAN LABUHAN HAJI ACEH SELATAN

KONTRAK REALISASI
NO. URAIAN PEKERJAAN JUMLAH HARGA BOBOT S/D MINGGU LALU MINGGU INI S/D MINGGU INI %
SATUAN VOLUME HARGA SATUAN (Rp) (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT

I PEKERJAAN PERSIAPAN
1 Survei Awal dan Penentuan Posisi Ls 1.00 7,000,000.00 7,000,000.00 0.739%
2 Pembersihan Lokasi M2 225.00 10,000.00 2,250,000.00 0.238%
3 Biaya Mobilisasi dan demobilisasi Paket 1.00 42,700,000.00 42,700,000.00 4.508%
4 Pemasangan Bowplank m' 60.00 15,000.00 900,000.00 0.095%
5 Pengukuran Paket 1.00 2,500,000.00 2,500,000.00 0.264%
6 Bangunan Direksi Keet dan Barak Kerja Paket 1.00 6,720,000.00 6,720,000.00 0.710%
7 Air bersih Bln 4.00 3,000,000.00 12,000,000.00 1.267%
8 Obat- obatan/ P3K Bln 4.00 1,500,000.00 6,000,000.00 0.633%
9 Papan Nama Proyek Paket 1.00 1,000,000.00 1,000,000.00 0.106%
10 Dokumentasi/Administrasi/As Built Drawing Paket 1.00 4,820,000.00 4,820,000.00 0.509%
Jumlah I 85,890,000 9.069%
II PEKERJAAN TANAH
1 Galian Tanah Pondasi M3 137.20 78,960.00 10,833,312.00 1.144%
2 Pasangan Batu Kosong (Aanstamping) M3 9.80 420,739.20 4,123,244.16 0.435%
3 Urugan Pasir Bawah Pondasi M3 9.80 228,144.00 2,235,811.20 0.236%
4 Timbunan Kembali Tanah Bekas Galian M3 117.85 48,720.00 5,741,652.00 0.606%
Jumlah II 22,934,019 2.421%
III PEKERJAAN BETON BERTULANG
Beton Bertulang K250
1 Pondasi Tapak M3 19.35 5,085,029.51 98,395,320.93 10.389%
2 Sloof 40/40 M3 2.80 4,885,028.31 13,678,079.25 1.444%
3 Plat Lantai 15 cm M3 2.87 7,233,807.86 20,761,028.55 2.192%
Jumlah III 132,834,429 14.025%
IV PEKERJAAN KONSTRUKSI MENARA
1 Pengadaan Pabrikasi Kerangka Menara Besi Baja Galvanis Kg 8,250.00 45,000.00 371,250,000.00 39.198%
2 Pengadaan Baut dan Ring Galvanis Bh 1,600.00 10,000.00 16,000,000.00 1.689%
3 Pemasangan/Perakitan Menara Unit 1.00 55,700,000.00 55,700,000.00 5.881%
4 Pembuatan Pintu Pengaman Lampu Suar Unit 1.00 3,094,200.00 3,094,200.00 0.327%
5 Cat Menara dengan Cat Marine Paint Putih 3x Unit 1.00 16,588,000.00 16,588,000.00 1.751%
6 Perancah dan Alat Bantu Unit 1.00 10,000,000.00 10,000,000.00 1.056%
Jumlah IV 472,632,200 49.902%
V PEKERJAAN PENGADAAN PERALATAN SBN DAN LAIN-LAIN
1 Pengadaan/Pemasangan Sistem Lampu Suar Jarak Tampak 12 NM Unit 1.00 90,000,000.00 90,000,000.00 9.502%
2 Pengadaan dan Pemasangan Solar Cell 12V - 50W lengkap Instaasi Unit 3.00 7,000,000.00 21,000,000.00 2.217%
Dudukan dan Instalasi ke Lampu Suar -
3 Pengadaan Battery Maintenance Free 12 - 105AH Bh 3.00 5,000,000.00 15,000,000.00 1.584%
4 Pembuatan Box Battery Unit 1.00 1,175,700.00 1,175,700.00 0.124%
5 Pengadaan dan Pemasangan Sistem Penangkal Petir Unit 1.00 7,820,000.00 7,820,000.00 0.826%
6 Pengadaan dan Pemasangan Radar Reflektor Unit 1.00 7,480,000.00 7,480,000.00 0.790%
PROGRES MINGGUAN
PERIODE TANGGAL : 18 MEI S/D 24 MEI 2017

KEGIATAN : PEMBANGUNAN SARANA PERHUBUNGAN LAUT


MINGGU I
NAMA PAKET : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
NOMOR KONTRAK : 02/KPA.09/PEL/2017
TANGGAL KONTRAK : 18 Mei 2017
NILAI KONTRAK : Rp 1.041.830.000,00
SUMBER DANA : APBA
TAHUN ANGGARAN : 2017
LOKASI : PELABUHAN LABUHAN HAJI ACEH SELATAN

KONTRAK REALISASI
NO. URAIAN PEKERJAAN JUMLAH HARGA BOBOT S/D MINGGU LALU MINGGU INI S/D MINGGU INI %
SATUAN VOLUME HARGA SATUAN (Rp) (%)
Jumlah V 142,475,700 15.043%
PROGRES MINGGUAN
PERIODE TANGGAL : 18 MEI S/D 24 MEI 2017

KEGIATAN : PEMBANGUNAN SARANA PERHUBUNGAN LAUT


MINGGU I
NAMA PAKET : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
NOMOR KONTRAK : 02/KPA.09/PEL/2017
TANGGAL KONTRAK : 18 Mei 2017
NILAI KONTRAK : Rp 1.041.830.000,00
SUMBER DANA : APBA
TAHUN ANGGARAN : 2017
LOKASI : PELABUHAN LABUHAN HAJI ACEH SELATAN

KONTRAK REALISASI
NO. URAIAN PEKERJAAN JUMLAH HARGA BOBOT S/D MINGGU LALU MINGGU INI S/D MINGGU INI %
SATUAN VOLUME HARGA SATUAN (Rp) (%)
VI PEKERJAAN PEMAGARAN LOKASI MENARA DENGAN PAGAR BRC 10 X 10 M
1 PEKERJAAN TANAH
a Galian Tanah Pondasi M3 17.80 78,960.00 1,405,488.00 0.148%
b Timbunan Kembali Tanah Bekas Galian M3 11.87 48,720.00 578,306.40 0.061%
c Urugan Pasir Bawah Pondasi M3 3.01 228,144.00 686,713.44 0.073%
d Pasangan Pondasi Batu Gunung M3 13.40 834,008.00 11,175,707.20 1.180%
e Pasangan Batu Kosong (Aanstamping) M3 2.53 420,739.20 1,064,470.18 0.112%
2 PEKERJAAN BETON BERTULANG
a Kolom 20/20 M3 1.31 5,162,010.69 6,762,234.00 0.714%
b Sloof 20/20 M3 1.80 4,980,516.71 8,964,930.07 0.947%
c Ring Balk 5/20 M3 0.52 5,684,493.15 2,955,936.44 0.312%
3 PEKERJAAN PASANGAN
a Pasangan Bata 1:2 M2 20.00 145,261.20 2,905,224.00 0.307%
b Plesteran 1:2 M2 57.60 66,891.78 3,852,966.30 0.407%
4 Tiang Pagar BRC T = 1,7 m + Asesoris kualitas No.1 Btg 30.00 600,000.00 18,000,000.00 1.900%
5 Pagar BRC T = 1,2 m + Asesoris kualitas No.1 Unit 15.00 1,300,000.00 19,500,000.00 2.059%
6 Pengecatan Dinding/Tembok Pagar M2 57.60 29,534.40 1,701,181.44 0.180%
7 Pembuatan Pintu Pagar dari Besi Plat lengkap Kunci dan Gembok Unit 1.00 8,000,000.00 8,000,000.00 0.845%
8 Relief Kolom Unit 16.00 175,000.00 2,800,000.00 0.296%
Jumlah VI 90,353,157 9.540%
Jumlah Total 947,119,506 100%

Disetujui oleh : Diperiksa oleh : Diajukan Oleh :


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
BIDANG PELAYARAN CV. CIPTA MARGA UTAMA CV.E-GROUP KARYA
DINAS PERHUBUNGAN ACEH

AL MUNAWAR, A.Md SUFNI ACHMAD HANURA PERKASA


NIP: 19820417 201212 1 002 INSPECTOR SITE MANAGER
PROGRES MINGGUAN
PERIODE TANGGAL : 25 MEI S/D 31 MEI 2017

KEGIATAN : PEMBANGUNAN SARANA PERHUBUNGAN LAUT


MINGGU II
NAMA PAKET : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
NOMOR KONTRAK : 02/KPA.09/PEL/2017
TANGGAL KONTRAK : 18 Mei 2017
NILAI KONTRAK : Rp 1.041.830.000,00
SUMBER DANA : APBA
TAHUN ANGGARAN : 2017
LOKASI : PELABUHAN LABUHAN HAJI ACEH SELATAN

KONTRAK REALISASI
NO. URAIAN PEKERJAAN JUMLAH HARGA BOBOT S/D MINGGU LALU MINGGU INI S/D MINGGU INI %
SATUAN VOLUME HARGA SATUAN (Rp) (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT

I PEKERJAAN PERSIAPAN
1 Survei Awal dan Penentuan Posisi Ls 1.00 7,000,000.00 7,000,000.00 0.739% - - 1.00 100.00% 1.00 100.00% 0.74%
2 Pembersihan Lokasi M2 225.00 10,000.00 2,250,000.00 0.238% - - 132.00 58.67% 132.00 58.67% 0.14%
3 Biaya Mobilisasi dan demobilisasi Paket 1.00 42,700,000.00 42,700,000.00 4.508% - - 0.25 25.00% 0.25 25.00% 1.13%
4 Pemasangan Bowplank m' 60.00 15,000.00 900,000.00 0.095% - - 58.00 96.67% 58.00 96.67% 0.09%
5 Pengukuran Paket 1.00 2,500,000.00 2,500,000.00 0.264% - - 1.00 100.00% 1.00 100.00% 0.26%
6 Bangunan Direksi Keet dan Barak Kerja Paket 1.00 6,720,000.00 6,720,000.00 0.710% - - 1.00 100.00% 1.00 100.00% 0.71%
7 Air bersih Bln 4.00 3,000,000.00 12,000,000.00 1.267% - - 0.50 12.50% 0.50 12.50% 0.16%
8 Obat- obatan/ P3K Bln 4.00 1,500,000.00 6,000,000.00 0.633% - - 0.50 12.50% 0.50 12.50% 0.08%
9 Papan Nama Proyek Paket 1.00 1,000,000.00 1,000,000.00 0.106% - - - -
10 Dokumentasi/Administrasi/As Built Drawing Paket 1.00 4,820,000.00 4,820,000.00 0.509% - - 0.05 5.00% 0.05 5.00% 0.03%
Jumlah I 85,890,000 9.069% 3.33%
II PEKERJAAN TANAH
1 Galian Tanah Pondasi M3 137.20 78,960.00 10,833,312.00 1.144% - - - - -
2 Pasangan Batu Kosong (Aanstamping) M3 9.80 420,739.20 4,123,244.16 0.435% - - - - -
3 Urugan Pasir Bawah Pondasi M3 9.80 228,144.00 2,235,811.20 0.236% - - - - -
4 Timbunan Kembali Tanah Bekas Galian M3 117.85 48,720.00 5,741,652.00 0.606% - - - - -
Jumlah II 22,934,019 2.421% -
III PEKERJAAN BETON BERTULANG
Beton Bertulang K250
1 Pondasi Tapak M3 19.35 5,085,029.51 98,395,320.93 10.389% - - - - -
2 Sloof 40/40 M3 2.80 4,885,028.31 13,678,079.25 1.444% - - - - -
3 Plat Lantai 15 cm M3 2.87 7,233,807.86 20,761,028.55 2.192% - - - - -
Jumlah III 132,834,429 14.025%
IV PEKERJAAN KONSTRUKSI MENARA
1 Pengadaan Pabrikasi Kerangka Menara Besi Baja Galvanis Kg 8,250.00 45,000.00 371,250,000.00 39.198% - - - - -
2 Pengadaan Baut dan Ring Galvanis Bh 1,600.00 10,000.00 16,000,000.00 1.689% - - - - -
3 Pemasangan/Perakitan Menara Unit 1.00 55,700,000.00 55,700,000.00 5.881% - - - - -
4 Pembuatan Pintu Pengaman Lampu Suar Unit 1.00 3,094,200.00 3,094,200.00 0.327% - - - - -
5 Cat Menara dengan Cat Marine Paint Putih 3x Unit 1.00 16,588,000.00 16,588,000.00 1.751% - - - - -
6 Perancah dan Alat Bantu Unit 1.00 10,000,000.00 10,000,000.00 1.056% - - - - -
Jumlah IV 472,632,200 49.902%
V PEKERJAAN PENGADAAN PERALATAN SBN DAN LAIN-LAIN
1 Pengadaan/Pemasangan Sistem Lampu Suar Jarak Tampak 12 NM Unit 1.00 90,000,000.00 90,000,000.00 9.502% - - - - -
2 Pengadaan dan Pemasangan Solar Cell 12V - 50W lengkap Instaasi Unit 3.00 7,000,000.00 21,000,000.00 2.217% - - - - -
Dudukan dan Instalasi ke Lampu Suar
3 Pengadaan Battery Maintenance Free 12 - 105AH Bh 3.00 5,000,000.00 15,000,000.00 1.584% - - - - -
4 Pembuatan Box Battery Unit 1.00 1,175,700.00 1,175,700.00 0.124% - - - - -
5 Pengadaan dan Pemasangan Sistem Penangkal Petir Unit 1.00 7,820,000.00 7,820,000.00 0.826% - - - - -
6 Pengadaan dan Pemasangan Radar Reflektor Unit 1.00 7,480,000.00 7,480,000.00 0.790% - - - - -
PROGRES MINGGUAN
PERIODE TANGGAL : 25 MEI S/D 31 MEI 2017

KEGIATAN : PEMBANGUNAN SARANA PERHUBUNGAN LAUT


MINGGU II
NAMA PAKET : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
NOMOR KONTRAK : 02/KPA.09/PEL/2017
TANGGAL KONTRAK : 18 Mei 2017
NILAI KONTRAK : Rp 1.041.830.000,00
SUMBER DANA : APBA
TAHUN ANGGARAN : 2017
LOKASI : PELABUHAN LABUHAN HAJI ACEH SELATAN

KONTRAK REALISASI
NO. URAIAN PEKERJAAN JUMLAH HARGA BOBOT S/D MINGGU LALU MINGGU INI S/D MINGGU INI %
SATUAN VOLUME HARGA SATUAN (Rp) (%)
Jumlah V 142,475,700 15.043%
PROGRES MINGGUAN
PERIODE TANGGAL : 25 MEI S/D 31 MEI 2017

KEGIATAN : PEMBANGUNAN SARANA PERHUBUNGAN LAUT


MINGGU II
NAMA PAKET : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
NOMOR KONTRAK : 02/KPA.09/PEL/2017
TANGGAL KONTRAK : 18 Mei 2017
NILAI KONTRAK : Rp 1.041.830.000,00
SUMBER DANA : APBA
TAHUN ANGGARAN : 2017
LOKASI : PELABUHAN LABUHAN HAJI ACEH SELATAN

KONTRAK REALISASI
NO. URAIAN PEKERJAAN JUMLAH HARGA BOBOT S/D MINGGU LALU MINGGU INI S/D MINGGU INI %
SATUAN VOLUME HARGA SATUAN (Rp) (%)
VI PEKERJAAN PEMAGARAN LOKASI MENARA DENGAN PAGAR BRC 10 X 10 M
1 PEKERJAAN TANAH
a Galian Tanah Pondasi M3 17.80 78,960.00 1,405,488.00 0.148% - - - - -
b Timbunan Kembali Tanah Bekas Galian M3 11.87 48,720.00 578,306.40 0.061% - - - - -
c Urugan Pasir Bawah Pondasi M3 3.01 228,144.00 686,713.44 0.073% - - - - -
d Pasangan Pondasi Batu Gunung M3 13.40 834,008.00 11,175,707.20 1.180% - - - - -
e Pasangan Batu Kosong (Aanstamping) M3 2.53 420,739.20 1,064,470.18 0.112% - - - - -
2 PEKERJAAN BETON BERTULANG
a Kolom 20/20 M3 1.31 5,162,010.69 6,762,234.00 0.714% - - - - -
b Sloof 20/20 M3 1.80 4,980,516.71 8,964,930.07 0.947% - - - - -
c Ring Balk 5/20 M3 0.52 5,684,493.15 2,955,936.44 0.312% - - - - -
3 PEKERJAAN PASANGAN -
a Pasangan Bata 1:2 M2 20.00 145,261.20 2,905,224.00 0.307% - - - - -
b Plesteran 1:2 M2 57.60 66,891.78 3,852,966.30 0.407% - - - - -
4 Tiang Pagar BRC T = 1,7 m + Asesoris kualitas No.1 Btg 30.00 600,000.00 18,000,000.00 1.900% - - - - -
5 Pagar BRC T = 1,2 m + Asesoris kualitas No.1 Unit 15.00 1,300,000.00 19,500,000.00 2.059% - - - - -
6 Pengecatan Dinding/Tembok Pagar M2 57.60 29,534.40 1,701,181.44 0.180% - - - - -
7 Pembuatan Pintu Pagar dari Besi Plat lengkap Kunci dan Gembok Unit 1.00 8,000,000.00 8,000,000.00 0.845% - - - - -
8 Relief Kolom Unit 16.00 175,000.00 2,800,000.00 0.296% - - - - -
Jumlah VI 90,353,157 9.540%
Jumlah Total 947,119,506 100% 3.334%

Disetujui oleh : Diperiksa oleh : Diajukan Oleh :


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
BIDANG PELAYARAN CV. CIPTA MARGA UTAMA CV.E-GROUP KARYA
DINAS PERHUBUNGAN ACEH

AL MUNAWAR, A.Md SUFNI ACHMAD HANURA PERKASA


NIP: 19820417 201212 1 002 INSPECTOR SITE MANAGER
PROGRES BULANAN
PERIODE TANGGAL : 18 MEI S/D 31 MEI 2017

KEGIATAN : PEMBANGUNAN SARANA PERHUBUNGAN LAUT


BULAN I
NAMA PAKET : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
NOMOR KONTRAK : 02/KPA.09/PEL/2017
TANGGAL KONTRAK : 18 Mei 2017
NILAI KONTRAK : Rp 1.041.830.000,00
SUMBER DANA : APBA
TAHUN ANGGARAN : 2017
LOKASI : PELABUHAN LABUHAN HAJI ACEH SELATAN

KONTRAK REALISASI
NO. URAIAN PEKERJAAN JUMLAH HARGA BOBOT S/D BULAN LALU BULAN INI S/D BULAN INI %
SATUAN VOLUME HARGA SATUAN (Rp) (%) VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT

I PEKERJAAN PERSIAPAN
1 Survei Awal dan Penentuan Posisi Ls 1.00 7,000,000.00 7,000,000.00 0.739% 1.00 100.00% 1.00 100.00% 0.739%
2 Pembersihan Lokasi M2 225.00 10,000.00 2,250,000.00 0.238% 132.00 58.67% 132.00 58.67% 0.139%
3 Biaya Mobilisasi dan demobilisasi Paket 1.00 42,700,000.00 42,700,000.00 4.508% 0.25 25.00% 0.25 25.00% 1.127%
4 Pemasangan Bowplank m' 60.00 15,000.00 900,000.00 0.095% 58.00 96.67% 58.00 96.67% 0.092%
5 Pengukuran Paket 1.00 2,500,000.00 2,500,000.00 0.264% 1.00 100.00% 1.00 100.00% 0.264%
6 Bangunan Direksi Keet dan Barak Kerja Paket 1.00 6,720,000.00 6,720,000.00 0.710% 1.00 100.00% 1.00 100.00% 0.710%
7 Air bersih Bln 4.00 3,000,000.00 12,000,000.00 1.267% 0.50 12.50% 0.50 12.50% 0.158%
8 Obat- obatan/ P3K Bln 4.00 1,500,000.00 6,000,000.00 0.633% 0.50 12.50% 0.50 12.50% 0.079%
9 Papan Nama Proyek Paket 1.00 1,000,000.00 1,000,000.00 0.106% - - - - -
10 Dokumentasi/Administrasi/As Built Drawing Paket 1.00 4,820,000.00 4,820,000.00 0.509% 0.05 5.00% 0.05 5.00% 0.025%
Jumlah I 85,890,000 9.069% 3.334%
II PEKERJAAN TANAH
1 Galian Tanah Pondasi M3 137.20 78,960.00 10,833,312.00 1.144% - - - - -
2 Pasangan Batu Kosong (Aanstamping) M3 9.80 420,739.20 4,123,244.16 0.435% - - - - -
3 Urugan Pasir Bawah Pondasi M3 9.80 228,144.00 2,235,811.20 0.236% - - - - -
4 Timbunan Kembali Tanah Bekas Galian M3 117.85 48,720.00 5,741,652.00 0.606% - - - - -
Jumlah II 22,934,019 2.421% -
III PEKERJAAN BETON BERTULANG
Beton Bertulang K250
1 Pondasi Tapak M3 19.35 5,085,029.51 98,395,320.93 10.389% - - - - -
2 Sloof 40/40 M3 2.80 4,885,028.31 13,678,079.25 1.444% - - - - -
3 Plat Lantai 15 cm M3 2.87 7,233,807.86 20,761,028.55 2.192% - - - - -
Jumlah III 132,834,429 14.025% -
IV PEKERJAAN KONSTRUKSI MENARA
1 Pengadaan Pabrikasi Kerangka Menara Besi Baja Galvanis Kg 8,250.00 45,000.00 371,250,000.00 39.198% - - - - -
2 Pengadaan Baut dan Ring Galvanis Bh 1,600.00 10,000.00 16,000,000.00 1.689% - - - - -
3 Pemasangan/Perakitan Menara Unit 1.00 55,700,000.00 55,700,000.00 5.881% - - - - -
4 Pembuatan Pintu Pengaman Lampu Suar Unit 1.00 3,094,200.00 3,094,200.00 0.327% - - - - -
5 Cat Menara dengan Cat Marine Paint Putih 3x Unit 1.00 16,588,000.00 16,588,000.00 1.751% - - - - -
6 Perancah dan Alat Bantu Unit 1.00 10,000,000.00 10,000,000.00 1.056% - - - - -
Jumlah IV 472,632,200 49.902% -
V PEKERJAAN PENGADAAN PERALATAN SBN DAN LAIN-LAIN
1 Pengadaan/Pemasangan Sistem Lampu Suar Jarak Tampak 12 NM Unit 1.00 90,000,000.00 90,000,000.00 9.502% - - - - -
2 Pengadaan dan Pemasangan Solar Cell 12V - 50W lengkap Instaasi Unit 3.00 7,000,000.00 21,000,000.00 2.217% - - - - -
Dudukan dan Instalasi ke Lampu Suar
3 Pengadaan Battery Maintenance Free 12 - 105AH Bh 3.00 5,000,000.00 15,000,000.00 1.584% - - - - -
4 Pembuatan Box Battery Unit 1.00 1,175,700.00 1,175,700.00 0.124% - - - - -
5 Pengadaan dan Pemasangan Sistem Penangkal Petir Unit 1.00 7,820,000.00 7,820,000.00 0.826% - - - - -
6 Pengadaan dan Pemasangan Radar Reflektor Unit 1.00 7,480,000.00 7,480,000.00 0.790% - - - - -
Jumlah V 142,475,700 15.043% -
PROGRES BULANAN
PERIODE TANGGAL : 18 MEI S/D 31 MEI 2017

KEGIATAN : PEMBANGUNAN SARANA PERHUBUNGAN LAUT


BULAN I
NAMA PAKET : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
NOMOR KONTRAK : 02/KPA.09/PEL/2017
TANGGAL KONTRAK : 18 Mei 2017
NILAI KONTRAK : Rp 1.041.830.000,00
SUMBER DANA : APBA
TAHUN ANGGARAN : 2017
LOKASI : PELABUHAN LABUHAN HAJI ACEH SELATAN

KONTRAK REALISASI
NO. URAIAN PEKERJAAN JUMLAH HARGA BOBOT S/D BULAN LALU BULAN INI S/D BULAN INI %
SATUAN VOLUME HARGA SATUAN (Rp) (%)
VI PEKERJAAN PEMAGARAN LOKASI MENARA DENGAN PAGAR BRC 10 X 10 M
1 PEKERJAAN TANAH
a Galian Tanah Pondasi M3 17.80 78,960.00 1,405,488.00 0.148% - - - - -
b Timbunan Kembali Tanah Bekas Galian M3 11.87 48,720.00 578,306.40 0.061% - - - - -
c Urugan Pasir Bawah Pondasi M3 3.01 228,144.00 686,713.44 0.073% - - - - -
d Pasangan Pondasi Batu Gunung M3 13.40 834,008.00 11,175,707.20 1.180% - - - - -
e Pasangan Batu Kosong (Aanstamping) M3 2.53 420,739.20 1,064,470.18 0.112% - - - - -
2 PEKERJAAN BETON BERTULANG
a Kolom 20/20 M3 1.31 5,162,010.69 6,762,234.00 0.714% - - - - -
b Sloof 20/20 M3 1.80 4,980,516.71 8,964,930.07 0.947% - - - - -
c Ring Balk 5/20 M3 0.52 5,684,493.15 2,955,936.44 0.312% - - - - -
3 PEKERJAAN PASANGAN
a Pasangan Bata 1:2 M2 20.00 145,261.20 2,905,224.00 0.307% - - - - -
b Plesteran 1:2 M2 57.60 66,891.78 3,852,966.30 0.407% - - - - -
4 Tiang Pagar BRC T = 1,7 m + Asesoris kualitas No.1 Btg 30.00 600,000.00 18,000,000.00 1.900% - - - - -
5 Pagar BRC T = 1,2 m + Asesoris kualitas No.1 Unit 15.00 1,300,000.00 19,500,000.00 2.059% - - - - -
6 Pengecatan Dinding/Tembok Pagar M2 57.60 29,534.40 1,701,181.44 0.180% - - - - -
7 Pembuatan Pintu Pagar dari Besi Plat lengkap Kunci dan Gembok Unit 1.00 8,000,000.00 8,000,000.00 0.845% - - - - -
8 Relief Kolom Unit 16.00 175,000.00 2,800,000.00 0.296% - - - - -
Jumlah VI 90,353,157 9.540% -
Jumlah Total 947,119,506 100% 3.334%

Disetujui oleh : Diperiksa oleh : Diajukan Oleh :


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
BIDANG PELAYARAN CV. CIPTA MARGA UTAMA CV.E-GROUP KARYA
DINAS PERHUBUNGAN ACEH

AL MUNAWAR, A.Md SUFNI ACHMAD HANURA PERKASA


NIP: 19820417 201212 1 002 INSPECTOR SITE MANAGER
REKAPITULASI PROGRES BULANAN
PERIODE TANGGAL : 18 MEI S/D 31 MEI 2017

KEGIATAN : PEMBANGUNAN SARANA PERHUBUNGAN LAUT


BULAN I
NAMA PAKET : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH
NOMOR KONTRAK : 02/KPA.09/PEL/2017
TANGGAL KONTRAK : 18 Mei 2017
NILAI KONTRAK : Rp 1.041.830.000,00
SUMBER DANA : APBA
TAHUN ANGGARAN : 2017
LOKASI : PELABUHAN LABUHAN HAJI ACEH SELATAN

REALISASI
NO. URAIAN PEKERJAAN JUMLAH HARGA BOBOT S/D BULAN LALU BULAN INI S/D BULAN INI %
(Rp) (%) BOBOT % BOBOT % BOBOT %

I. PEKERJAAN PERSIAPAN Rp 85,890,000.00 9.069% 36.763% 3.334% 36.763% 3.334%


II. PEKERJAAN TANAH Rp 22,934,019.36 2.421% - - -
III. PEKERJAAN BETON BERTULANG Rp 132,834,428.73 14.025% - - -
IV. PEKERJAAN KONSTRUKSI MENARA Rp 472,632,200.00 49.902% - - -
V. PEKERJAAN PENGADAAN PERALATAN SBN DAN LAIN-LAIN Rp 142,475,700.00 15.043% - - -
VI. PEKERJAAN PEMAGARAN LOKASI MENARA DENGAN PAGAR BRC 10 X 10 M Rp 90,353,157.47 9.540% - - -
JUMLAH 947,119,505.56 100% - 3.334% 3.334%
PPN 10% 94,711,950.56
JUMLAH TOTAL 1,041,831,456.11
DIBULATKAN 1,041,830,000.00

Disetujui oleh : Diperiksa oleh : Diajukan Oleh :


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
BIDANG PELAYARAN CV. CIPTA MARGA UTAMA CV.E-GROUP KARYA
DINAS PERHUBUNGAN ACEH

AL MUNAWAR, A.Md SUFNI ACHMAD HANURA PERKASA


NIP: 19820417 201212 1 002 INSPECTOR SITE MANAGER

Mengetahui/Menyetujui:
KUASA PENGGUNA ANGGARAN
BIDANG PELAYARAN
DINAS PERHUBUNGAN ACEH

T. FAISAL, ST, MT
NIP: 19750114 200312 1 003
MONTHLY CERTIFICATE (MC)
PERIODE TANGGAL : 18 MEI S/D 31 MEI 2017

KEGIATAN : PEMBANGUNAN SARANA PERHUBUNGAN LAUT


NAMA PAKET : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH SERTIFIKAT : 01
NOMOR KONTRAK : 02/KPA.09/PEL/2017 PERIODE : 18 MEI S/D 31 MEI 2017
TANGGAL KONTRAK : 18 Mei 2017 TANGGAL : 31 MEI 2017
NILAI KONTRAK : Rp 1.041.830.000,00
SUMBER DANA : APBA
TAHUN ANGGARAN : 2017
LOKASI : PELABUHAN LABUHAN HAJI ACEH SELATAN

KONTRAK REALISASI
S/D BULAN LALU BULAN INI S/D BULAN INI
NO. URAIAN PEKERJAAN JUMLAH HARGA BOBOT %
SATUAN VOLUME HARGA SATUAN JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA
(Rp) (%) VOLUME VOLUME VOLUME
(Rp) (Rp) (Rp)

I PEKERJAAN PERSIAPAN
1 Survei Awal dan Penentuan Posisi Ls 1.00 7,000,000.00 7,000,000.00 0.74% 1.00 Rp 7,000,000 1.00 Rp 7,000,000 0.74%
2 Pembersihan Lokasi M2 225.00 10,000.00 2,250,000.00 0.24% 132.00 Rp 1,320,000 132.00 Rp 1,320,000 0.14%
3 Biaya Mobilisasi dan demobilisasi Paket 1.00 42,700,000.00 42,700,000.00 4.51% 0.25 Rp 10,675,000 0.25 Rp 10,675,000 1.13%
4 Pemasangan Bowplank m' 60.00 15,000.00 900,000.00 0.10% 58.00 Rp 870,000 58.00 Rp 870,000 0.09%
5 Pengukuran Paket 1.00 2,500,000.00 2,500,000.00 0.26% 1.00 Rp 2,500,000 1.00 Rp 2,500,000 0.26%
6 Bangunan Direksi Keet dan Barak Kerja Paket 1.00 6,720,000.00 6,720,000.00 0.71% 1.00 Rp 6,720,000 1.00 Rp 6,720,000 0.71%
7 Air bersih Bln 4.00 3,000,000.00 12,000,000.00 1.27% 0.50 Rp 1,500,000 0.50 Rp 1,500,000 0.16%
8 Obat- obatan/ P3K Bln 4.00 1,500,000.00 6,000,000.00 0.63% 0.50 Rp 750,000 0.50 Rp 750,000 0.08%
9 Papan Nama Proyek Paket 1.00 1,000,000.00 1,000,000.00 0.11% - Rp - - Rp - -
10 Dokumentasi/Administrasi/As Built Drawing Paket 1.00 4,820,000.00 4,820,000.00 0.51% 0.05 Rp 241,000 0.05 Rp 241,000 0.03%
Jumlah I 85,890,000 9.07% Rp 31,576,000 Rp 31,576,000 3.33%
II PEKERJAAN TANAH
1 Galian Tanah Pondasi M3 137.20 78,960.00 10,833,312.00 1.14% - Rp - - Rp - -
2 Pasangan Batu Kosong (Aanstamping) M3 9.80 420,739.20 4,123,244.16 0.44% - Rp - - Rp - -
3 Urugan Pasir Bawah Pondasi M3 9.80 228,144.00 2,235,811.20 0.24% - Rp - - Rp - -
4 Timbunan Kembali Tanah Bekas Galian M3 117.85 48,720.00 5,741,652.00 0.61% - Rp - - Rp - -
Jumlah II 22,934,019 2.42% Rp - Rp - -
III PEKERJAAN BETON BERTULANG
Beton Bertulang K250
1 Pondasi Tapak M3 19.35 5,085,029.51 98,395,320.93 10.39% - Rp - - Rp - -
2 Sloof 40/40 M3 2.80 4,885,028.31 13,678,079.25 1.44% - Rp - - Rp - -
3 Plat Lantai 15 cm M3 2.87 7,233,807.86 20,761,028.55 2.19% - Rp - - Rp - -
Jumlah III 132,834,429 14.03% Rp - Rp - -
IV PEKERJAAN KONSTRUKSI MENARA
1 Pengadaan Pabrikasi Kerangka Menara Besi Baja Galvanis Kg 8,250.00 45,000.00 371,250,000.00 39.20% - Rp - Rp - -
2 Pengadaan Baut dan Ring Galvanis Bh 1,600.00 10,000.00 16,000,000.00 1.69% - Rp - Rp - -
3 Pemasangan/Perakitan Menara Unit 1.00 55,700,000.00 55,700,000.00 5.88% - Rp - Rp - -
4 Pembuatan Pintu Pengaman Lampu Suar Unit 1.00 3,094,200.00 3,094,200.00 0.33% - Rp - Rp - -
5 Cat Menara dengan Cat Marine Paint Putih 3x Unit 1.00 16,588,000.00 16,588,000.00 1.75% - Rp - Rp - -
6 Perancah dan Alat Bantu Unit 1.00 10,000,000.00 10,000,000.00 1.06% - Rp - Rp - -
Jumlah IV 472,632,200 49.90% Rp - Rp - -
V PEKERJAAN PENGADAAN PERALATAN SBN DAN LAIN-LAIN
1 Pengadaan/Pemasangan Sistem Lampu Suar Jarak Tampak 12 NM Unit 1.00 90,000,000.00 90,000,000.00 9.50% - Rp - - Rp - -
2 Pengadaan dan Pemasangan Solar Cell 12V - 50W lengkap Instaasi Unit 3.00 7,000,000.00 21,000,000.00 2.22% - Rp - - Rp - -
Dudukan dan Instalasi ke Lampu Suar -
3 Pengadaan Battery Maintenance Free 12 - 105AH Bh 3.00 5,000,000.00 15,000,000.00 1.58% - Rp - - Rp - -
4 Pembuatan Box Battery Unit 1.00 1,175,700.00 1,175,700.00 0.12% - Rp - - Rp - -
5 Pengadaan dan Pemasangan Sistem Penangkal Petir Unit 1.00 7,820,000.00 7,820,000.00 0.83% - Rp - - Rp - -
6 Pengadaan dan Pemasangan Radar Reflektor Unit 1.00 7,480,000.00 7,480,000.00 0.79% - Rp - - Rp - -
Jumlah V 142,475,700 15.04% Rp - Rp -
MONTHLY CERTIFICATE (MC)
PERIODE TANGGAL : 18 MEI S/D 31 MEI 2017

KEGIATAN : PEMBANGUNAN SARANA PERHUBUNGAN LAUT


NAMA PAKET : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH SERTIFIKAT : 01
NOMOR KONTRAK : 02/KPA.09/PEL/2017 PERIODE : 18 MEI S/D 31 MEI 2017
TANGGAL KONTRAK : 18 Mei 2017 TANGGAL : 31 MEI 2017
NILAI KONTRAK : Rp 1.041.830.000,00
SUMBER DANA : APBA
TAHUN ANGGARAN : 2017
LOKASI : PELABUHAN LABUHAN HAJI ACEH SELATAN

KONTRAK REALISASI
S/D BULAN LALU BULAN INI S/D BULAN INI
NO. URAIAN PEKERJAAN JUMLAH HARGA BOBOT %
SATUAN VOLUME HARGA SATUAN
(Rp) (%)
VI PEKERJAAN PEMAGARAN LOKASI MENARA DENGAN PAGAR BRC 10 X 10 M
1 PEKERJAAN TANAH
a Galian Tanah Pondasi M3 17.80 78,960.00 1,405,488.00 0.15% - Rp - - Rp - -
b Timbunan Kembali Tanah Bekas Galian M3 11.87 48,720.00 578,306.40 0.06% - Rp - - Rp - -
c Urugan Pasir Bawah Pondasi M3 3.01 228,144.00 686,713.44 0.07% - Rp - - Rp - -
d Pasangan Pondasi Batu Gunung M3 13.40 834,008.00 11,175,707.20 1.18% - Rp - - Rp - -
e Pasangan Batu Kosong (Aanstamping) M3 2.53 420,739.20 1,064,470.18 0.11% - Rp - - Rp - -
2 PEKERJAAN BETON BERTULANG 0.00
a Kolom 20/20 M3 1.31 5,162,010.69 6,762,234.00 0.71% - Rp - - Rp - -
b Sloof 20/20 M3 1.80 4,980,516.71 8,964,930.07 0.95% - Rp - - Rp - -
c Ring Balk 5/20 M3 0.52 5,684,493.15 2,955,936.44 0.31% - Rp - - Rp - -
3 PEKERJAAN PASANGAN 0.00
a Pasangan Bata 1:2 M2 20.00 145,261.20 2,905,224.00 0.31% - Rp - - Rp - -
b Plesteran 1:2 M2 57.60 66,891.78 3,852,966.30 0.41% - Rp - - Rp - -
4 Tiang Pagar BRC T = 1,7 m + Asesoris kualitas No.1 Btg 30.00 600,000.00 18,000,000.00 1.90% - Rp - - Rp - -
5 Pagar BRC T = 1,2 m + Asesoris kualitas No.1 Unit 15.00 1,300,000.00 19,500,000.00 2.06% - Rp - - Rp - -
6 Pengecatan Dinding/Tembok Pagar M2 57.60 29,534.40 1,701,181.44 0.18% - Rp - - Rp - -
7 Pembuatan Pintu Pagar dari Besi Plat lengkap Kunci dan Gembok Unit 1.00 8,000,000.00 8,000,000.00 0.84% - Rp - - Rp - -
8 Relief Kolom Unit 16.00 175,000.00 2,800,000.00 0.30% - Rp - - Rp - -
Jumlah VI 90,353,157 9.54% Rp - Rp - -
Jumlah Total 947,119,506 100% Rp - Rp 31,576,000 Rp 31,576,000 3.33%

Disetujui oleh : Diperiksa oleh : Diajukan Oleh :


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
BIDANG PELAYARAN CV. CIPTA MARGA UTAMA CV.E-GROUP KARYA
DINAS PERHUBUNGAN ACEH

AL MUNAWAR, A.Md SUFNI ACHMAD HANURA PERKASA


NIP: 19820417 201212 1 002 INSPECTOR SITE MANAGER
REKAPITULASI MONTHLY CERTIFICATE (MC)
KEGIATAN : PEMBANGUNAN SARANA PERHUBUNGAN LAUT
NAMA PAKET : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH SERTIFIKAT : 01
NOMOR KONTRAK : 02/KPA.09/PEL/2017 PERIODE : 18 MEI S/D 31 MEI 2017
TANGGAL KONTRAK : 18 Mei 2017 TANGGAL : 31 MEI 2017
NILAI KONTRAK : Rp 1.041.830.000,00
SUMBER DANA : APBA
TAHUN ANGGARAN : 2017
LOKASI : PELABUHAN LABUHAN HAJI ACEH SELATAN

KONTRAK JUMLAH PEMBAYARAN


S/D BULAN LALU BULAN INI S/D BULAN INI BOBOT
NO. URAIAN PEKERJAAN JUMLAH HARGA BOBOT KET
(Rp) (%) JUMLAH HARGA JUMLAH HARGA JUMLAH HARGA PEKERJAAN SELURUH
(Rp) (Rp) (Rp) SENDIRI PEKERJAAN

I PEKERJAAN PERSIAPAN Rp 85,890,000.00 9.07% Rp 31,576,000.00 Rp 31,576,000.00 36.76% 3.33%


II. PEKERJAAN TANAH Rp 22,934,019.36 2.42% Rp - Rp - - -
III. PEKERJAAN BETON BERTULANG Rp 132,834,428.73 14.03% Rp - Rp - - -
IV. PEKERJAAN KONSTRUKSI MENARA Rp 472,632,200.00 49.90% Rp - Rp - - -
V. PEKERJAAN PENGADAAN PERALATAN SBN DAN LAIN-LAIN Rp 142,475,700.00 15.04% Rp - Rp -
VI. PEKERJAAN PEMAGARAN LOKASI MENARA DENGAN PAGAR BRC 10 X 10 M Rp 90,353,157.47 9.54% Rp - Rp -

I JUMLAH Rp 947,119,505.56 100.00% Rp - Rp 31,576,000.00 Rp 31,576,000.00 3.33%


II PPN 10% Rp 94,711,950.56 Rp - Rp 3,157,600.00 Rp 3,157,600.00
III JUMLAH TOTAL Rp 1,041,831,456.11 Rp - Rp 34,733,600.00 Rp 34,733,600.00
IV DIBULATKAN Rp 1,041,830,000.00 Rp - Rp 34,733,600.00 Rp 34,733,600.00
V JUMLAH KOTOR SERTIFIKAT S/D BULAN INI Rp 34,733,600.00 S/D BULAN LALU
VI JUMLAH KOTOR SERTIFIKAT S/D BULAN LALU Rp -
VII JUMLAH KOTOR SERTIKAT BULAN INI (V) - (VI) Rp 34,733,600.00
POTONGAN: BULAN INI
VIII PENGEMBALIAN UANG MUKA (VII) x 20% Rp 6,946,720.00
3.33%
IX RETENSI (VII) x 5% Rp 1,736,680.00
X JUMLAH POTONGAN (VIII) + (IX) Rp 8,683,400.00 S/D BULAN INI
XI JUMLAH BERSIH SERTIFIKAT BULAN INI (VII) - (X) Rp 26,050,200.00
3.33%
XII JUMLAH BERSIH SERTIFIKAT BULAN INI DIBULATKAN Rp 26,050,200.00

Disetujui oleh : Diperiksa oleh : Diajukan Oleh :


PEJABAT PELAKSANA TEKNIS KEGIATAN KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
BIDANG PELAYARAN CV. CIPTA MARGA UTAMA CV.E-GROUP KARYA
DINAS PERHUBUNGAN ACEH

AL MUNAWAR, A.Md SUFNI ACHMAD HANURA PERKASA


NIP: 19820417 201212 1 002 INSPECTOR SITE MANAGER

Mengetahui/Menyetujui:
KUASA PENGGUNA ANGGARAN
BIDANG PELAYARAN
DINAS PERHUBUNGAN ACEH

T. FAISAL, ST, MT
NIP: 19750114 200312 1 003
FOTO DOKUMENTASI
PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN AC

PENENTUAN TITIK LOKASI DAN


KORRDINAT TOWER

PENENTUAN TITIK LOKASI DAN


KORRDINAT TOWER

KONTRAKTOR PELAKSANA KONSULTAN PENGAWAS


CV. E GROUP KARYA CV. CIPTA MARGA UTAMA

ACHMAD HANURA PERKASA SUFNI


SITE MANAGER INSPECTOR

PPTK BIDANG PELAYARAN


DINAS PERHUBUNGAN ACEH

AL MUNAWAR. Amd
Nip . 19820417 201212 1 002
FOTO DOKUMENTASI
PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN AC

PEMASANGAN BOWPLANK

PEMASANGAN BOWPLANK
KONTRAKTOR PELAKSANA KONSULTAN PENGAWAS
CV. E GROUP KARYA CV. CIPTA MARGA UTAMA

ACHMAD HANURA PERKASA SUFNI


SITE MANAGER INSPECTOR

PPTK BIDANG PELAYARAN


DINAS PERHUBUNGAN ACEH

AL MUNAWAR. Amd
Nip . 19820417 201212 1 002
TASI
SI PELAYARAN ACEH

ULTAN PENGAWAS
TA MARGA UTAMA

SUFNI
INSPECTOR
TASI
SI PELAYARAN ACEH

3
ULTAN PENGAWAS
TA MARGA UTAMA

SUFNI
INSPECTOR
LAPORAN HARIAN
TANGGAL : Thursday, May 18, 2017
HARI : Kamis

PEKERJAAN : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH PELAKSANA : CV.E-GROUP KARYA
PENGAWAS : CV. CIPTA MARGA UTAMA

KEGIATAN HARI INI


BAHAN/ MATERIAL YANG MASUK
VOLUME NO. URAIAN JUMLAH SATUAN
NO. URAIAN SATUAN KONTRAK REALISASI YG BLM DI
LAKSANAKAN 1 Semen Sak
2 Pasir Pasang M3
1 Pengurusan Administrasi 3 Pasir Beton M3
4 Kerikil M3
5 Batu Gunung M3
6 Besi Tulangan Btg
7 Kayu Kelas II M3
8 Kayu Kelas III M3
9 Papan Bekisting M3
10 Batu Bata Buah
11 Besi Baja Galvanis Kg
12 Baut Galvanis Kg
13 Lampu Suar Bh
14 Solar Cell Bh
15 Baterey Bh
16 Radar Reflektor Bh
17 Cat Kg
18 Tiang BRC Unit
19 Pagar BRC Unit

PERSONIL DAN TENAGA KERJA


NO. URAIAN JUMLAH SATUAN
1 Site Manager Orang
2 Pelaksana Lapangan orang
3 Juru Gambar orang
4 Juru Ukur orang
5 Administrasi orang
6 Mandor orang
7 Kepala Tukang orang
8 Tukang orang
9 Pekerja orang

PERALATAN YANG DI GUNAKAN


NO. URAIAN JUMLAH SATUAN
1 Cangkul
2 Sekop
3 Kereta Sorong
4 Molen
5 Genset
6 Kuas

KETERANGAN CUACA Konsultan Pengawas Kontraktor Pelaksana


CERAH : Jam s/d CV. CITRA MARGA UTAMA CV. E-GROUP KARYA
HUJAN : Jam s/d
MENDUNG : Jam s/d

JAM KERJA
PAGI : Jam 08.00 s/d 12.00 SUKNI ACHMAD HANURA PERKASA
SIANG : Jam 13.00 s/d 17.00 Inspector Site Manager

CATATAN :
LAPORAN HARIAN
TANGGAL : Friday, May 19, 2017
HARI : Jumat

PEKERJAAN : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH PELAKSANA : CV.E-GROUP KARYA
PENGAWAS : CV. CIPTA MARGA UTAMA

KEGIATAN HARI INI


BAHAN/ MATERIAL YANG MASUK
VOLUME NO. URAIAN JUMLAH SATUAN
NO. URAIAN SATUAN KONTRAK REALISASI YG BLM DI
LAKSANAKAN 1 Semen Sak
2 Pasir Pasang M3
1 Pengurusan Administrasi 3 Pasir Beton M3
4 Kerikil M3
5 Batu Gunung M3
6 Besi Tulangan Btg
7 Kayu Kelas II M3
8 Kayu Kelas III M3
9 Papan Bekisting M3
10 Batu Bata Buah
11 Besi Baja Galvanis Kg
12 Baut Galvanis Kg
13 Lampu Suar Bh
14 Solar Cell Bh
15 Baterey Bh
16 Radar Reflektor Bh
17 Cat Kg
18 Tiang BRC Unit
19 Pagar BRC Unit

PERSONIL DAN TENAGA KERJA


NO. URAIAN JUMLAH SATUAN
1 Site Manager Orang
2 Pelaksana Lapangan orang
3 Juru Gambar orang
4 Juru Ukur orang
5 Administrasi orang
6 Mandor orang
7 Kepala Tukang orang
8 Tukang orang
9 Pekerja orang

PERALATAN YANG DI GUNAKAN


NO. URAIAN JUMLAH SATUAN
1 Cangkul
2 Sekop
3 Kereta Sorong
4 Molen
5 Genset
6 Kuas

KETERANGAN CUACA Konsultan Pengawas Kontraktor Pelaksana


CERAH : Jam s/d CV. CITRA MARGA UTAMA CV. E-GROUP KARYA
HUJAN : Jam s/d
MENDUNG : Jam s/d

JAM KERJA
PAGI : Jam 08.00 s/d 12.00 SUKNI ACHMAD HANURA PERKASA
SIANG : Jam 13.00 s/d 17.00 Inspector Site Manager

CATATAN :
LAPORAN HARIAN
TANGGAL : Saturday, May 20, 2017
HARI : Sabtu

PEKERJAAN : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH PELAKSANA : CV.E-GROUP KARYA
PENGAWAS : CV. CIPTA MARGA UTAMA

KEGIATAN HARI INI


BAHAN/ MATERIAL YANG MASUK
VOLUME NO. URAIAN JUMLAH SATUAN
NO. URAIAN SATUAN KONTRAK REALISASI YG BLM DI
LAKSANAKAN 1 Semen Sak
2 Pasir Pasang M3
1 Pengurusan Administrasi 3 Pasir Beton M3
4 Kerikil M3
5 Batu Gunung M3
6 Besi Tulangan Btg
7 Kayu Kelas II M3
8 Kayu Kelas III M3
9 Papan Bekisting M3
10 Batu Bata Buah
11 Besi Baja Galvanis Kg
12 Baut Galvanis Kg
13 Lampu Suar Bh
14 Solar Cell Bh
15 Baterey Bh
16 Radar Reflektor Bh
17 Cat Kg
18 Tiang BRC Unit
19 Pagar BRC Unit

PERSONIL DAN TENAGA KERJA


NO. URAIAN JUMLAH SATUAN
1 Site Manager Orang
2 Pelaksana Lapangan orang
3 Juru Gambar orang
4 Juru Ukur orang
5 Administrasi orang
6 Mandor orang
7 Kepala Tukang orang
8 Tukang orang
9 Pekerja orang

PERALATAN YANG DI GUNAKAN


NO. URAIAN JUMLAH SATUAN
1 Cangkul
2 Sekop
3 Kereta Sorong
4 Molen
5 Genset
6 Kuas

KETERANGAN CUACA Konsultan Pengawas Kontraktor Pelaksana


CERAH : Jam s/d CV. CITRA MARGA UTAMA CV. E-GROUP KARYA
HUJAN : Jam s/d
MENDUNG : Jam s/d

JAM KERJA
PAGI : Jam 08.00 s/d 12.00 SUKNI ACHMAD HANURA PERKASA
SIANG : Jam 13.00 s/d 17.00 Inspector Site Manager

CATATAN :
LAPORAN HARIAN
TANGGAL : Sunday, May 21, 2017
HARI : Minggu

PEKERJAAN : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH PELAKSANA : CV.E-GROUP KARYA
PENGAWAS : CV. CIPTA MARGA UTAMA

KEGIATAN HARI INI


BAHAN/ MATERIAL YANG MASUK
VOLUME NO. URAIAN JUMLAH SATUAN
NO. URAIAN SATUAN KONTRAK REALISASI YG BLM DI
LAKSANAKAN 1 Semen Sak
2 Pasir Pasang M3
1 Pengurusan Administrasi 3 Pasir Beton M3
4 Kerikil M3
5 Batu Gunung M3
6 Besi Tulangan Btg
7 Kayu Kelas II M3
8 Kayu Kelas III M3
9 Papan Bekisting M3
10 Batu Bata Buah
11 Besi Baja Galvanis Kg
12 Baut Galvanis Kg
13 Lampu Suar Bh
14 Solar Cell Bh
15 Baterey Bh
16 Radar Reflektor Bh
17 Cat Kg
18 Tiang BRC Unit
19 Pagar BRC Unit

PERSONIL DAN TENAGA KERJA


NO. URAIAN JUMLAH SATUAN
1 Site Manager Orang
2 Pelaksana Lapangan orang
3 Juru Gambar orang
4 Juru Ukur orang
5 Administrasi orang
6 Mandor orang
7 Kepala Tukang orang
8 Tukang orang
9 Pekerja orang

PERALATAN YANG DI GUNAKAN


NO. URAIAN JUMLAH SATUAN
1 Cangkul
2 Sekop
3 Kereta Sorong
4 Molen
5 Genset
6 Kuas

KETERANGAN CUACA Konsultan Pengawas Kontraktor Pelaksana


CERAH : Jam s/d CV. CITRA MARGA UTAMA CV. E-GROUP KARYA
HUJAN : Jam s/d
MENDUNG : Jam s/d

JAM KERJA
PAGI : Jam 08.00 s/d 12.00 SUKNI ACHMAD HANURA PERKASA
SIANG : Jam 13.00 s/d 17.00 Inspector Site Manager

CATATAN :
LAPORAN HARIAN
TANGGAL : Monday, May 22, 2017
HARI : Senin

PEKERJAAN : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH PELAKSANA : CV.E-GROUP KARYA
PENGAWAS : CV. CIPTA MARGA UTAMA

KEGIATAN HARI INI


BAHAN/ MATERIAL YANG MASUK
VOLUME NO. URAIAN JUMLAH SATUAN
NO. URAIAN SATUAN KONTRAK REALISASI YG BLM DI
LAKSANAKAN 1 Semen Sak
2 Pasir Pasang M3
1 Pengurusan Administrasi 3 Pasir Beton M3
4 Kerikil M3
5 Batu Gunung M3
6 Besi Tulangan Btg
7 Kayu Kelas II M3
8 Kayu Kelas III M3
9 Papan Bekisting M3
10 Batu Bata Buah
11 Besi Baja Galvanis Kg
12 Baut Galvanis Kg
13 Lampu Suar Bh
14 Solar Cell Bh
15 Baterey Bh
16 Radar Reflektor Bh
17 Cat Kg
18 Tiang BRC Unit
19 Pagar BRC Unit

PERSONIL DAN TENAGA KERJA


NO. URAIAN JUMLAH SATUAN
1 Site Manager Orang
2 Pelaksana Lapangan orang
3 Juru Gambar orang
4 Juru Ukur orang
5 Administrasi orang
6 Mandor orang
7 Kepala Tukang orang
8 Tukang orang
9 Pekerja orang

PERALATAN YANG DI GUNAKAN


NO. URAIAN JUMLAH SATUAN
1 Cangkul
2 Sekop
3 Kereta Sorong
4 Molen
5 Genset
6 Kuas

KETERANGAN CUACA Konsultan Pengawas Kontraktor Pelaksana


CERAH : Jam s/d CV. CITRA MARGA UTAMA CV. E-GROUP KARYA
HUJAN : Jam s/d
MENDUNG : Jam s/d

JAM KERJA
PAGI : Jam 08.00 s/d 12.00 SUKNI ACHMAD HANURA PERKASA
SIANG : Jam 13.00 s/d 17.00 Inspector Site Manager

CATATAN :
LAPORAN HARIAN
TANGGAL : Tuesday, May 23, 2017
HARI : Minggu

PEKERJAAN : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH PELAKSANA : CV.E-GROUP KARYA
PENGAWAS : CV. CIPTA MARGA UTAMA

KEGIATAN HARI INI


BAHAN/ MATERIAL YANG MASUK
VOLUME NO. URAIAN JUMLAH SATUAN
NO. URAIAN SATUAN KONTRAK REALISASI YG BLM DI
LAKSANAKAN 1 Semen Sak
2 Pasir Pasang M3
1 Pengurusan Administrasi 3 Pasir Beton M3
4 Kerikil M3
5 Batu Gunung M3
6 Besi Tulangan Btg
7 Kayu Kelas II M3
8 Kayu Kelas III M3
9 Papan Bekisting M3
10 Batu Bata Buah
11 Besi Baja Galvanis Kg
12 Baut Galvanis Kg
13 Lampu Suar Bh
14 Solar Cell Bh
15 Baterey Bh
16 Radar Reflektor Bh
17 Cat Kg
18 Tiang BRC Unit
19 Pagar BRC Unit

PERSONIL DAN TENAGA KERJA


NO. URAIAN JUMLAH SATUAN
1 Site Manager Orang
2 Pelaksana Lapangan orang
3 Juru Gambar orang
4 Juru Ukur orang
5 Administrasi orang
6 Mandor orang
7 Kepala Tukang orang
8 Tukang orang
9 Pekerja orang

PERALATAN YANG DI GUNAKAN


NO. URAIAN JUMLAH SATUAN
1 Cangkul
2 Sekop
3 Kereta Sorong
4 Molen
5 Genset
6 Kuas

KETERANGAN CUACA Konsultan Pengawas Kontraktor Pelaksana


CERAH : Jam s/d CV. CITRA MARGA UTAMA CV. E-GROUP KARYA
HUJAN : Jam s/d
MENDUNG : Jam s/d

JAM KERJA
PAGI : Jam 08.00 s/d 12.00 SUKNI ACHMAD HANURA PERKASA
SIANG : Jam 13.00 s/d 17.00 Inspector Site Manager

CATATAN :
LAPORAN HARIAN
TANGGAL : Wednesday, May 24, 2017
HARI : Rabu

PEKERJAAN : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH PELAKSANA : CV.E-GROUP KARYA
PENGAWAS : CV. CIPTA MARGA UTAMA

KEGIATAN HARI INI


BAHAN/ MATERIAL YANG MASUK
VOLUME NO. URAIAN JUMLAH SATUAN
NO. URAIAN SATUAN KONTRAK REALISASI YG BLM DI
LAKSANAKAN 1 Semen Sak
2 Pasir Pasang M3
1 Pengurusan Administrasi 3 Pasir Beton M3
4 Kerikil M3
5 Batu Gunung M3
6 Besi Tulangan Btg
7 Kayu Kelas II M3
8 Kayu Kelas III M3
9 Papan Bekisting M3
10 Batu Bata Buah
11 Besi Baja Galvanis Kg
12 Baut Galvanis Kg
13 Lampu Suar Bh
14 Solar Cell Bh
15 Baterey Bh
16 Radar Reflektor Bh
17 Cat Kg
18 Tiang BRC Unit
19 Pagar BRC Unit

PERSONIL DAN TENAGA KERJA


NO. URAIAN JUMLAH SATUAN
1 Site Manager Orang
2 Pelaksana Lapangan orang
3 Juru Gambar orang
4 Juru Ukur orang
5 Administrasi orang
6 Mandor orang
7 Kepala Tukang orang
8 Tukang orang
9 Pekerja orang

PERALATAN YANG DI GUNAKAN


NO. URAIAN JUMLAH SATUAN
1 Cangkul Bh
2 Sekop Bh
3 Kereta Sorong Bh
4 Molen Bh
5 Genset Bh
6 Kuas Bh

KETERANGAN CUACA Konsultan Pengawas Kontraktor Pelaksana


CERAH : Jam s/d CV. CITRA MARGA UTAMA CV. E-GROUP KARYA
HUJAN : Jam s/d
MENDUNG : Jam s/d

JAM KERJA
PAGI : Jam 08.00 s/d 12.00 SUKNI ACHMAD HANURA PERKASA
SIANG : Jam 13.00 s/d 17.00 Inspector Site Manager

CATATAN :
LAPORAN HARIAN
TANGGAL : Thursday, May 25, 2017
HARI : Kamis

PEKERJAAN : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH PELAKSANA : CV.E-GROUP KARYA
PENGAWAS : CV. CIPTA MARGA UTAMA

KEGIATAN HARI INI


BAHAN/ MATERIAL YANG MASUK
VOLUME NO. URAIAN JUMLAH SATUAN
NO. URAIAN SATUAN KONTRAK REALISASI YG BLM DI
LAKSANAKAN 1 Semen Sak
2 Pasir Pasang M3
1 Pengurusan Administrasi 3 Pasir Beton M3
4 Kerikil M3
5 Batu Gunung M3
6 Besi Tulangan Btg
7 Kayu Kelas II M3
8 Kayu Kelas III M3
9 Papan Bekisting M3
10 Batu Bata Buah
11 Besi Baja Galvanis Kg
12 Baut Galvanis Kg
13 Lampu Suar Bh
14 Solar Cell Bh
15 Baterey Bh
16 Radar Reflektor Bh
17 Cat Kg
18 Tiang BRC Unit
19 Pagar BRC Unit

PERSONIL DAN TENAGA KERJA


NO. URAIAN JUMLAH SATUAN
1 Site Manager Orang
2 Pelaksana Lapangan orang
3 Juru Gambar orang
4 Juru Ukur orang
5 Administrasi orang
6 Mandor orang
7 Kepala Tukang orang
8 Tukang orang
9 Pekerja orang

PERALATAN YANG DI GUNAKAN


NO. URAIAN JUMLAH SATUAN
1 Cangkul Bh
2 Sekop Bh
3 Kereta Sorong Bh
4 Molen Bh
5 Genset Bh
6 Kuas Bh

KETERANGAN CUACA Konsultan Pengawas Kontraktor Pelaksana


CERAH : Jam s/d CV. CITRA MARGA UTAMA CV. E-GROUP KARYA
HUJAN : Jam s/d
MENDUNG : Jam s/d

JAM KERJA
PAGI : Jam 08.00 s/d 12.00 SUKNI ACHMAD HANURA PERKASA
SIANG : Jam 13.00 s/d 17.00 Inspector Site Manager

CATATAN :
LAPORAN HARIAN
TANGGAL : Friday, May 26, 2017
HARI : Jumat

PEKERJAAN : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH PELAKSANA : CV.E-GROUP KARYA
PENGAWAS : CV. CIPTA MARGA UTAMA

KEGIATAN HARI INI


BAHAN/ MATERIAL YANG MASUK
VOLUME NO. URAIAN JUMLAH SATUAN
NO. URAIAN SATUAN KONTRAK REALISASI YG BLM DI
LAKSANAKAN 1 Semen Sak
2 Pasir Pasang M3
1 Pengurusan Administrasi 3 Pasir Beton M3
2 Persiapan Kelokasi 4 Kerikil M3
5 Batu Gunung M3
6 Besi Tulangan Btg
7 Kayu Kelas II M3
8 Kayu Kelas III M3
9 Papan Bekisting M3
10 Batu Bata Buah
11 Besi Baja Galvanis Kg
12 Baut Galvanis Kg
13 Lampu Suar Bh
14 Solar Cell Bh
15 Baterey Bh
16 Radar Reflektor Bh
17 Cat Kg
18 Tiang BRC Unit
19 Pagar BRC Unit

PERSONIL DAN TENAGA KERJA


NO. URAIAN JUMLAH SATUAN
1 Site Manager 1 Orang
2 Pelaksana Lapangan 1 orang
3 Juru Gambar 1 orang
4 Juru Ukur 1 orang
5 Administrasi 1 orang
6 Mandor 1 orang
7 Kepala Tukang 1 orang
8 Tukang 3 orang
9 Pekerja 6 orang

PERALATAN YANG DI GUNAKAN


NO. URAIAN JUMLAH SATUAN
1 Cangkul 6 Bh
2 Sekop 6 Bh
3 Kereta Sorong 6 Bh
4 Molen 1 Bh
5 Genset 1 Bh
6 Kuas 6 Bh

KETERANGAN CUACA Konsultan Pengawas Kontraktor Pelaksana


CERAH : Jam s/d CV. CITRA MARGA UTAMA CV. E-GROUP KARYA
HUJAN : Jam s/d
MENDUNG : Jam s/d

JAM KERJA
PAGI : Jam 08.00 s/d 12.00 SUKNI ACHMAD HANURA PERKASA
SIANG : Jam 13.00 s/d 17.00 Inspector Site Manager

CATATAN :
LAPORAN HARIAN
TANGGAL : Saturday, May 27, 2017
HARI : Sabtu

PEKERJAAN : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH PELAKSANA : CV.E-GROUP KARYA
PENGAWAS : CV. CIPTA MARGA UTAMA

KEGIATAN HARI INI


BAHAN/ MATERIAL YANG MASUK
VOLUME NO. URAIAN JUMLAH SATUAN
NO. URAIAN SATUAN KONTRAK REALISASI YG BLM DI
LAKSANAKAN 1 Semen 5.00 Sak
2 Pasir Pasang 4.00 M3
1 Mobilisasi Tenaga Kerja dan Material Ke Lapangan 3 Pasir Beton 4.00 M3
2 Peninjaun Lapangan 4 Kerikil 4.00 M3
3 Penentuan Titik Koordinat Tower 5 Batu Gunung 4.00 M3
6 Besi Tulangan Btg
7 Kayu Kelas II 1.00 M3
8 Kayu Kelas III 2.00 M3
9 Papan Bekisting 2.00 M3
10 Batu Bata Buah
11 Besi Baja Galvanis Kg
12 Baut Galvanis Kg
13 Lampu Suar Bh
14 Solar Cell Bh
15 Baterey Bh
16 Radar Reflektor Bh
17 Cat Kg
18 Tiang BRC Unit
19 Pagar BRC Unit

PERSONIL DAN TENAGA KERJA


NO. URAIAN JUMLAH SATUAN
1 Site Manager 1 Orang
2 Pelaksana Lapangan 1 orang
3 Juru Gambar 1 orang
4 Juru Ukur 1 orang
5 Administrasi 1 orang
6 Mandor 1 orang
7 Kepala Tukang 1 orang
8 Tukang 3 orang
9 Pekerja 6 orang

PERALATAN YANG DI GUNAKAN


NO. URAIAN JUMLAH SATUAN
1 Cangkul 6 Bh
2 Sekop 6 Bh
3 Kereta Sorong 6 Bh
4 Molen 1 Bh
5 Genset 1 Bh
6 Kuas 6 Bh

KETERANGAN CUACA Konsultan Pengawas Kontraktor Pelaksana


CERAH : Jam s/d CV. CITRA MARGA UTAMA CV. E-GROUP KARYA
HUJAN : Jam s/d
MENDUNG : Jam s/d

JAM KERJA
PAGI : Jam 08.00 s/d 12.00 SUKNI ACHMAD HANURA PERKASA
SIANG : Jam 13.00 s/d 17.00 Inspector Site Manager

CATATAN :
LAPORAN HARIAN
TANGGAL : Sunday, May 28, 2017
HARI : Minggu

PEKERJAAN : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH PELAKSANA : CV.E-GROUP KARYA
PENGAWAS : CV. CIPTA MARGA UTAMA

KEGIATAN HARI INI


BAHAN/ MATERIAL YANG MASUK
VOLUME NO. URAIAN JUMLAH SATUAN
NO. URAIAN SATUAN KONTRAK REALISASI YG BLM DI
LAKSANAKAN 1 Semen Sak
2 Pasir Pasang M3
1 Pembersihan Lokasi m2 225 132 3 Pasir Beton M3
2 Pembuatan Direksi Keet 4 Kerikil M3
5 Batu Gunung M3
6 Besi Tulangan Btg
7 Kayu Kelas II M3
8 Kayu Kelas III M3
9 Papan Bekisting M3
10 Batu Bata Buah
11 Besi Baja Galvanis Kg
12 Baut Galvanis Kg
13 Lampu Suar Bh
14 Solar Cell Bh
15 Baterey Bh
16 Radar Reflektor Bh
17 Cat Kg
18 Tiang BRC Unit
19 Pagar BRC Unit

PERSONIL DAN TENAGA KERJA


NO. URAIAN JUMLAH SATUAN
1 Site Manager 1 Orang
2 Pelaksana Lapangan 1 orang
3 Juru Gambar 1 orang
4 Juru Ukur 1 orang
5 Administrasi 1 orang
6 Mandor 1 orang
7 Kepala Tukang 1 orang
8 Tukang 3 orang
9 Pekerja 6 orang

PERALATAN YANG DI GUNAKAN


NO. URAIAN JUMLAH SATUAN
1 Cangkul 6 Bh
2 Sekop 6 Bh
3 Kereta Sorong 6 Bh
4 Molen 1 Bh
5 Genset 1 Bh
6 Kuas 6 Bh

KETERANGAN CUACA Konsultan Pengawas Kontraktor Pelaksana


CERAH : Jam s/d CV. CITRA MARGA UTAMA CV. E-GROUP KARYA
HUJAN : Jam s/d
MENDUNG : Jam s/d

JAM KERJA
PAGI : Jam 08.00 s/d 12.00 SUKNI ACHMAD HANURA PERKASA
SIANG : Jam 13.00 s/d 17.00 Inspector Site Manager

CATATAN :
LAPORAN HARIAN
TANGGAL : Monday, May 29, 2017
HARI : Senin

PEKERJAAN : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH PELAKSANA : CV.E-GROUP KARYA
PENGAWAS : CV. CIPTA MARGA UTAMA

KEGIATAN HARI INI


BAHAN/ MATERIAL YANG MASUK
VOLUME NO. URAIAN JUMLAH SATUAN
NO. URAIAN SATUAN KONTRAK REALISASI YG BLM DI
LAKSANAKAN 1 Semen Sak
2 Pasir Pasang M3
1 Pemberisahan Lokasi 3 Pasir Beton M3
2 Pemasangan Bowplank 4 Kerikil M3
5 Batu Gunung M3
6 Besi Tulangan Btg
7 Kayu Kelas II M3
8 Kayu Kelas III M3
9 Papan Bekisting M3
10 Batu Bata Buah
11 Besi Baja Galvanis Kg
12 Baut Galvanis Kg
13 Lampu Suar Bh
14 Solar Cell Bh
15 Baterey Bh
16 Radar Reflektor Bh
17 Cat Kg
18 Tiang BRC Unit
19 Pagar BRC Unit

PERSONIL DAN TENAGA KERJA


NO. URAIAN JUMLAH SATUAN
1 Site Manager 1 Orang
2 Pelaksana Lapangan 1 orang
3 Juru Gambar 1 orang
4 Juru Ukur 1 orang
5 Administrasi 1 orang
6 Mandor 1 orang
7 Kepala Tukang 1 orang
8 Tukang 3 orang
9 Pekerja 6 orang

PERALATAN YANG DI GUNAKAN


NO. URAIAN JUMLAH SATUAN
1 Cangkul 6 Bh
2 Sekop 6 Bh
3 Kereta Sorong 6 Bh
4 Molen 1 Bh
5 Genset 1 Bh
6 Kuas 6 Bh

KETERANGAN CUACA Konsultan Pengawas Kontraktor Pelaksana


CERAH : Jam s/d CV. CITRA MARGA UTAMA CV. E-GROUP KARYA
HUJAN : Jam s/d
MENDUNG : Jam s/d

JAM KERJA
PAGI : Jam 08.00 s/d 12.00 SUKNI ACHMAD HANURA PERKASA
SIANG : Jam 13.00 s/d 17.00 Inspector Site Manager

CATATAN :
LAPORAN HARIAN
TANGGAL : Tuesday, May 30, 2017
HARI : Selasa

PEKERJAAN : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH PELAKSANA : CV.E-GROUP KARYA
PENGAWAS : CV. CIPTA MARGA UTAMA

KEGIATAN HARI INI


BAHAN/ MATERIAL YANG MASUK
VOLUME NO. URAIAN JUMLAH SATUAN
NO. URAIAN SATUAN KONTRAK REALISASI YG BLM DI
LAKSANAKAN 1 Semen Sak
2 Pasir Pasang M3
1 Pemasangan Bowplank 3 Pasir Beton M3
4 Kerikil M3
5 Batu Gunung M3
6 Besi Tulangan Btg
7 Kayu Kelas II M3
8 Kayu Kelas III M3
9 Papan Bekisting M3
10 Batu Bata Buah
11 Besi Baja Galvanis Kg
12 Baut Galvanis Kg
13 Lampu Suar Bh
14 Solar Cell Bh
15 Baterey Bh
16 Radar Reflektor Bh
17 Cat Kg
18 Tiang BRC Unit
19 Pagar BRC Unit

PERSONIL DAN TENAGA KERJA


NO. URAIAN JUMLAH SATUAN
1 Site Manager 1 Orang
2 Pelaksana Lapangan 1 orang
3 Juru Gambar 1 orang
4 Juru Ukur 1 orang
5 Administrasi 1 orang
6 Mandor 1 orang
7 Kepala Tukang 1 orang
8 Tukang 3 orang
9 Pekerja 6 orang

PERALATAN YANG DI GUNAKAN


NO. URAIAN JUMLAH SATUAN
1 Cangkul 6 Bh
2 Sekop 6 Bh
3 Kereta Sorong 6 Bh
4 Molen 1 Bh
5 Genset 1 Bh
6 Kuas 6 Bh

KETERANGAN CUACA Konsultan Pengawas Kontraktor Pelaksana


CERAH : Jam s/d CV. CITRA MARGA UTAMA CV. E-GROUP KARYA
HUJAN : Jam s/d
MENDUNG : Jam s/d

JAM KERJA
PAGI : Jam 08.00 s/d 12.00 SUKNI ACHMAD HANURA PERKASA
SIANG : Jam 13.00 s/d 17.00 Inspector Site Manager

CATATAN :
LAPORAN HARIAN
TANGGAL : Wednesday, May 31, 2017
HARI : Rabu

PEKERJAAN : PEMBANGUNAN SARANA BANTU NAVIGASI PELAYARAN ACEH PELAKSANA : CV.E-GROUP KARYA
PENGAWAS : CV. CIPTA MARGA UTAMA

KEGIATAN HARI INI


BAHAN/ MATERIAL YANG MASUK
VOLUME NO. URAIAN JUMLAH SATUAN
NO. URAIAN SATUAN KONTRAK REALISASI YG BLM DI
LAKSANAKAN 1 Semen Sak
2 Pasir Pasang M3
3 Pasir Beton M3
4 Kerikil M3
5 Batu Gunung M3
6 Besi Tulangan Btg
7 Kayu Kelas II M3
8 Kayu Kelas III M3
9 Papan Bekisting M3
10 Batu Bata Buah
11 Besi Baja Galvanis Kg
12 Baut Galvanis Kg
13 Lampu Suar Bh
14 Solar Cell Bh
15 Baterey Bh
16 Radar Reflektor Bh
17 Cat Kg
18 Tiang BRC Unit
19 Pagar BRC Unit

PERSONIL DAN TENAGA KERJA


NO. URAIAN JUMLAH SATUAN
1 Site Manager 1 Orang
2 Pelaksana Lapangan 1 orang
3 Juru Gambar 1 orang
4 Juru Ukur 1 orang
5 Administrasi 1 orang
6 Mandor 1 orang
7 Kepala Tukang 1 orang
8 Tukang 3 orang
9 Pekerja 6 orang

PERALATAN YANG DI GUNAKAN


NO. URAIAN JUMLAH SATUAN
1 Cangkul 6 Bh
2 Sekop 6 Bh
3 Kereta Sorong 6 Bh
4 Molen 1 Bh
5 Genset 1 Bh
6 Kuas 6 Bh

KETERANGAN CUACA Konsultan Pengawas Kontraktor Pelaksana


CERAH : Jam s/d CV. CITRA MARGA UTAMA CV. E-GROUP KARYA
HUJAN : Jam s/d
MENDUNG : Jam s/d

JAM KERJA
PAGI : Jam 08.00 s/d 12.00 SUKNI ACHMAD HANURA PERKASA
SIANG : Jam 13.00 s/d 17.00 Inspector Site Manager

CATATAN :