You are on page 1of 9

SPECIFICATION FOR PAINTING

PROJECT Pro. Part Scope Dis. Doc. SERIAL REV.


IGAT 6 D PL ME SPC 0009 02 7 1

SPECIFICATION FOR PAINTING

FINAL
02 MK A.N. M.M. 89.12 -
APPROVED
01 IFA MK BM AN 89.10 -
00 IFR MK BM AN 89.06 -

PURPOSE OF
REV. PREPARED CHECKED APPROVED DATE REMARKS
ISSUE

DOCUMENT REVISION SHEET


- REVISED SHEETS ISSUED FOR
ONLY ATTACHED
- REVIEW
- APRROVAL
- ENTIRE DOCUMENT - QUOTATION
RE-ISSUED - PURCHASE
- CONSTRUCTION
- INFORMATION

- ENTIRE DOCUMENT

REVISED

SPECIFICATION FOR PAINTING

PROJECT Pro. Part Scope Dis. Doc. SERIAL REV.


IGAT 6 D PL ME SPC 0009 02 7 2



SPECIFICATION FOR PAINTING

PROJECT Pro. Part Scope Dis. Doc. SERIAL REV.


IGAT 6 D PL ME SPC 0009 02 7 3

00 01 02 REMARK 00 01 02 REMARK
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

SPECIFICATION FOR PAINTING

PROJECT Pro. Part Scope Dis. Doc. SERIAL REV.


IGAT 6 D PL ME SPC 0009 02 7 4

Table of contents
1. Introduction
2. Scope
3. Definitions
4. Codes and standards
5. Painting systems

SPECIFICATION FOR PAINTING

PROJECT Pro. Part Scope Dis. Doc. SERIAL REV.


IGAT 6 D PL ME SPC 0009 02 7 5

1- Introduction
Iranian Gas Engineering & Development Company (I.G.E.D.C) has intended to perform gas
transmission pipeline and gas compressor stations for transferring of 110 MMSCMD of natural
gas to be fed from South Pars phases 22 ~ 24 from Assalouyeh to Bazargan.
Design of a new 56" gas transmission pipeline from Assalouyeh to Bazargan has been
described under this EPC Contract.
2- Scope
This specification covers the minimum requirement for material, surface preparation and
application of above ground protective painting for piping, equipment and steel structures
Launcher -Receiver trap and LBV stations.

3- Definitions
Client: Iranian Gas Engineering & Development Company (IGEDC).
MC: Ghods Niroo Consulting Engineers.
CONSULTANT: Haraz Rah Consulting Engineers.
CONTRACTOR: Gharargah Khatam-AL-Anbia.Niroo Goostar Institute.

4- Codes and standards


This specification is based on IPS standards as mentioned below;
IPS-E-TP-100 Engineering standard for paints
IPS-C-TP-101 Construction standard for Surface preparation
IPS-C-TP-102 Construction standard for Painting

SPECIFICATION FOR PAINTING

PROJECT Pro. Part Scope Dis. Doc. SERIAL REV.


IGAT 6 D PL ME SPC 0009 02 7 6

IPS-M-TP-130 Material and equipment standard for colored alkyd paint for top coat
(finish) except white
IPS-M-TP-215 Material and equipment standard for epoxy-polyamide primer
IPS-M-TP-220 Epoxy polyamide intermediate paint
IPS-M-TP-235 Material and equipment standard for two pack aliphatic polyurethane
paint as top-coat (finish)
IPS-M-TP-115 Red lead, iron oxide, raw linseed oil and alkyd primer
IPS-M-TP-250 Amine-cured epoxy resin as primer, intermediate, and top-coat for
atmospheric environment
01 IGS-O-CH-042(0)
It is necessary that Latest edition of standards which mentioned above shall be used & the
hard copies of them shall be issued with the relevant requisition for information of vendors &
construction personnel only.
5- Painting systems
Painting system has been selected based on IPS-E-TP-100. For details refer to table 1
& 2.

Table 1 Pipe works, Equipments, Painting system (External surfaces)*


Surface preparation (Note 3)
Paint system No.(Note 2)

Intermediate coat (IC)


Primer coat (PC)

Top coat (TC)


Life (years)

Minimum dry film thickness


Station

(micron)

Epoxy Epoxy Two pack


All launcher - Long PC IC TC TOTAL
SA polyamide polyamide poly
receiver & (10-15) 7C
2 1/2 (IPS-M- (IPS-M- urethane
LBV stations (Note 1) 70 100 70 240
TP-215) TP-220) (IPS-M-

SPECIFICATION FOR PAINTING

PROJECT Pro. Part Scope Dis. Doc. SERIAL REV.


IGAT 6 D PL ME SPC 0009 02 7 7

TP-235)

Refer to IPS-E-TP-100, Table 2, group 7 and note 1 below group 7.

(*) ACC. to IPS-E-TP-100(Table 1), Para .2.1.


NOTES:
1- Refer to IPS-E-TP-100 (Engineering standard for paints) Para.9.1.
2- Paint system numbers are specified according to table 1 Para. 1.2 & 1.2.2 of IPS-E-
TP-100. For paint color schedule see table 3 below.
3- Refer to IPS-E-TP-100 Para. 8.2.3 and IPS-C-TP-101.
4- Equipments are referred to Launcher Receiver scraper traps.

Table 2 Exposed steel structure (Platforms, etc )*


Surface preparation (Note 3)
Paint system No.(Note 2)

Intermediate coat (IC)


Primer coat (PC)

Top coat (TC)


Life (years)

Minimum dry film thickness


Station

(micron)

Alkyd Alkyd
Red lead PC IC TC TOTAL
paint paint
All launcher - Medium ST 3 (IPS-M-
(IPS-M- (IPS-M-
receiver & (5-10) 1E TP-115) 70 80 80 230
TP-130) TP-130)
LBV stations (Note 1)

Refer to IPS-E-TP-100, Table 2 group 1.



SPECIFICATION FOR PAINTING

PROJECT Pro. Part Scope Dis. Doc. SERIAL REV.


IGAT 6 D PL ME SPC 0009 02 7 8

(*) ACC. to IPS-E-TP-100 (Table 1), Para .1.2.2.


NOTES:
1- Refer to IPS-E-TP-100 (Engineering standard for paints) Para.9.1.
2- Paint system numbers are specified according to table 1 Para. 1.2.2 of IPS-E-TP-
100. For paint color schedule see table 3 below.
3- Refer to IPS-E-TP-100 Para. 8.2.3 and IPS-C-TP-101.

Table 3 paint color schedule for pipe works,


equipments steel structure and etc*
Item Color (see note 1)
A) Pipe work
1. Gas lines Canary yellow to BS 381C NO. 309 or Ral 1023
2. Vent & drain lines White (Ral 9010)
B) Equipments
1. Scraper traps White (Ral 1090)
2. Valves, Flange to Flange on gas-line White & Canary yellow to BS 381C NO.309
* Refer to IPS-E-TP-100 (Engineering standard for paints) sec.11
1- For information only. Finalized later with end user.