Professional Documents
Culture Documents
INTERMEDIATE
1 TARGET OPENING
PRESSURE UP_2
INTERMEDIATE
2 RAMP TIME
PRESSURE UP_2
REGENERANT
3 TARGET OPENING
DISPLACEMENT_3
REGENERANT
4 RAMP TIME
DISPLACEMENT_3 & 4
FINAL PRESSURE
5 TARGET OPENING
UP2_01
FINAL PRESSURE
6 RAMP TIME
UP2_01
OINTS
C 10 1 15
m3 3 1.6 7.5
ES
% 10 0 25
min 20 15 30
% 20 0 100
min 20 15 30
% 30 0 100
min 17 15 30
FEED PROCESS SWITCHPOINTS
C 8 1 10
C 65 40 65
m3 20 8 60
min 60 60 180
C 76 50 90
ADJUSTABLE MAKEUP GAS DRIER TIMERS
4300 24 4300
240 1 240
35 15 60
35 15 60
35 15 60
120 15 250
420 60 600
160 15 200
300 60 600
35 15 60
35 15 60
35 15 60
35 15 60
60 30 90
60 30 120
35 15 60
35 15 60
120 15 250
300 60 600
ADJUSTABLE FEED DRIER TIMERS
170 24 170
240 1 480
35 15 60
120 15 250
360 60 600
120 15 200
300 60 600
300 60 600
60 30 90
35 15 60
120 15 250
300 60 600
MISCELLENEOUS FEED AND GAS TIMERS
45 15 60
60 15 120
2 1 10
60 60 150
GAS DRIER A REGENERATION ST
ISOLATION
FINAL DEPRESSURE
GA_FINAL DEPRESSURE_02 FINAL DEPRESSURING
FILL
FILL
REGENERATION LINEUP
HEAT
GA_HEAT_02 REGENERATE
COOL
REGENERATION END
REGENERATION END
FINAL PRESSURE UP 1
(OPTIONAL)
REGENERANT DEPRESSURE
1 (OPTIONAL)
INTERMEDIATE PRESSURE
UP (OPTIONAL)
GA_INTERMEDIATE CLOSE PRESSURIZATION/ REGENERANT DISPLACEMENT
PRESSURE UP_04 VALVES AND PROCESS OUTLET UPSTREAM VALVE
GA_FINAL PRESSURE UP
FINAL PRESSURE UP 2 FINAL PRESSURE UP
2_01
RECOVERY STEPS IF
CURRENTLY IN FILL_02 STEP
RECOVERY STEPS IF
CURRENTLY IN LIQUID
REMOVAL_01 STEP OR HEAT
OR COOL STAGES
GA_RECOVERY_8R CLOSE REGENERANT BLEED VALVES
DESCRIPTION CONDITIONS
XV-121 IS CONFIRMED OPEN WHILE XV-149, XV-150, XV-151 AND XV-152 ARE CONFIRMED CLOSE
S OUTLET BLEED, WAIT TO START NEXT
REGENERATION
TI-015:PV < 65 C AND THE CONDITION IS SATISFIED FOR 15 MINUTES.
GAS DRIER SECTION AND REGENERATION SECTION BAD PV / MV ALARM ARE NOT ACTIVE
GAS REGENERATION TIMER HAS EXPIRED (4300 MINUTES) OR OPERATOR HAS PRESSED THE GAS
BUTTON
OSE PROCESS INLET BLEED XV-128 IS CONFIRMED CLOSED WHILE ALL THE GAS DRIER VALVE POSITIONS ARE VERIFIED
S INLET VALVES TO BYPASS LEAD DRIER XV-124, XV-126 AND XV-127 ARE CONFIRMED OPEN WHILE ALL THE GAS DRIER VALVE POSITIONS
ENERANT DISPLACEMENT/ LOWER XV-090 IS CONFIRMED CLOSED WHILE ALL THE GAS DRIER VALVE POSITIONS ARE VERIFIED
DEPRESSURING BLEED
XV-088 AND XV-089 ARE CONFIRMED OPEN AND THE CONDITION IS SATISFIED FOR 1 MINUTE
OSE EQUALIZATION VALVE XV-133 IS CONFIRMED CLOSED WHILE ALL THE GAS DRIER VALVE POSITIONS ARE VERIFIED
ENERANT DISPLACEMENT/ LOWER XV-088 AND XV-089 ARE CONFIRMED CLOSED WHILE ALL THE GAS DRIER VALVE POSITIONS ARE V
DEPRESSURING VALVES
UPPER DEPRESSURING VALVES PDI-006.PV > 0.60 bar (GAS FINAL DEPRESSURE_01 SWITCH POINT)
FINAL DEPRESSURING XV-097, XV-098, XV-108 AND XV-136 ARE CONFIRMED OPEN
ALL GAS DRIER VALVE POSITIONS ARE VERIFIED WHILE GAS DRIER SECTION AND REGENERATION
MV ALARM IS NOT ACTIVE
PI-005.PV < 2.50 bar AND THE CONDITION IS SATISFIED FOR 5 MINUTES.
FYI-005A.PV > 1.80 m3/hr AND FOR 1 MINUTE IT SHOULD BE GREATER THAN 3.15 m 3/hr
ENERANT FLOW AND BACK PRESSURE PI-005.PV </= PYI-013A.PV AND PI-005.PV </= PI-060.PV
XV-093 AND PV-012 ARE CONFIRMED CLOSED ALSO PIC-012.MV < 0.5%
ALL GAS DRIER VALVE POSITIONS ARE VERIFIED WHILE REGENERATION SECTION BAD PV / MV ALA
ACTIVE
TOTALIZED ACTUAL VOLUMETRIC FLOW > 0.92 m 3
DRIER TO BE REGENERATED
LI-004.PV > 50%
UPPER DEPRESSURING VALVES XV-097, XV-098, XV-101 ARE CONFIRMED CLOSED WHILE ALL THE GAS DRIER VALVE POSITIONS A
TO ESTABLISH DOWNFLOW PATH FOR XV-099 AND XV-100 ARE CONFIRMED OPEN
REGENERANT
ALL GAS DRIER VALVE POSITIONS ARE VERIFIED WHILE REGENERATION SECTION BAD PV / MV ALA
ACTIVE
FYI-005A.PV > 1.80 m3/hr AND FOR 1 MINUTE IT SHOULD BE GREATER THAN 3.60 m 3/hr
ALL GAS DRIER VALVE POSITIONS ARE VERIFIED WHILE REGENERATION SECTION BAD PV / MV ALA
ACTIVE
SEQUENCE IS NOT IN RECOVERY MODE AND ALL GAS DRIER VALVE POSITIONS ARE VERIFIED WHI
SECTION BAD PV / MV ALARM IS NOT ACTIVE
LI-007.PV < 30.0 % AFTER WHICH 60 min REGENERANT SUPERHEATER HOLD TIMER ACTIVATES.
ACE VAPORIZER IN SERVICE
TI-017.PV - TYI-022A.PV < 10 C, TYI-022A.PV > 65 C AND TI-017.PV - TYI-022A.PV > 0 C.
THESE CONDITION SHOULD REMAIN SATISFIED FOR 5 MINUTES AFTER ACHIEVING THE VALUES.
PIC-012.SP = PIC-012.SPT: 3.50 bar AND PYI-012A.PV = PIC-012.SPT: 3.5 bar (+ / - 0.26 bar ERROR
SEQUENCE IS NOT IN RECOVERY MODE AND ALL GAS DRIER VALVE POSITIONS ARE VERIFIED WHI
SECTION BAD PV / MV ALARM IS NOT ACTIVE
REGENERANT SUPERHEATER
REGENERANT SUPERHEATER FYI-005A.PV > 1.80 m3/hr AND PYI-012A.PV = PIC-012.SPT: 3.5 bar (+ / - 0.26 bar ERROR IS ALLOW
SEQUENCE IS NOT IN RECOVERY MODE AND ALL GAS DRIER VALVE POSITIONS ARE VERIFIED WHI
SECTION AND REGENERATION SECTION BAD PV / MV ALARM IS NOT ACTIVE
TI-016.PV > TI-016.S14: 280 C. AFTER ACHIEVING THIS VALUE GAS DRIER REGENERATION SOAK T
(60 min)
SEQUENCE IS NOT IN RECOVERY MODE AND ALL GAS DRIER VALVE POSITIONS ARE VERIFIED WHI
SECTION AND REGENERATION SECTION BAD PV / MV ALARM IS NOT ACTIVE
REGENERANT SUPERHEATER FYI-005A.PV > 1.80 m3/hr AND PYI-012A.PV = PIC-012.SPT: 3.5 bar (+ / - 0.26 bar ERROR IS ALLOW
SEQUENCE IS NOT IN RECOVERY MODE AND ALL GAS DRIER VALVE POSITIONS ARE VERIFIED WHI
SECTION AND REGENERATION SECTION BAD PV / MV ALARM IS NOT ACTIVE
SUPER HEATER IS NOT OPERATING AND XL-006A GIVES GAS DRIER A "NORMAL" STATUS
TI-016.PV < 150.0 C (GAS TARGET COOLING TEMPERATURE) AND PYI-012A.PV = PIC-012.SPT: 3.5
OWNFLOW WITH REGENERANT VAPOR ERROR IS ALLOWED)
ORIZER AND REGENERANT FLOW XV-099 AND XV-100 ARE CONFIRMED CLOSED AND REMAINS CLOSED FOR 5 MINUTES
ALL GAS DRIER VALVE POSITIONS ARE VERIFIED WHILE REGENERATION SECTION BAD PV / MV ALA
ACTIVE
PIC-013.MV < 0.5 % AND ALL GAS DRIER VALVE POSITIONS ARE VERIFIED WHILE REGENERATION
MV ALARM IS NOT ACTIVE
R FROM REGENERANT RETURN PATH
XV-101 IS CONFIRMED OPEN WHILE XV-091, XV-092 AND XV-136 ARE CONFIRMED CLOSED
FOR DEPRESSURE FLARE_01:
1) REGENERANT DISPLACEMENT OPTION IS NOT ENABLED
2) REGENERANT DUMP TO FLARE OPTION IS ENABLED
3) XV-093 IS CONFIRMED OPEN AND ALL GAS DRIER VALVE POSITION ARE VERIFIED
XV-097 AND XV-098 ARE CONFIRMED OPEN AND PDI-006.PV < 0.40 bar FOR 1 MINUTE
R DEPRESSURING VALVES TO VENT
RIZED REGENERANT TO FLARE
ALL GAS DRIER VALVE POSITIONS ARE VERIFIED WHILE GAS DRIER SECTION BAD PV / MV ALARM
UPPER DEPRESSURING VALVES XV-097 AND XV-098 ARE CONFIRMED CLOSED AND ALL GAS DRIER VALVE POSITIONS ARE VERIFIE
ALL GAS DRIER VALVE POSITIONS ARE VERIFIED WHILE GAS DRIER SECTION AND REGENERATION
MV ALARM IS NOT ACTIVE
SE PROCESS OUTLET BLEED XV-121 IS CONFIRMED CLOSED AND XL-006A GIVES GAS DRIER A "NORMAL" STATUS
ZATION/ REGENERANT DISPLACEMENT THE SEQUENCE WILL ADVANCE DIRECTLY TO FINAL PRESSURE UP 2_01 STEP:
1) XV-118 AND XV-119 ARE CONFIRMED OPEN AND XV-125.MV < 0.5 %
PROCESS OUTLET UPSTREAM VALVE 2) ALL GAS DRIER VALVE POSITIONS ARE VERIFIED WHILE GAS DRIER SECTION BAD PV / MV ALAR
XV-118 AND XV-119 ARE CONFIRMED OPEN AND XV-125.MV < 0.5 %
ZATION/ REGENERANT DISPLACEMENT
PROCESS OUTLET UPSTREAM VALVE
ALL GAS DRIER VALVE POSITIONS ARE VERIFIED WHILE GAS DRIER SECTION BAD PV / MV ALARM
XV-118 AND XV-119 ARE CONFIRMED CLOSED AND XV-125.MV < 0.5 %
IZATION/ REGENERANT DISPLACEMENT
PROCESS OUTLET UPSTREAM VALVE
ALL GAS DRIER VALVE POSITIONS ARE VERIFIED WHILE GAS DRIER SECTION BAD PV / MV ALARM
XV-132 IS CONFIRMED OPEN WHILE XV-121 IS CONFIRMED CLOSED AND XV-125.MV < 0.5 %
ESS OUTLET BLEED, OPEN COMMON
ERANT DISPLACEMENT VALVE
ALL GAS DRIER VALVE POSITIONS ARE VERIFIED WHILE GAS DRIER SECTION BAD PV / MV ALARM
ALVE, OPEN PRESSURE / DISPLACEMENT XV-118 AND XV-119 ARE CONFIRMED OPEN WHILE XV-133 IS CONFIRMED CLOSED
CESS OUTLET UPSTREAM VALVES
ALVE, OPEN PRESSURE / DISPLACEMENT
CESS OUTLET UPSTREAM VALVES
ALL GAS DRIER VALVE POSITIONS ARE VERIFIED WHILE GAS DRIER SECTION BAD PV / MV ALARM
TOTALIZED DISPLACEMENT FLOW > 3.0 m3 AND 120 MINUTES MINIMUM REGENERANT DISPLACE
EXPIRES.
REGENERANT DISPLACEMENT
ALL GAS DRIER VALVE POSITIONS ARE VERIFIED WHILE GAS DRIER SECTION BAD PV / MV ALARM
XV-094, XV-095 AND XV-120 ARE CONFIRMED OPEN AND XV-125.MV < 0.5 %
OVER VALVES AND PROCESS OUTLET
DOWNSTREAM VALVE
ALL GAS DRIER VALVE POSITIONS ARE VERIFIED WHILE GAS DRIER SECTION BAD PV / MV ALARM
OUTLET VALVES TO ESTABLISH LEAD-LAG XV-114, XV-115 AND XV-118 ARE CONFIRMED CLOSED AND ALL GAS DRIER VALVE POSITIONS ARE
FLOW PATH
ALL GAS DRIER VALVE POSITIONS ARE VERIFIED WHILE GAS DRIER SECTION AND REGENERATION
MV ALARM IS NOT ACTIVE
FYI-005A.PV > 1.80 m3/hr AND FOR 1 MINUTE IT SHOULD BE GREATER THAN 3.15 m 3/hr
ENERANT FLOW AND BACK PRESSURE, PI-005.PV </= PYI-013A.PV AND PI-005.PV </= PI-060.PV
RESUME FILLING
XV-093 AND PV-012 ARE CONFIRMED CLOSED ALSO PIC-012.MV < 0.5%
ALL GAS DRIER VALVE POSITIONS ARE VERIFIED WHILE REGENERATION SECTION BAD PV / MV ALA
ACTIVE
ALL GAS DRIER VALVE POSITIONS ARE VERIFIED WHILE REGENERATION SECTION BAD PV / MV ALA
ACTIVE
FYI-005A.PV > 1.80 m3/hr AND FOR 1 MINUTE IT SHOULD BE GREATER THAN 3.60 m 3/hr
ALL GAS DRIER VALVE POSITIONS ARE VERIFIED WHILE REGENERATION SECTION BAD PV / MV ALA
ACTIVE
SEQUENCE IS NOT IN RECOVERY MODE AND ALL GAS DRIER VALVE POSITIONS ARE VERIFIED WHI
SECTION BAD PV / MV ALARM IS NOT ACTIVE
LI-007.PV < 30.0 % AFTER WHICH 60 min REGENERANT SUPERHEATER HOLD TIMER ACTIVATES.
REGENERANT SUPERHEATER
TI-017.PV - TYI-022A.PV < 10 C, TYI-022A.PV > 65 C AND TI-017.PV - TYI-022A.PV > 0 C
THESE CONDITION SHOULD REMAIN SATISFIED FOR 5 MINUTES AFTER ACHIEVING THE VALUES.
PIC-012.SP = PIC-012.SPT: 3.50 bar AND PYI-012A.PV = PIC-012.SPT: 3.5 bar (+ / - 0.26 bar ERROR
REGENERANT BLEED VALVES XV-101 AND XV-093 ARE CONFIRMED CLOSED AND ALL GAS DRIER VALVE POSITIONS ARE VERIFIE
FOR RECOVERY_10R:
1) REGENERATION SOAK TIMER IS NOT EXPIRED AND TI-016.PV > TI-016.S14: 280 C
2) XV-099, XV-100, XV-091 AND XV-092 ARE CONFIRMED OPEN
3) ALL GAS DRIER VALVE POSITION VERIFIED
PEN REGENERANT VALVES
FOR RECOVERY_11R:
1) 200 MIN REGENERATION SOAK TIMER EXPIRED AND TI-016.PV > TI-016.S14: 280 C
2) XV-099, XV-100, XV-091 AND XV-092 ARE CONFIRMED OPEN
3) ALL GAS DRIER VALVE POSITION VERIFIED
SEQUENCE IS NOT IN RECOVERY MODE AND ALL GAS DRIER VALVE POSITIONS ARE VERIFIED WHI
SECTION BAD PV / MV ALARM IS NOT ACTIVE
RETURN TO HEAT_01 FYI-005A.PV > 1.80 m3/hr AND PYI-012A.PV = PIC-012.SPT: 3.5 bar (+ / - 0.26 bar ERROR IS ALLOW
SEQUENCE IS NOT IN RECOVERY MODE AND ALL GAS DRIER VALVE POSITIONS ARE VERIFIED WHI
SECTION AND REGENERATION SECTION BAD PV / MV ALARM IS NOT ACTIVE
SUPER HEATER IS NOT OPERATING AND XL-006A GIVES GAS DRIER A "NORMAL" STATUS
XV-108 IS CONFIRMED CLOSED AND TYI-022A.PV - TI-017.PV < 20 C FOR ATLEAST 5 MINUTES
ETURN TO REGEN END_01 XV-099 AND XV-100 ARE CONFIRMED CLOSED AND REMAINS CLOSED FOR 5 MINUTES
ALL GAS DRIER VALVE POSITIONS ARE VERIFIED WHILE REGENERATION SECTION BAD PV / MV ALA
ACTIVE
CONDITIONS
ACTIVE
OPEN WHILE ALL THE GAS DRIER VALVE POSITIONS ARE VERIFIED
OPTION IS ENABLED
WHILE ALL THE GAS DRIER VALVE POSITIONS ARE VERIFIED
RM IS NOT ACTIVE
< 0.5 %
MV < 0.5 %
FIRMED OPEN
PI-060.PV
MV < 0.5%
V < 0.5 %
0.0 C
5 MINUTES
OT ENABLED
OT ENABLED
DRIER VALVE POSITION ARE VERIFIED
ABLED
DRIER VALVE POSITION ARE VERIFIED
< 0.5 %
NFIRMED OPEN
IED WHILE GAS DRIER SECTION BAD PV / MV ALARM IS NOT ACTIVE
RMED OPEN
IED WHILE GAS DRIER SECTION BAD PV / MV ALARM IS NOT ACTIVE
MED OPEN
5%
5%
CLOSED
< 0.5 %
RY MODE
MV < 0.5 %
D WHILE GAS DRIER SECTION AND REGENERATION SECTION BAD PV /
PI-060.PV
m3
RY MODE
MV < 0.5 %
V < 0.5 %