You are on page 1of 35

DENSIDAD DE MUROS VERIFICACION DE LA DENS

DATOS TIPO EDIFICACION ( A B) B Am = Area en planta de muros en


Ap = Area en planta de la edificac
ANCHO DE MUROS DE SOGA = 0.13 m N = Numero de pisos de la edific
ANCHO DE MUROS DE CABEZA = 0.23 m
Am N
>
Area 1 piso = 257.67 m2 Ap 130
Area 2 piso = 257.67 m2
Area 3 piso = 257.67 m2 Am N
>
Area 4 piso = 257.67 m2 Ap 140
Nmero de pisos = 4
PISO N 1
DIRECCION X DIRECCION Y VERIFICACION
MURO MURO
t= 0.13 t= 0.23 t= 0.13 t= 0.23 X-X Am =
1X 4.15 1Y 8.35
2X 2.60 2Y 3.90
3X 3.60 3Y 3.45 Am
=
4X 3.60 4Y 3.90 Ap
5X 2.20 5Y 2.05
6X 7.35 6Y 3.10 N
=
7X 5.75 7Y 1.75 140
8X 4.00 8Y 8.35
9X 4.15 9Y 1.75 Y-Y Am =
10X 2.60 10Y 3.10
11X 3.60 11Y 2.05
12X 3.60 12Y 3.90 Am
=
13X 2.20 13Y 3.45 Ap
14X 5.75 14Y 3.90
15Y 8.35 N
=
16Y 2.90 140
17Y 2.90

TOTALES 27.25 27.90 23.90 43.25


55.15 67.15

PISO N 2
DIRECCION X DIRECCION Y VERIFICACION
MURO MURO
t= 0.13 t= 0.23 t= 0.13 t= 0.23 X-X Am =
1X 4.15 1Y 8.35
2X 2.60 2Y 3.90
3X 3.60 3Y 3.45 Am
=
4X 3.60 4Y 3.90 Ap
5X 2.20 5Y 2.05
6X 7.35 6Y 3.10 N
=
7X 5.75 7Y 1.75 140
8X 4.00 8Y 8.35
9X 4.15 9Y 1.75 Y-Y Am =
10X 2.60 10Y 3.10
11X 3.60 11Y 2.05
12X 3.60 12Y 3.90 Am
=
13X 2.20 13Y 3.45 Ap
14X 5.75 14Y 3.90
15Y 8.35 N
=
16Y 2.90 140
17Y 2.90

TOTALES 27.25 27.90 23.90 43.25


IFICACION DE LA DENSIDAD DE MUROS

ea en planta de muros en cada direccin (m2)


ea en planta de la edificacin por piso (m2)
umero de pisos de la edificacin

Para edificios (A)

Para viviendas de 1 2 pisos (B)

VERIFICACION
9.96 m2

0.03865
OK

0.02857

13.05 m2

0.05066
OK

0.02857

VERIFICACION
9.96 m2

0.03865
OK

0.02857

13.05 m2

0.05066
OK

0.02857
ANALISIS DE MUROS POR CARGA VERTICAL
Anlisis para un metro lineal de Muro

DATOS PESO DE ALBAILERIA 1800 (Kg/m3)


N DE PISOS 4 pisos
PESO DE ALIGERADO 280 (Kg/m2)
PESO DE ACABADOS 100 (Kg/m2)
PESO DE CONCRETO 2400 (Kg/m3)
ALTURA DEL MURO 2.4 (m)
SOBRECARGA 1 NIVEL 200 (Kg/m2)
SOBRECARGA 2 NIVEL 150 (Kg/m2)

EN LA DIRECCION "X"

ESPESOR AREA PESO PROPIO PESO PESO PESO TOTAL


MURO t TRIBUTARIA MUROS TECHO ACABADOS PARAPETOS CARGA
N ALIGERADO DE ALIGERADO MUERTA ( Pd )
(m) (m2) (Kg) (Kg) (Kg) (Kg) (Kg)
1X 0.23 3,974.40 - - 210.60 4,185.00
2X 0.23 3,974.40 - - 3,974.40
3X 0.23 3,974.40 - - 3,974.40
4X 0.23 3,974.40 - - 3,974.40
5X 0.13 2.125 2,246.40 2,380.00 850.00 5,476.40
6X 0.13 2.125 2,246.40 2,380.00 850.00 210.60 5,687.00
7X 0.13 2.125 2,246.40 2,380.00 850.00 210.60 5,687.00
8X 0.13 0.600 2,246.40 672.00 240.00 210.60 3,369.00
9X 0.23 3,974.40 - - 210.60 4,185.00
10X 0.23 3,974.40 - - 3,974.40
11X 0.23 3,974.40 - - 3,974.40
12X 0.23 3,974.40 - - 3,974.40
13X 0.13 2.125 2,246.40 2,380.00 850.00 5,476.40
14X 0.13 2.125 2,246.40 2,380.00 850.00 210.60 5,687.00

EN LA DIRECCION "Y"

ESPESOR AREA PESO PROPIO PESO PESO PESO TOTAL


MURO t TRIBUTARIA MUROS TECHO ACABADOS PARAPETOS CARGA
ALIGERADO DE ALIGERADO MUERTA ( Pd )
(m) (m2) (Kg) (Kg) (Kg) (Kg) (Kg)
1Y 0.23 1.900 3,974.40 2,128.00 760.00 210.60 7,073.00
2Y 0.23 3.600 3,974.40 4,032.00 1,440.00 9,446.40
3Y 0.23 3.600 3,974.40 4,032.00 1,440.00 9,446.40
4Y 0.13 3.650 2,246.40 4,088.00 1,460.00 7,794.40
5Y 0.13 3.650 2,246.40 4,088.00 1,460.00 7,794.40
6Y 0.13 - 2,246.40 - - 210.60 2,457.00
7Y 0.23 1.825 3,974.40 2,044.00 730.00 210.60 6,959.00
8Y 0.23 3.650 3,974.40 4,088.00 1,460.00 210.60 9,733.00
9Y 0.23 1.825 3,974.40 2,044.00 730.00 210.60 6,959.00
10Y 0.13 - 2,246.40 - - 2,246.40
11Y 0.13 3.650 2,246.40 4,088.00 1,460.00 7,794.40
12Y 0.13 3.650 2,246.40 4,088.00 1,460.00 7,794.40
13Y 0.23 3.600 3,974.40 4,032.00 1,440.00 9,446.40
14Y 0.23 3.600 3,974.40 4,032.00 1,440.00 210.60 9,657.00
15Y 0.23 1.900 3,974.40 2,128.00 760.00 210.60 7,073.00
16Y 0.13 - 2,246.40 - - 210.60 2,457.00
17Y 0.13 - 2,246.40 - - 210.60 2,457.00
GA VERTICAL

TOTAL ESFUERZO ESFUERZO ESFUERZO ESFUERZO VERIFICACION


CARGA ACT. POR ACT. POR ACTIVO ADMISIBLE
VIVA ( PL ) C. MUERTA C. VIVA TOTAL fa < Fa
(Kg) fd (Kg/cm2) fL (Kg/cm2) fa (Kg/cm2) Fa (Kg/cm2)
- 1.82 - 1.82 10.93 OK!
- 1.73 - 1.73 10.93 OK!
- 1.73 - 1.73 10.93 OK!
- 1.73 - 1.73 10.93 OK!
1,593.75 4.21 1.23 5.44 8.66 OK!
1,593.75 4.37 1.23 5.60 8.66 OK!
1,593.75 4.37 1.23 5.60 8.66 OK!
450.00 2.59 0.35 2.94 8.66 OK!
- 1.82 - 1.82 10.93 OK!
- 1.73 - 1.73 10.93 OK!
- 1.73 - 1.73 10.93 OK!
- 1.73 - 1.73 10.93 OK!
1,593.75 4.21 1.23 5.44 8.66 OK!
1,593.75 4.37 1.23 5.60 8.66 OK!

TOTAL ESFUERZO ESFUERZO ESFUERZO ESFUERZO VERIFICACION


CARGA ACT. POR ACT. POR ACTIVO ADMISIBLE
VIVA ( PL ) C. MUERTA C. VIVA TOTAL fa < Fa
(Kg) fd (Kg/cm2) fL (Kg/cm2) fa (Kg/cm )
2
Fa (Kg/cm )
2

1,425.00 3.08 0.62 3.69 10.93 OK! 59,059.55


2,700.00 4.11 1.17 5.28 10.93 OK! 36,840.96
2,700.00 4.11 1.17 5.28 10.93 OK! 32,590.08
2,737.50 6.00 2.11 8.10 8.66 OK! 30,398.16
2,737.50 6.00 2.11 8.10 8.66 OK! 15,978.52
- 1.89 - 1.89 8.66 OK! 7,616.70
1,368.75 3.03 0.60 3.62 10.93 OK! 12,178.25
2,737.50 4.23 1.19 5.42 10.93 OK! 81,270.55
1,368.75 3.03 0.60 3.62 10.93 OK! 12,178.25
- 1.73 - 1.73 8.66 OK! 6,963.84
2,737.50 6.00 2.11 8.10 8.66 OK! 15,978.52
2,737.50 6.00 2.11 8.10 8.66 OK! 30,398.16
2,700.00 4.11 1.17 5.28 10.93 OK! 32,590.08
2,700.00 4.20 1.17 5.37 10.93 OK! 37,662.30
1,425.00 3.08 0.62 3.69 10.93 OK! 59,059.55
- 1.89 - 1.89 8.66 OK! 7,125.30
- 1.89 - 1.89 8.66 OK! 7,125.30
11,898.75 70,958.30 19,205.00 3.69
10,530.00 47,370.96 8,970.00 5.28
9,315.00 41,905.08 7,935.00 5.28
10,676.25 41,074.41 5,070.00 8.10
5,611.88 21,590.40 2,665.00 8.10
- 7,616.70 4,030.00 1.89
2,395.31 14,573.56 4,025.00 3.62
22,858.13 104,128.68 19,205.00 5.42
2,395.31 14,573.56 4,025.00 3.62
- 6,963.84 4,030.00 1.73
5,611.88 21,590.40 2,665.00 8.10
10,676.25 41,074.41 5,070.00 8.10
9,315.00 41,905.08 7,935.00 5.28
10,530.00 48,192.30 8,970.00 5.37
11,898.75 70,958.30 19,205.00 3.69
- 7,125.30 3,770.00 1.89
- 7,125.30 3,770.00 1.89
DATOS
PESO DE ALBAILERIA 1800 (Kg/m3)
N DE PISOS 4
PESO DE ALIGERADO 280 (Kg/m2)
PESO DE ACABADOS 100 (Kg/m2)
AREA TECHADA 257.67 m2
ALTURA DEL MURO 2.4 (m)
LONGITUD DE MUROS PORTANTES (DIRECCION "X")
PARA t = 0.13 L= 27.25 m
PARA t = 0.23 L= 27.90 m
LONGITUD DE MUROS PORTANTES (DIRECCION "X")
PARA t = 0.13 L= 23.90 m
PARA t = 0.23 L= 43.25 m
LONG. DE MUROS NO PORTANTES 2.90 m
LONG. DE ALFEIZARES 20.55 m
ALTURA DE ALFEIZARES 0.90 m
LONGITUD DE PARAPETOS 76.70 m
ALTURA DE PARAPETOS 0.90 m
SOBRECARGA 1 NIVEL 200 (Kg/m2) % PART. 25%
SOBRECARGA 2 NIVEL 150 (Kg/m2) % PART. 25%

PESO DE PESO DE PESO DE PESO DE PESO PESO DE


PISO MUROS MUROS NO ALFEIZARES LOSA DE PARAPETO
PORTANTES PORTANTES ALIGERADA ACABADOS

4 99,420.48 1,628.64 4,327.83 72,147.60 25,767.00 16,153.02


3 99,420.48 1,628.64 4,327.83 72,147.60 25,767.00
2 99,420.48 1,628.64 4,327.83 72,147.60 25,767.00
1 99,420.48 1,628.64 4,327.83 72,147.60 25,767.00

397,681.92 6,514.56 17,311.32 288,590.40 103,068.00 16,153.02


DATOS

ZONA : Factor de Zona Z=


USO : Factor de Uso U=
SUELO : Factor de suelo S=
Periodo del Perfil Tp =
Ductilidad Rd =
Ct =

Nmero de pisos n=
Altura del primer piso h1er piso. =
Altura de entrepiso hentre piso =
Altura total del edificio hn =

Prticos Placas de Albailera


Sist. Dual Concreto armada
Desp. Mximo d d=0.007he d=0.007he d=0.005he
90.1845000 90.1845000 64.4175000
Ductibilidad Rd 10 7.5 6
Desp. Elstico Mximo d 1 = d / Rd 9.0184500 12.0246000 10.7362500

TOTAL DE TOTAL DE PESO TOTAL Fi Vi


CARGA CARGA DEL Pihi(V) (Ton)
MUERTA VIVA EDIFICIO hi Pihi S Pihi Vi=(Vi+1)+Fi

"CM" "CV" Pi= CM +CV

219,444.57 9,662.63 229,107.20 10.28 2355221.96 72671.80 72671.799


203,291.55 12,883.50 216,175.05 7.71 1666709.64 51427.33 124099.134
203,291.55 12,883.50 216,175.05 5.14 1111139.76 34284.89 158384.024
203,291.55 12,883.50 216,175.05 2.57 555569.88 17142.44 175526.469

829,319.22 48,313.13 877,632.35 5688641.24 175526.47


S CM S CV Pedif S Pihi
0.40 Periodo Fund. Edificio : T = hn / Ct T=
1.00 Factor de Amplif. Ssmica: C=2.5(Tp/T) 1.25
<= 2.5 C=
1.20
0.90 Peso del Edificio : P = CM + CV P=
6.00
60.00 FUERZA CORTANTE EN LA BASE : V = ZUCSP/Rd V=

4.00 Si : T < 0.7 ===> Fa = 0 Fa =


2.57 Si : T > 0.7 ===> Fa =0.07TV <= 0.15V
2.57
10.28

Calculo h (para analisis x flexion)


Fi/V hi (Fi/V)*hi
0.41 10.28 4.21
0.29 7.71 2.24
0.20 5.14 1.03
0.10 2.57 0.26
7.74 =h
0.17
2.50

877,632.35 Kg

175,526.47 Kg

-
ANALISIS SISMICO EN LA DIRECCION Y-Y PISO N 1
Cortante basal entrepiso Vx = 175,526.47 Kg Momento polar de Inercia J = 91.1847
Ancho de edificacin Dy = 12.450 m
centro de gravedad Yg = 7.1937 m
centro de torsin Ycr=Sy.Kx/SKx= 6.4207 m
exentricidad ey = Yg - Ycr = 0.7730 m Mtx1 = Vx(ey + eacc) = 354,212.41 Kg-m
excent. Accidental eacc= 0.1Dy = 1.2450 m Mtx2 = Vx(ey - eacc) = -82,848.49 Kg-m

PISO: 01 DATOS GEOMETRICOS DIRECCION X-X DIRECCION Y-Y


(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)
MURO ESPESOR ALTURA LONGITUD x y RIGIDEZ X-X Cortante Trasl. % Absorcion RIGIDEZ Y-Y Cortante Trasl.
t (m) h (m) L (m) (m) (m) Kx/Em Vtras (Kg) (Vi/Vx)*100% Ky/Em Vtras (Kg)
1x 0.23 2.40 4.15 3.675 12.325 0.091685 17406.040 9.92% 0.000907 122.816
2x 0.23 2.40 2.60 1.300 8.675 0.038882 7381.616 4.21% 0.000568 76.945
3x 0.23 2.40 3.60 6.550 8.675 0.072209 13708.705 7.81% 0.000787 106.539
4x 0.23 2.40 3.60 6.550 7.175 0.072209 13708.705 7.81% 0.000787 106.539
5x 0.13 2.40 2.20 2.700 4.175 0.015356 2915.264 1.66% 0.000087 11.811
6x 0.13 2.40 7.35 10.875 4.175 0.116190 22058.369 12.57% 0.000291 39.461
7x 0.13 2.40 5.75 4.475 0.075 0.084249 15994.476 9.11% 0.000228 30.871
8x 0.13 2.40 4.00 10.850 0.075 0.048799 9264.296 5.28% 0.000159 21.475
9x 0.23 2.40 4.15 18.075 12.325 0.091685 17406.040 9.92% 0.000907 122.816
10x 0.23 2.40 2.60 20.450 8.675 0.038882 7381.616 4.21% 0.000568 76.945
11x 0.23 2.40 3.60 15.200 8.675 0.072209 13708.705 7.81% 0.000787 106.539
12x 0.23 2.40 3.60 15.200 7.175 0.072209 13708.705 7.81% 0.000787 106.539
13x 0.13 2.40 2.20 19.050 4.175 0.015356 2915.264 1.66% 0.000087 11.811
14x 0.13 2.40 5.75 17.275 0.075 0.084249 15994.476 9.11% 0.000228 30.871

1y 8.35 2.40 0.23 0.125 8.275 0.001825 346.416 0.20% 0.240270 32538.472
2y 3.90 2.40 0.23 3.675 10.500 0.000852 161.799 0.09% 0.082783 11210.907
3y 3.45 2.40 0.23 3.675 5.825 0.000754 143.130 0.08% 0.066986 9071.558
4y 3.90 2.40 0.13 7.275 10.500 0.000155 29.353 0.02% 0.046791 6336.600
5y 2.05 2.40 0.13 7.275 5.125 0.000081 15.429 0.01% 0.013091 1772.809
6y 3.10 2.40 0.13 7.275 1.550 0.000123 23.332 0.01% 0.031110 4213.067
7y 1.75 2.40 0.23 8.225 7.925 0.000382 72.602 0.04% 0.015937 2158.249
8y 8.35 2.40 0.23 10.875 8.275 0.001825 346.416 0.20% 0.240270 32538.472
9y 1.75 2.40 0.23 13.525 7.925 0.000382 72.602 0.04% 0.015937 2158.249
10y 3.10 2.40 0.13 14.475 1.550 0.000123 23.332 0.01% 0.031110 4213.067
11y 2.05 2.40 0.13 14.475 5.125 0.000081 15.429 0.01% 0.013091 1772.809
12y 3.90 2.40 0.13 14.475 10.500 0.000155 29.353 0.02% 0.046791 6336.600
13y 3.45 2.40 0.23 18.075 5.825 0.000754 143.130 0.08% 0.066986 9071.558
14y 3.90 2.40 0.23 18.075 10.500 0.000852 161.799 0.09% 0.082783 11210.907
15y 8.35 2.40 0.23 21.625 8.275 0.001825 346.416 0.20% 0.240270 32538.472
16y 2.90 2.40 0.13 9.550 2.800 0.000115 21.826 0.01% 0.027368 3706.348
17y 2.90 2.40 0.13 12.200 2.800 0.000115 21.826 0.01% 0.027368 3706.348
0.924569 175,526.469 100.00% 1.296120 175,526.469
S Kx/Em Vx S Ky/Em Vy
ANALISIS SISMICO EN LA DIRECCION X-X PISO N 1
Cortante basal entrepiso Vx = 175,526.47 Kg Momento polar de Inercia J = 91.1847
Ancho de edificacin Dx = 21.750 m
centro de gravedad Xg = 10.8744 m
centro de torsin Xcr=Sx.Ky/SKy= 10.8750 m
exentricidad ex = Xg -Xcr = -0.0006 m Mty1 = Vy(ex + eacc) = 381,875.39 Kg-m
excent. Accidental eacc= 0.1Dx = 2.1750 m Mty2 = Vy(ex - eacc) = -381,664.75 Kg-m

IRECCION Y-Y CENTRO RIGIDEZ CENTRO DE MASA MOMENTO POLAR DE INERCIA


(11) (12) (13) (14) (15) (16) (17) (18) (19) (20) (21)
% Absorcion y . Kx/Em y . Ky/Em Peso: Pi Pi * x Pi * y (x - Xcr) (Ky/Em)(x-Xcr)2 (y - Ycr) (Kx/Em)(y-Ycr)2 J
(Vi/Vy)*100% (5) * (4) (1)*(2)*(3)*1800 (4) * (14) (5) * (14) (4) - Xcr (9)(17) 2
(5) - Ycr (6)(19) 2
(18) + (20)
0.07% 1.130013 0.003333 4123.440 15,153.642 50,821.398 -7.2000 0.0470 5.9043 3.1961 3.2432
0.04% 0.337301 0.000739 2583.360 3,358.368 22,410.648 -9.5750 0.0521 2.2543 0.1976 0.2497
0.06% 0.626416 0.005153 3576.960 23,429.088 31,030.128 -4.3250 0.0147 2.2543 0.3669 0.3817
0.06% 0.518102 0.005153 3576.960 23,429.088 25,664.688 -4.3250 0.0147 0.7543 0.0411 0.0558
0.01% 0.064111 0.000235 1235.520 3,335.904 5,158.296 -8.1750 0.0058 -2.2457 0.0774 0.0833
0.02% 0.485095 0.003169 4127.760 44,889.390 17,233.398 0.0000 0.0000 -2.2457 0.5860 0.5860
0.02% 0.006319 0.001020 3229.200 14,450.670 242.190 -6.4000 0.0093 -6.3457 3.3926 3.4019
0.01% 0.003660 0.001721 2246.400 24,373.440 168.480 -0.0250 0.0000 -6.3457 1.9651 1.9651
0.07% 1.130013 0.016392 4123.440 74,531.178 50,821.398 7.2000 0.0470 5.9043 3.1961 3.2432
0.04% 0.337301 0.011619 2583.360 52,829.712 22,410.648 9.5750 0.0521 2.2543 0.1976 0.2497
0.06% 0.626416 0.011958 3576.960 54,369.792 31,030.128 4.3250 0.0147 2.2543 0.3669 0.3817
0.06% 0.518102 0.011958 3576.960 54,369.792 25,664.688 4.3250 0.0147 0.7543 0.0411 0.0558
0.01% 0.064111 0.001661 1235.520 23,536.656 5,158.296 8.1750 0.0058 -2.2457 0.0774 0.0833
0.02% 0.006319 0.003938 3229.200 55,784.430 242.190 6.4000 0.0093 -6.3457 3.3926 3.4019

18.54% 0.015100 0.030034 8296.560 1,037.070 68,654.034 -10.7500 27.7662 1.8543 0.0063 27.7725
6.39% 0.008949 0.304229 3875.040 14,240.772 40,687.920 -7.2000 4.2915 4.0793 0.0142 4.3057
5.17% 0.004392 0.246174 3427.920 12,597.606 19,967.634 -7.2000 3.4726 -0.5957 0.0003 3.4728
3.61% 0.001623 0.340402 2190.240 15,933.996 22,997.520 -3.6000 0.6064 4.0793 0.0026 0.6090
1.01% 0.000417 0.095235 1151.280 8,375.562 5,900.310 -3.6000 0.1697 -1.2957 0.0001 0.1698
2.40% 0.000190 0.226326 1740.960 12,665.484 2,698.488 -3.6000 0.4032 -4.8707 0.0029 0.4061
1.23% 0.003031 0.131081 1738.800 14,301.630 13,779.990 -2.6500 0.1119 1.5043 0.0009 0.1128
18.54% 0.015100 2.612938 8296.560 90,225.090 68,654.034 0.0000 0.0000 1.8543 0.0063 0.0063
1.23% 0.003031 0.215547 1738.800 23,517.270 13,779.990 2.6500 0.1119 1.5043 0.0009 0.1128
2.40% 0.000190 0.450318 1740.960 25,200.396 2,698.488 3.6000 0.4032 -4.8707 0.0029 0.4061
1.01% 0.000417 0.189489 1151.280 16,664.778 5,900.310 3.6000 0.1697 -1.2957 0.0001 0.1698
3.61% 0.001623 0.677294 2190.240 31,703.724 22,997.520 3.6000 0.6064 4.0793 0.0026 0.6090
5.17% 0.004392 1.210773 3427.920 61,959.654 19,967.634 7.2000 3.4726 -0.5957 0.0003 3.4728
6.39% 0.008949 1.496310 3875.040 70,041.348 40,687.920 7.2000 4.2915 4.0793 0.0142 4.3057
18.54% 0.015100 5.195841 8296.560 179,413.110 68,654.034 10.7500 27.7662 1.8543 0.0063 27.7725
2.11% 0.000322 0.261368 1628.640 15,553.512 4,560.192 -1.3250 0.0480 -3.6207 0.0015 0.0496
2.11% 0.000322 0.333894 1628.640 19,869.408 4,560.192 1.3250 0.0480 -3.6207 0.0015 0.0496
100.00% 5.936423 14.095302 99,420.480 1,081,141.560 715,202.784 91.1847
S y.Kx/Em S x.Ky/Em S Pi S Pi * xi S Pi * yi S Ji

10.87
INCREMENTO DE CORTANTES POR TORSIN (D) CORTANTES DE DISEO
(22) (23) (24) (25) (26) (27) (28) (29) (30) (31) (32)
DV1X DV2X DVX DV1Y DV2Y DVY VX Diseo % de Vy Diseo % de V Final diseo
Mtx1*(6)(19)/J Mtx2*(6)(19)/J (asumido) Mtx1*(9)(17)/J Mtx2*(9)(17)/J (asumido) (7) + (24) Absorcin (10) + (27) Absorcin El > de (28) y (30)
2102.826 -491.840 2102.826 -27.346 27.331 27.331 19,508.866 11.11% 150.146 0.09% 19,508.866
340.481 -79.637 340.481 -22.783 22.771 22.771 7,722.097 4.40% 99.716 0.06% 7,722.097
632.321 -147.897 632.321 -14.249 14.242 14.242 14,341.026 8.17% 120.781 0.07% 14,341.026
211.569 -49.485 211.569 -14.249 14.242 14.242 13,920.274 7.93% 120.781 0.07% 13,920.274
-133.961 31.333 31.333 -2.986 2.984 2.984 2,946.596 1.68% 14.796 0.01% 2,946.596
-1013.614 237.079 237.079 0.000 0.000 0.000 22,295.448 12.70% 39.461 0.02% 22,295.448
-2076.783 485.749 485.749 -6.110 6.106 6.106 16,480.225 9.39% 36.977 0.02% 16,480.225
-1202.911 281.355 281.355 -0.017 0.017 0.017 9,545.651 5.44% 21.492 0.01% 9,545.651
2102.826 -491.840 2102.826 27.346 -27.331 27.346 19,508.866 11.11% 150.161 0.09% 19,508.866
340.481 -79.637 340.481 22.784 -22.771 22.784 7,722.097 4.40% 99.728 0.06% 7,722.097
632.321 -147.897 632.321 14.249 -14.242 14.249 14,341.026 8.17% 120.788 0.07% 14,341.026
211.569 -49.485 211.569 14.249 -14.242 14.249 13,920.274 7.93% 120.788 0.07% 13,920.274
-133.961 31.333 31.333 2.986 -2.984 2.986 2,946.596 1.68% 14.797 0.01% 2,946.596
-2076.783 485.749 485.749 6.110 -6.106 6.110 16,480.225 9.39% 36.981 0.02% 16,480.225

13.143 -3.074 13.143 -10817.022 10811.056 10811.056 359.560 0.20% 43,349.528 24.70% 43,349.528
13.505 -3.159 13.505 -2496.176 2494.800 2494.800 175.304 0.10% 13,705.707 7.81% 13,705.707
-1.745 0.408 0.408 -2019.837 2018.723 2018.723 143.538 0.08% 11,090.281 6.32% 11,090.281
2.450 -0.573 2.450 -705.441 705.052 705.052 31.803 0.02% 7,041.651 4.01% 7,041.651
-0.409 0.096 0.096 -197.363 197.254 197.254 15.525 0.01% 1,970.064 1.12% 1,970.064
-2.325 0.544 0.544 -469.032 468.774 468.774 23.876 0.01% 4,681.840 2.67% 4,681.840
2.235 -0.523 2.235 -176.868 176.770 176.770 74.837 0.04% 2,335.019 1.33% 2,335.019
13.143 -3.074 13.143 0.003 -0.003 0.003 359.560 0.20% 32,538.476 18.54% 32,538.476
2.235 -0.523 2.235 176.868 -176.771 176.868 74.837 0.04% 2,335.117 1.33% 2,335.117
-2.325 0.544 0.544 469.033 -468.774 469.033 23.876 0.01% 4,682.100 2.67% 4,682.100
-0.409 0.096 0.096 197.364 -197.255 197.364 15.525 0.01% 1,970.173 1.12% 1,970.173
2.450 -0.573 2.450 705.442 -705.053 705.442 31.803 0.02% 7,042.042 4.01% 7,042.042
-1.745 0.408 0.408 2019.839 -2018.725 2019.839 143.538 0.08% 11,091.397 6.32% 11,091.397
13.505 -3.159 13.505 2496.179 -2494.802 2496.179 175.304 0.10% 13,707.086 7.81% 13,707.086
13.143 -3.074 13.143 10817.028 -10811.062 10817.028 359.560 0.20% 43,355.501 24.70% 43,355.501
-1.617 0.378 0.378 -151.867 151.783 151.783 22.205 0.01% 3,858.131 2.20% 3,858.131
-1.617 0.378 0.378 151.868 -151.784 151.868 22.205 0.01% 3,858.216 2.20% 3,858.216
104.67% 119.50%
ANALISIS POR CORTE Y CONFINAMIENTO

DATOS

Resistencia de la Albaileria a la compresin f'm = 60 (Kg/cm2)


Resistencia del Concreto a la compresin f'c = 210 (Kg/cm2)
Esfuerzo de Fluencia del Acero fy = 4200 (Kg/cm2)
Altura de entrepiso h= 2.57 m

X-X
ESPESOR LONGITUD ESFUERZO CORTANTE ESFUERZO ESF. CORT. ESF. CORT. VERIFICACION VERIFICACION AREA DE CONCRETO
MURO t L ACT. POR FINAL CORTANTE ADMISIBLE ADMISIBLE ESF. CORT. ESF. CORT. Requerida Mnima seccin
N C. MUERTA DE DISEO ACTUANTE Mortero C/cal Mortero S/cal Mortero C/cal Mortero S/cal Asumida
(cm) (cm) fd (Kg/cm2) V (Kg) Va=V/(t x L) Vm (cc) Vm (sc) Va < Vm (cc) Va < Vm (sc) (cm2) (cm2) (cm2)
1X 23.00 415.00 1.82 19,508.87 2.04 2.13 1.53 OK! ERROR 1,211.62 460.00 1,380.00
2X 23.00 260.00 1.73 7,722.10 1.29 2.11 1.51 OK! OK! 479.59 460.00 690.00
3X 23.00 245.00 1.73 9,759.87 1.73 2.11 1.51 OK! ERROR 606.15 460.00 690.00
23.00 115.00 1.73 4,581.16 1.73 2.11 1.51 OK! ERROR 284.52 460.00 690.00
4X 23.00 360.00 1.73 13,920.27 1.68 2.11 1.51 OK! ERROR 864.53 460.00 920.00
5X 13.00 220.00 4.21 2,946.60 1.03 2.56 1.96 OK! OK! 183.00 260.00 325.00
6X 13.00 735.00 4.37 22,295.45 2.33 2.59 1.99 OK! ERROR 1,384.68 260.00 CAMBIAR
7X 13.00 575.00 4.37 16,480.22 2.20 2.59 1.99 OK! ERROR 1,023.52 260.00 CAMBIAR
8X 13.00 400.00 2.59 9,545.65 1.84 2.27 1.67 OK! ERROR 592.84 260.00 650.00
9X 23.00 415.00 1.82 19,508.87 2.04 2.13 1.53 OK! ERROR 1,211.62 460.00 1,380.00
10X 23.00 260.00 1.73 7,722.10 1.29 2.11 1.51 OK! OK! 479.59 460.00 690.00
11X 23.00 360.00 1.73 14,341.03 1.73 2.11 1.51 OK! ERROR 890.66 460.00 CAMBIAR
12X 23.00 360.00 1.73 13,920.27 1.68 2.11 1.51 OK! ERROR 864.53 460.00 920.00
13X 13.00 220.00 4.21 2,946.60 1.03 2.56 1.96 OK! OK! 183.00 260.00 325.00
14X 13.00 575.00 4.37 16,480.22 2.20 2.59 1.99 OK! ERROR 1,023.52 260.00 CAMBIAR

Y-Y
1Y 23.00 835.00 3.08 43,349.53 2.26 2.35 1.75 OK! ERROR 2,692.26 460.00 CAMBIAR
2Y 23.00 390.00 4.11 13,705.71 1.53 2.54 1.94 OK! OK! 851.21 460.00 920.00
3Y 23.00 345.00 4.11 11,090.28 1.40 2.54 1.94 OK! OK! 688.77 460.00 690.00
4Y 13.00 390.00 6.00 7,041.65 1.39 2.88 2.28 OK! OK! 437.33 260.00 520.00
5Y 13.00 205.00 6.00 1,970.06 0.74 2.88 2.28 OK! OK! 122.35 260.00 325.00
6Y 13.00 310.00 1.89 4,681.84 1.16 2.14 1.54 OK! OK! 290.77 260.00 325.00
7Y 23.00 175.00 3.03 2,335.02 0.58 2.34 1.74 OK! OK! 145.02 460.00 575.00
8Y 23.00 835.00 4.23 32,538.48 1.69 2.56 1.96 OK! OK! 2,020.83 460.00 CAMBIAR
9Y 23.00 175.00 3.03 2,335.12 0.58 2.34 1.74 OK! OK! 145.02 460.00 690.00
10Y 13.00 310.00 1.73 4,682.10 1.16 2.11 1.51 OK! OK! 290.79 260.00 325.00
11Y 13.00 205.00 6.00 1,970.17 0.74 2.88 2.28 OK! OK! 122.36 260.00 325.00
12Y 13.00 390.00 6.00 7,042.04 1.39 2.88 2.28 OK! OK! 437.35 260.00 520.00
13Y 23.00 345.00 4.11 11,091.40 1.40 2.54 1.94 OK! OK! 688.84 460.00 690.00
14Y 23.00 390.00 4.20 13,707.09 1.53 2.56 1.96 OK! OK! 851.29 460.00 920.00
15Y 23.00 835.00 3.08 43,355.50 2.26 2.35 1.75 OK! ERROR 2,692.63 460.00 CAMBIAR
16Y 13.00 290.00 1.89 3,858.13 1.02 2.14 1.54 OK! OK! 239.61 260.00 325.00
17Y 13.00 290.00 1.89 3,858.22 1.02 2.14 1.54 OK! OK! 239.62 260.00 325.00
DE CONCRETO ACERO EN CONFINAMIENTOS Confinamiento Confinamiento ESTRIBAJE
seccin Acero Horiz. Acero Vert. Acero Horizontal Vertical
Asumida Viga Solera Columna Mnimo (Vigas) (Columnas)
(cm ) 2 Ash (cm )2
Asv (cm )
2
As min (cm )
2
Ash (cm ) 2
Asv (cm2)
23 x 60 6.50 4.03 6.90 6.90 6.90
23 x 30 2.57 2.54 3.45 3.45 3.45
23 x 30 3.25 3.41 3.45 3.45 3.45
23 x 30 1.53 3.41 3.45 3.45 3.45
23 x 40 4.64 3.31 4.60 4.64 4.60
13 x 25 0.98 1.15 1.63 1.63 1.63
13 x 60 7.43 2.60 3.90 7.43 3.90
13 x 40 5.49 2.46 2.60 5.49 2.60
13 x 50 3.18 2.04 3.25 3.25 3.25
23 x 60 6.50 4.03 6.90 6.90 6.90
23 x 30 2.57 2.54 3.45 3.45 3.45
23 x 30 4.78 3.41 3.45 4.78 3.45
23 x 40 4.64 3.31 4.60 4.64 4.60
13 x 25 0.98 1.15 1.63 1.63 1.63
13 x 40 5.49 2.46 2.60 5.49 2.60

23 x 60 14.45 4.45 6.90 14.45 6.90


23 x 40 4.57 3.01 4.60 4.60 4.60
23 x 30 3.70 2.75 3.45 3.70 3.45
13 x 40 2.35 1.55 2.60 2.60 2.60
13 x 25 0.66 0.82 1.63 1.63 1.63
13 x 25 1.56 1.29 1.63 1.63 1.63
23 x 25 0.78 1.14 2.88 2.88 2.88
23 x 40 10.85 3.34 4.60 10.85 4.60
23 x 30 0.78 1.14 3.45 3.45 3.45
13 x 25 1.56 1.29 1.63 1.63 1.63
13 x 25 0.66 0.82 1.63 1.63 1.63
13 x 40 2.35 1.55 2.60 2.60 2.60
23 x 30 3.70 2.75 3.45 3.70 3.45
23 x 40 4.57 3.01 4.60 4.60 4.60
23 x 60 14.45 4.45 6.90 14.45 6.90
13 x 25 1.29 1.14 1.63 1.63 1.63
13 x 25 1.29 1.14 1.63 1.63 1.63
JKB N,MMMMMMMMMMMMMMMMMMMMMMM\
ANALISIS POR FLEXOCOMP

DATOS Fa = 8.66 (Kg/cm2) Para t = 13 cm


Fa = 10.93 (Kg/cm2) Para t = 23 cm Relacin de mdulos para transformar concreto a albailer
f'm = 60 (Kg/cm2) n= Ec/Em = 15000(f'c)1/2/500f'm
Fm =0.40 f'm 24 (Kg/cm2) n= 7.00
h muro = 2.4 m
Fy = 4,200.00 (Kg/cm2)
f= 0.9
X-X
ESPESOR LONGITUD AREA MODULO ALTURA ESF. CORT. MOMENTO MAX ESF. RESULT. ESF. RESULT. SE DEBE CALCULO DE NUEVOS VALORE
MURO t L A=t*L DE SECCION DISEO POR FLEXION CARGA VERT. DEL MOMENTO VERFICAR QUE AREA

N S = t*L2/6 h V M fa = Pi/A fm = Mi/S C=fa/Fa+fm/Fm A


(cm) (cm) (cm )
2
(cm )3
(cm) (Kg (Kg-cm) (Kg/cm )2
(Kg/cm )
2
C <= 1.33 (cm2)
1X 23.00 415.00 9,545.00 660,195.83 774.00 19,508.87 15,099,862.30 1.82 22.87 1.12
2X 23.00 260.00 5,980.00 259,133.33 774.00 7,722.10 5,976,903.36 1.73 23.06 1.12
3X 23.00 360.00 8,280.00 496,800.00 774.00 14,341.03 11,099,954.34 1.73 22.34 1.09
4X 23.00 360.00 8,280.00 496,800.00 774.00 13,920.27 10,774,292.35 1.73 21.69 1.06
5X 13.00 220.00 2,860.00 104,866.67 774.00 2,946.60 2,280,665.68 5.44 21.75 1.53 6,760.00
6X 13.00 735.00 9,555.00 1,170,487.50 774.00 22,295.45 17,256,676.97 5.60 14.74 1.26
7X 13.00 575.00 7,475.00 716,354.17 774.00 16,480.22 12,755,693.82 5.60 17.81 1.39 13,715.00
8X 13.00 400.00 5,200.00 346,666.67 774.00 9,545.65 7,388,333.70 2.94 21.31 1.23
9X 23.00 415.00 9,545.00 660,195.83 774.00 19,508.87 15,099,862.30 1.82 22.87 1.12
10X 23.00 260.00 5,980.00 259,133.33 774.00 7,722.10 5,976,903.36 1.73 23.06 1.12
11X 23.00 360.00 8,280.00 496,800.00 774.00 14,341.03 11,099,954.34 1.73 22.34 1.09
12X 23.00 360.00 8,280.00 496,800.00 774.00 13,920.27 10,774,292.35 1.73 21.69 1.06
13X 13.00 220.00 2,860.00 104,866.67 774.00 2,946.60 2,280,665.68 5.44 21.75 1.53 6,760.00
14X 13.00 575.00 7,475.00 716,354.17 774.00 16,480.22 12,755,693.82 5.60 17.81 1.39 13,715.00

Y-Y
1Y 23.00 835.00 19,205.00 2,672,695.83 774.00 43,349.53 33,552,534.90 3.69 12.55 0.86
2Y 23.00 390.00 8,970.00 583,050.00 774.00 13,705.71 10,608,216.96 5.28 18.19 1.24
3Y 23.00 345.00 7,935.00 456,262.50 774.00 11,090.28 8,583,877.57 5.28 18.81 1.27
4Y 13.00 390.00 5,070.00 329,550.00 774.00 7,041.65 5,450,238.18 8.10 16.54 1.62 11,310.00
5Y 13.00 205.00 2,665.00 91,054.17 774.00 1,970.06 1,524,829.25 8.10 16.75 1.63 6,565.00
6Y 13.00 310.00 4,030.00 208,216.67 774.00 4,681.84 3,623,744.27 1.89 17.40 0.94
7Y 23.00 175.00 4,025.00 117,395.83 774.00 2,335.02 1,807,304.84 3.62 15.39 0.97
8Y 23.00 835.00 19,205.00 2,672,695.83 774.00 32,538.48 25,184,780.08 5.42 9.42 0.89
9Y 23.00 175.00 4,025.00 117,395.83 774.00 2,335.12 1,807,380.66 3.62 15.40 0.97
10Y 13.00 310.00 4,030.00 208,216.67 774.00 4,682.10 3,623,945.12 1.73 17.40 0.92
11Y 13.00 205.00 2,665.00 91,054.17 774.00 1,970.17 1,524,913.76 8.10 16.75 1.63 6,565.00
12Y 13.00 390.00 5,070.00 329,550.00 774.00 7,042.04 5,450,540.27 8.10 16.54 1.62 11,310.00
13Y 23.00 345.00 7,935.00 456,262.50 774.00 11,091.40 8,584,741.20 5.28 18.82 1.27
14Y 23.00 390.00 8,970.00 583,050.00 774.00 13,707.09 10,609,284.26 5.37 18.20 1.25
15Y 23.00 835.00 19,205.00 2,672,695.83 774.00 43,355.50 33,557,157.64 3.69 12.56 0.86
16Y 13.00 290.00 3,770.00 182,216.67 774.00 3,858.13 2,986,193.50 1.89 16.39 0.90
17Y 13.00 290.00 3,770.00 182,216.67 774.00 3,858.22 2,986,258.88 1.89 16.39 0.90

SEC b h Icg A d Ad2 I


3
(cm) (cm) (cm )
3
(cm )2
(cm) (cm ) (cm3)
1 91 40 485,333 3,640 175 111,475,000 111,960,333 S=
2 13 310 32,273,583 4,030 0 0 32,273,583 fa=
3 91 40 485,333 3,640 175 111,475,000 111,960,333 fm=
33,244,250 11,310 222,950,000 256,194,250 C=
SIS POR FLEXOCOMPRESION

nsformar concreto a albaileria cuando C >= 1.33


5000(f'c)1/2/500f'm

CALCULO DE NUEVOS VALORES PARA LOS MUROS QUE NO CUMPLEN (C<=1.33) ESF. MAXIMO ESF. MAXIMO LONG. DE MURO FUERZA DE AREA DE
MODULO SEC ESF. CARGA VERT ESF. DEL MOMENTO NUEVO "C" COMPRESION TRACCION TRACCIONADA TRACCION ACERO POR

S fa = Pi/A fm = Mi/S C=fa/Fa+fm/Fm s C=fm+fa s t=fm-fa X=(s t/s t+s c)L T=(s t.X.t)/2 TRACCION
(cm ) 3
(Kg/cm )2
(Kg/cm )2
C <= 1.33 (Kg/cm )
2
(Kg/cm )
2
(cm) (Kg As (cm2)
24.69 21.05 190.99 46,239.36 15.29
24.79 21.34 120.26 29,508.96 9.76
24.07 20.61 166.08 39,372.53 13.02
23.42 19.96 165.66 38,023.97 12.57
443,753.03 2.30 5.14 0.48 7.44 2.84 60.75 1,120.94 0.37
20.34 9.14 227.90 13,543.08 4.48
2,272,329.82 3.05 5.61 0.59 8.67 2.56 131.17 2,183.49 0.72
24.25 18.37 172.43 20,594.66 6.81
24.69 21.05 190.99 46,239.36 15.29
24.79 21.34 120.26 29,508.96 9.76
24.07 20.61 166.08 39,372.53 13.02
23.42 19.96 165.66 38,023.97 12.57
443,753.03 2.30 5.14 0.48 7.44 2.84 60.75 1,120.94 0.37
2,272,329.82 3.05 5.61 0.59 8.67 2.56 131.17 2,183.49 0.72

16.25 8.86 294.62 30,015.90 9.93


23.48 12.91 138.40 20,552.80 6.80
24.09 13.53 124.08 19,309.41 6.39
1,313,816.67 3.63 4.15 0.59 7.78 0.52 24.29 81.58 0.03
401,231.00 3.29 3.80 0.54 7.09 0.51 13.80 45.90 0.02
19.29 15.51 138.17 13,932.69 4.61
19.02 11.77 66.92 9,061.30 3.00
14.84 4.00 177.27 8,156.61 2.70
19.02 11.77 66.92 9,061.91 3.00
19.13 15.68 139.61 14,226.15 4.70
401,231.00 3.29 3.80 0.54 7.09 0.51 13.81 45.93 0.02
1,313,816.67 3.63 4.15 0.59 7.78 0.52 24.30 81.64 0.03
24.10 13.53 124.08 19,312.87 6.39
23.57 12.82 137.42 20,266.11 6.70
16.25 8.86 294.64 30,023.48 9.93
18.28 14.50 128.28 12,088.61 4.00
18.28 14.50 128.28 12,088.95 4.00
AREA DE Confinamiento ESTRIBAJE
ACERO POR Vertical

CORTE (Columnas)
Asv (cm )
2
Asv (cm2)
6.90 15.29
3.45 9.76
3.45 13.02
4.60 12.57
1.63 1.63
3.90 4.48
2.60 2.60
3.25 6.81
6.90 15.29
3.45 9.76
3.45 13.02
4.60 12.57
1.63 1.63
2.60 2.60

6.90 9.93
4.60 6.80
3.45 6.39
2.60 2.60
1.63 1.63
1.63 4.61
2.88 3.00
4.60 4.60
3.45 3.45
1.63 4.70
1.63 1.63
2.60 2.60
3.45 6.39
4.60 6.70
6.90 9.93
1.63 4.00
1.63 4.00
Dimetro Area
#
[ Pulg ] [ cm ] [ cm2 ]

2 1/4 0.64 0.32


3 3/8 0.95 0.71
4 1/2 1.27 1.27
5 5/8 1.59 1.98
6 3/4 1.91 2.85
8 1 2.54 5.07
11 1 3/8 3.49 9.58

X-X
seccin CONFINAMIENTO HORIZONTAL CONFINAMIENTO VERTICAL ESTRIBAJE
MURO Asumida Acero Vigas Dimetros elegidos Vigas Ash (cm2) Acero Colum. Dimetros elegidos Columnas Asv (cm2)
N t x b Final N barra N barra Final N barra N barra
(cm ) 2 Ash (cm2) var # var # (cm^2) Asv (cm2) var # var # (cm^2)
1X 23 x 60 6.90 6 4 1/2 7.60 15.29 8 5 5/8 15.83
2X 23 x 30 3.45 4 4 1/2 5.07 9.76 4 5 5/8 2 4 1/2 10.45
3X 23 x 30 3.45 4 4 1/2 5.07 13.02 6 5 5/8 2 3 3/8 13.30
4X 23 x 40 4.64 4 4 1/2 5.07 12.57 6 5 5/8 2 3 3/8 13.30
5X 13 x 25 1.63 4 3 3/8 2.85 1.63 4 4 1/2 5.07
6X 13 x 60 7.43 4 5 5/8 7.92 4.48
7X 13 x 40 5.49 4 4 1/2 2 3 3/8 6.49 2.60 4 4 1/2 5.07
8X 13 x 50 3.25 6 3 3/8 4.28 6.81 6 4 1/2 7.60
9X 23 x 60 6.90 4 5 5/8 7.92 15.29 8 5 5/8 15.83
10X 23 x 30 3.45 4 4 1/2 5.07 9.76 4 5 5/8 2 4 1/2 10.45
11X 23 x 30 4.78 4 4 1/2 5.07 13.02 6 5 5/8 2 3 3/8 13.30
12X 23 x 40 4.64 4 4 1/2 5.07 12.57 6 5 5/8 2 3 3/8 13.30
13X 13 x 25 1.63 4 3 3/8 2.85 1.63 4 4 1/2 5.07
14X 13 x 40 5.49 4 4 1/2 2 3 3/8 6.49 2.60 4 4 1/2 5.07

Y-Y
1Y 23 x 60 14.45 20 2 1/4 6.33 9.93 8 4 1/2 10.13
2Y 23 x 40 4.60 4 4 1/2 5.07 6.80 6 4 1/2 7.60
3Y 23 x 30 3.70 6 3 3/8 4.28 6.39 6 4 1/2 7.60
4Y 13 x 40 2.60 15 5 5/8 29.69 2.60 4 4 1/2 5.07
5Y 13 x 25 1.63 1.63 4 3 3/8 2.85
6Y 13 x 25 1.63 4.61 4 4 1/2 5.07
7Y 23 x 25 2.88 3.00 6 5 5/8 2 4 1/2 14.41
8Y 23 x 40 10.85 4.60 6 4 1/2 7.60
9Y 23 x 30 3.45 3.45 6 5 5/8 2 4 1/2 14.41
10Y 13 x 25 1.63 4.70 4 4 1/2 5.07
11Y 13 x 25 1.63 1.63 4 3 3/8 2.85
12Y 13 x 40 2.60 2.60 4 4 1/2 5.07
13Y 23 x 30 3.70 6.39 6 4 1/2 7.60
14Y 23 x 40 4.60 6.70 6 4 1/2 7.60
15Y 23 x 60 14.45 9.93 8 4 1/2 10.13
16Y 13 x 25 1.63 4.00 4 4 1/2 5.07
17Y 13 x 25 1.63 4.00 4 4 1/2 5.07