You are on page 1of 1

Hole

Rod Extension 4.1 m (Lubang Bor)


Hole (Pipa Tambahan 4.1 m)
(Lubang Bor)

Rod Starter 6.1 m


Rod Starter 6.1 m (Pipa Drilling 6.1 meter)
(Pipa Drilling 6.1 meter) Hole
(Lubang Bor)

Bench Height 5 Meter


Hole target 5.5 Meter

Rod Starter 6.1 m


(Pipa Drilling 6.1 meter)
Bench Height 7.5 Meter
Hole target 8 Meter

You might also like