Professional Documents
Culture Documents
REKAYASA
ENGINEERING & CONSTRUCTION
Doc. No. Rev. No.
REVAMPING PHASE II PROJECT ATTACHMENT 3
HSE-FF-S.3 A
HSE Date: 15/06/2007 Page 1 of 2
REKAYASA
ENGINEERING & CONSTRUCTION
Doc. No. Rev. No.
REVAMPING PHASE II PROJECT ATTACHMENT 3
HSE-FF-S.3 A
HSE Date: 15/06/2007 Page 2 of 2
Apakah Tanda dari Pabrik masih ada & terbaca / Does the
Tidak /
Ya
8 factory sign still stick and able to read it
No
Apakah ada bocoran-bocoran dari pipa / Does any leak
Tidak /
Ya
9 from the pipe No
Apakah kerangan2 dalam keadaan baik / Does all the valve
Tidak /
Ya
10 in good condition No
Apakah manifold dalam keadaan baik / Does the manifold
Tidak /
Ya
11 in good condition No
Apakah ada kerangan pembuang / Does any release valve
Tidak /
Ya
12 No
REKOMENDASI / :
RECOMENDATION
KESIMPULAN /
CONCLUSION
Mengetahui, / Acknowledge Inspector 1 Inspector 2