Objective Welding Opertions for ICV , Dummy weld cover and CSS-1
Preparation Ensure all the requirements are fulfilled as per the Machine Start up check sheet , Shift Startup Checksheet and Process Parameter.
1.Part - Rework .
2. Production Rejection Hourly Report - . Process Parameter PPS
Set Vs Actual .
3. For Defective part , mark the defective area and Identify with "NO PASS" sticker and & Follow NC Part Handling Procedure document no Pdn/WI/10
4. In case of any abnormality found during the operation, stop the machine & inform shift leader / maintenance.
Special Instructions
5. Shift- Rejection Details Scrap Note , Slug Rejection Part Scrap- Move .
7. machine parameter minimum value . (For ex (20010) value (190) , Nominal value
.